CN101913371B - System linkage method after train jam in rail transportation - Google Patents

System linkage method after train jam in rail transportation Download PDF

Info

Publication number
CN101913371B
CN101913371B CN201010271958.6A CN201010271958A CN101913371B CN 101913371 B CN101913371 B CN 101913371B CN 201010271958 A CN201010271958 A CN 201010271958A CN 101913371 B CN101913371 B CN 101913371B
Authority
CN
China
Prior art keywords
monitoring system
control center
station
train
comprehensive monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201010271958.6A
Other languages
Chinese (zh)
Other versions
CN101913371A (en
Inventor
张洁
刘建红
朱燕蓓
刘畅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Shanghai Design Institute Group Co Ltd
Original Assignee
China Railway Shanghai Design Institute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Shanghai Design Institute Group Co Ltd filed Critical China Railway Shanghai Design Institute Group Co Ltd
Priority to CN201010271958.6A priority Critical patent/CN101913371B/en
Publication of CN101913371A publication Critical patent/CN101913371A/en
Application granted granted Critical
Publication of CN101913371B publication Critical patent/CN101913371B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The invention belongs to the technical field of rail transportation, and particularly relates to a system linkage method after train jam in rail transportation. The method comprises the steps of: intercoupling special systems arranged in railway stations, intervals and a control center; monitoring the train running state by a train automatic monitoring system, transmitting collected train jam position information to a comprehensive monitoring system of the control center; and selecting starting a railway station interval jam model or a railway station track running region jam model by the comprehensive monitoring system of the control center according to the collected jam position information. The system linkage method has the advantages that a set of rapid response plans after trains are jammed at the railway stations or the intervals is established, so as to improve the automation degree of rail transportation operation, realize the functions of optimizing the management, saving labors and increasing efficiency as well as lowering the function of manual false operation, improve the comprehensive response speed of systems of the rail transportation, and guarantee safety of persons and equipment.

Description

System linkage method in track traffic after train obstruction
Technical field
The invention belongs to track traffic technical field, be specifically related to the system linkage method after train obstruction in a kind of track traffic.
Background technology
At present, Metro in Paris of France 3 abroad, 5, 13, No. 14 lines, Singapore's Northeast Line and meridian line, airport, Hong Kong line, Tseung Kwan O's line, Walt Disney's line and Kao-hsiung, Fei Libin Manila subway all has comprehensive monitoring system, the part circuit in Some Domestic city also starts to build comprehensive monitoring system, but the subsystem that each line generalization supervisory system contains and the application demand of each operation management unit are had nothing in common with each other, also each have their own difference of the interlock scope of system and interlock ability, lack unitarity, do not form certain standard and system, therefore the linkage pattern between each line cannot be completely general.
Each built and building in rail line in Shanghai City at present, there is no the comprehensive monitoring system that builds and come into operation, the comprehensive coordination and response speed and the automaticity that respectively set up separately between system all remain at low levels.In succession open-minded along with each rail line, the going from strength to strength of Rail traffic network scale, the average daily volume of the flow of passengers also significantly promotes thereupon.Set up a set of sound, adapt to Shanghai Rail Transit feature, and automaticity is high, the track traffic synthetic of comprehensive fast response time monitoring joint-action mechanism has become Shanghai Rail Transit construction and the extremely urgent demand of operating administration.
Track traffic synthetic monitoring system joint-action mechanism, for the business association completing between each subsystem, formulate rapid reaction prediction scheme, realize the analysis decision linkage function under effective management, coordination and operation and abnormal condition under normal circumstances, tool is of great significance.
Summary of the invention
The object of the invention is according to above-mentioned the deficiencies in the prior art part, system linkage method after train obstruction in a kind of track traffic is provided, the method is by intercoupling the professional system arranging in station, interval and control center, set up the quick response prediction scheme under a set of abnormal condition, to improve rail line operation automaticity, the function that realizes optimum management, joint person's synergy, reduction artificial incorrect operation realizes the analysis decision linkage function of comprehensive monitoring system to real time fail simultaneously.
The object of the invention realizes and being completed by following technical scheme:
A system linkage method in track traffic after train obstruction, there is the interlock control after train blocks for station, the interval of track traffic in the method, it is characterized in that described method comprises:
(1) professional system arranging in described station, interval and control center is intercoupled, above-mentioned professional system comprises train automatic monitoring system, screen door, broadcast system, passenger information system, electromechanical equipment supervisory system and comprehensive monitoring system;
(2) by described train automatic monitoring system monitoring train operation state, and the gathered train positional information of being obstructed is sent to described control center comprehensive monitoring system;
(3) described control center comprehensive monitoring system is according to step 2) the positional information selection startup of being obstructed that gathers: the interval blocking model in station or Gui Hang district, station blocking model.
The concrete steps of the interval blocking model in described station are:
(a) according to blocking occurrence positions, determine the two adjacent stations of blocking occurrence positions
(b) described control center comprehensive monitoring system control start dynamo-electric equipment monitoring system, to the interval air-supply at determined two adjacent stations in step a);
(c) described control center comprehensive monitoring system control start broadcast system, reports blockage information to determined two adjacent stations in step a);
(d) described control center comprehensive monitoring system control start passenger information system, issues blockage information to determined two adjacent stations in step a);
(e) described control center comprehensive monitoring system presenting bank is adjusted, and is adjusted by train automatic monitoring system terminal and is carried out corresponding detaining car and operate wanting to enter the follow-up train of this section by row;
(f) described control center comprehensive monitoring system is pointed out the yardman that takes precautions against natural calamities, and according to circumstances determines whether open interval emergency lighting and road man is implemented to emergency evacuation.
The concrete steps of Gui Hang district, described station blocking model are:
(a) there is station according to blocking occurrence positions, determine to block;
(b), there is the air-supply of Gui Hang district, station to blocking in described control center comprehensive monitoring system control start dynamo-electric equipment monitoring system;
(c), there is station and report blockage information in described control center comprehensive monitoring system control start broadcast system to blocking;
(d), there is station and issue blockage information in described control center comprehensive monitoring system control start passenger information system to blocking;
(e) described control center comprehensive monitoring system presenting bank is adjusted, and adjusts the follow-up train that Gui Hang district, station occurs wanting to enter this obstruction by train automatic monitoring system terminal to carry out detaining car operate by row;
(f) described control center comprehensive monitoring system is pointed out the yardman that takes precautions against natural calamities, and according to circumstances determines that the screen door of one side platform occurs to block whether to open Gui Hang district, station, and road man is implemented to emergency evacuation.
Advantage of the present invention is: set up a set of equipment and occurred the quick response prediction scheme under stopping state, to improve rail line operation automaticity, realize the function of optimum management, joint person's synergy, reduction artificial incorrect operation, realize the analysis decision linkage function of comprehensive monitoring system to real time fail simultaneously, thereby improve the comprehensive response speed of the each system of track traffic, ensure the person and device security.
Embodiment
By the following examples feature of the present invention and other correlated characteristic are described in further detail, so that technician's of the same trade understanding:
Terminological interpretation in the present invention: in this area, each technical term and commonly using is write a Chinese character in simplified form as shown in the table, following examples Chinese and English is write a Chinese character in simplified form all and is taken this as the standard, other implication except following clearly definition must not be explained or be interpreted as to its meaning, as: ATS meaning is herein train automatic monitoring system, must not be understood to other implications such as the automatic transfer switching electric appliance in other technologies field.
Essential Terms interpret table
? English name Chinese is explained Setting position or region
ACS Access Control System Gate control system Station, control center
AFC Automatic Fare Collection AFC system Station, control center
ATS Automatic Train Supervision Train automatic monitoring system Station, control center
CISCS Central Integrated Supervision Control System Control center's comprehensive monitoring system Control center
CCTV Closed Circuit Television Closed-circuit television system Station, control center
CLK Clock Clock system Station, control center
EMCS Electric & Mechanic Control System Electromechanical equipment supervisory system Station, control center
FAS Fire Alarm System Automatic fire alarm system Station, control center
IBP Integrated Backup Panel Integrated backup panel Station
ISCS Integrated Supervision Control System Comprehensive monitoring system Station, control center
OCC Operating Control Center Control center ----------------
PA Public Address Broadcast system Station, control center
PIS Passenger Information System Passenger information system Station, control center
PSD Platform Screen Door Screen door Station
PSCADA Power Supervision Control And Data Acquisition Electric power monitoring system Station, control center
SIG Signalling System Signal system Station, control center
SISCS Station Integrated Supervision Control System Station comprehensive monitoring system Station
System linkage method flow process
Native system interlock method, for track traffic station or the interval interlock control occurring after train stops up, mainly comprises the following steps:
(1) professional system arranging in described station, interval and control center is intercoupled, above-mentioned professional system comprises train automatic monitoring system, screen door, broadcast system, passenger information system, electromechanical equipment supervisory system and comprehensive monitoring system;
(2) by described train automatic monitoring system monitoring train operation state, and the gathered train positional information of being obstructed is sent to described control center comprehensive monitoring system;
(3) described control center comprehensive monitoring system is according to step 2) the positional information selection startup of being obstructed that gathers: the interval blocking model in station or Gui Hang district, station blocking model.
Wherein, step 3) in the concrete steps of the interval blocking model in station as follows:
(a) according to blocking occurrence positions, determine the two adjacent stations of blocking occurrence positions
(b) described control center comprehensive monitoring system control start dynamo-electric equipment monitoring system, to the interval air-supply at determined two adjacent stations in step a);
(c) described control center comprehensive monitoring system control start broadcast system, reports blockage information to determined two adjacent stations in step a);
(d) described control center comprehensive monitoring system control start passenger information system, issues blockage information to determined two adjacent stations in step a);
(e) described control center comprehensive monitoring system presenting bank is adjusted, and is adjusted by train automatic monitoring system terminal and is carried out corresponding detaining car and operate wanting to enter the follow-up train of this section by row;
(f) described control center comprehensive monitoring system is pointed out the yardman that takes precautions against natural calamities, and according to circumstances determines whether open interval emergency lighting and road man is implemented to emergency evacuation.
The concrete steps of Gui Hang district, station blocking model are:
(a) there is station according to blocking occurrence positions, determine to block;
(b), there is the air-supply of Gui Hang district, station to blocking in described control center comprehensive monitoring system control start dynamo-electric equipment monitoring system;
(c), there is station and report blockage information in described control center comprehensive monitoring system control start broadcast system to blocking;
(d), there is station and issue blockage information in described control center comprehensive monitoring system control start passenger information system to blocking;
(e) described control center comprehensive monitoring system presenting bank is adjusted, and adjusts the follow-up train that Gui Hang district, station occurs wanting to enter this obstruction by train automatic monitoring system terminal to carry out detaining car operate by row;
(f) described control center comprehensive monitoring system is pointed out the yardman that takes precautions against natural calamities, and according to circumstances determines that the screen door of one side platform occurs to block whether to open Gui Hang district, station, and road man is implemented to emergency evacuation.

Claims (1)

1. tackle for track traffic the system interlink disposal route that train blocks for one kind, the method for the underground station of track traffic, parking lot, power transformation in one's power control center there is the interlock control after train blocks in interval, it is characterized in that described method comprises:
(1) professional system arranging in described station, interval and control center is intercoupled, above-mentioned professional system comprises train automatic monitoring system, screen door, broadcast system, passenger information system, electromechanical equipment supervisory system and comprehensive monitoring system;
(2) described train automatic monitoring system monitoring train operation state, and the gathered train positional information of being obstructed is sent to the described comprehensive monitoring system of described control center;
(3) the described comprehensive monitoring system of described control center gathers according to step (2) positional information of being obstructed and selects startup: the interval blocking model in station or Gui Hang district, station blocking model;
The concrete steps of the interval blocking model in wherein said station are:
(a) described comprehensive monitoring system, according to blocking occurrence positions, is determined the two adjacent stations of blocking occurrence positions;
(b) described control center comprehensive monitoring system control start described electromechanical equipment supervisory system, to the interval air-supply at determined two adjacent stations in step (a);
(c) described control center comprehensive monitoring system control start broadcast system, reports blockage information to determined two adjacent stations in step (a);
(d) described control center comprehensive monitoring system control start passenger information system, issues blockage information to determined two adjacent stations in step (a);
(e) described control center comprehensive monitoring system presenting bank is adjusted, and is adjusted by train automatic monitoring system terminal and is carried out corresponding detaining car and operate wanting to enter the follow-up train of this section by row;
(f) described control center comprehensive monitoring system is pointed out the yardman that takes precautions against natural calamities, and according to circumstances determines whether open interval emergency lighting and road man is implemented to emergency evacuation.
2. a kind of system interlink disposal route of tackling train obstruction for track traffic according to claim 1, is characterized in that the concrete steps of Gui Hang district, described station blocking model are:
(a) there is station according to blocking occurrence positions, determine to block in described comprehensive monitoring system;
(b), there is the air-supply of Gui Hang district, station to blocking in described control center comprehensive monitoring system control start dynamo-electric equipment monitoring system;
(c), there is station and report blockage information in described control center comprehensive monitoring system control start broadcast system to blocking;
(d), there is station and issue blockage information in described control center comprehensive monitoring system control start passenger information system to blocking;
(e) described control center comprehensive monitoring system presenting bank is adjusted, and adjusts the follow-up train that Gui Hang district, station occurs wanting to enter this obstruction by train automatic monitoring system terminal to carry out detaining car operate by row;
(f) described control center comprehensive monitoring system is pointed out the yardman that takes precautions against natural calamities, and according to circumstances determines that the screen door of one side platform occurs to block whether to open Gui Hang district, station, and road man is implemented to emergency evacuation.
CN201010271958.6A 2010-09-03 2010-09-03 System linkage method after train jam in rail transportation Active CN101913371B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010271958.6A CN101913371B (en) 2010-09-03 2010-09-03 System linkage method after train jam in rail transportation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010271958.6A CN101913371B (en) 2010-09-03 2010-09-03 System linkage method after train jam in rail transportation

Publications (2)

Publication Number Publication Date
CN101913371A CN101913371A (en) 2010-12-15
CN101913371B true CN101913371B (en) 2014-05-14

Family

ID=43321070

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010271958.6A Active CN101913371B (en) 2010-09-03 2010-09-03 System linkage method after train jam in rail transportation

Country Status (1)

Country Link
CN (1) CN101913371B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102916838B (en) * 2012-10-25 2015-05-20 国电南瑞科技股份有限公司 Realization method for comprehensive monitoring system and ATS (Automatic Train Supervision) system interface
CN105187763A (en) * 2015-06-25 2015-12-23 国电南瑞科技股份有限公司 Rail transit comprehensive monitoring picture batch processing point connection realizing method
CN105197071B (en) * 2015-10-19 2017-03-22 南京国电南自轨道交通工程有限公司 System linking method after train jam in rail transit
CN105257141B (en) * 2015-10-30 2017-01-11 北京交控科技股份有限公司 Garage door control method and system suitable for full-automatic driving
CN107985350A (en) * 2017-11-10 2018-05-04 青岛海信网络科技股份有限公司 A kind of inter-linked controlling method and correlating center at Metro Network center
CN112590886B (en) * 2020-12-30 2022-08-26 卡斯柯信号有限公司 Method for judging and alarming running jam of train section
CN113810374B (en) * 2021-08-11 2023-03-14 交控科技股份有限公司 Station equipment linkage method suitable for rail transit under multi-operation scene condition

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4491290A (en) * 1979-06-22 1985-01-01 Douglas Robert D Train defect detecting and enunciating system
CN101562727A (en) * 2008-04-15 2009-10-21 上海交技发展股份有限公司 Track traffic video monitoring network management system

Also Published As

Publication number Publication date
CN101913371A (en) 2010-12-15

Similar Documents

Publication Publication Date Title
CN101913371B (en) System linkage method after train jam in rail transportation
CN101927776B (en) System linkage method for disaster occurrence in rail transportation
CN101927777B (en) System linkage method in rail transit after equipment failure
CN104859687B (en) Full-automatic driving rolling stock section security management and control system and method
CN103046829B (en) Rail traffic safety door controlling method
CN111688767B (en) Method for superposing CTCS system and CBTC system
CN103707904B (en) Temporary speed-limiting method under the rail CBTC pattern of a kind of city and speed limiting system
CN105292185B (en) A kind of unmanned control system
CN103754242A (en) City regional railway signal system and control method thereof
CN104267704A (en) Novel tunnel monitoring system
CN105278500B (en) A kind of track traffic linking fire method and system based on environmental unit and monitoring system
CN102529981A (en) Shielded gate/safety gate safety protection system of track traffic platform
CN204552426U (en) A kind of rail transit platform screen door cell controller
CN107357180A (en) A kind of integrated control system of signal and gate
CN106672017A (en) Rail transit turnout remote control system based on mobile terminal and method
CN104228885A (en) Tramcar positive line signal control system and control method thereof
CN202167107U (en) Fire alarm system for urban rail traffic vehicles
CN105197071B (en) System linking method after train jam in rail transit
CN103643854A (en) System and method for controlling bus rapid transit (BRT) safety door
CN210118160U (en) Double-hole single-track railway tunnel random parking rescue system
CN104507234B (en) Lighting control system and lighting control method for tramcar station
CN107089250A (en) A kind of yard switching method of radio scheduling locomotive signal and monitoring system
CN202280349U (en) Shield door system applied to APM system
CN114590296A (en) High-speed railway crossing control system
CN204259259U (en) Tramcar station Lighting Control Assembly

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant