CN109750667A - A kind of Pseudobulbus Bletillae (Rhizoma Bletillae) over-water construction floating platform and installation method - Google Patents
A kind of Pseudobulbus Bletillae (Rhizoma Bletillae) over-water construction floating platform and installation method Download PDFInfo
- Publication number
- CN109750667A CN109750667A CN201910153107.2A CN201910153107A CN109750667A CN 109750667 A CN109750667 A CN 109750667A CN 201910153107 A CN201910153107 A CN 201910153107A CN 109750667 A CN109750667 A CN 109750667A
- Authority
- CN
- China
- Prior art keywords
- floating platform
- tightening machine
- bletillae
- plate
- cushion cap
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 81
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 20
- 238000009434 installation Methods 0.000 title claims abstract description 15
- 238000000034 method Methods 0.000 title claims abstract description 13
- 230000000694 effects Effects 0.000 claims description 16
- 238000009966 trimming Methods 0.000 claims description 8
- 239000000203 mixture Substances 0.000 claims description 6
- 239000002689 soil Substances 0.000 claims description 4
- 238000007599 discharging Methods 0.000 claims description 3
- 239000007787 solid Substances 0.000 claims description 3
- 239000000463 material Substances 0.000 abstract description 7
- 238000005096 rolling process Methods 0.000 description 3
- 230000007812 deficiency Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000001066 destructive effect Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- 239000003643 water by type Substances 0.000 description 1
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
- Revetment (AREA)
Abstract
The present invention relates to Pseudobulbus Bletillae (Rhizoma Bletillae) mounting technique waterborne fields, specifically a kind of Pseudobulbus Bletillae (Rhizoma Bletillae) over-water construction floating platform and installation method, equipped with construction floating platform, it is characterized in that the construction floating platform is equipped with strip groove, clip assembly is equipped at the front opening of the strip groove, the rear end side of the construction floating platform is equipped with fixing anchor bar, vertical guide frame is equipped on the outside of two strip grooves above the construction floating platform, lateral cushion cap frame is equipped between vertical guide frame on the outside of two strip grooves, the both ends of the lateral cushion cap frame are connected through slide track component with vertical guide frame respectively, the lateral cushion cap frame is equipped with tightening machine support plate, the rear and front end of the tightening machine support plate is connected through slide track component with lateral cushion cap frame respectively, the tightening machine support plate is equipped with tightening machine fixation hole, the tightening machine Body is fixed on tightening machine fixation hole, has many advantages, such as that structure is simple, easy to use, construction is quick, saves human and material resources and financial resources.
Description
Technical field
The present invention relates to Pseudobulbus Bletillae (Rhizoma Bletillae) mounting technique waterborne field, specifically a kind of structure is simple, easy to use, construction
Quickly, the Pseudobulbus Bletillae (Rhizoma Bletillae) over-water construction floating platform and installation method of human and material resources and financial resources are saved.
Background technique
It is well known that highway, railway, steel construction, house etc. need to do the form that underground foundation is all made of concreting, mix
Solidifying soil underground foundation is firm, corrosion-resistant, for the stability for improving concrete foundation, can generally pour big cube of buried concrete
Pier, to improve security performance, still, that there are programs is complicated for the processing of concrete foundation, it is big to pour cubic metre of earth area, to construction site
Ground environment is destructive strong, and manpower and material resources are at high cost and the constructional difficulties of Special environment the deficiencies of, and existing steel-pipe pile
It is difficult to be able to satisfy the requirement such as required bearing capacity, pulling capacity again, therefore just produces the structure of Pseudobulbus Bletillae (Rhizoma Bletillae).
Currently, the installation built in water is also required to Pseudobulbus Bletillae (Rhizoma Bletillae) structure, however the piling construction Pseudobulbus Bletillae (Rhizoma Bletillae) in waters, lead to
Normal construction personnel can not directly operate, and need to build scaffold or other foothold bit platforms, and construction personnel stands to come above it
It constructs Pseudobulbus Bletillae (Rhizoma Bletillae), this mode generally requires to build the interim foothold platform for being identical to plank road length in water, after Practical Completion
It removes again, waste of manpower, material resources, financial resources, and efficiency is relatively very low.
Summary of the invention
Present invention aim to address above-mentioned the deficiencies in the prior art, provide that a kind of structure is simple, easy to use, construction is fast
Speed, the Pseudobulbus Bletillae (Rhizoma Bletillae) over-water construction floating platform and installation method for saving human and material resources and financial resources.
The technical solution adopted by the present invention to solve the technical problems is:
A kind of Pseudobulbus Bletillae (Rhizoma Bletillae) over-water construction floating platform, be equipped with construction floating platform, it is characterised in that the construction floating platform be equipped with two or
Person is a plurality of parallel and strip groove in front openings, is equipped at the front opening of the strip groove and has accomplished fluently for connecting
Pseudobulbus Bletillae (Rhizoma Bletillae) clip assembly, the rear end side of the described construction floating platform is equipped with the fixation anchor parallel with clip assembly position
Bar, the fixing anchor bar pass through the fixation that the arc panel that construction floating platform side is equipped with realizes operation platform, and the construction is floating
The outside of outermost two strip grooves is equipped with vertical guide frame, the lower end of the vertical guide frame and construction floating platform above platform
It is connected, lateral cushion cap frame is equipped between the vertical guide frame on the outside of two strip grooves, the lateral cushion cap frame
Both ends are connected through slide track component with vertical guide frame respectively, and the top of one end of the lateral cushion cap frame is equipped with movable pulley,
The front and rear sides of the upper end of the side vertical guide frame are respectively equipped with connecting column and fixed pulley, one end of the rope with
Connecting column is connected, and the other end sequentially passes through the movable pulley on lateral cushion cap frame, the fixed pulley on vertical guide frame and applies with being located at
Motor on work floating platform is connected, and the lateral cushion cap frame is equipped with tightening machine support plate, the tightening machine support plate
Rear and front end be connected respectively through slide track component with lateral cushion cap frame, the tightening machine support plate is fixed equipped with tightening machine
Hole, the body of the tightening machine are fixed on tightening machine fixation hole, and the output shaft of tightening machine is pierced by simultaneously by tightening machine fixation hole
It is connected by connector with Pseudobulbus Bletillae (Rhizoma Bletillae), rotated by tightening machine while drives rope to pull lateral cushion cap by electric motor operation
Frame moves down the final fixation for realizing Pseudobulbus Bletillae (Rhizoma Bletillae).
Clip assembly of the present invention is formed by fixing card adapter plate, activity card adapter plate, hinge and connection bolt, described
The both ends of fixed card adapter plate are connected with the construction floating platform of strip groove side respectively, one end of activity card adapter plate with through hinge and solid
Determine card adapter plate to be hinged, the connecting screw hole that the other end of activity card adapter plate is equipped with through the other end of connection bolt and fixed card adapter plate
It is connected, the two sides that fixed card adapter plate and activity card adapter plate are fastened on Pseudobulbus Bletillae (Rhizoma Bletillae) is achieved a fixed connection by connection bolt.
Vertical guide frame of the present invention is connected through sliding rail with construction floating platform, by sliding vertical guide along sliding rail
Frame realizes that the variation of mounting distance between adjacent Pseudobulbus Bletillae (Rhizoma Bletillae) is adjusted.
Tightening machine fixation hole in tightening machine support plate of the present invention is set as bar shaped fixation hole in the front-back direction, described
Bar shaped fixation hole rear tightening machine support plate be equipped with support base, support base be equipped with fine tuning screw hole, the fine tuning
Screw hole is interior to be equipped with fine tuning screw rod, and the one end for finely tuning screw rod puts in the tightening machine warp beam in fine tuning screw hole and being located on bar shaped fixation hole
Rotation connection is held, the other end for finely tuning screw rod stretches out fine tuning screw hole and is connected with trimming hand wheel, realizes by rotation trimming hand wheel
The back-and-forth motion of tightening machine, and then realize fine tuning.
Slide track component between vertical guide frame of the present invention and lateral cushion cap frame by idler wheel, U-shaped connecting plate and is led
To board group at the vertical guide frame is made of two support rods and connecting plate, and the outside of the support rod is equipped with vertical
Sliding slot is equipped with idler wheel in the vertical chute, and idler wheel is connected in the vertical chute and scrolls up and down, the middle part of idler wheel through bearing with
U-shaped connecting plate is connected, and the U-shaped connecting plate is connected to support rod two sides and is connected with idler wheel, passes through the rolling of idler wheel
Realize moving up and down for U-shaped connecting plate, the upper end of the support plate is connected through connecting plate, the both ends point of the connecting plate
Not She You connecting column and fixed pulley, the middle part of connecting plate is equipped with strip-shaped hole, and one end of the rope is connected with connecting column, separately
One end sequentially passes through the strip-shaped hole of connecting plate, the movable pulley being located on guide plate, the strip-shaped hole on connecting plate, fixed pulley and is located at
Motor on construction floating platform is connected, and the guide plate is connected with U-shaped connecting plate, the U-shaped connecting plate and transverse direction
Cushion cap frame is connected.
Slide track component between tightening machine support plate of the present invention and lateral cushion cap frame is made of idler wheel, the rotation
Tight machine support plate is set as N-shaped plate, and it is two bar shaped transverse bars, the outside of the bar shaped transverse bar that the lateral cushion cap, which is set up,
Horizontal concrete chute equipped with left and right directions, horizontal concrete chute is interior to be equipped with idler wheel, and the idler wheel is connected in horizontal concrete chute and scrolls left and right,
The middle part of idler wheel is connected through bearing with N-shaped plate, and N-shaped plate is connected to bar shaped transverse bar two sides and is connected with idler wheel, passes through rolling
Wheel scrolling realization N-shaped plate moves left and right.
A kind of installation method of Pseudobulbus Bletillae (Rhizoma Bletillae) over-water construction floating platform, it is characterised in that the step of installation method is as follows:
(1), point that is first that Pseudobulbus Bletillae (Rhizoma Bletillae) is tentatively fixed and will installing;
(2), the floating platform that then will construct is mobile, is fixed on the strip groove on construction floating platform between tentatively fixed Pseudobulbus Bletillae (Rhizoma Bletillae);
(3), the Pseudobulbus Bletillae (Rhizoma Bletillae) stake that clip assembly has been accomplished fluently with front respectively is connected, fixing anchor bar is fixed across arc panel
In the soil below the water surface, and then fix construction floating platform;
(4), again by adjusting the position of lateral cushion cap frame and tightening machine, the Pseudobulbus Bletillae (Rhizoma Bletillae) tentatively fixed is connected by connector
On tightening machine;Tightening machine is opened, while discharging rope, Pseudobulbus Bletillae (Rhizoma Bletillae) is further secured to the point set, and then complete
The installation of Pseudobulbus Bletillae (Rhizoma Bletillae).
The present invention since the described construction floating platform is equipped with two or strip groove a plurality of parallel and in front openings,
The clip assembly for connecting the Pseudobulbus Bletillae (Rhizoma Bletillae) accomplished fluently, the construction floating platform are equipped at the front opening of the strip groove
Rear end side be equipped with the fixing anchor bar parallel with clip assembly position, the fixing anchor bar pass through construction floating platform side set
Some arc panels realize the fixation of operation platform, and the outside of outermost two strip grooves is equipped with perpendicular above the construction floating platform
The lower end of guide rail gantry, the vertical guide frame is connected with construction floating platform, vertically leading on the outside of two strip grooves
Lateral cushion cap frame is equipped between rail gantry, the both ends of the lateral cushion cap frame are connected through slide track component with vertical guide frame respectively
It connects, the top of one end of the lateral cushion cap frame is equipped with movable pulley, the front and back two of the upper end of the side vertical guide frame
Side is respectively equipped with connecting column and fixed pulley, and one end of the rope is connected with connecting column, and the other end, which sequentially passes through, laterally to be held
The fixed pulley on movable pulley, vertical guide frame on rack is connected with the motor being located on construction floating platform, the transverse direction
Cushion cap frame is equipped with tightening machine support plate, and the rear and front end of the tightening machine support plate is respectively through slide track component and lateral cushion cap
Frame is connected, and the tightening machine support plate is equipped with tightening machine fixation hole, and the body of the tightening machine is fixed on tightening machine
On fixation hole, the output shaft of tightening machine is pierced by by tightening machine fixation hole and passes through connector to be connected with Pseudobulbus Bletillae (Rhizoma Bletillae), by screwing
The fixation for moving down final realization Pseudobulbus Bletillae (Rhizoma Bletillae) that machine rotates while driving rope to pull lateral cushion cap frame by electric motor operation,
Have many advantages, such as that structure is simple, easy to use, construction is quick, saves human and material resources and financial resources.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention.
Fig. 2 is the structural schematic diagram in another direction of the invention.
Specific embodiment
The following further describes the present invention with reference to the drawings:
As shown in the picture, a kind of Pseudobulbus Bletillae (Rhizoma Bletillae) over-water construction floating platform is equipped with construction floating platform 1, it is characterised in that the construction floating platform 1
It is equipped with two or a plurality of parallel and be equipped with and use at the strip groove of front openings 2, the front opening of the strip groove 2
It is equipped with and clip assembly position in the rear end side of the clip assembly for the Pseudobulbus Bletillae (Rhizoma Bletillae) that connection has been accomplished fluently, the construction floating platform 1
Parallel fixing anchor bar 3, the fixing anchor bar 3 pass through the arc panel 4 that construction 1 side of floating platform is equipped with and realize operation platform
Fixed, the outside of 1 outermost two strip grooves 2 in top of construction floating platform is equipped with vertical guide frame 5, and described vertically leads
The lower end of rail gantry 5 is connected with construction floating platform 1, is equipped between the vertical guide frame 5 in two strip grooves, 2 outside and laterally holds
The both ends of rack 6, the lateral cushion cap frame 6 are connected through slide track component with vertical guide frame 5 respectively, the lateral cushion cap
The top of one end of frame 6 is equipped with movable pulley 7, and the front and rear sides of the upper end of the side vertical guide frame 5 are respectively equipped with connection
One end of column 8 and fixed pulley 9, the rope is connected with connecting column 8, and the other end sequentially passes through dynamic on lateral cushion cap frame 6
Fixed pulley 9 on pulley 7, vertical guide frame 5 is connected with the motor being located on construction floating platform 1, the lateral cushion cap frame 6
It is equipped with tightening machine support plate 10, the rear and front end of the tightening machine support plate 10 is respectively through slide track component and lateral cushion cap frame
6 are connected, and the tightening machine support plate 10 is equipped with tightening machine fixation hole 11, and the body of the tightening machine, which is fixed on, to be screwed
On machine fixation hole 11, the output shaft of tightening machine is pierced by by tightening machine fixation hole 11 and is connected by connector with Pseudobulbus Bletillae (Rhizoma Bletillae), leads to
It crosses tightening machine rotation while pulling moving down for lateral cushion cap frame 6 finally to realize ground spiral shell by 12 work belt running rope rope of motor
The fixation of silk, motor 12 are located on construction floating platform 1, and the clip assembly is by fixing card adapter plate 13, activity card adapter plate 14, closing
Page 15 and connection bolt composition, the both ends of the fixation card adapter plate 13 are connected with the construction floating platform 1 of 2 side of strip groove respectively
It connects, one end of activity card adapter plate 14 is hinged with through hinge 15 and fixed card adapter plate 13, and the other end of activity card adapter plate 14 is through even
Connecting bolt is connected with the connecting screw hole that the other end of fixed card adapter plate 13 is equipped with, will fixed 13 He of card adapter plate by connection bolt
The two sides that activity card adapter plate 14 is fastened on Pseudobulbus Bletillae (Rhizoma Bletillae) achieve a fixed connection, and the vertical guide frame 5 is through sliding rail and construction floating platform 1
It is connected, realizes that the variation of mounting distance between adjacent Pseudobulbus Bletillae (Rhizoma Bletillae) is adjusted by sliding vertical guide frame 5 along sliding rail, it is described
Tightening machine fixation hole 11 in tightening machine support plate 10 is set as bar shaped fixation hole in the front-back direction, after the bar shaped fixation hole
The tightening machine support plate 10 of side is equipped with support base 16, and support base 16 is equipped with fine tuning screw hole, is equipped in the fine tuning screw hole
Finely tune screw rod 17, fine tuning screw rod 17 one end put in fine tuning screw hole in forwarded with the tightening machine warp beam being located on bar shaped fixation hole it is dynamic
Connection, the other end of fine tuning screw rod 17 stretch out fine tuning screw hole and are connected with trimming hand wheel 18, realized by rotation trimming hand wheel 18
The back-and-forth motion of tightening machine, and then realize fine tuning, the slide track component between the vertical guide frame 5 and lateral cushion cap frame 6 by
Idler wheel 19, U-shaped connecting plate 20 and guide plate 21 form, and the vertical guide frame 5 is by two support rods 22 and 23 groups of connecting plate
At the outside of the support rod 22 is equipped with the vertical chute 24, and idler wheel 19 is equipped in the vertical chute 24, and idler wheel 19 is clamped
It is scrolled up and down in the vertical chute 24, the middle part of idler wheel 19 is connected through bearing with U-shaped connecting plate 20, the U-shaped connecting plate
20 are connected to 22 two sides of support rod and are connected with idler wheel 19, by moving down on the U-shaped connecting plate 20 of the scrolling realization of idler wheel 19
Dynamic, the upper end of the support plate is connected through connecting plate 23, and the both ends of the connecting plate 23 are respectively equipped with connecting column 8 and determine
The middle part of pulley 9, connecting plate 23 is equipped with strip-shaped hole 25, and one end of the rope is connected with connecting column 8, and the other end is successively worn
It the strip-shaped hole 25 for crossing connecting plate 23, the movable pulley 7 being located on guide plate 21, the strip-shaped hole 25 on connecting plate 23, fixed pulley 9 and sets
Motor 12 on construction floating platform 1 is connected, and the guide plate 21 is connected with U-shaped connecting plate 20, the U-shaped connection
Plate 20 is connected with lateral cushion cap frame 6, and the slide track component between the tightening machine support plate 10 and lateral cushion cap frame 6 is by idler wheel
19 compositions, the tightening machine support plate 10 are set as N-shaped plate, and the lateral cushion cap frame 6 is set as two bar shaped transverse bars 27, institute
The outside for the bar shaped transverse bar 27 stated is equipped with the horizontal concrete chute 26 of left and right directions, and idler wheel 19 is equipped in horizontal concrete chute 26, described
Idler wheel 19 is connected in horizontal concrete chute 26 and scrolls left and right, and the middle part of idler wheel 19 is connected through bearing with N-shaped plate, and N-shaped plate is connected to
27 two sides of bar shaped transverse bar are simultaneously connected with idler wheel 19, pass through moving left and right for 19 scrolling realization N-shaped plate of idler wheel, the installation method
The step of it is as follows: (1), first that Pseudobulbus Bletillae (Rhizoma Bletillae) is tentatively fixed with the point that will be installed;(2), the floating platform 1 that then will construct is mobile,
It is fixed on the strip groove 2 on construction floating platform 1 between tentatively fixed Pseudobulbus Bletillae (Rhizoma Bletillae);(3), by clip assembly respectively with front
The Pseudobulbus Bletillae (Rhizoma Bletillae) stake accomplished fluently is connected, and fixing anchor bar 3 is passed through arc panel 4 and is fixed in the soil below the water surface, and then is fixed
Construction floating platform 1;(4), the Pseudobulbus Bletillae (Rhizoma Bletillae) tentatively fixed is passed through into company by adjusting the position of lateral cushion cap frame 6 and tightening machine again
Fitting is connected on tightening machine;Tightening machine is opened, while discharging rope, Pseudobulbus Bletillae (Rhizoma Bletillae) is further secured to the point set,
And then complete the installation of Pseudobulbus Bletillae (Rhizoma Bletillae).
The present invention can first fix the position of construction floating platform 1 when in use, then carry out the fixation of Pseudobulbus Bletillae (Rhizoma Bletillae) again, construct
Fixation arc panel 4 on floating platform 1 in the clip assembly of strip groove 2 can also 1 phase of construction floating platform through hinge 15 with 2 side of strip groove
Hingedly, so that clip assembly is hinged on 2 side of strip groove of construction 1 side of floating platform, make the opening of 2 side of strip groove for Pseudobulbus Bletillae (Rhizoma Bletillae)
It passes through, facilitates installation, the present invention is equipped with two or a plurality of parallel and in front openings due to the construction floating platform 1
Strip groove 2 is equipped with the clip assembly for connecting the Pseudobulbus Bletillae (Rhizoma Bletillae) accomplished fluently at the front opening of the strip groove 2, described
The rear end side of construction floating platform 1 be equipped with the fixing anchor bar 3 parallel with clip assembly position, the fixing anchor bar 3 passes through
The arc panel 4 that construction 1 side of floating platform is equipped with realizes the fixation of operation platform, outermost two of 1 top of construction floating platform
The outside of strip groove 2 is equipped with vertical guide frame 5, and the lower end of the vertical guide frame 5 is connected with construction floating platform 1, described
Lateral cushion cap frame 6 is equipped between the vertical guide frame 5 in two 2 outsides of strip groove, the both ends of the lateral cushion cap frame 6 pass through respectively
Slide track component is connected with vertical guide frame 5, and the top of one end of the lateral cushion cap frame 6 is equipped with movable pulley 7, and described should
The front and rear sides of the upper end of side vertical guide frame 5 are respectively equipped with connecting column 8 and fixed pulley 9, one end of the rope and connection
Column 8 is connected, and the other end sequentially passes through the movable pulley 7 on lateral cushion cap frame 6, the fixed pulley 9 on vertical guide frame 5 and applies with being located at
Motor 12 on work floating platform 1 is connected, and the lateral cushion cap frame 6 is equipped with tightening machine support plate 10, the tightening machine
The rear and front end of support plate 10 is connected through slide track component with lateral cushion cap frame 6 respectively, sets in the tightening machine support plate 10
There is tightening machine fixation hole 11, the body of the tightening machine is fixed on tightening machine fixation hole 11, and the output shaft of tightening machine is by revolving
Tight machine fixation hole 11 is pierced by and is connected by connector with Pseudobulbus Bletillae (Rhizoma Bletillae), is rotated by tightening machine while being worked by motor 12
Rope is driven to pull the fixation for moving down final realization Pseudobulbus Bletillae (Rhizoma Bletillae) of lateral cushion cap frame 6, the clip assembly is by fixing card
Fishplate bar 13, activity card adapter plate 14, hinge 15 and connection bolt composition, the both ends of the fixation card adapter plate 13 respectively with strip groove
The construction floating platform 1 of 2 sides is connected, and one end of activity card adapter plate 14 is hinged with through hinge 15 and fixed card adapter plate 13, activity
The other end of card adapter plate 14 is connected through connection bolt with the connecting screw hole that the other end of fixed card adapter plate 13 is equipped with, and passes through connection
Bolt achieves a fixed connection the two sides that fixed card adapter plate 13 and activity card adapter plate 14 are fastened on Pseudobulbus Bletillae (Rhizoma Bletillae), the vertical guide
Frame 5 is connected through sliding rail with construction floating platform 1, is installed between adjacent Pseudobulbus Bletillae (Rhizoma Bletillae) by realizing along sliding rail sliding vertical guide frame 5
The variation of distance is adjusted, and the tightening machine fixation hole 11 in the tightening machine support plate 10 is set as bar shaped in the front-back direction and fixes
Hole, the tightening machine support plate 10 at the rear of the bar shaped fixation hole are equipped with support base 16, and support base 16 is equipped with fine tuning spiral shell
Hole, is equipped with fine tuning screw rod 17 in the fine tuning screw hole, one end of fine tuning screw rod 17 put in fine tuning screw hole with to be located at bar shaped solid
Determine the tightening machine warp beam on hole and hold rotation connection, the other end of fine tuning screw rod 17 stretches out fine tuning screw hole and is connected with trimming hand wheel 18
It connects, the back-and-forth motion of tightening machine is realized by rotating trimming hand wheel 18, and then realize fine tuning, the vertical guide frame 5 and cross
Be made of to the slide track component between cushion cap frame 6 idler wheel 19, U-shaped connecting plate 23 and guide plate 21, the vertical guide frame 5 by
Two support rods 22 and connecting plate 23 form, and the outside of the support rod 22 is equipped with the vertical chute 24, the vertical chute
Idler wheel 19 is equipped in 24, idler wheel 19 is connected in the vertical chute 24 and scrolls up and down, and the middle part of idler wheel 19 is through bearing and U-shaped connecting plate
20 are connected, and the U-shaped connecting plate 20 is connected to 22 two sides of support rod and is connected with idler wheel 19, pass through the rolling of idler wheel 19
Realize moving up and down for U-shaped connecting plate 20, the upper end of the support plate is connected through connecting plate 23, the connecting plate 23
Both ends are respectively equipped with connecting column 8 and fixed pulley 9, and the middle part of connecting plate 23 is equipped with strip-shaped hole 25, one end of the rope and company
It connects column 8 to be connected, the other end sequentially passes through the strip-shaped hole 25 of connecting plate 23, the movable pulley 7 being located on guide plate 21, connecting plate 23
On strip-shaped hole 25, fixed pulley 9 be connected with the motor 12 being located on construction floating platform 1, the guide plate 21 and U-shaped connection
Plate 20 is connected, and the U-shaped connecting plate 20 is connected with lateral cushion cap frame 6, and the tightening machine support plate 10 is held with lateral
Slide track component between rack 6 is made of idler wheel 19, and the tightening machine support plate 10 is set as N-shaped plate, the lateral cushion cap
Frame 6 is set as two bar shaped transverse bars 27, and the outside of the bar shaped transverse bar 27 is equipped with the horizontal concrete chute 26 of left and right directions, laterally
Idler wheel 19 is equipped in sliding slot 26, the idler wheel 19 is connected in horizontal concrete chute 26 and scrolls left and right, and the middle part of idler wheel 19 is through bearing
It is connected with N-shaped plate, N-shaped plate is connected to 27 two sides of bar shaped transverse bar and is connected with idler wheel 19, passes through 19 scrolling realization n of idler wheel
Template moves left and right, and has many advantages, such as that structure is simple, easy to use, construction is quick, saves human and material resources and financial resources.
Claims (7)
1. a kind of Pseudobulbus Bletillae (Rhizoma Bletillae) over-water construction floating platform is equipped with construction floating platform, it is characterised in that the construction floating platform is equipped with two
Or strip grooves a plurality of parallel and in front openings, it is equipped at the front opening of the strip groove and has been beaten for connecting
The rear end side of the clip assembly of good Pseudobulbus Bletillae (Rhizoma Bletillae), the construction floating platform is equipped with the fixation anchor parallel with clip assembly position
Bar, the fixing anchor bar pass through the fixation that the arc panel that construction floating platform side is equipped with realizes operation platform, and the construction is floating
The outside of outermost two strip grooves is equipped with vertical guide frame, the lower end of the vertical guide frame and construction floating platform above platform
It is connected, lateral cushion cap frame is equipped between the vertical guide frame on the outside of two strip grooves, the lateral cushion cap frame
Both ends are connected through slide track component with vertical guide frame respectively, and the top of one end of the lateral cushion cap frame is equipped with movable pulley,
The front and rear sides of the upper end of the side vertical guide frame are respectively equipped with connecting column and fixed pulley, one end of the rope with
Connecting column is connected, and the other end sequentially passes through the movable pulley on lateral cushion cap frame, the fixed pulley on vertical guide frame and applies with being located at
Motor on work floating platform is connected, and the lateral cushion cap frame is equipped with tightening machine support plate, the tightening machine support plate
Rear and front end be connected respectively through slide track component with lateral cushion cap frame, the tightening machine support plate is fixed equipped with tightening machine
Hole, the body of the tightening machine are fixed on tightening machine fixation hole, and the output shaft of tightening machine is pierced by simultaneously by tightening machine fixation hole
It is connected by connector with Pseudobulbus Bletillae (Rhizoma Bletillae), rotated by tightening machine while drives rope to pull lateral cushion cap by electric motor operation
Frame moves down the final fixation for realizing Pseudobulbus Bletillae (Rhizoma Bletillae).
2. a kind of Pseudobulbus Bletillae (Rhizoma Bletillae) over-water construction floating platform according to claim 1, it is characterised in that the clip assembly is by solid
Determine card adapter plate, activity card adapter plate, hinge and connection bolt composition, the both ends of the fixation card adapter plate respectively with strip groove side
Construction floating platform be connected, one end of activity card adapter plate is hinged with through hinge and fixed card adapter plate, activity card adapter plate it is another
End is connected through connection bolt with the connecting screw hole that the other end of fixed card adapter plate is equipped with, will fixed card adapter plate by connection bolt
The two sides for being fastened on Pseudobulbus Bletillae (Rhizoma Bletillae) with activity card adapter plate achieve a fixed connection.
3. a kind of Pseudobulbus Bletillae (Rhizoma Bletillae) over-water construction floating platform according to claim 1, it is characterised in that the vertical guide frame warp
Sliding rail is connected with construction floating platform, by sliding the change that vertical guide frame realizes mounting distance between adjacent Pseudobulbus Bletillae (Rhizoma Bletillae) along sliding rail
Change and adjusts.
4. a kind of Pseudobulbus Bletillae (Rhizoma Bletillae) over-water construction floating platform according to claim 1, it is characterised in that the tightening machine support plate
On tightening machine fixation hole be set as bar shaped fixation hole in the front-back direction, the tightening machine support plate at the rear of the bar shaped fixation hole
It is equipped with support base, support base is equipped with fine tuning screw hole, fine tuning screw rod is equipped in the fine tuning screw hole, finely tunes one end of screw rod
It puts in fine tuning screw hole and holds rotation connection with the tightening machine warp beam being located on bar shaped fixation hole, the other end stretching for finely tuning screw rod is micro-
It adjusts screw hole to be connected with trimming hand wheel, the back-and-forth motion of tightening machine is realized by rotation trimming hand wheel, and then realize fine tuning.
5. a kind of Pseudobulbus Bletillae (Rhizoma Bletillae) over-water construction floating platform according to claim 1, it is characterised in that the vertical guide frame with
Slide track component between lateral cushion cap frame is made of idler wheel, U-shaped connecting plate and guide plate, and the vertical guide frame is by two branch
Strut and connecting plate composition, the outside of the support rod are equipped with the vertical chute, are equipped with idler wheel, idler wheel in the vertical chute
It is connected in the vertical chute and scrolls up and down, the middle part of idler wheel is connected through bearing with U-shaped connecting plate, the U-shaped connection board
It connects in support rod two sides and is connected with idler wheel, by moving up and down for the U-shaped connecting plate of the scrolling realization of idler wheel, the support
The upper end of plate is connected through connecting plate, and the both ends of the connecting plate are respectively equipped with connecting column and fixed pulley, the middle part of connecting plate
Equipped with strip-shaped hole, one end of the rope is connected with connecting column, and the other end sequentially passes through the strip-shaped hole of connecting plate, is located at and leads
The strip-shaped hole on movable pulley, connecting plate, fixed pulley on plate are connected with the motor being located on construction floating platform, and described leads
It is connected to plate with U-shaped connecting plate, the U-shaped connecting plate is connected with lateral cushion cap frame.
6. a kind of Pseudobulbus Bletillae (Rhizoma Bletillae) over-water construction floating platform according to claim 1, it is characterised in that the tightening machine support plate
Slide track component between lateral cushion cap frame is made of idler wheel, and the tightening machine support plate is set as N-shaped plate, and the transverse direction is held
Rack is set as two bar shaped transverse bars, and the outside of the bar shaped transverse bar is equipped with the horizontal concrete chute of left and right directions, horizontal concrete chute
Interior to be equipped with idler wheel, the idler wheel is connected in horizontal concrete chute and scrolls left and right, and the middle part of idler wheel is connected through bearing with N-shaped plate, n
Template is connected to bar shaped transverse bar two sides and is connected with idler wheel, passes through moving left and right for idler wheel scrolling realization N-shaped plate.
7. a kind of installation method of Pseudobulbus Bletillae (Rhizoma Bletillae) over-water construction floating platform, it is characterised in that the step of installation method is as follows:
(1), point that is first that Pseudobulbus Bletillae (Rhizoma Bletillae) is tentatively fixed and will installing;
(2), the floating platform that then will construct is mobile, is fixed on the strip groove on construction floating platform between tentatively fixed Pseudobulbus Bletillae (Rhizoma Bletillae);
(3), the Pseudobulbus Bletillae (Rhizoma Bletillae) stake that clip assembly has been accomplished fluently with front respectively is connected, fixing anchor bar is fixed across arc panel
In the soil below the water surface, and then fix construction floating platform;
(4), again by adjusting the position of lateral cushion cap frame and tightening machine, the Pseudobulbus Bletillae (Rhizoma Bletillae) tentatively fixed is connected by connector
On tightening machine;Tightening machine is opened, while discharging rope, Pseudobulbus Bletillae (Rhizoma Bletillae) is further secured to the point set, and then complete
The installation of Pseudobulbus Bletillae (Rhizoma Bletillae).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910153107.2A CN109750667B (en) | 2019-02-28 | 2019-02-28 | Ground screw water construction floating platform and installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910153107.2A CN109750667B (en) | 2019-02-28 | 2019-02-28 | Ground screw water construction floating platform and installation method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109750667A true CN109750667A (en) | 2019-05-14 |
CN109750667B CN109750667B (en) | 2024-08-20 |
Family
ID=66407882
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910153107.2A Active CN109750667B (en) | 2019-02-28 | 2019-02-28 | Ground screw water construction floating platform and installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109750667B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110130342A (en) * | 2019-05-22 | 2019-08-16 | 游军 | A kind of pile driving equipment of underwater reinforced concrete prefabricated board pile driving construction and pile-driving method |
CN113622417A (en) * | 2021-08-27 | 2021-11-09 | 江苏山水环境建设集团股份有限公司 | Construction method of assembly type ground screw foundation pile |
CN116695705A (en) * | 2023-08-09 | 2023-09-05 | 中铁建设集团有限公司 | Construction method of miniature steel pipe pile for water trestle ground screw |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101936068A (en) * | 2010-08-27 | 2011-01-05 | 山东高阳建设有限公司 | Method for constructing cliff scaffold platform |
CN101954959A (en) * | 2009-10-27 | 2011-01-26 | 中国海洋石油总公司 | Deepwater semi-submerged drilling platform |
CN203924065U (en) * | 2014-06-30 | 2014-11-05 | 连云港前沿重工机械有限公司 | A kind of non-excavating horizontal directional drilling machine earth anchor anchor device |
CN104711995A (en) * | 2015-03-24 | 2015-06-17 | 北京中水新能工程技术有限公司 | Spiral pile anchor rod |
CN105604058A (en) * | 2016-03-10 | 2016-05-25 | 国家电网公司 | Water area screw anchor construction equipment |
CN205557514U (en) * | 2016-03-10 | 2016-09-07 | 国家电网公司 | Waters spiral anchor construction equipment |
CN107429519A (en) * | 2015-01-15 | 2017-12-01 | 伯恩哈德·吉泽尔 | Earth anchor with the base for bearing load |
CN207173912U (en) * | 2017-09-13 | 2018-04-03 | 上海然庆环境科技有限公司 | A kind of water floating body platform |
CN207794081U (en) * | 2017-12-21 | 2018-08-31 | 羲和太阳能电力有限公司 | A kind of anchoring underwater device pile driving system |
CN209703506U (en) * | 2019-02-28 | 2019-11-29 | 威海立达尔机械股份有限公司 | A kind of Pseudobulbus Bletillae (Rhizoma Bletillae) over-water construction floating platform |
-
2019
- 2019-02-28 CN CN201910153107.2A patent/CN109750667B/en active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101954959A (en) * | 2009-10-27 | 2011-01-26 | 中国海洋石油总公司 | Deepwater semi-submerged drilling platform |
CN101936068A (en) * | 2010-08-27 | 2011-01-05 | 山东高阳建设有限公司 | Method for constructing cliff scaffold platform |
CN203924065U (en) * | 2014-06-30 | 2014-11-05 | 连云港前沿重工机械有限公司 | A kind of non-excavating horizontal directional drilling machine earth anchor anchor device |
CN107429519A (en) * | 2015-01-15 | 2017-12-01 | 伯恩哈德·吉泽尔 | Earth anchor with the base for bearing load |
CN104711995A (en) * | 2015-03-24 | 2015-06-17 | 北京中水新能工程技术有限公司 | Spiral pile anchor rod |
CN105604058A (en) * | 2016-03-10 | 2016-05-25 | 国家电网公司 | Water area screw anchor construction equipment |
CN205557514U (en) * | 2016-03-10 | 2016-09-07 | 国家电网公司 | Waters spiral anchor construction equipment |
CN207173912U (en) * | 2017-09-13 | 2018-04-03 | 上海然庆环境科技有限公司 | A kind of water floating body platform |
CN207794081U (en) * | 2017-12-21 | 2018-08-31 | 羲和太阳能电力有限公司 | A kind of anchoring underwater device pile driving system |
CN209703506U (en) * | 2019-02-28 | 2019-11-29 | 威海立达尔机械股份有限公司 | A kind of Pseudobulbus Bletillae (Rhizoma Bletillae) over-water construction floating platform |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110130342A (en) * | 2019-05-22 | 2019-08-16 | 游军 | A kind of pile driving equipment of underwater reinforced concrete prefabricated board pile driving construction and pile-driving method |
CN110130342B (en) * | 2019-05-22 | 2021-03-23 | 游军 | Piling equipment and piling method for underwater reinforced concrete prefabricated sheet pile construction |
CN113622417A (en) * | 2021-08-27 | 2021-11-09 | 江苏山水环境建设集团股份有限公司 | Construction method of assembly type ground screw foundation pile |
CN116695705A (en) * | 2023-08-09 | 2023-09-05 | 中铁建设集团有限公司 | Construction method of miniature steel pipe pile for water trestle ground screw |
Also Published As
Publication number | Publication date |
---|---|
CN109750667B (en) | 2024-08-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109750667A (en) | A kind of Pseudobulbus Bletillae (Rhizoma Bletillae) over-water construction floating platform and installation method | |
CN101289828A (en) | Construction equipment and construction process of double-block ballastless track | |
CN113006476B (en) | Fastening system of concrete rectangular column template and construction method of concrete column | |
CN110454220A (en) | Assembled reusable flexible filling barricade | |
CN209703506U (en) | A kind of Pseudobulbus Bletillae (Rhizoma Bletillae) over-water construction floating platform | |
CN208777478U (en) | A kind of auto-folder acoustic barrier | |
CN206666970U (en) | A kind of temporary pavement laying apparatus for road construction | |
CN204982673U (en) | Continuous steel of high mound of hollow thin wall structure 0# section binds and pre -compaction support in 100 -meter dash | |
CN110820529B (en) | Bridge deck openable folding tower type cable-stayed bridge | |
CN213773363U (en) | Municipal works are with pile device | |
CN215714626U (en) | Bridge railing installation connecting device | |
CN215979418U (en) | Supporting and connecting structure for road, bridge and tunnel | |
CN211553994U (en) | Concatenation formula soil moisture seepage analogue means | |
CN209082852U (en) | A kind of solar energy roof for low-rise building | |
CN210238544U (en) | Swing type integral cofferdam moving device | |
CN210217182U (en) | Outer roofing tarpaulin installation tractive auxiliary device | |
CN202359513U (en) | Variable-height traveling girder-erecting machine | |
CN217782033U (en) | Portable auxiliary piling platform | |
CN221695087U (en) | Construction steel bar bending device | |
CN205713284U (en) | A kind of equipment machine room | |
CN221448345U (en) | Novel roof solar tracking system | |
CN217501706U (en) | Roadway support device with solidified top | |
CN215977110U (en) | Slope protection structure for hydraulic and hydroelectric engineering | |
CN220929425U (en) | Support frame structure for tunnel construction safety | |
CN219410675U (en) | Structure is reformed transform to department three ripples guardrail of marking time convenient to bridge overhauls |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |