CN105187763A - Rail transit comprehensive monitoring picture batch processing point connection realizing method - Google Patents

Rail transit comprehensive monitoring picture batch processing point connection realizing method Download PDF

Info

Publication number
CN105187763A
CN105187763A CN201510357162.5A CN201510357162A CN105187763A CN 105187763 A CN105187763 A CN 105187763A CN 201510357162 A CN201510357162 A CN 201510357162A CN 105187763 A CN105187763 A CN 105187763A
Authority
CN
China
Prior art keywords
equipment
professional system
professional
image file
numbering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510357162.5A
Other languages
Chinese (zh)
Inventor
魏成林
王丹平
何敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nari Technology Co Ltd
NARI Nanjing Control System Co Ltd
Original Assignee
Nari Technology Co Ltd
NARI Nanjing Control System Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nari Technology Co Ltd, NARI Nanjing Control System Co Ltd filed Critical Nari Technology Co Ltd
Priority to CN201510357162.5A priority Critical patent/CN105187763A/en
Publication of CN105187763A publication Critical patent/CN105187763A/en
Pending legal-status Critical Current

Links

Landscapes

  • Closed-Circuit Television Systems (AREA)

Abstract

The invention discloses a rail transit comprehensive monitoring picture batch processing point connection realizing method comprising the steps as follows: step 1, a plurality of professional system point tables are constructed; step 2, different professional systems export point tables of respective format, and extract equipment number and equipment information from the point tables of respective format; step 3, the equipment number and equipment information extracted in step 2 are stored in the corresponding professional system point tables; step 4, the professional system number and the equipment station number are filled in different professional system point tables; step 5, an equipment image file is generated according to the professional system point tables; and step 6, an image is obtained according to the equipment image file. According to the invention, the professional system point tables are constructed, a picture is drawn according to the professional system point tables, and therefore, comprehensive monitoring picture batch processing point connection is realized. Compared with traditional manual operation, the speed is high, and the accuracy rate is increased.

Description

A kind of batch processing of track traffic synthetic monitored picture connects some implementation method
Technical field
The batch processing that the present invention relates to a kind of track traffic synthetic monitored picture connects some implementation method, belongs to track traffic synthetic monitoring system field.
Background technology
Along with the fast development of city rail comprehensively monitoring industry in recent years, require that the quantity of control point is improving constantly, article one, the some quantity of rail line comprehensively monitoring reaches 1,000,000 grades, especially concerning unit in charge of construction, if pure manual words, be a sizable workload, and accuracy cannot ensure, unit of operation also needs one perfect not have system defective.It is the comprehensively monitoring picture that unit in charge of construction or unit of operation all need that an accuracy is 100% badly.
Traditional comprehensively monitoring is limited by cost, the reasons such as technical conditions, and the batch processing that often can not realize comprehensively monitoring picture connects a little.
Summary of the invention
In order to solve the problems of the technologies described above, the batch processing that the invention provides a kind of track traffic synthetic monitored picture connects some implementation method.
In order to achieve the above object, the technical solution adopted in the present invention is:
The batch processing of track traffic synthetic monitored picture connects a some implementation method, comprises the following steps,
Step one, builds several professional system point tables;
The professional system that the corresponding comprehensive monitoring system of each professional system point table is external;
Described professional system comprises PWR, BAS, CCTV, PSD, ACS, FAS, AFC, PA and PIS;
Element in described professional system point table comprises Station XXX residing for device numbering, facility information and the equipment in professional system numbering, professional system;
Step 2, different professional systems derives the some table of respective form, and extracts device numbering and facility information from the some table of respective form;
Step 3, by the device numbering that extracts in step 2 and facility information stored in the professional system point table of correspondence;
Step 4, inserts Station XXX residing for professional system numbering and equipment in different professional systems point table;
Wherein, a corresponding professional system of professional system numbering, a corresponding station of Station XXX,
Described professional system numbering and Station XXX all set according to actual conditions;
Step 5, according to professional system point table, generates equipment image file;
Data line in a professional system point table, generates an equipment image file;
Step 6, obtains image according to equipment image file.
Generating the process of an equipment image file is, generates several pels respectively in order to Station XXX residing for display device numbering, display device information, display device and control this equipment.
Described facility information comprises the type of equipment, the pattern of equipment, the mailing address of equipment and the position residing for equipment.
The equipment image file generated in step 5 is windows text file, before acquisition image, need to judge whether comprehensive monitoring system is Windows system, if for Windows system can directly use, if not, then need equipment image file to carry out format conversion, convert the form mated with comprehensive monitoring system to.
The beneficial effect that the present invention reaches: 1, the present invention builds each professional system point table, draw according to professional system point table, the batch processing achieving comprehensively monitoring picture connects a little, and compared to traditional-handwork operation, speed is fast, improves accuracy; 2, the present invention can adapt to different systems.
Embodiment
Following examples only for technical scheme of the present invention is clearly described, and can not limit the scope of the invention with this.
The batch processing of track traffic synthetic monitored picture connects a some implementation method, comprises the following steps:
Step one, builds several professional system point tables;
The professional system that the corresponding comprehensive monitoring system of each professional system point table is external;
Professional system comprises PWR, BAS, CCTV, PSD, ACS, FAS, AFC, PA and PIS;
Element in professional system point table comprises Station XXX residing for device numbering, facility information and the equipment in professional system numbering, professional system;
Facility information comprises the type of equipment, the pattern of equipment, the mailing address of equipment and the position residing for equipment.
Step 2, different professional systems derives the some table of respective form, and extracts device numbering and facility information from the some table of respective form.
Step 3, by the device numbering that extracts in step 2 and facility information stored in the professional system point table of correspondence.
Step 4, inserts Station XXX residing for professional system numbering and equipment in different professional systems point table;
Wherein, a corresponding professional system of professional system numbering, a corresponding station of Station XXX,
Described professional system numbering and Station XXX are all according to actual conditions setting, and as closed-circuit television professional system is numbered CCTV, No. two, Suzhou line high ferro northern station Station XXX is 01;
Step 5, according to professional system point table, generates equipment image file;
Generating the process of an equipment image file is, generates several pels respectively in order to Station XXX residing for display device numbering, display device information, display device and control this equipment;
Data line in a professional system point table, generates an equipment image file.
Step 6, obtains image according to equipment image file.
In order to different systems can be adapted to, the equipment image file generated in step 5 is windows text file, before acquisition image, need to judge whether comprehensive monitoring system is Windows system, if can directly use for Windows system, if not, equipment image file is then needed to carry out format conversion, convert the form mated with comprehensive monitoring system to, such as: comprehensive monitoring system is linux system, then equipment converting of image file is become Linux text.
Below for CCTV
1) CCTV point table is built;
2) from CCTV, derive original point table, and therefrom extract device numbering and facility information; The i.e. position (as control room, station), camera status (normal or fault) etc. of video camera coding (as 01001), camera type (as ball machine, gunlock), video camera;
3) device numbering and facility information are shown stored in CCTV point;
4) numbering (as " C1 ") of CCTV is inserted CCTV point table, the Station XXX residing for each video camera is inserted CCTV point table (if the video camera of 01001 numbering is in the station being numbered 02); Constitute a complete CCTV point table;
5) equipment image file is generated;
Generate a pel in order to show video camera coding, with second pel in order to show camera status, with the 3rd pel in order to show the position of video camera, control video camera with the 4th pel; These four pels constitute the image file of a video camera;
6) image is obtained according to equipment image file.
The batch processing of above-mentioned track traffic synthetic monitored picture connects some implementation method, be based upon on the investigation basis to true subway running situation, use and run the consistent image of subway line with true, final image is applied in metro environment, by building various professional system point table, draws according to professional system point table, the batch processing achieving comprehensively monitoring picture connects a little, compared to traditional-handwork operation, speed is fast, improves accuracy.
Point situation is connected below for the line generalization monitoring of No. two, Suzhou.
Statistics comparing result as shown in Table 1:
Table one contrast table
The above is only the preferred embodiment of the present invention; it should be pointed out that for those skilled in the art, under the prerequisite not departing from the technology of the present invention principle; can also make some improvement and distortion, these improve and distortion also should be considered as protection scope of the present invention.

Claims (4)

1. the batch processing of track traffic synthetic monitored picture connects a some implementation method, it is characterized in that: comprise the following steps,
Step one, builds several professional system point tables;
The professional system that the corresponding comprehensive monitoring system of each professional system point table is external;
Described professional system comprises PWR, BAS, CCTV, PSD, ACS, FAS, AFC, PA and PIS;
Element in described professional system point table comprises Station XXX residing for device numbering, facility information and the equipment in professional system numbering, professional system;
Step 2, different professional systems derives the some table of respective form, and extracts device numbering and facility information from the some table of respective form;
Step 3, by the device numbering that extracts in step 2 and facility information stored in the professional system point table of correspondence;
Step 4, inserts Station XXX residing for professional system numbering and equipment in different professional systems point table;
Wherein, a corresponding professional system of professional system numbering, a corresponding station of Station XXX,
Described professional system numbering and Station XXX all set according to actual conditions;
Step 5, according to professional system point table, generates equipment image file;
Data line in a professional system point table, generates an equipment image file;
Step 6, obtains image according to equipment image file.
2. the batch processing of a kind of track traffic synthetic monitored picture according to claim 1 connects some implementation method, it is characterized in that: generating the process of an equipment image file is, generate several pels respectively in order to Station XXX residing for display device numbering, display device information, display device and control this equipment.
3. the batch processing of a kind of track traffic synthetic monitored picture according to claim 2 connects a some implementation method, it is characterized in that: described facility information comprises the type of equipment, the pattern of equipment, the mailing address of equipment and the position residing for equipment.
4. the batch processing of a kind of track traffic synthetic monitored picture according to claim 1 connects some implementation method, it is characterized in that: the equipment image file generated in step 5 is windows text file, before acquisition image, need to judge whether comprehensive monitoring system is Windows system, if for Windows system can directly use, if not, then need equipment image file to carry out format conversion, convert the form mated with comprehensive monitoring system to.
CN201510357162.5A 2015-06-25 2015-06-25 Rail transit comprehensive monitoring picture batch processing point connection realizing method Pending CN105187763A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510357162.5A CN105187763A (en) 2015-06-25 2015-06-25 Rail transit comprehensive monitoring picture batch processing point connection realizing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510357162.5A CN105187763A (en) 2015-06-25 2015-06-25 Rail transit comprehensive monitoring picture batch processing point connection realizing method

Publications (1)

Publication Number Publication Date
CN105187763A true CN105187763A (en) 2015-12-23

Family

ID=54909586

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510357162.5A Pending CN105187763A (en) 2015-06-25 2015-06-25 Rail transit comprehensive monitoring picture batch processing point connection realizing method

Country Status (1)

Country Link
CN (1) CN105187763A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113836611A (en) * 2021-08-25 2021-12-24 通号城市轨道交通技术有限公司 Equipment number file generation method and device, electronic equipment and storage medium

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101634852A (en) * 2009-07-20 2010-01-27 广州地铁设计研究院有限公司 Fire linking control system applied to urban rail transit and method
CN101882403A (en) * 2010-06-25 2010-11-10 上海电机学院 Rail transportation operation state display method
CN101913371A (en) * 2010-09-03 2010-12-15 中铁上海设计院集团有限公司 System linkage method after train jam in rail transportation
CN101927777A (en) * 2010-09-03 2010-12-29 中铁上海设计院集团有限公司 System linkage method in rail transit after equipment failure
CN103605864A (en) * 2013-11-28 2014-02-26 北京交通大学 Urban rail transit network train working diagram displaying method
CN104240017A (en) * 2014-09-01 2014-12-24 广州市地下铁道总公司 Networking management method for urban rail transit line net
CN104243623A (en) * 2014-09-15 2014-12-24 中国铁道科学研究院电子计算技术研究所 Passenger-information-system-to-ATS-system interface data processing system and method
CN104504609A (en) * 2014-12-05 2015-04-08 广东电网有限责任公司江门供电局 Automatic maintenance method for parameters of master station and station end device in electrical power system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101634852A (en) * 2009-07-20 2010-01-27 广州地铁设计研究院有限公司 Fire linking control system applied to urban rail transit and method
CN101882403A (en) * 2010-06-25 2010-11-10 上海电机学院 Rail transportation operation state display method
CN101913371A (en) * 2010-09-03 2010-12-15 中铁上海设计院集团有限公司 System linkage method after train jam in rail transportation
CN101927777A (en) * 2010-09-03 2010-12-29 中铁上海设计院集团有限公司 System linkage method in rail transit after equipment failure
CN103605864A (en) * 2013-11-28 2014-02-26 北京交通大学 Urban rail transit network train working diagram displaying method
CN104240017A (en) * 2014-09-01 2014-12-24 广州市地下铁道总公司 Networking management method for urban rail transit line net
CN104243623A (en) * 2014-09-15 2014-12-24 中国铁道科学研究院电子计算技术研究所 Passenger-information-system-to-ATS-system interface data processing system and method
CN104504609A (en) * 2014-12-05 2015-04-08 广东电网有限责任公司江门供电局 Automatic maintenance method for parameters of master station and station end device in electrical power system

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
匿名: "EXCEL2007中怎样制作三维饼图", 《百度经验》 *
李海,张献: "地铁延长线综合监控集成方法探析", 《快轨论坛》 *
李美玲: "广州城市轨道现网数据标准的研究与实现", 《中国优秀硕士学位论文全文数据库》 *
肖汉: "数据点表在远程监管系统中的应用研究", 《计算机应用研究》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113836611A (en) * 2021-08-25 2021-12-24 通号城市轨道交通技术有限公司 Equipment number file generation method and device, electronic equipment and storage medium

Similar Documents

Publication Publication Date Title
CN107004271B (en) Display method, display apparatus, electronic device, computer program product, and storage medium
EP2448267A1 (en) Track-side fault detection system and method and apparatus for implementing the same
WO2020015724A8 (en) Picture acquisition method, and picture processing method and device
CN105407278A (en) Panoramic video traffic situation monitoring system and method
CN202261389U (en) Power transmission line operation and maintenance routing inspection management information system
CN104463097A (en) High-voltage wire image detection method based on local self-adaptation threshold value partitioning algorithm
CN107835424A (en) A kind of media sync transmission player method based on data perception
MX2018011498A (en) Method, apparatus and stream of formatting an immersive video for legacy and immersive rendering devices.
MX2020013016A (en) Seamless injection of augmented three-dimensional imagery using a positionally encoded video stream.
CN105187763A (en) Rail transit comprehensive monitoring picture batch processing point connection realizing method
CN103248830A (en) Real-time video combination method for augmented reality scene of mobile intelligent terminal
CN104485032B (en) A kind of track traffic cctv surveillance simulation training system and its implementation
CN111083311A (en) Synchronization system and method for airborne multi-channel video and POS data of unmanned aerial vehicle
CN103997651A (en) Data compression method and device for composite images
CN113011252A (en) Track foreign matter intrusion detection system and method
CN111102927A (en) Bus duct size detection system, method and device
CN105446685A (en) Document playing method and system
CN107124583A (en) A kind of monitoring system of quick obtaining video monitoring information
CN204833154U (en) Geographic information guides system based on AR technique
CN204965945U (en) Three -dimensional LED display screen in rotation type space based on splicing technology
CN113971753A (en) Virtual robot inspection method based on multiple fixed cameras
CN103200364B (en) Based on the camera lifting lattice special efficacy image pickup method of marker characteristic
CN207835649U (en) A kind of device of the farmland monitor video defogging sharpening of UAV flight
CN206879020U (en) A kind of multimedia sharing module device
CN104834378A (en) Geographic information guide system based on AR (augmented reality) technology

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20151223