CN101920275B - 一种循环水冷却系统 - Google Patents

一种循环水冷却系统 Download PDF

Info

Publication number
CN101920275B
CN101920275B CN2010102625108A CN201010262510A CN101920275B CN 101920275 B CN101920275 B CN 101920275B CN 2010102625108 A CN2010102625108 A CN 2010102625108A CN 201010262510 A CN201010262510 A CN 201010262510A CN 101920275 B CN101920275 B CN 101920275B
Authority
CN
China
Prior art keywords
water
pump
cooling
sedimentation basin
laminar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2010102625108A
Other languages
English (en)
Other versions
CN101920275A (zh
Inventor
苗建武
于树金
李宏州
温军强
魏少青
武续涛
齐小虎
边仁杰
侯立华
王金星
杨环
姜海杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Iron And Steel Group Co ltd
Original Assignee
HEBEI WENFENG IRON AND STEEL CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEBEI WENFENG IRON AND STEEL CO Ltd filed Critical HEBEI WENFENG IRON AND STEEL CO Ltd
Priority to CN2010102625108A priority Critical patent/CN101920275B/zh
Publication of CN101920275A publication Critical patent/CN101920275A/zh
Application granted granted Critical
Publication of CN101920275B publication Critical patent/CN101920275B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)
  • Jet Pumps And Other Pumps (AREA)

Abstract

本发明公开一种循环水冷却系统,由凉水塔、蓄水池、层流冷却水箱和沉淀池组成,由Ⅰ号水泵从蓄水池抽取冷却水向层流冷却水箱供水,层流冷却水箱内的冷却水层流冷却工件后的热水流入沉淀池,层流冷却水箱的溢流管通向沉淀池内,流入沉淀池内热水在沉淀池内沉淀杂质后由Ⅱ号水泵提升至凉水塔,提升到凉水塔内的热水在淋入蓄水池的过程中完成对循环水的冷却,所述的Ⅱ号水泵为离心水泵,Ⅱ号水泵的进水管通过射流泵与沉淀池连通,射流泵的混合管与Ⅱ号水泵的进水管连通,射流泵的吸入室与伸入沉淀池的管道连通,射流泵的喷嘴与潜水泵的出水口连通,在潜水泵与射流泵之间的连通管道上设置有Ⅰ号截门。是耗电量小的带钢轧制生产线层流循环水冷却系统。

Description

一种循环水冷却系统
技术领域
本发明涉及一种工业循环水系统,尤其是一种带钢轧制生产线层流循环水冷却系统。
背景技术
目前带钢轧制生产线层流循环水冷却系统存在两方面的缺陷,一、沉淀池中的水是冷却带钢后的热水,提升热水到冷却塔冷却的水泵,一般采用自吸水泵,自吸水泵比普通双吸离心泵能耗高百分之五到十,若采用普通双吸离心泵在吸水口加装单向底阀也加大阻力浪费能耗。二、是高位水箱的水泵供水流量大于所需用水流量,过量的供水部分采用溢流的方式排放掉,无疑这部分排放掉的水消耗了水泵的功率而没有做功,浪费了能源。因此,设计一种耗电量小、节约能源的带钢轧制生产线层流循环水冷却系统,是目前需要解决的技术问题。
发明内容
本发明所要解决的技术问题是提供一种耗电量小、节约能源的一种带钢轧制生产线层流循环水冷却系统。
本发明解决其技术问题的技术方案是:
一种循环水冷却系统,由凉水塔、蓄水池、层流冷却水箱和沉淀池组成,由Ⅰ号水泵从蓄水池抽取冷却水向层流冷却水箱供水,层流冷却水箱内的冷却水层流冷却工件后的热水流入沉淀池,层流冷却水箱的溢流管通向沉淀池内,流入沉淀池内热水在沉淀池内沉淀杂质后由Ⅱ号水泵提升至凉水塔,提升到凉水塔内的热水在淋入蓄水池的过程中完成对循环水的冷却,所述的Ⅱ号水泵为离心水泵,Ⅱ号水泵的进水管通过射流泵与沉淀池连通,射流泵的混合管与Ⅱ号水泵的进水管连通,射流泵的吸入室与伸入沉淀池的管道连通,射流泵的喷嘴与潜水泵的出水口连通,在潜水泵与射流泵之间的连通管道上设置有Ⅰ号截门。
本发明解决其技术问题的技术方案还可以是:
本发明所述的潜水泵通过悬挂杆悬挂在漂浮平台的下部中心位置。
本发明所述的射流泵的喷嘴的中心线与射流泵的混合管的中心线之间有5~25°的夹角。
本发明在潜水泵与射流泵喷嘴连接的管道上设置有三通,潜水泵通过三通用管道与蓄水池连通,在潜水泵与蓄水池连通的管道上设置有Ⅱ号截门。
本发明所述的Ⅰ号水泵为变量水泵,Ⅰ号水泵的变量功能通过水泵电机的供电变频器实现,在层流冷却水箱的水面上设置有液位传感器,液位传感器的液位模拟信号传递给水泵电机的供电变频器,变频后Ⅰ号水泵的供水量与带钢轧制生产线层流循环水冷却系统的实际需水量匹配。
与现有技术相比,本发明的冷却水泵由自吸水泵改为双吸离心泵,节电5~10%,层流冷却水箱供水泵为变频水泵,直接减少层流冷却水箱的溢流水量,节电30%。
附图说明
图1是本发明的系统原理图;
图2是图1中件6与件4的连接图;
图3是图1中件8的漂浮原理图。
具体实施方式
如图所示,一种循环水冷却系统,由凉水塔1、蓄水池2、层流冷却水箱12和沉淀池10组成,由Ⅰ号水泵3从蓄水池2抽取冷却水向层流冷却水箱12供水,层流冷却水箱12内的冷却水层流冷却工件9后的热水流入沉淀池10,层流冷却水箱12的溢流管11通向沉淀池10内,流入沉淀池10内热水在沉淀池10内沉淀杂质后由Ⅱ号水泵4提升至凉水塔1,提升到凉水塔1内的热水在淋入蓄水池2的过程中完成对循环水的冷却,所述的Ⅱ号水泵4为离心水泵,Ⅱ号水泵4的进水管通过射流泵6与沉淀池10连通,射流泵6的混合管与Ⅱ号水泵4的进水管连通,射流泵6的吸入室与伸入沉淀池10的管道连通,射流泵6的喷嘴与潜水泵8的出水口连通,在潜水泵8与射流泵6之间的连通管道上设置有Ⅰ号截门7。所述的潜水泵8通过悬挂杆15悬挂在漂浮平台16的下部中心位置。所述的射流泵6的喷嘴的中心线与射流泵6的混合管的中心线之间有5~25°的夹角。在潜水泵8与射流泵6喷嘴连接的管道上设置有三通,潜水泵8通过三通用管道与蓄水池2连通,在潜水泵8与蓄水池2连通的管道上设置有Ⅱ号截门5。所述的Ⅰ号水泵3为变量水泵,Ⅰ号水泵3的变量功能通过水泵电机的供电变频器14实现,在层流冷却水箱12的水面上设置有液位传感器13,液位传感器13的液位模拟信号传递给水泵电机的供电变频器,变频后Ⅰ号水泵3的供水量与带钢轧制生产线层流循环水冷却系统的实际需水量匹配。启动Ⅱ号水泵4前,先打开Ⅰ号截门7,启动潜水泵8,30秒后启动Ⅱ号水泵4,待Ⅱ号水泵4运转正常后关闭潜水泵8和Ⅰ号截门7。在冬季不需要凉水塔凉水时,启动潜水泵8,打开Ⅱ号截门5由潜水泵8直接向蓄水池2供水。

Claims (5)

1.一种循环水冷却系统,由凉水塔(1)、蓄水池(2)、层流冷却水箱(12)和沉淀池(10)组成,由Ⅰ号水泵(3)从蓄水池(2)抽取冷却水向层流冷却水箱(12)供水,层流冷却水箱(12)内的冷却水层流冷却工件(9)后的热水流入沉淀池(10),层流冷却水箱(12)的溢流管(11)通向沉淀池(10)内,流入沉淀池(10)内热水在沉淀池(10)内沉淀杂质后由Ⅱ号水泵(4)提升至凉水塔(1),提升到凉水塔(1)内的热水在淋入蓄水池(2)的过程中完成对循环水的冷却,其特征在于:所述的Ⅱ号水泵(4)为离心水泵,Ⅱ号水泵(4)的进水管通过射流泵(6)与沉淀池(10)连通,射流泵(6)的混合管与Ⅱ号水泵(4)的进水管连通,射流泵(6)的吸入室与伸入沉淀池(10)的管道连通,射流泵(6)的喷嘴与潜水泵(8)的出水口连通,在潜水泵(8)与射流泵(6)之间的连通管道上设置有Ⅰ号截门(7)。
2.根据权利要求1所述的一种循环水冷却系统,其特征在于:所述的潜水泵(8)通过悬挂杆(15)悬挂在漂浮平台(16)的下部中心位置。
3.根据权利要求1或2所述的一种循环水冷却系统,其特征在于:在潜水泵(8)与射流泵(6)喷嘴连接的管道上设置有三通,潜水泵(8)通过三通用管道与蓄水池(2)连通,在潜水泵(8)与蓄水池(2)连通的管道上设置有Ⅱ号截门(5)。
4.根据权利要求3所述的一种循环水冷却系统,其特征在于:所述的射流泵(6)的喷嘴的中心线与射流泵(6)的混合管的中心线之间有5~25°的夹角。
5.根据权利要求4所述的一种循环水冷却系统,其特征在于:所述的Ⅰ号水泵(3)为变量水泵,Ⅰ号水泵(3)的变量功能通过水泵电机的供电变频器(14)实现,在层流冷却水箱(12)的水面上设置有液位传感器(13),液位传感器(13)的液位模拟信号传递给水泵电机的供电变频器,变频后Ⅰ号水泵(3)的供水量与带钢轧制生产线层流循环水冷却系统的实际需水量匹配。
CN2010102625108A 2010-08-25 2010-08-25 一种循环水冷却系统 Active CN101920275B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102625108A CN101920275B (zh) 2010-08-25 2010-08-25 一种循环水冷却系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102625108A CN101920275B (zh) 2010-08-25 2010-08-25 一种循环水冷却系统

Publications (2)

Publication Number Publication Date
CN101920275A CN101920275A (zh) 2010-12-22
CN101920275B true CN101920275B (zh) 2012-07-25

Family

ID=43335634

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102625108A Active CN101920275B (zh) 2010-08-25 2010-08-25 一种循环水冷却系统

Country Status (1)

Country Link
CN (1) CN101920275B (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102513363A (zh) * 2011-11-24 2012-06-27 庄河市长盛机械制造有限公司 铸轧机冷却装置
CN104588419B (zh) * 2014-12-28 2016-05-18 鞍钢集团朝阳钢铁有限公司 一种梯级利用热轧水资源的冷却循环系统及方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5794658A (en) * 1996-08-29 1998-08-18 Bethlehem Steel Corporation High energy pump system for use in the descaling of steel
US5996200A (en) * 1993-09-09 1999-12-07 Sms Schloemann-Siemag Aktiengesellschaft Descaling device and method
CN201058344Y (zh) * 2007-06-06 2008-05-14 登电集团铝加工有限公司 铸轧机循环水冷却装置
CN201340152Y (zh) * 2008-12-24 2009-11-04 洛阳龙门煤业有限公司 一种新型的循环水冷却装置
CN201852482U (zh) * 2010-08-25 2011-06-01 河北文丰钢铁有限公司 一种循环水冷却系统

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60223603A (ja) * 1984-04-19 1985-11-08 Sumitomo Metal Ind Ltd 薄鋼帯の冷間圧延方法
JP3149579B2 (ja) * 1992-10-28 2001-03-26 住友金属工業株式会社 脱スケール方法及び装置
JP2973180B2 (ja) * 1996-05-13 1999-11-08 新潟ウオシントン株式会社 高圧ディスケーリング装置の運転方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5996200A (en) * 1993-09-09 1999-12-07 Sms Schloemann-Siemag Aktiengesellschaft Descaling device and method
US5794658A (en) * 1996-08-29 1998-08-18 Bethlehem Steel Corporation High energy pump system for use in the descaling of steel
CN201058344Y (zh) * 2007-06-06 2008-05-14 登电集团铝加工有限公司 铸轧机循环水冷却装置
CN201340152Y (zh) * 2008-12-24 2009-11-04 洛阳龙门煤业有限公司 一种新型的循环水冷却装置
CN201852482U (zh) * 2010-08-25 2011-06-01 河北文丰钢铁有限公司 一种循环水冷却系统

Also Published As

Publication number Publication date
CN101920275A (zh) 2010-12-22

Similar Documents

Publication Publication Date Title
CN202371909U (zh) 太阳能热水器智能温控节水系统
CN103292470A (zh) 一种应用在热水器的节水副水箱装置
CN201852482U (zh) 一种循环水冷却系统
CN101920275B (zh) 一种循环水冷却系统
CN101571039A (zh) 井内稠油开采降粘加热方法
CN203201741U (zh) 一种移动式注水系统的泵组合
CN101947523B (zh) 硅片清洗废水回用装置
CN101672284A (zh) 水泵前置外联式射流器
CN201354770Y (zh) 一种泵冷却水循环装置
CN203768090U (zh) 反应沉淀池盲区排泥装置
CN201187455Y (zh) 小口径高扬程离心泵水力模型
CN206362038U (zh) 一种冰浆布水装置
CN202465432U (zh) 新型除铁除锰设备
CN201882932U (zh) 硅片清洗废水回用装置
CN201705742U (zh) 射水抽气系统
CN207187202U (zh) 一种高效且节能的提取液静置沉淀罐
CN201953673U (zh) 水环式真空泵的节水装置
CN203700129U (zh) 一种节能型污泥提升设备
CN204098194U (zh) 一种排水装置
CN205495028U (zh) 萃取剂的定量添加装置
CN205714792U (zh) 一种管道泵引水装置
CN203346111U (zh) 一体式双相流溶气机
CN204344472U (zh) 直联式自吸泵结构
CN203783653U (zh) 一种射水抽气器专用水箱
CN203441838U (zh) 用于工业冷却水循环系统的水流射流节能增压器

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Miao Jianwu

Inventor after: Wang Jinxing

Inventor after: Yang Huan

Inventor after: Jiang Haijie

Inventor after: Yu Shujin

Inventor after: Li Hongzhou

Inventor after: Wen Junqiang

Inventor after: Wei Shaoqing

Inventor after: Wu Xutao

Inventor after: Qi Xiaohu

Inventor after: Bian Renjie

Inventor after: Hou Lihua

Inventor before: Miao Jianwu

Inventor before: Yu Shujin

Inventor before: Li Hongzhou

Inventor before: Bian Renjie

Inventor before: Hou Lihua

Inventor before: Wang Jinxing

Inventor before: Yang Huan

Inventor before: Jiang Haijie

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: MIAO JIANWU YU SHUJIN LI HONGZHOU BIAN RENJIE HOU LIHUA WANG JINXING YANG HUAN JIANG HAIJIE TO: MIAO JIANWU YU SHUJIN LI HONGZHOU WEN JUNQIANG WEI SHAOQING WU XUTAO QI XIAOHU BIAN RENJIE HOU LIHUA WANG JINXING YANG HUAN JIANG HAIJIE

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20221103

Address after: 056300 east of Chongyi village, Shangtuan urban and rural areas, Wu'an city, Handan City, Hebei Province

Patentee after: Jinan Iron and Steel Group Co.,Ltd.

Address before: 056300 south side of Wu'an South Ring Road, Handan City, Hebei Province

Patentee before: HEBEI WENFENG IRON AND STEEL Co.,Ltd.

TR01 Transfer of patent right