CN101936036A - 一种双坡屋面单元活动房的快速搭建方法 - Google Patents

一种双坡屋面单元活动房的快速搭建方法 Download PDF

Info

Publication number
CN101936036A
CN101936036A CN 201010277266 CN201010277266A CN101936036A CN 101936036 A CN101936036 A CN 101936036A CN 201010277266 CN201010277266 CN 201010277266 CN 201010277266 A CN201010277266 A CN 201010277266A CN 101936036 A CN101936036 A CN 101936036A
Authority
CN
China
Prior art keywords
corner
roof
rectangle frame
post
unit activity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010277266
Other languages
English (en)
Other versions
CN101936036B (zh
Inventor
赵晓文
侯忠明
田新民
徐明建
姚凯
危刚
马鹤年
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Architectural Engineering Institute of General Logistics Department of PLA
Original Assignee
Architectural Engineering Institute of General Logistics Department of PLA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Architectural Engineering Institute of General Logistics Department of PLA filed Critical Architectural Engineering Institute of General Logistics Department of PLA
Priority to CN 201010277266 priority Critical patent/CN101936036B/zh
Publication of CN101936036A publication Critical patent/CN101936036A/zh
Application granted granted Critical
Publication of CN101936036B publication Critical patent/CN101936036B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明公开了一种双坡屋面单元活动房的快装搭建方法,通过旋转角柱(中支柱)与底骨架和屋檐圈梁之间的活动销轴连接设计,实现了主体结构的转动安装:可先由作业人员在地面的正常操作高度范围内快速完成活动房屋的底骨架、角柱(中支柱)、屋面结构件及屋面板的快速、方便安装,再通过环链葫芦将已完成的主体结构及屋面系统旋转扶正,之后通过固定角柱加固竖直结构并完成四周侧板、次要构件和附属构件的安装,快速完成整个单元房的搭建,安装过程无需对各构件进行吊装和空中稳固,搭建过程安全、快速、可靠。

Description

一种双坡屋面单元活动房的快速搭建方法
技术领域
本发明涉及简易活动房的施工方法,特别涉及一种主体框架可旋转的双坡屋面单元活动房的快速搭建方法。
背景技术
现有活动房屋主要为轻钢框架结构,其通常由基础(底座)、框架结构和围护板材组成。此类活动房在搭建过程中,主要是依靠人力或吊装设备,将各种类型的结构件和大板抬举或吊升到一定高度,再借助必要的脚手架等设施稳固构件,通过人工在空中完成各构件、屋面板之间的联接和安装。这种结构设计的活动房屋搭建过程施工难度大,需要借助各种辅助设施完成大质量构件的空中安装,因而拆、装过程中需要花费大量的人力和时间,同时空中作业存在较多的安全隐患。
活动房屋作为一种舒适性较好的临时性住房,一直在国家抗击地震、雨雪和台风等自然灾害时的灾民安置、野外作业人员的用房保障、海外反恐维和与部队野营住房保障、高山海岛边防营房的快速修建等方面具有重要的地位和作用;活动房屋通常是在野外简陋或应急条件下,需要尽可能依靠人工和简单的工具与设备,以尽可能少的人力和资源,尽可能方便快捷地完成活动房屋的搭建和拆除工作,同时还要保证装拆过程中的快速和安全。
发明内容
本发明的目的在于克服传统活动房屋的结构所造成施工中存在的上述问题,提供一种结构框架可旋转的双坡屋面单元活动房快速搭建方法。
为达到以上目的,本发明是采取如下技术方案予以实现的:
一种双坡屋面单元活动房的快速搭建方法,包括下述步骤:
(1)先将底骨架拼装成矩形框并在四角及周边设调平支撑,再将面积与底骨架矩形框相同大小的屋檐圈梁四角下方设置上角件,并通过铰链将四根旋转角柱分别连接在四个上角件与底骨架矩形框的四角上;
(2)利用正、背立面各两根临时支撑柱在底骨架矩形框长边上支撑起屋檐圈梁,在正、背立面屋檐圈梁左侧上角件和右侧底骨架对角处栓挂带有环链葫芦的链条,并张紧,在正、背立面屋檐圈梁的右侧上角件和底骨架矩形框长边中部分别安装限位钢丝绳;
(3)之后安装三角形屋架及屋面板,完成屋面系统的搭建;然后卸掉临时支撑柱,并利用正、背立面的两个环链葫芦同步收紧链条,拉动旋转角柱绕其两端连接的铰链旋转托起屋面系统,直至四个旋转角柱转动到竖直位置,在限位钢丝绳的作用下不再转动,构成竖直单元活动房框架;
(4)先在正、背立面一侧的旋转角柱内侧,在上角件与底骨架矩形框之间安装固定角柱并紧固,取下环链葫芦,再完成其它旋转角柱内侧固定角柱的安装紧固,使竖直单元活动房框架形成稳定的结构体系,最后安装四周侧板,完成整个单元活动房的搭建。
上述方法中,底骨架矩形框长边中部与屋檐圈梁长边中部可选择性的通过铰链连接辅助性的中支柱,以增加结构强度和刚度。
本发明单元房通过旋转角柱(中支柱)与底骨架和屋檐圈梁之间的活动销轴连接设计,实现了主体结构的转动安装。可先由作业人员在地面的正常操作高度范围内快速完成活动房屋的底骨架、角柱(中支柱)、屋面结构及屋面板的快速、方便安装,再通过环链葫芦将已完成的主体结构及屋面系统旋转扶正,之后通过固定角柱加固竖直结构并完成四周侧板、次要构件和附属构件的安装,快速完成整个单元活动房的搭建。安装过程无需对各构件进行吊装和空中稳固,搭建过程安全、快速、可靠。
附图说明
图1为本发明双坡屋面单元活动房安装初始状态示意图。
图2为图1状态双坡屋面单元活动房辅助设施及屋面板安装完成状态图。
图3为图2状态单元活动房旋转站立后状态图。
图4为图3状态单元活动房拆除辅助设施后加固状态图。
图5为本发明双坡屋面单元活动房结构搭建完成的立体图。
图1-图5中:1、屋檐圈梁;2、上角件;3、中支柱;4、活动销轴;5、旋转角柱;6、底骨架;7、调平支撑;8、环链葫芦;9、卸扣;10、限位钢丝绳;11、屋面板;12、临时支撑柱;13、固定角柱;14三角形屋架。
具体实施方式
以下结合附图及具体实施过程对本发明作进一步的详细说明。
一种双坡屋面单元活动房的快装搭建方法,包括下述步骤:
(1)参照图1所示,先将底骨架6拼装成矩形框并在四角设调平支撑7,再将面积与底骨架矩形框相同大小的屋檐圈梁1与其四角的上角件2连接,并通过铰链(活动销轴4)将四根旋转角柱5分别连接在四个上角件2与底骨架矩形框的四角上;底骨架矩形框长边中部与屋檐圈梁1长边中部可选择性的通过铰链连接辅助性的中支柱3;
(2)参照图2所示,利用正、背立面共四根临时支撑柱12在底骨架矩形框长边上支撑起屋檐圈梁1在一定高度,在正、背立面屋檐圈梁左侧上角件2和右侧底骨架对角处均通过卸扣9栓挂带有环链葫芦8的链条,并张紧,同时在正、背立面屋檐圈梁的右侧上角件和底骨架矩形框长边中部分别安装限位钢丝绳10,保证主体结构旋转扶正到位后不再转动;
(3)之后操作人员可在地面适宜的高度范围内快速安装三角形屋架及屋面板11等部件,完成屋面系统的搭建;然后卸掉临时支撑柱12,并利用正、背立面的两个环链葫芦同步收紧链条,拉动各立面的旋转角柱5及中支柱3绕其两端连接的铰链旋转,托起屋面系统,直至四个旋转角柱和两个中支柱转动到竖直位置,在限位钢丝绳10的作用下不再转动,构成竖直结构框架,形成如图3所示活动房旋转站立后的状态;
(4)参照图4所示,先在正、背立面一侧的旋转角柱内侧,在上角件与底骨架之间安装固定角柱13并紧固,取下环链葫芦8及链条,再完成其它固定角柱的安装紧固,使活动房形成稳定的结构体系,形成如图5所示活动房的状态。最后安装活动房四周侧板等部件,完成整个活动房的搭建,
该活动房拆除时按上述安装过程的逆向操作即可。

Claims (3)

1.一种双坡屋面单元活动房的快速搭建方法,其特征在于,包括下述步骤:
(1)先将底骨架拼装成矩形框并在四角及周边设调平支撑,再将面积与底骨架矩形框相同大小的屋檐圈梁四角通过上角件连接,并通过铰链将四根旋转角柱分别连接在四个上角件与底骨架矩形框的四角上;
(2)利用正、背立面两侧各两根临时支撑柱在底骨架矩形框长边上支撑起屋檐圈梁于一定高度,在正、背立面屋檐圈梁左侧上角件和右侧底骨架对角处栓挂带有环链葫芦的链条,并张紧,在正、背立面屋檐圈梁的右侧上角件和底骨架矩形框长边中部分别安装限位钢丝绳;
(3)之后安装三角形屋架及屋面板,完成屋面系统的搭建;然后卸掉临时支撑柱,并利用正、背立面的两个环链葫芦同步收紧链条,拉动角柱绕其两端连接的铰链旋转托起屋面系统,直至四个旋转角柱转动到竖直位置,在限位钢丝绳的作用下不再转动,构成竖直单元活动房框架;
(4)先在正、背立面一侧角柱的内侧,在上角件与底骨架之间安装固定角柱并紧固,再取下环链葫芦及链条,完成其它旋转角柱内侧固定角柱的安装紧固,使竖直单元活动房框架形成稳定的结构体系,最后安装四周侧板,完成整个单元活动房的搭建。
2.如权利要求1所述的双坡屋面单元活动房的快速搭建方法,其特征在于,底骨架矩形框长边中部与屋檐圈梁长边中部可选择性的通过铰链连接有辅助性的中支柱。
3.如权利要求1所述的双坡屋面单元活动房的快速搭建方法,其特征在于,所述在正、背立面屋檐圈梁左侧上角件和右侧底骨架对角处栓挂带有环链葫芦的链条是通过卸扣实现的。
CN 201010277266 2010-09-09 2010-09-09 一种双坡屋面单元活动房的快速搭建方法 Expired - Fee Related CN101936036B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010277266 CN101936036B (zh) 2010-09-09 2010-09-09 一种双坡屋面单元活动房的快速搭建方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010277266 CN101936036B (zh) 2010-09-09 2010-09-09 一种双坡屋面单元活动房的快速搭建方法

Publications (2)

Publication Number Publication Date
CN101936036A true CN101936036A (zh) 2011-01-05
CN101936036B CN101936036B (zh) 2011-10-05

Family

ID=43389588

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010277266 Expired - Fee Related CN101936036B (zh) 2010-09-09 2010-09-09 一种双坡屋面单元活动房的快速搭建方法

Country Status (1)

Country Link
CN (1) CN101936036B (zh)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1176036A1 (ru) * 1983-07-01 1985-08-30 Str Trest Mekh Rabot Energomek "ckлaдhoe пaheльhoe здahиe"
CN1260852A (zh) * 1997-04-25 2000-07-19 创新发展企业斯德哥尔摩有限公司 可扩展的、用于开展活动的活动式房屋
CN2444010Y (zh) * 2000-10-20 2001-08-22 李宝忠 一种快速拼接式活动房
CN200967999Y (zh) * 2006-11-27 2007-10-31 上海德力西集团有限公司 一种可拆装集装箱式活动房
CN200989007Y (zh) * 2006-12-29 2007-12-12 中国人民解放军总后勤部建筑工程研究所 扩展集装箱式活动房
CN201031441Y (zh) * 2007-02-25 2008-03-05 张勇飞 可重复快速拆装的多用途活动房屋
CN101560792A (zh) * 2009-05-14 2009-10-21 王志国 快速构建房屋的方法及其通过该方法所构建的房屋

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1176036A1 (ru) * 1983-07-01 1985-08-30 Str Trest Mekh Rabot Energomek "ckлaдhoe пaheльhoe здahиe"
CN1260852A (zh) * 1997-04-25 2000-07-19 创新发展企业斯德哥尔摩有限公司 可扩展的、用于开展活动的活动式房屋
CN2444010Y (zh) * 2000-10-20 2001-08-22 李宝忠 一种快速拼接式活动房
CN200967999Y (zh) * 2006-11-27 2007-10-31 上海德力西集团有限公司 一种可拆装集装箱式活动房
CN200989007Y (zh) * 2006-12-29 2007-12-12 中国人民解放军总后勤部建筑工程研究所 扩展集装箱式活动房
CN201031441Y (zh) * 2007-02-25 2008-03-05 张勇飞 可重复快速拆装的多用途活动房屋
CN101560792A (zh) * 2009-05-14 2009-10-21 王志国 快速构建房屋的方法及其通过该方法所构建的房屋

Also Published As

Publication number Publication date
CN101936036B (zh) 2011-10-05

Similar Documents

Publication Publication Date Title
CN105604334B (zh) 一种用于大跨度钢桁架整体安装的快速施工方法
CN102155096B (zh) 巨大跨度钢管屋桁架组装施工方法
CN102235092B (zh) 悬挂式钢结构分层吊装施工工艺
CN104234200B (zh) 一种弦支穹顶索杆系逐环提升安装方法
CN101775896B (zh) 安装钢屋盖设备管道的刚性吊挂式脚手架
CN206591862U (zh) 一种地铁高架车站施工保护平台车
CN206692235U (zh) 一种钢结构穹顶起吊安装装置
CN102425261B (zh) 大跨度多单元张拉膜结构及其安装施工方法
CN109184061A (zh) 空间结构外挑檐吊顶系统结构及施工方法
CN106522364B (zh) 一种用于体育场周边的“拉花”钢结构体系及其安装工艺
CN201794320U (zh) 可转动搭建的快装单元活动房
CN205502551U (zh) 一种高空大跨度连廊施工悬吊平台
CN201635377U (zh) 安装大跨度钢屋盖设备管道的刚性吊挂式脚手架
CN101936036B (zh) 一种双坡屋面单元活动房的快速搭建方法
CN203034777U (zh) 轨道式移动高大操作平台
CN204402001U (zh) 用于钢结构屋面内板安装的可移动式操作平台系统
JP2979039B2 (ja) 大空間建物の構築装置
CN110424811B (zh) 一种钢结构间冷塔展开平台的施工方法
JP5881381B2 (ja) 組立式屋上用簡易クレーン、及びこのクレーンを用いた吊荷の搬入または搬出方法
CN216471868U (zh) 一种免塔吊建筑装配式构件吊装平台
CN110886225A (zh) 索塔斜拉索安装体系的施工方法
CN215291317U (zh) 一种便于组装且经济的桁车平台
CN110219416A (zh) 一种预制混凝土y型梁组件及其施工方法
CN205077697U (zh) 组合装配式吊顶反向支撑体系结构
CN205502543U (zh) 一种拱结构支撑架

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20110105

Assignee: Cangzhou Huabei Petroleum Feida Petroleum Equipment Co., Ltd.

Assignor: Architectural Engineering Inst., General Logistics Department, P. L. A.

Contract record no.: 2012990000643

Denomination of invention: Method for building double-pitch roof unit activity house quickly

Granted publication date: 20111005

License type: Exclusive License

Record date: 20120903

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111005

Termination date: 20150909

EXPY Termination of patent right or utility model