CN101936068A - Method for constructing cliff scaffold platform - Google Patents

Method for constructing cliff scaffold platform Download PDF

Info

Publication number
CN101936068A
CN101936068A CN 201010265312 CN201010265312A CN101936068A CN 101936068 A CN101936068 A CN 101936068A CN 201010265312 CN201010265312 CN 201010265312 CN 201010265312 A CN201010265312 A CN 201010265312A CN 101936068 A CN101936068 A CN 101936068A
Authority
CN
China
Prior art keywords
section
guide rail
scaffolding platform
scaffold platform
vierendeel girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010265312
Other languages
Chinese (zh)
Other versions
CN101936068B (en
Inventor
路尚修
孙裕国
常新文
孙近生
边昌学
傅卫东
朱德军
郭玉芳
朱栋梁
常玉真
王万峰
崔骞
许连海
张建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Gaoyang Construction Co., Ltd.
Shandong Qifeng Construction Co., Ltd.
Original Assignee
SHANDONG GAOYANG CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG GAOYANG CONSTRUCTION CO Ltd filed Critical SHANDONG GAOYANG CONSTRUCTION CO Ltd
Priority to CN2010102653127A priority Critical patent/CN101936068B/en
Publication of CN101936068A publication Critical patent/CN101936068A/en
Application granted granted Critical
Publication of CN101936068B publication Critical patent/CN101936068B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The invention discloses a method for constructing a cliff scaffold platform, and belongs to the field of building plank construction. The method comprises the following steps of: overhanging a section of frame beam at the initial section of the constructed scaffold platform and in the to-be-extended direction of the scaffold platform; drilling a group of anchor rod down holes required for the mounting extended section of the scaffold platform by using a rock down-hole drill; arranging heavy-load detachable composite functional anchor rods (26) in the anchor rod down holes, and fixing frame rods (31) and upright rods (27) to construct the extended section of the scaffold platform; and butting a section of guide rail (28) with corresponding length on the extended section of the scaffold platform, opening bolts connected on the guide rail (28) on the lower part of a connecting plate (30), and pushing the frame beam along the guide rail so that the frame beam extends the next section in the to-be-extended direction of the scaffold platform. The scaffold platform can bear heavy load without a ground support or a peak suspension rod; and due to overhanging type construction, the extended direction can turn left and right and pitch with variable angle along with the shape of a mountain.

Description

A kind of building method of overhanging cliff scaffolding platform
Technical field
A kind of building method of overhanging cliff scaffolding platform belongs to building plank road construction field.Be specifically related to a kind of building method of overhanging cliff scaffolding platform.
Background technology
The plank road construction technology has been achieved the steep cliff plank road of one of three invention on China's ancient building history, the ancient plank road construction methods such as intercept water boat-carrying construction method, high-altitude suspension cable, cage construction method that adopt realize more, and along with the progress of modern science and technology, the progress of plank road construction technology is but also unsatisfactory.Intercept water the boat-carrying construction method because of being subjected to its essential condition---the restriction of water, be not suitable for the construction of anhydrous place; High-altitude suspension cable, cage construction method, even the auxiliary of helicopter arranged, some highly difficult engineering still can't be carried out construction, and suspension cable construction damages easily to natural environment, and particularly some vegetation in thousand sustains damage, be difficult to recover, at present, world-renowned certain mountain " West Coast plank road " that China is domestic, the long number km is suspended on 1500 meters high cliffs of cutter as cutting, because be subjected to the restriction of construction technology, band shape and many precious vegetation that can only build up horizontal extension damage to some extent.
Summary of the invention
The technical problem to be solved in the present invention is: overcome the deficiencies in the prior art, provide a kind of not by ground supports, not by the mountain top suspension cable, can take the weight and carry, overhanging type is built, can construct continuously, bearing of trend can be followed about the shape on mountain and be turned to, the building method of a kind of overhanging cliff scaffolding platform of pitching angle.
The technical solution adopted for the present invention to solve the technical problems is: the building method of this a kind of overhanging cliff scaffolding platform,
It is characterized in that, may further comprise the steps:
1.1, one a section guide rail and a segment frames beam be installed on the scaffolding platform initial segment of having put up, the both sides of guide rail and Vierendeel girder are linked together with junction plate, bolt, and to the scaffolding platform desire bearing of trend segment frames beam of encorbelmenting;
1.2, above or below the Vierendeel girder section of encorbelmenting, install or lift many rock down-the-hole drills, get the required anchor pole down-the-hole in scaffolding platform installation extension with the rock down-the-hole drill;
1.3, by Vierendeel girder the dismountable complex function anchor pole of heavy load is installed in the anchor pole down-the-hole, the complex function anchor pole builds the extension of scaffolding platform as fixedly hack lever and vertical rod of anchor point;
1.4, on the extension of scaffolding platform, dock the guide rail of one section respective length again, open the junction plate bottom and be connected bolt on the guide rail, promote Vierendeel girder along guide rail, make it desire bearing of trend and extend next section, prepare next construction unit to scaffolding platform.
The Vierendeel girder of described step 1.1 comprises that brace summer section, work beam section and framework cant beam section bolt are formed by connecting, the end of four faces of each straight beam section is equipped with the hinge seat board, the adjacent beams section is to the hinge axis and the hinge axis cottor pin of the hinge seat board aggregate erection unified specification of edge fit, form the one-directional rotation state, open by required deflection angle between adjacent two straight beam sections, filling framework cant beam section connects by bolt, and the rigid frame that forms beat is set a roof beam in place.
Described Vierendeel girder below is provided with a plurality of trundle brackets, and castor is housed in the trundle bracket, and the castor below is provided with the guide rail groove.
Described guide rail comprises that the cross section, top is the guide rail groove of concave shape and the channel beam of bottom, the channel beam bottom is connected on the hack lever by the bolt of lower base that is provided with semicircle concave surface, the channel beam opening surface is provided with support plate, inside is provided with the liner clamp, guide rail is desired the extension and is connected to steering knuckle, and its angle of bend and Vierendeel girder deflection angle match.
The pipe and the expansion termination of rising in the complex function anchor pole of described step 1.3 comprises, interior pipe bottom is connected to rise expands the termination, the outside is with outer tube, the outer tube bottom has multiple-grooved and forms multiple tooth termination and be centered around to rise and expand the outside, termination, the outer tube end plate of top cover tape splicing reinforcing rib, the outer tube end plate is provided with a plurality of screws, and interior pipe top is provided with the inner tube plate, inner tube plate outer rim is provided with a plurality of radially short grooves, is with packing ring in outer tube outside and the technology gap, down-the-hole port.
It is turntable that described outer tube end plate is provided with a plurality of balls, and ball is that turntable shaft is housed on the turntable, can connect hack lever, directly socket vertical rod by fastener in level, vertical direction deflection before turntable shaft is fastening.
Compared with prior art, the beneficial effect that building method had of a kind of overhanging cliff scaffolding platform of the present invention is: the end frame beam of 1, encorbelmenting on scaffolding platform, in the extension not by beneath ground supports, not by the mountain top suspension cable on top, removed the condition restriction of job site;
2, Vierendeel girder adopts the bolted mode of each beam section to constitute, add framework cant beam section especially, solved the difficult problem that turns to of scaffolding platform bearing of trend, scaffolding platform can be followed about the surface of crag and be turned to, the pitching angle is so that evade the zone near extending target and getting around;
3, adopt overlap joint track type moveable installing frame to set a roof beam in place, Vierendeel girder is slidably recycled, and each operation of plank road construction can be carried out by flowing water, uninterrupted construction, and platform member can round-robin;
4, adopt the complex function anchor pole that can bear heavy load, work progress safety, quick, and detachable recycling have also been protected environment when saving cost.
Description of drawings
Fig. 1 is a front view schematic diagram after the complex function anchor pole tensioner of the present invention.
Fig. 2 is that the front view schematic diagram is built in scaffolding platform extension of the present invention.
Fig. 3 is a scaffolding platform sectional schematic diagram of the present invention.
Fig. 4 is brace summer section of the present invention, guide rail, hack lever syntagmatic schematic diagram.
Fig. 5 is scaffolding platform level of the present invention beam section syntagmatic schematic diagram when turning to.
Fig. 6 is the scaffolding platform of the present invention beam section syntagmatic schematic diagram when extending that rises.
Fig. 7 connects the front view schematic diagram between guide rail of the present invention.
Fig. 8 connects the sectional view schematic diagram between guide rail of the present invention.
Fig. 9 is that guide rail of the present invention and hack lever installation concern schematic diagram.
Wherein: 1, interior pipe 2, rise and expand termination 3, outer tube 4, packing ring 5, outer tube end plate 6, check bolt 7, tensioner nut 8, inner tube plate 9, tensioner screw rod 10, turret base 11, turntable gland 12, turntable shaft 13, turntable is stablized piece 14, metal fire prevention bed board 15, small-sized lifting machinery 16, brace summer section 17, the first rock down-the-hole drill 18, first support 19, the first work beam section 20, second support 21, the second rock down-the-hole drill 22, the second work beam section 23, hanging basket 24, the 3rd rock down-the-hole drill 25, the 3rd support 26, complex function anchor pole 27, vertical rod 28, guide rail 29, castor 30, junction plate 31, hack lever 32, trundle bracket 33, guide rail groove 34, support plate 35, angle iron blend stop 36, bearing block 37, beam 38, base 39, framework cant beam section 40, beam section set bolt 41, hinge axis 42, hinge seat board 43, scaffold guard rail 44, scaffold protecting wire net 45, liner clamp 46, the cylinder cushion block.
Fig. 1~9th, most preferred embodiment of the present invention is described further below in conjunction with the building method of 1~9 pair of a kind of overhanging cliff scaffolding platform of the present invention of accompanying drawing:
The specific embodiment
With reference to accompanying drawing 1: complex function anchor pole of the present invention
Complex function anchor pole 26, by interior pipe 1, rise and expand termination 2, outer tube 3, packing ring 4, outer tube end plate 5, check bolt 6, tensioner nut 7, inner tube plate 8, tensioner screw rod 9, turret base 10, turntable gland 11, turntable shaft 12 and turntable are stablized piece 13 and are formed, pipe 1 outside in outer tube 3 is set in, inner sleeve 1 lower thread connects the expansion termination 2 of rising, the top inner tube plate 8 that is threaded, outer tube 3 bottoms have multiple-grooved and form multiple tooth termination and be centered around to rise and expand 2 outsides, termination, top is socketed with the outer tube end plate 5 of band reinforcing rib, being fixed with a plurality of balls on the outer tube end plate 5 is turntable, ball is that turntable comprises turret base 10, turntable gland 11, turntable shaft 12 and turntable are stablized piece 13, turret base 10 and turntable gland 11 close up the back and form the sphere inner chamber, turntable shaft 12 end spherical in shape is installed in the sphere inner chamber, can be before turntable shaft 12 is fastening in level, vertical direction deflection, the thickness of turntable gland 11 and openings of sizes can be set according to turntable shaft 12 required deflection angles, and extension connects hack lever 31 by fastener, directly socket vertical rod 27, outer tube end plate 5 plate faces are provided with a plurality of screws that check bolt 6 is housed, the outer rim of inner tube plate 8 is provided with a plurality of radially short grooves, screw rod is housed and is furnished with nut, the packing ring 4 that the useful foil of cover rolls in the technology gap, port of outer tube 3 outsides and down-the-hole.
With reference to accompanying drawing 2~9:
Fig. 2 left part is the part that scaffolding platform has been put up, and Fig. 3 is the lateral view of Fig. 2.Hack lever 31 is three-dimensional orthogonal equidistantly with the fastener assembling, and its spacing is set according to load, and hack lever 31 is fixed on the complex function anchor pole 26 of top, and vertical rod 27 is installed on the complex function anchor pole 26 of below, and vertical rod 27 upper ends are connected with the hack lever 31 of fastener with its top; The top layer of scaffolding platform is laid metal fire prevention bed board 14, small-sized lifting machinery 15 is housed, but the section of encorbelmenting of small-sized lifting machinery 15 auxiliary pulling Vierendeel girder in Vierendeel girder moves, hack lever 31 exceeds the part of metal fire prevention bed board more than 14 and adds transverse strands bar formation scaffold guard rail 43, scaffold guard rail 43 inboards are provided with scaffold protecting wire net 44, Vierendeel girder brace summer section 16 and one section guide rail 28 are installed on the scaffolding platform that installing frame is set a roof beam in place, and are provided with metal fire prevention bed board 14 and scaffold protecting wire net 44.
Fig. 2 right side is divided into the part that scaffolding platform is encorbelmented and, as shown in Figure 2, encorbelment two sections work beams, the first work beam section, 19 tops are provided with installs the first rock down-the-hole drill, 17, the first work beam sections, 19 belows and is provided with second support 20 on first support, 18, the first supports 18, the second rock down-the-hole drill 21 is installed on second support 20, on the second work beam section 22 hanging basket 23 is installed, is provided with in the hanging basket 23 the 3rd rock down-the-hole drill 24 is installed on the 3rd support 25, the three supports 25.
As shown in Figure 4, Vierendeel girder brace summer section 16, the bottom of the first work beam section 19 is provided with trundle bracket 32, castor 29 is housed in the trundle bracket 32, castor 29 belows are provided with guide rail groove 33, castor 29 can roll in guide rail groove 33, guide rail groove 33 cross sections are concave shape, fixedly connected formation guide rail 28 with the channel beam of its underpart, brace summer section 16 both sides are connected on the channel beam with junction plate 30 bolts, the channel beam bottom is connected on the hack lever 31 by base 38 bolts that are provided with semicircle concave surface, its opening surface is provided with support plate 34, to strengthen the rigidity of guide rail 28, top welding angle iron blend stop 35 blocks the bearing block 36 that is welded on the junction plate 30, in case the Vierendeel girder section of encorbelmenting tenesmus in moving process, guide rail 28 is desired elongated end and can be switched through to joint, and its angle of bend and Vierendeel girder deflection angle match.
As Fig. 5, shown in Figure 6, Vierendeel girder comprises that brace summer section 16, work beam section and framework cant beam section 39 bolts are formed by connecting, the end of four faces of each straight beam section is equipped with hinge seat board 42, the adjacent beams section is to the hinge axis 41 and the hinge axis cottor pin of the hinge seat board 42 aggregate erection unified specifications of edge fit, form the one-directional rotation state, realization with hinge axis 41 be about axis, four direction beat up and down, open by required deflection angle between adjacent two straight beam sections, filling framework cant beam section 39, connect by bolt, the rigid frame that forms beat is set a roof beam in place.
As Fig. 7, shown in Figure 8, the channel beam inside of mounted one section guide rail 28 bottom is provided with liner clamp 45, and liner clamp 45 can snap in the channel beam of guide rail bottom, scaffolding platform extension, and bolt connects two sections guide rails.
As shown in Figure 9, guide rail 28 is used bolton by base 38, cylinder cushion block 46 with hack lever 31.
The course of work is as follows:
Initial period:
At first in the starting point of construction with scaffolding platform, build one section heavy load scaffold by other modes, choose the two-layer face of working (spacing or about two meters) of scaffold, scaffold guard rail 43, scaffold protecting wire net 44 all are set, lay metal fire prevention bed board 14, top layer is as personnel, goods and materials central core of circulation and working platform, lay equipment such as special-purpose light pole-climbing or small-sized lifting machinery 15, air compressor, cutting machine, bottom is installed and fixed frame is set a roof beam in place, and serves as operating personnel's passage and working platform.
Working stage comprises the steps:
1, one a section guide rail 28 and a segment frames beam are installed on the scaffolding platform initial segment of having put up, this segment frames beam is a brace summer section 16, two sides are connected on the guide rail 28 with junction plate 30 bolts, keep fixedlying connected of junction plate 30 bottoms and guide rail 28, to the scaffolding platform desire bearing of trend segment frames beam of encorbelmenting; If construction the time runs into precious vegetation on the crag or crag when radian occurring, between adjacent two straight beam sections can about, four direction is opened according to required deflection angle up and down, filling framework cant beam section 39, connect by bolt, formation with hinge axis 41 be axis about, up and down in the four direction on the selected a certain direction beat rigidity of the certain angle Vierendeel girder of encorbelmenting, the tiltedly gradient modularization of section 39 of Vierendeel girder (as 10 degree, 15 degree, 45 degree) is aided with cushion block and can be combined into various deflection angles.
2, Vierendeel girder protracts behind the position of setting, encorbelment at Vierendeel girder and to install above or below the work beam section of end or many rock down-the-hole drills of lifting, as shown in Figure 3, on the first work beam section 19 first support 18 is installed, the first rock down-the-hole drill 17 is installed on first support 18, second support 20 is installed in the first work beam section, 19 belows, the second rock down-the-hole drill 21 is installed on second support 20, on the second work beam section 22 hanging basket 23 is installed, the 3rd support 25 is installed in the hanging basket 23, the 3rd rock down-the-hole drill 24 is installed on the 3rd support 25, is started the rig controller, promptly available rock down-the-hole drill is got the scaffolding platform the required anchor pole down-the-hole in extension is installed.
3, by Vierendeel girder complex function anchor pole 26 is installed, as shown in Figure 1, interior pipe 1 is inserted in outer tube 3 inside, two ends are threaded respectively to rise and expand termination 2, inner tube plate 8, after inserting in the anchor pole down-the-hole, the tensioner screw rod 9 of in the fluting of inner tube plate 8, outer tube end plate 5, packing into, regulate the distance that tensioner nut 7 strengthens between inner tube plate 8 and the outer tube end plate 5, make the multiple tooth termination spreading of outer tube 3 fully embed in the rock, tightly prevent to get loose with another nut back of the body, after adjusting the position, fill in packing ring 4 between outer tube 3 and down-the-hole; Turret base 10 has been welded to the correct position of outer tube end plate 5, bolt connects turntable gland 11, turntable gland 11 has certain thickness, thickness and openings of sizes are set according to turntable shaft 12 required rotational angles, the turntable shaft of installing in the sphere inner chamber that closes up back formation 12 this moments can be in level, vertical direction deflection, rotating table axle 12 is to required angle, fastening turntable gland 11, turntable is installed on turntable gland 11 is stablized piece 13, make fixedly the turntable shaft 12 can not deflection under design load, on turntable shaft 12, connect hack lever 31 then, vertical rod 27, vertical rod 27 upper ends are connected with upper strata hack lever 31 usefulness fasteners, build the scaffolding platform extension with this.
4, the guide rail 28 of one section respective length of butt joint on the extension of scaffolding platform, as shown in Figure 8, the liner clamp 45 of channel beam inside, mounted guide rail 28 bottom is snapped in the channel beam of one section guide rail 28 bottom that needs butt joint, bolt connects, open being connected of junction plate 30 bottoms and guide rail 28 then, promote Vierendeel girder, castor 29 rolls in guide rail groove 33, Vierendeel girder is desired bearing of trend along scaffolding platform and is extended to next group bolthole punch position, set a roof beam in place and guide rail 28 with junction plate 30 fixed frames, prepare next construction unit.
In addition; construction can socket on the small-sized anchor pole that adds in addition by wire rope with equipment, and construction is protected frame, beam etc. with being provided with suspention between equipment and the rock, under the prerequisite of protection equipment and maintenance equipment working condition; unloaded, to reduce the full payload of scaffold.
The above only is preferred embodiment of the present invention, is not to be the restriction of the present invention being made other form, and any those skilled in the art may utilize the technology contents of above-mentioned announcement to be changed or be modified as the equivalent embodiment of equivalent variations.But every technical solution of the present invention content that do not break away to any simple modification, equivalent variations and remodeling that above embodiment did, still belongs to the protection domain of technical solution of the present invention according to technical spirit of the present invention.

Claims (6)

1. the building method of an overhanging cliff scaffolding platform is characterized in that, may further comprise the steps:
1.1, one a section guide rail (28) and a segment frames beam be installed on the scaffolding platform initial segment of having put up, the both sides of guide rail (28) and Vierendeel girder are linked together with junction plate (30) bolt, and desire the bearing of trend segment frames beam of encorbelmenting to scaffolding platform;
1.2, above or below the Vierendeel girder section of encorbelmenting, install or lift many rock down-the-hole drills, get the required anchor pole down-the-hole in scaffolding platform installation extension with the rock down-the-hole drill;
1.3, by Vierendeel girder the dismountable complex function anchor pole of heavy load (26) is installed in the anchor pole down-the-hole, complex function anchor pole (26) builds the extension of scaffolding platform as fixedly hack lever (31) and vertical rod (27) of anchor point;
1.4, on the extension of scaffolding platform, dock the guide rail (28) of one section respective length again, open junction plate (30) bottom and be connected bolt on the guide rail (28), promote Vierendeel girder along guide rail, make it desire bearing of trend and extend next section, prepare next construction unit to scaffolding platform.
2. the building method of a kind of overhanging cliff scaffolding platform according to claim 1, it is characterized in that: the Vierendeel girder of described step 1.1 comprises brace summer section (16), work beam section and framework cant beam section (39) bolt are formed by connecting, the end of four faces of each straight beam section is equipped with hinge seat board (42), the adjacent beams section is to the hinge axis (41) and the hinge axis cottor pin of hinge seat board (42) the aggregate erection unified specification of edge fit, form the one-directional rotation state, open by required deflection angle between adjacent two straight beam sections, filling framework cant beam section (39), connect by bolt, the rigid frame that forms beat is set a roof beam in place.
3. the building method of a kind of overhanging cliff scaffolding platform according to claim 2, it is characterized in that: described Vierendeel girder below is provided with a plurality of trundle brackets (32), castor (29) is housed in the trundle bracket (32), and castor (29) below is provided with guide rail groove (33).
4. the building method of a kind of overhanging cliff scaffolding platform according to claim 3, it is characterized in that: described guide rail (28) comprises that the cross section, top is the guide rail groove (33) of concave shape and the channel beam of bottom, the channel beam bottom is connected on the hack lever (31) by base (38) bolt that is provided with semicircle concave surface, the channel beam opening surface is provided with support plate (34), inside is provided with liner clamp (45), guide rail (28) is desired the extension and is connected to steering knuckle, and its angle of bend and Vierendeel girder deflection angle match.
5. the building method of a kind of overhanging cliff scaffolding platform according to claim 1, it is characterized in that: the complex function anchor pole (26) of described step 1.3 comprises interior pipe (1) and rises by expansion termination (2), interior pipe (1) bottom is connected to rise expands termination (2), the outside is with outer tube (3), outer tube (3) bottom has multiple-grooved and forms multiple tooth termination and be centered around to rise and expand outside, termination (2), the outer tube end plate (5) of top cover tape splicing reinforcing rib, outer tube end plate (5) is provided with a plurality of screws, interior pipe (2) top is provided with inner tube plate (8), inner tube plate (8) outer rim is provided with a plurality of radially short grooves, is with packing ring (4) in outer tube (3) outside and the technology gap, down-the-hole port.
6. the building method of a kind of overhanging cliff scaffolding platform according to claim 5, it is characterized in that: it is turntable that described outer tube end plate (5) is provided with a plurality of balls, ball is that turntable shaft (12) is housed on the turntable, can connect hack lever (31), directly socket vertical rod (27) by fastener in level, vertical direction deflection before turntable shaft (12) is fastening.
CN2010102653127A 2010-08-27 2010-08-27 Method for constructing cliff scaffold platform Expired - Fee Related CN101936068B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102653127A CN101936068B (en) 2010-08-27 2010-08-27 Method for constructing cliff scaffold platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102653127A CN101936068B (en) 2010-08-27 2010-08-27 Method for constructing cliff scaffold platform

Publications (2)

Publication Number Publication Date
CN101936068A true CN101936068A (en) 2011-01-05
CN101936068B CN101936068B (en) 2011-12-28

Family

ID=43389619

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102653127A Expired - Fee Related CN101936068B (en) 2010-08-27 2010-08-27 Method for constructing cliff scaffold platform

Country Status (1)

Country Link
CN (1) CN101936068B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102392532A (en) * 2011-10-28 2012-03-28 山东万鑫建设有限公司 Construction method for built-in hanging scaffold of high-rise building
CN105003035A (en) * 2015-02-10 2015-10-28 中国电建集团贵阳勘测设计研究院有限公司 Constructing method and structure of bridge crane access steel ladder for underground powerhouse
CN105256711A (en) * 2015-10-03 2016-01-20 任金瑞 Channel apparatus of hard base cliff wall
CN105626138A (en) * 2015-12-31 2016-06-01 中国建筑第八工程局有限公司 Precipice escape way structure and construction method thereof
CN108978675A (en) * 2018-08-23 2018-12-11 东莞市建筑科学研究所 Support component, foundation pit outer support system, foundation pit and construction method
CN109098452A (en) * 2018-08-09 2018-12-28 上海宝冶建筑装饰有限公司 Scenic spot complicated landform Steel Structure Installation method
CN109594915A (en) * 2017-09-30 2019-04-09 张家界航空工业职业技术学院 A kind of steep cliff rock drill
CN109750667A (en) * 2019-02-28 2019-05-14 威海立达尔机械股份有限公司 A kind of Pseudobulbus Bletillae (Rhizoma Bletillae) over-water construction floating platform and installation method
CN113529530A (en) * 2021-06-21 2021-10-22 浙江万里建设工程有限公司 Construction method of anchor-inserted triangular formwork support for overhead cantilever trestle
CN115059312A (en) * 2022-07-06 2022-09-16 中国五冶集团有限公司 Tool suitable for positioning, installing and unloading large steel structure and construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4517781A (en) * 1983-04-01 1985-05-21 Leblanc J T Apparatus and process for placement of prefabricated structures
CN2225517Y (en) * 1995-07-14 1996-04-24 张国增 Crawling operation table
US6575102B2 (en) * 2001-02-09 2003-06-10 Trn Business Trust Temperature controlled railway car
CA2330125C (en) * 1998-04-24 2005-09-06 Flex-Ability Concepts, L.L.C. Apparatus and methods of forming a curved structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4517781A (en) * 1983-04-01 1985-05-21 Leblanc J T Apparatus and process for placement of prefabricated structures
CN2225517Y (en) * 1995-07-14 1996-04-24 张国增 Crawling operation table
CA2330125C (en) * 1998-04-24 2005-09-06 Flex-Ability Concepts, L.L.C. Apparatus and methods of forming a curved structure
US6575102B2 (en) * 2001-02-09 2003-06-10 Trn Business Trust Temperature controlled railway car

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102392532A (en) * 2011-10-28 2012-03-28 山东万鑫建设有限公司 Construction method for built-in hanging scaffold of high-rise building
CN102392532B (en) * 2011-10-28 2013-05-29 山东万鑫建设有限公司 Construction method for built-in hanging scaffold of high-rise building
CN105003035A (en) * 2015-02-10 2015-10-28 中国电建集团贵阳勘测设计研究院有限公司 Constructing method and structure of bridge crane access steel ladder for underground powerhouse
CN105003035B (en) * 2015-02-10 2017-07-11 中国电建集团贵阳勘测设计研究院有限公司 The construction method and structure of bridge machine steel ladder on a kind of underground power house
CN105256711A (en) * 2015-10-03 2016-01-20 任金瑞 Channel apparatus of hard base cliff wall
CN105626138A (en) * 2015-12-31 2016-06-01 中国建筑第八工程局有限公司 Precipice escape way structure and construction method thereof
CN109594915A (en) * 2017-09-30 2019-04-09 张家界航空工业职业技术学院 A kind of steep cliff rock drill
CN109594915B (en) * 2017-09-30 2020-05-19 张家界航空工业职业技术学院 Cliff rock drill
CN109098452A (en) * 2018-08-09 2018-12-28 上海宝冶建筑装饰有限公司 Scenic spot complicated landform Steel Structure Installation method
CN109098452B (en) * 2018-08-09 2020-11-27 上海宝冶建筑装饰有限公司 Scenic spot complex terrain steel structure installation method
CN108978675A (en) * 2018-08-23 2018-12-11 东莞市建筑科学研究所 Support component, foundation pit outer support system, foundation pit and construction method
CN108978675B (en) * 2018-08-23 2023-11-28 东莞市建筑科学研究院有限公司 Support assembly, foundation pit outer support system, foundation pit and construction method
CN109750667A (en) * 2019-02-28 2019-05-14 威海立达尔机械股份有限公司 A kind of Pseudobulbus Bletillae (Rhizoma Bletillae) over-water construction floating platform and installation method
CN113529530A (en) * 2021-06-21 2021-10-22 浙江万里建设工程有限公司 Construction method of anchor-inserted triangular formwork support for overhead cantilever trestle
CN115059312A (en) * 2022-07-06 2022-09-16 中国五冶集团有限公司 Tool suitable for positioning, installing and unloading large steel structure and construction method
CN115059312B (en) * 2022-07-06 2023-07-18 中国五冶集团有限公司 Tool and construction method suitable for positioning, mounting and dismounting large-scale steel structure

Also Published As

Publication number Publication date
CN101936068B (en) 2011-12-28

Similar Documents

Publication Publication Date Title
CN101936068B (en) Method for constructing cliff scaffold platform
CN104060844B (en) Sliding device and lifting device for truss frame of steel structural transfer floor of the high-rise building and construction method thereof
CN201707453U (en) Auxiliary device for radar nondestructive detection used in wall of tunnel
CN104989094B (en) Installing method of walking hanging basket
CN204877479U (en) Shaft is hydraulic pressure slipform for lining cutting
CN105134220B (en) A kind of vertical shaft lining cutting hydraulic slip-form
CN103103925B (en) Combined H-shaped steel column bracket
CN101974913A (en) Parallel construction method of bridge deepwater foundation bored pile and cofferdam
CN107083853A (en) Modularization multi-storied garage and its installation method
CN101215928B (en) Attached lifting scaffold trolley type inclining-proof device and method of use thereof
CN102383815A (en) Suspension type driftage temporary supporting device and use method thereof
CN109881585B (en) Assembled working platform for high pier construction
CN107724659A (en) One kind can transverse shifting stable type building hanging basket
CN102912991A (en) Track hosting device and track hoisting method of large curtain wall unit plate
CN203769738U (en) Suspension point movable type pumping unit
CN211689948U (en) Suspension operation platform device for construction of suspension cable at tower part of cable-stayed bridge
CN205558915U (en) Portable operation device
CN107587885A (en) Two lining trolley structures and assembling method in a kind of standard cross-section of tunnel
CN205875162U (en) Unilateral formula rock -anchored beam concrete placement rebar installation platform truck
CN205474862U (en) Wet seam template operation platform of portable case roof beam
CN202323771U (en) Installation and maintenance system for highway bridge
CN208870611U (en) A kind of multi-functional trolley of tunnel self-propelled splash guard dossal reinforcing bar positioning one
CN207177310U (en) A kind of crane beam on rock wall for underground power house reinforcing bar is from steady structure
CN201148725Y (en) Trolley type inclining-proof device adhering to elevating scaffold
CN206737521U (en) Multi-storied garage with steel structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Lu Shangxiu

Inventor after: Wang Deqiang

Inventor after: Zhu Dongliang

Inventor after: Chang Yuzhen

Inventor after: Wang Wanfeng

Inventor after: Cui Jian

Inventor after: Xu Lianhai

Inventor after: Zhang Jian

Inventor after: Sun Yuguo

Inventor after: Chang Xinwen

Inventor after: Sun Jinsheng

Inventor after: Bian Changxue

Inventor after: Fu Weidong

Inventor after: Zhu Dejun

Inventor after: Guo Yufang

Inventor after: Guo Haiyan

Inventor before: Lu Shangxiu

Inventor before: Chang Yuzhen

Inventor before: Wang Wanfeng

Inventor before: Cui Jian

Inventor before: Xu Lianhai

Inventor before: Zhang Jian

Inventor before: Sun Yuguo

Inventor before: Chang Xinwen

Inventor before: Sun Jinsheng

Inventor before: Bian Changxue

Inventor before: Fu Weidong

Inventor before: Zhu Dejun

Inventor before: Guo Yufang

Inventor before: Zhu Dongliang

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LU SHANGXIU SUN YUGUO CHANG XINWEN SUN JINSHENG BIAN CHANGXUE FU WEIDONG ZHU DEJUN GUO YUFANG ZHU DONGLIANG CHANG YUZHEN WANG WANFENG CUI QIAN XU LIANHAI ZHANG JIAN TO: LU SHANGXIU SUN YUGUO CHANG XINWEN SUN JINSHENG BIAN CHANGXUE FU WEIDONG ZHU DEJUN GUO YUFANG GUO HAIYAN WANG DEQIANG ZHU DONGLIANG CHANG YUZHEN WANG WANFENG CUI QIAN XU LIANHAI ZHANG JIAN

ASS Succession or assignment of patent right

Owner name: SHANDONG QIFENG CONSTRUCTION CO., LTD.

Free format text: FORMER OWNER: LU SHANGXIU

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20111013

Address after: 255400 Shandong Province, Zibo city Linzi District Guan Road No. 174

Applicant after: Shandong Gaoyang Construction Co., Ltd.

Co-applicant after: Shandong Qifeng Construction Co., Ltd.

Address before: 255400 Shandong Province, Zibo city Linzi District Guan Road No. 174

Applicant before: Shandong Gaoyang Construction Co., Ltd.

Co-applicant before: Lu Shangxiu

C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Lu Shangxiu

Inventor after: Guo Yufang

Inventor after: Guo Haiyan

Inventor after: Wang Deqiang

Inventor after: Zhu Dongliang

Inventor after: Chang Yuzhen

Inventor after: Wang Wanfeng

Inventor after: Cui Jian

Inventor after: Xu Lianhai

Inventor after: Zhang Jian

Inventor after: Sun Yuguo

Inventor after: Chang Xinwen

Inventor after: Tian Xufeng

Inventor after: Sun Jinsheng

Inventor after: Tian Zhaochun

Inventor after: Bian Changxue

Inventor after: Fu Weidong

Inventor after: Zhu Dejun

Inventor before: Lu Shangxiu

Inventor before: Wang Deqiang

Inventor before: Zhu Dongliang

Inventor before: Chang Yuzhen

Inventor before: Wang Wanfeng

Inventor before: Cui Jian

Inventor before: Xu Lianhai

Inventor before: Zhang Jian

Inventor before: Sun Yuguo

Inventor before: Chang Xinwen

Inventor before: Sun Jinsheng

Inventor before: Bian Changxue

Inventor before: Fu Weidong

Inventor before: Zhu Dejun

Inventor before: Guo Yufang

Inventor before: Guo Haiyan

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LU SHANGXIU SUN YUGUO CHANG XINWEN SUN JINSHENG BIAN CHANGXUE FU WEIDONG ZHU DEJUN GUO YUFANG GUO HAIYAN WANG DEQIANG ZHU DONGLIANG CHANG YUZHEN WANG WANFENG CUI JIAN XU LIANHAI ZHANG JIAN TO: LU SHANGXIU SUN YUGUO CHANG XINWEN TIAN XUFENG SUN JINSHENG TIAN ZHAOCHUN BIAN CHANGXUE FU WEIDONG ZHU DEJUN GUO YUFANG GUO HAIYAN WANG DEQIANG ZHU DONGLIANG CHANG YUZHEN WANG WANFENG CUI QIAN XU LIANHAI ZHANG JIAN

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111228

Termination date: 20170827

CF01 Termination of patent right due to non-payment of annual fee