CN103183212B - Method for preparation and transportation before warehousing of steel coil finished product - Google Patents

Method for preparation and transportation before warehousing of steel coil finished product Download PDF

Info

Publication number
CN103183212B
CN103183212B CN201110453112.9A CN201110453112A CN103183212B CN 103183212 B CN103183212 B CN 103183212B CN 201110453112 A CN201110453112 A CN 201110453112A CN 103183212 B CN103183212 B CN 103183212B
Authority
CN
China
Prior art keywords
coil
strip
walking
conveyer
finished product
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110453112.9A
Other languages
Chinese (zh)
Other versions
CN103183212A (en
Inventor
任树忠
任涛
刘士平
李芳�
杜少欣
赵明侠
孙长飞
郑建
孔令东
涂咏梅
张泽华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ansteel Engineering Technology Corp Ltd
Original Assignee
Ansteel Engineering Technology Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ansteel Engineering Technology Corp Ltd filed Critical Ansteel Engineering Technology Corp Ltd
Priority to CN201110453112.9A priority Critical patent/CN103183212B/en
Publication of CN103183212A publication Critical patent/CN103183212A/en
Application granted granted Critical
Publication of CN103183212B publication Critical patent/CN103183212B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Replacement Of Web Rolls (AREA)

Abstract

The invention relates to the field of steel coil transportation, in particular to a method and a device for preparation and transportation before warehousing of a steel coil finished product. The device is characterized by comprising a conveying line consisting of a chain conveyer, a walking beam type conveyer and a lifting mechanism, wherein the conveying line starts from the space behind a coiler, ends at the space in front of a finished product warehouse and is vertically connected with the head of a check line; and bundling equipment, weighing equipment, printing equipment and supplementary bundling equipment are arranged along the conveying belt side. Compared with the prior art, the method and the device have the beneficial effects that the bundling, weighing, printing, surface inspection and supplementary bundling functions are finished sequentially in a transportation process of the steel coil; the steel coil is flexible in transportation direction; scattered coil placement to a plurality of finished product warehouses can be realized, the investment is low, the equipment is reliable in operation, and different requirements of rolling production lines on different annual production capacities can be met by increasing or decreasing the number of the walking beam type conveyer and the chain conveyer.

Description

The method of transport is reorganized and outfit before a kind of coil of strip finished product warehouse-in
Technical field
The present invention relates to steel coil transportation field, before particularly relating to a kind of coil of strip finished product warehouse-in, reorganize and outfit method and the device of transport.
Background technology
In hot-rolled strip production line subsequent process, after namely coiling machine becomes coiled sheet band coil of strip, reorganize and outfit before must putting in storage coil of strip, then transport into warehouse for finished product.In the process, coil of strip will complete bundling, weighs, spray printing, surface inspection, finished product volume rolls off the production line the steps such as stacking.
At present, reorganize and outfit in process before the warehouse-in of domestic and international many production lines, the transport of coil of strip adopts chain conveyor or walking-beam coil conveyer completely, adopt the advantage of chain conveyor to be that weight of equipment is light, dependable performance but exist transporting direction single, the drawback such as not cushion.Adopt the advantage of walking-beam coil conveyer be transporting direction flexibly, can realize the short time buffering and bundling can be completed, weigh, the multiple working procedure such as spray printing, but exist weight of equipment heavy, invest high deficiency.
Summary of the invention
Method and the device of transport is reorganized and outfit before the object of this invention is to provide a kind of coil of strip finished product warehouse-in, overcome the deficiencies in the prior art, make the functions such as coil of strip order in transportation completes bundling, weighs, spray printing, surface inspection, complement bundle, steel coil transportation direction is flexible, can realize to multiple warehouse for finished products dispersion last volume.
For solving the problems of the technologies described above, technical scheme of the present invention is:
The method of transport is reorganized and outfit before a kind of coil of strip finished product warehouse-in, comprise the supply line that fortune volume dolly, chain conveyor, walking-beam coil conveyer and elevator are formed, supply line is whole to warehouse for finished product after starting from coiling machine, supply line and inspection the end of a thread portion vertical connection, be provided with bundling along supply line side, weigh, spray printing, benefit binding apparatus, specifically comprise the steps:
A) roll up dolly be connected by transporting between one end of chain conveyor one and the outlet of coiling machine, the coil of strip that coiling machine rolls off the production line is after baler bundling, fortune is rolled up dolly and is placed on by coil of strip on chain conveyor one, and it is vertical that the traffic direction of chain conveyor one and fortune roll up trolley travelling direction;
B) coil of strip is transported to getting of walking-beam coil conveyer one head and rolls up position by chain conveyor one;
C) walking-beam coil conveyer one is transported to coil of strip and is checked line fixed saddle place, when coil of strip needs to check, check that coil of strip is transported on inspection line by the transport vehicle for steel coils on line, transport back after inspection and check line fixed saddle place, after checking line fixed saddle, connect walking-beam coil conveyer two;
D) walking-beam coil conveyer two is provided with weigher along the line, completes coil of strip and weighs, and then walking-beam coil conveyer two transports coil of strip to elevator one;
E) coil of strip is transported to elevator two by walking-beam coil conveyer three after being promoted by elevator one by coil of strip, and the position, side of walking-beam coil conveyer three is provided with jet printer and baler, and coil of strip completed spray printing and the complement bundle function of coil of strip before upper elevator two;
F) coil of strip is risen on ground by elevator two, respectively by forward, the walking-beam coil conveyer four in three directions, walking-beam coil conveyer five or walking-beam coil conveyer six are taken away left, to the right;
G) coil of strip is transported on chain conveyor two through walking-beam coil conveyer five, is transported to warehouse for finished product one by crane; Coil of strip is transported on chain conveyor three through walking-beam coil conveyer six, is transported to warehouse for finished product two by crane; Coil of strip on walking-beam coil conveyer four is transported to warehouse for finished product three through crane, and steel coils packing is waited to deliver.
The device of transport is reorganized and outfit before a kind of coil of strip finished product warehouse-in, comprise chain conveyor, fortune volume trolley travelling channel end is located at by chain conveyor one, the traffic direction of chain conveyor one is vertical with the traffic direction that fortune rolls up dolly, chain conveyor one, walking-beam coil conveyer one, check line fixed saddle, walking-beam coil conveyer two, elevator one, walking-beam coil conveyer three and elevator two connect successively, walking-beam coil conveyer two is provided with weigher along the line, the position, side of walking-beam coil conveyer three is provided with jet printer and baler, elevator two be provided with three outlet respectively with walking-beam coil conveyer four, walking-beam coil conveyer five, the head of walking-beam coil conveyer six is connected, the afterbody of walking-beam coil conveyer five is connected with chain conveyor two, the afterbody of walking-beam coil conveyer six is connected with chain conveyor three.
Described fortune volume trolley travelling channel side is provided with baler.
Compared with prior art, the invention has the beneficial effects as follows: make the functions such as coil of strip order in transportation completes bundling, weighs, spray printing, surface inspection, complement bundle, steel coil transportation direction is flexible, can realize to multiple warehouse for finished products dispersion last volume, small investment, equipment are reliable, by increasing and decreasing the quantity of walking-beam coil conveyer and chain conveyor, the different requirements of the different rolling line of yearly productive capacity can be met.
Accompanying drawing explanation
Fig. 1 embodiment of the present invention structural representation.
In figure: 1-fortune volume dolly one 2-baler one 3-fortune volume dolly two 4-baler two 5-chain conveyor one 6-walking-beam coil conveyer one 7-checks that line fixed saddle 8-checks line transport vehicle for steel coils 9-walking-beam coil conveyer two 10-weigher 11-elevator one 12-walking-beam coil conveyer three 13-jet printer 14-baler three 15-elevator two 16-walking-beam coil conveyer four 17-walking-beam coil conveyer five 18-walking-beam coil conveyer six 19-chain conveyor two 20-chain conveyor three 21-warehouse for finished product one 22-warehouse for finished product two 23-warehouse for finished product three
Detailed description of the invention
Be described further below in conjunction with the detailed description of the invention of accompanying drawing to invention:
See Fig. 1, it is the device example structure schematic diagram reorganizing and outfit transport before a kind of coil of strip finished product warehouse-in of the present invention, fortune volume dolly 1 is located at by chain conveyor 1 and fortune rolls up the end that dolly 23 runs passage, it is vertical with transporting the traffic direction rolling up dolly 23 that the traffic direction of chain conveyor 1 and fortune roll up dolly 1, chain conveyor 1, walking-beam coil conveyer 1, check line fixed saddle 7, walking-beam coil conveyer 29, elevator 1, walking-beam coil conveyer 3 12 and elevator 2 15 connect successively, walking-beam coil conveyer 29 is provided with weigher 10 along the line, the position, side of walking-beam coil conveyer 3 12 is provided with jet printer 13 and baler 3 14, elevator 2 15 be provided with three outlet respectively with walking-beam coil conveyer 4 16, walking-beam coil conveyer 5 17, the head of walking-beam coil conveyer 6 18 is connected, the afterbody of walking-beam coil conveyer 5 17 is connected with chain conveyor 2 19, the afterbody of walking-beam coil conveyer 6 18 is connected with chain conveyor 3 20.The operation channel side of fortune volume dolly 1 is provided with baler 1, and the operation channel side of fortune volume dolly 23 is provided with baler 24.
The present invention starts from after coiling machine eventually to warehouse for finished product, and the functions such as coil of strip order in transportation completes bundling, weighs, spray printing, surface inspection, complement bundle, specifically comprise the steps:
A) roll up dolly 1 roll up dolly 23 and be connected with transporting by transporting between one end of chain conveyor 1 and the outlet of coiling machine, the coil of strip that coiling machine rolls off the production line is after baler 1 and baler 24 bundling, coil of strip is placed on chain conveyor 1 by fortune volume dolly 1 and fortune volume dolly 23, and the traffic direction of chain conveyor 1 is rolled up dolly 1 and transports that to roll up dolly 23 traffic direction vertical with transporting;
B) coil of strip is transported to getting of walking-beam coil conveyer 1 head and rolls up position by chain conveyor 1;
C) walking-beam coil conveyer 1 is transported to coil of strip and is checked line fixed saddle 7 place, when coil of strip needs to check, check that coil of strip is transported on inspection line by the transport vehicle for steel coils 8 on line, transport back after inspection and check line fixed saddle 7 place, after checking line fixed saddle 7, connect walking-beam coil conveyer 29;
D) walking-beam coil conveyer 29 is provided with weigher 10 along the line, completes coil of strip and weighs, and then walking-beam coil conveyer 29 transports coil of strip to elevator 1;
E) coil of strip is transported to elevator 2 15 by walking-beam coil conveyer 3 12 after being promoted by elevator 1 by coil of strip, the position, side of walking-beam coil conveyer 3 12 is provided with jet printer 13 and baler 3 14, and coil of strip completed spray printing and the complement bundle function of coil of strip before upper elevator 2 15;
F) coil of strip is risen on ground by elevator 2 15, respectively by forward, the walking-beam coil conveyer 4 16 in three directions, walking-beam coil conveyer 5 17 or walking-beam coil conveyer 6 18 are taken away left, to the right;
G) coil of strip is transported on chain conveyor 2 19 through walking-beam coil conveyer 5 17, is transported to warehouse for finished product 1 by crane; Coil of strip is transported on chain conveyor 3 20 through walking-beam coil conveyer 6 18, is transported to warehouse for finished product 2 22 by crane; Coil of strip on walking-beam coil conveyer 4 16 is transported to warehouse for finished product 3 23 through crane, and steel coils packing is waited to deliver.

Claims (1)

1. before a coil of strip finished product warehouse-in, reorganize and outfit the method for transport, it is characterized in that, comprise the supply line that fortune volume dolly, chain conveyor, walking-beam coil conveyer and elevator are formed, supply line is whole to warehouse for finished product after starting from coiling machine, supply line and inspection the end of a thread portion vertical connection, be provided with bundling along supply line side, weigh, spray printing, benefit binding apparatus, specifically comprise the steps:
A) roll up dolly be connected by transporting between one end of chain conveyor one and the outlet of coiling machine, the coil of strip that coiling machine rolls off the production line is after baler bundling, fortune is rolled up dolly and is placed on by coil of strip on chain conveyor one, and it is vertical that the traffic direction of chain conveyor one and fortune roll up trolley travelling direction;
B) coil of strip is transported to getting of walking-beam coil conveyer one head and rolls up position by chain conveyor one;
C) walking-beam coil conveyer one is transported to coil of strip and is checked line fixed saddle place, when coil of strip needs to check, check that coil of strip is transported on inspection line by the transport vehicle for steel coils on line, transport back after inspection and check line fixed saddle place, after checking line fixed saddle, connect walking-beam coil conveyer two;
D) walking-beam coil conveyer two is provided with weigher along the line, completes coil of strip and weighs, and then walking-beam coil conveyer two transports coil of strip to elevator one;
E) coil of strip is transported to elevator two by walking-beam coil conveyer three after being promoted by elevator one by coil of strip, and the position, side of walking-beam coil conveyer three is provided with jet printer and baler, and coil of strip completed spray printing and the complement bundle function of coil of strip before upper elevator two;
F) coil of strip is risen on ground by elevator two, respectively by forward, the walking-beam coil conveyer four in three directions, walking-beam coil conveyer five or walking-beam coil conveyer six are taken away left, to the right;
G) coil of strip is transported on chain conveyor two through walking-beam coil conveyer five, is transported to warehouse for finished product one by crane; Coil of strip is transported on chain conveyor three through walking-beam coil conveyer six, is transported to warehouse for finished product two by crane; Coil of strip on walking-beam coil conveyer four is transported to warehouse for finished product three through crane, and steel coils packing is waited to deliver.
CN201110453112.9A 2011-12-29 2011-12-29 Method for preparation and transportation before warehousing of steel coil finished product Active CN103183212B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110453112.9A CN103183212B (en) 2011-12-29 2011-12-29 Method for preparation and transportation before warehousing of steel coil finished product

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110453112.9A CN103183212B (en) 2011-12-29 2011-12-29 Method for preparation and transportation before warehousing of steel coil finished product

Publications (2)

Publication Number Publication Date
CN103183212A CN103183212A (en) 2013-07-03
CN103183212B true CN103183212B (en) 2015-04-29

Family

ID=48674713

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110453112.9A Active CN103183212B (en) 2011-12-29 2011-12-29 Method for preparation and transportation before warehousing of steel coil finished product

Country Status (1)

Country Link
CN (1) CN103183212B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10279911B2 (en) 2016-10-10 2019-05-07 Jervis B. Webb Company System and method for storing and sequencing luggage items
US10035598B2 (en) 2016-10-10 2018-07-31 Jervis B. Webb Company System and method for expanding a luggage inspection area
CN106628979A (en) * 2016-12-20 2017-05-10 中冶南方工程技术有限公司 Steel coil overturning and striding transportation system
CN108341206A (en) * 2018-03-09 2018-07-31 上海梅山工业民用工程设计研究院有限公司 A kind of coil of strip transport system
CN110342169A (en) * 2019-08-19 2019-10-18 上海梅山工业民用工程设计研究院有限公司 A kind of efficient coil of strip conveying system
CN112026373A (en) * 2020-08-13 2020-12-04 北京首钢自动化信息技术有限公司 Label printing method, system and equipment
CN112456331B (en) * 2020-11-06 2022-11-15 河钢股份有限公司承德分公司 Method for realizing automatic control of unmanned manual packing area of reservoir area

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2362781Y (en) * 1998-07-24 2000-02-09 深圳市金达科技实业有限公司 Conveying equipment for coiled steel strip package production line
US6843358B1 (en) * 2002-04-02 2005-01-18 Arthur B. Rhodes Rotatable transfer track device
CN2835160Y (en) * 2005-10-14 2006-11-08 中国第二重型机械集团公司 Stepping transfer arrangement
CN201660284U (en) * 2009-12-23 2010-12-01 鞍钢集团工程技术有限公司 Parallel steel coil stepping conveying device
CN201678239U (en) * 2009-12-28 2010-12-22 中冶南方工程技术有限公司 Conveying device for hot rolled or cold rolled steel coils
CN202379415U (en) * 2011-12-29 2012-08-15 鞍钢集团工程技术有限公司 Reconditioning-conveying device before warehousing of steel coil finished product

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060289271A1 (en) * 2005-06-01 2006-12-28 Nelson Jonathan M Firewood delivery apparatus

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2362781Y (en) * 1998-07-24 2000-02-09 深圳市金达科技实业有限公司 Conveying equipment for coiled steel strip package production line
US6843358B1 (en) * 2002-04-02 2005-01-18 Arthur B. Rhodes Rotatable transfer track device
CN2835160Y (en) * 2005-10-14 2006-11-08 中国第二重型机械集团公司 Stepping transfer arrangement
CN201660284U (en) * 2009-12-23 2010-12-01 鞍钢集团工程技术有限公司 Parallel steel coil stepping conveying device
CN201678239U (en) * 2009-12-28 2010-12-22 中冶南方工程技术有限公司 Conveying device for hot rolled or cold rolled steel coils
CN202379415U (en) * 2011-12-29 2012-08-15 鞍钢集团工程技术有限公司 Reconditioning-conveying device before warehousing of steel coil finished product

Also Published As

Publication number Publication date
CN103183212A (en) 2013-07-03

Similar Documents

Publication Publication Date Title
CN103183212B (en) Method for preparation and transportation before warehousing of steel coil finished product
CN107265130B (en) Automatic conveying and stacking device for material box of filling machine
CN202379415U (en) Reconditioning-conveying device before warehousing of steel coil finished product
CN101326103B (en) Method and apparatus for transporting rolls during packing
CN201485076U (en) Waterproof coiled material stacking device
CN205616307U (en) Supplementary unloader that goes up of steel strip coils finished product winding packagine machine
CN104891158B (en) A kind of robot palletizing system
CN101941027A (en) High-speed coil unloading and aligning method of qualified finished wire coils
CN204297652U (en) A kind of planer-type lift and conveyer
CN104590842A (en) Automatic production line for forming to sintering of ferrite magnetic steel and implementation method
CN206013634U (en) A kind of two-part bamboo clappers conveying mechanism with baffle plate
CN108341206A (en) A kind of coil of strip transport system
CN205003534U (en) Production warehousing and transportation system
CN206199876U (en) A kind of strip calibration devices
CN205526708U (en) Smoke box commodity circulation stack system
CN203624537U (en) Diversion and guide weighing conveyor
CN204416391U (en) A kind of ferrite magnetic steel is molded into the automatic production line of sintering
CN207346152U (en) Aluminium volume automatic winding ties up storage production line
CN207000914U (en) One kind pushes away case stacking machine
CN209352096U (en) A kind of AGV trolley automatic handing system
CN209420696U (en) Fluent wheel silkworm frame
CN208070621U (en) A kind of coil of strip transport system
CN205150917U (en) High -speed automatic checkweigher
CN202936029U (en) Finished yarn roll transporting and weighing device
CN207577224U (en) A kind of coiled sheet fabrication production line

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant