Summary of the invention
The objective of the invention is to consider the problems referred to above and a kind of real-time monitoring that can realize the IGBT collector voltage is provided; can effectively solve technical problem untimely to the IGBT overvoltage protection in the prior art, that cause IGBT to damage, the method for supervising of the IGBT collector overvoltage double protection of the safety and reliability of raising electromagnetic oven complete machine.
Technical scheme of the present invention is: the method for supervising of IGBT collector overvoltage double protection of the present invention, wherein IGBT collector overvoltage double protection circuit comprises IGBT, microcontroller, the IGBT drive circuit, resistance R 1 and resistance R 2, the output of IGBT drive circuit is connected with the grid G of IGBT, be connected the microcontroller input after divider resistance R1 and resistance R 2 dividing potential drops of the collector electrode C of IGBT by series connection, the microcontroller output is connected with IGBT drive circuit input, microcontroller comprises comparator C MP1 and CMP2, the one IGBT control circuit and the 2nd IGBT control circuit, the negative input end of comparator C MP1 and CMP2 is connected reference voltage Vref 1 and Vref2 respectively, output connects an IGBT control circuit and the 2nd IGBT control circuit respectively, during comparator C MP1 output high level, by the processing of an IGBT control circuit, microcontroller produces interrupt handling routine INT1; When described comparator C MP2 exported high level, by the processing of the 2nd IGBT control circuit, IGBT turn-offed, and microcontroller produces interrupt handling routine INT2; Whenever enter interrupt handling routine INT1 one time, the next service time Ton of IGBT reduces time Δ T, and Δ T<Ton; Whenever enter interrupt handling routine INT2 one time, IGBT is turn-offed always, have up to microcontroller inside one restart signal IGBT could be open-minded again.
The size of above-mentioned reference voltage Vref 1 and Vref2 is selected by the inner related register of microcontroller, and Vref1>Vref2.
The present invention compared with prior art; have following beneficial effect: microcontroller of the present invention passes through the unusual detection of IGBT C pole tension; reduce IGBT service time timely or directly turn-off IGBT and guarantee that power device IGBT is operated in normal condition; by the real-time monitoring to electromagnetic oven IGBT C pole tension; effectively solve technical problem untimely to the IGBT overvoltage protection in the prior art, that cause IGBT to damage, improve the safety and reliability of electromagnetic oven complete machine.The present invention is that a kind of design is ingenious, function admirable, the method for supervising of convenient and practical IGBT C utmost point overvoltage double protection.
Embodiment
Embodiment:
Circuit theory diagrams of the present invention as shown in Figure 1, include IGBT current collection extreme pressure dual-protection circuit, IGBT current collection extreme pressure dual-protection circuit comprises IGBT, microcontroller 1, IGBT drive circuit 2, resistance R 1, resistance R 2, the output of IGBT drive circuit 2 is connected with the grid G of IGBT, the collector electrode C of IGBT is by the divider resistance R1 of series connection, connect microcontroller 1 input after resistance R 2 dividing potential drops, microcontroller 1 output is connected with IGBT drive circuit 2 inputs, microcontroller 1 comprises comparator C MP1 and CMP2, the one IGBT control circuit 11 and the 2nd IGBT control circuit 12, comparator C MP1, the negative input end of CMP2 connects reference voltage Vref 1 and Vref2 respectively, output connects an IGBT control circuit 11 and the 2nd IGBT control circuit 12 respectively, during comparator C MP1 output high level, by the processing of an IGBT control circuit 11, microcontroller 1 produces interrupt handling routine INT1; When described comparator C MP2 exported high level, by the processing of the 2nd IGBT control circuit 12, IGBT turn-offed, and microcontroller 1 produces interrupt handling routine INT2.
The size of above-mentioned reference voltage Vref 1 and Vref2 is selected by microcontroller 1 inner related register, and Vref1>Vref2.
Whenever enter interrupt routine INT1 one time, the next service time Ton of IGBT reduces time Δ T, and Δ T<Ton.
In the present embodiment, whenever enter interrupt routine INT2 one time, IGBT is turn-offed always, have up to microcontroller 1 inside one restart signal IGBT could be open-minded again.
In the present embodiment, IGBT drive circuit 2 is prior art circuits, does not repeat them here.
The one IGBT control circuit 11, the 2nd IGBT control circuit 12 belong to the modular circuit among the integrated heating chip MH2C33P of Sanyo.
Reference voltage Vref 1 and Vref2 size can be selected by microcontroller 1 inner related register, and Vref1>Vref2;
If IGBT collector electrode C voltage is Vc, IGBT C utmost point rated voltage is Vo.
Vc satisfies condition when IGBT collector electrode C voltage: when Vc*R2/ (R1+R2)>Vref1 and Vo-Vc<Vo*10%, comparator C MP1 makes microcontroller produce interrupt handling routine INT1 to an IGBT control circuit 11 output high level signals.
MP2 satisfies condition when comparator C: Vc*R2/ (R1+R2)>Vref2, and during Vc ≈ Vo, CMP2 directly turn-offs IGBT, and makes microcontroller 1 produce interrupt handling routine INT2 to the 2nd IGBT control circuit 12 output high level signals.
Operation principle of the present invention is as follows:
As shown in Figure 2, whenever enter interrupt handling routine INT1 one time, the specified register of microcontroller 1 (program pointer and general register A, B etc.) stacked, by the adjustment to IGBT driving pulse width register PPG value, current PPG subtracts 1 or subtract 2, make the next service time Ton of IGBT reduce time Δ T, and Δ T<Ton, guarantee corresponding the reducing of collector electrode C voltage of IGBT IGBT in next switch periods, last specified register is popped, withdraw from the INT1 interrupt handling routine, just in the interrupt routine of INT1, finish the suitable adjustment to IGBT driving pulse width.
As shown in Figure 3, whenever enter interrupt handling routine INT2 one time, the specified register of microcontroller is stacked, by software turn-off time of IGBT is set, the turn-off time finishes the back microcontroller and restarts IGBT, and last specified register is popped, withdraw from interrupt handling routine, the INT2 interrupt handling routine guarantees that its safety is guaranteed in the IGBT break-off when voltage ripple of power network is big.