CN101906796A - 一种并联式混合动力液压挖掘机的主动控制策略 - Google Patents

一种并联式混合动力液压挖掘机的主动控制策略 Download PDF

Info

Publication number
CN101906796A
CN101906796A CN 201010221595 CN201010221595A CN101906796A CN 101906796 A CN101906796 A CN 101906796A CN 201010221595 CN201010221595 CN 201010221595 CN 201010221595 A CN201010221595 A CN 201010221595A CN 101906796 A CN101906796 A CN 101906796A
Authority
CN
China
Prior art keywords
power
hydraulic pump
signal
drive motor
main drive
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010221595
Other languages
English (en)
Other versions
CN101906796B (zh
Inventor
易振
徐惠余
戴斯盛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jianglu Electromechanical Science & Technology Co Ltd
Original Assignee
Jianglu Electromechanical Science & Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jianglu Electromechanical Science & Technology Co Ltd filed Critical Jianglu Electromechanical Science & Technology Co Ltd
Priority to CN2010102215955A priority Critical patent/CN101906796B/zh
Publication of CN101906796A publication Critical patent/CN101906796A/zh
Application granted granted Critical
Publication of CN101906796B publication Critical patent/CN101906796B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Operation Control Of Excavators (AREA)

Abstract

本发明涉及一种并联式混合动力液压挖掘机的主动控制策略。该主动混合动力控制策略是采集液压系统对实际工况的反馈信号,通过对液压泵所需功率进行预先优化计算,并结合发动机的当前目标转速、超级电容当前电能,综合计算出主驱动电机的发电/电动工况,发电/电动的功率大小和时间,以及计算控制发动机工作到下一功率输出点,并下发液压泵排量比例电磁阀控制量命令。优点是动力匹配及时,挖掘机工作动作反应敏捷,工作性能稳定,并对发动机的控制更加灵活,更省油。

Description

一种并联式混合动力液压挖掘机的主动控制策略
技术领域
本发明涉及一种并联式混合动力液压挖掘机的主动控制策略。
背景技术
并联式混合动力液压挖掘机的动力混合由主驱动电机、发动机、液压泵组成。当液压泵所需要的功率小于发动机的输出功率时,主驱动电机处于发电机状态,将多余的能量转换成电能存储到超级电容内,当液压泵所需要的功率大于发动机的输出功率时,主驱动电机处于电动机状态,与发动机一起提供液压泵的功率。目前,对混合动力液压挖掘机的控制策略有单工作点控制、双工作点控制、基于SOC来判断决策工作点切换的控制等,这些控制策略统称为被动控制策略,即不提前预判驾驶员的操作所对应液压系统动作所需功率,以及采集液压系统对实际工况的反馈信号。这些混合动力液压挖掘机的被动控制策略在实际应用中会造成动力匹配落后于实际功率需求,性能不稳定,挖掘机工作动作滞后。基于改善被动混合动力控制策略的种种缺陷,发明了该主动混合动力控制策略。
发明内容
本发明的目的是提供给并联式混合动力挖掘机的一种主动混合动力控制策略,能实现动力匹配及时,挖掘机工作动作反应敏捷,工作性能稳定,并对发动机的控制更加灵活,更省油。
该主动混合动力控制策略是基于提前预判驾驶员的操作所对应液压系统动作所需功率,以及对采集液压系统对实际工况的反馈信号的闭环控制,通过对液压泵所需功率进行预先优化计算,并结合发动机的当前目标转速、超级电容当前电能,综合计算出主驱动电机的发电/电动工况,发电/电动的功率大小和时间,以及计算控制发动机工作到下一功率输出点,并下发液压泵排量比例电磁阀控制量命令。
该主动混合动力控制策略的主要实现方式如下:
主动混合动力控制策略的输入、输出及控制组件的连接和信号传输方向详见附图1。主动动力混合控制器采集左/右手柄、左/右踏板传来的信号以及超级电容、液压泵压力传感器传来的反馈信号,通过对液压泵所需功率进行预先优化计算,并结合发动机的当前目标转速、超级电容当前电能,经综合计算后,将信号传给主驱动电机、发动机、液压泵,主驱动电机将反馈信号经超级电容传给主动动力混合控制器,液压泵将反馈信号经液压泵压力传感器传给主动动力混合控制器。
传统液压挖掘机的一个工作周期是:放动臂-放斗杆-放产斗-挖土-收产斗-收斗杆-收动臂-回转-放土-再回转,循环下一个工作周期。不同工况,不同的操作员对应工作周期中不同动作所花时间也不相同。工作周期中各动作所对应的液压泵输出功率通过对传统液压挖掘机加装压力和流量传感器器实测获得。
主动混合动力控制策略的预先优化计算数学模型是基于这些实测数据而建立的,具体如下:
1、采集左/右手柄的动臂收/放、斗杆收/放、产斗收/放的信号,根据信号大小查询实测数据库中当前动作所对应的液压泵输出功率,采集液压泵压力反馈信号和超级电容电压信号,估算出整个工作周期的平均功率,计算出主驱动电机的发电/电动工况,发电/电动的功率大小和时间,以及计算控制发动机工作功率输出点,并下发液压泵排量比例电磁阀控制量命令;
2、液压泵的压力反馈信号与手柄信号大小对应的动作快慢相关联,如在某一手柄信号值时,压力反馈值大于实测数据,则设定的功率点偏小,需调大功率点,直至压力反馈值与实测数据大致相当时为止;
3、当一个工作周期完成后,将此工作周期的平均输出功率算出,存入FLASH中,并将最近3个工作周期的平均输出功率取平均值,来判断确定挖掘机当前处于什么工况,作为下一工作周期液压泵所需功率进行预先优化计算的工况。
主动控制策略流程图见附图3。
该主动混合动力控制策略的优点是动力匹配及时,挖掘机工作动作反应敏捷,工作性能稳定,并对发动机的控制更加灵活,更省油。
附图说明
图1是主动混合动力控制策略组成及连接框图。
图2是实测数据库结构表。
图3是主动混合动力控制策略工作流程图。
具体实施方式
主控制器通过CAN总线采集挖掘机的手柄和踏板的控制信号,根据预先建立的数学模型计算出液压泵的理论所需功率;同时,接收液压控制器传输来的液压泵排量和压力信号,计算出液压泵当前实际消耗功率,将这两个功率值进一步优化,得出主动混合动力控制策略的液压泵所需功率。
当液压泵所需功率大于发动机当前转速下的最大功率时,检测超级电容的电量,计算出能提供主驱动电机处于电动机状态下的功率与时间,匹配出发动机新的转速(升转速,升功率),并控制发动机工作到新的功率点。
当液压泵所需功率小于发动机当前转速下的最大功率时,检测超级电容的电量,计算主驱动电机处于发电机状态下的功率与充满电时间,匹配出发动机新的转速(降转速,降功率),并控制发动机工作到新的功率点。
主动混合动力控制策略工作过程如下:
1、主动动力混合控制器通过CAN总线接收左/右手柄和左/右踏板输出的控制信号,其中左手柄前后方向操作对应斗杆的收/放信号,左手柄左右方向操作对应回转平台的左右回转信号,右手柄前后方向操作对应动臂的收/放信号,右手柄左右方向操作对应产斗的收/放信号,左/右踏板的操作分别对应挖掘机的前进、后退和转向。
2、主动动力混合控制器根据这些信号大小和读取的工况信息(工况信息是将最近3个工作周期的平均输出功率取平均值来判断确定挖掘机当前处于什么工况,并存入FLASH中),在实测数据库中查询当前动作所需的功率值,结合超级电容的电压值(Usoc)和当前工况的平均功率值(PT),综合运算出主驱动电机功率(PD),发动机功率(PF),液压泵功率(PY)。
当Usoc<(UMAX-UMIN)*80%+UMIN
PF=PT+P(Usoc)
PY=Pt
PD=PY-PF
当Usoc>=(UMAX-UMIN)*80%+UMIN
PF=PT
PY=Pt
PD=PY-PF
式中P(Usoc)表示Usoc对应的超级电容功率,主驱动电机功率PD为正数表示主驱动电机工作在电动工况,主驱动电机功率PD为负数表示主驱动电机工作在发电工况。
3、主动动力混合控制器将综合运算出主驱动电机功率(PD),发动机功率(PF),液压泵功率(PY)分别传输给电机驱动器、发动机ECU和液压泵排量比例电磁阀,控制主驱动电机,发动机,液压泵工作在相对应的功率。
4、主动动力混合控制器采集液压泵压力反馈信号,在不同挖掘机工况下手柄信号大小对应的液压泵压力反馈信号不同,如果在某一手柄信号值时,压力反馈值与实测数据库中对应值不同,则在实测数据库中查询此手柄信号值在所有工况下的压力反馈实测数,匹配出与之相当的数据对应的工况(平均功率),根据新的平均功率重新算出主驱动电机功率(PD),发动机功率(PF),液压泵功率(PY)。

Claims (2)

1.一种并联式混合动力液压挖掘机的主动控制策略,其特征在于主动动力混合控制器采集左/右手柄、左/右踏板传来的信号以及超级电容、液压泵压力传感器传来的反馈信号,通过对液压泵所需功率进行预先优化计算,并结合发动机的当前目标转速、超级电容当前电能,经综合计算后,将信号传给主驱动电机、发动机、液压泵,主驱动电机将反馈信号经超级电容传给主动动力混合控制器,液压泵将反馈信号经液压泵压力传感器传给主动动力混合控制器,主动混合动力控制策略工作过程如下:
(1)、主动动力混合控制器通过CAN总线接收左/右手柄和左/右踏板输出的控制信号,其中左手柄前后方向操作对应斗杆的收/放信号,左手柄左右方向操作对应回转平台的左右回转信号,右手柄前后方向操作对应动臂的收/放信号,右手柄左右方向操作对应产斗的收/放信号,左/右踏板的操作分别对应挖掘机的前进、后退和转向;
(2)、主动动力混合控制器根据这些信号大小和读取的工况信息,工况信息是将最近3个工作周期的平均输出功率取平均值来判断确定挖掘机当前处于什么工况,并存入FLASH中,在实测数据库中查询当前动作所需的功率值,结合超级电容的电压值(Usoc)和当前工况的平均功率值(PT),综合运算出主驱动电机功率(P0),发动机功率(PF),液压泵功率(PY);
当Usoc<(UMAX-UMIN)*80%+UMIN
PF=PT+P(Usoc)
PY=Pt
PD=PY-PF
当Usoc>=(UMAX-UMIN)*80%+UMIN
PF=PT
PY=Pt
PD=PY-PF
式中P(Usoc)表示Usoc对应的超级电容功率,主驱动电机功率PD为正数表示主驱动电机工作在电动工况,主驱动电机功率PD为负数表示主驱动电机工作在发电工况;
(3)、主动动力混合控制器将综合运算出主驱动电机功率PD,发动机功率PF,液压泵功率PY分别传输给电机驱动器、发动机ECU和液压泵排量比例电磁阀,控制主驱动电机,发动机,液压泵工作在相对应的功率;
(4)、主动动力混合控制器采集液压泵压力反馈信号,在不同挖掘机工况下手柄信号大小对应的液压泵压力反馈信号不同,如果在某一手柄信号值时,压力反馈值与实测数据库中对应值不同,则在实测数据库中查询此手柄信号值在所有工况下的压力反馈实测数,匹配出与之相当的数据对应的工况,即平均功率,根据新的平均功率重新算出主驱动电机功率PD,发动机功率PF,液压泵功率PY
2.根据权利要求1所述的一种并联式混合动力液压挖掘机的主动控制策略,其特征在于主动混合动力控制策略的预先优化计算数学模型是基于这些实测数据而建立的,具体如下:
(1)、采集左/右手柄的动臂收/放、斗杆收/放、产斗收/放的信号,根据信号大小查询实测数据库中当前动作所对应的液压泵输出功率,采集液压泵压力反馈信号和超级电容电压信号,估算出整个工作周期的平均功率,计算出主驱动电机的发电/电动工况,发电/电动的功率大小和时间,以及计算控制发动机工作功率输出点,并下发液压泵排量比例电磁阀控制量命令;
(2)、液压泵的压力反馈信号与手柄信号大小对应的动作快慢相关联,如在某一手柄信号值时,压力反馈值大于实测数据,则设定的功率点偏小,需调大功率点,直至压力反馈值与实测数据大致相当时为止;
(3)、当一个工作周期完成后,将此工作周期的平均输出功率算出,存入FLASH中,并将最近3个工作周期的平均输出功率取平均值,来判断确定挖掘机当前处于什么工况,作为下一工作周期液压泵所需功率进行预先优化计算的工况。
CN2010102215955A 2010-07-09 2010-07-09 一种并联式混合动力液压挖掘机的主动控制策略 Expired - Fee Related CN101906796B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102215955A CN101906796B (zh) 2010-07-09 2010-07-09 一种并联式混合动力液压挖掘机的主动控制策略

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102215955A CN101906796B (zh) 2010-07-09 2010-07-09 一种并联式混合动力液压挖掘机的主动控制策略

Publications (2)

Publication Number Publication Date
CN101906796A true CN101906796A (zh) 2010-12-08
CN101906796B CN101906796B (zh) 2012-02-01

Family

ID=43262370

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102215955A Expired - Fee Related CN101906796B (zh) 2010-07-09 2010-07-09 一种并联式混合动力液压挖掘机的主动控制策略

Country Status (1)

Country Link
CN (1) CN101906796B (zh)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535566A (zh) * 2010-12-31 2012-07-04 上海派芬自动控制技术有限公司 主动式铲运车控制系统
CN102535556A (zh) * 2012-01-09 2012-07-04 三一重工股份有限公司 用于提升挖掘机动力响应特性的系统和方法、挖掘机
CN103080435A (zh) * 2010-12-17 2013-05-01 川崎重工业株式会社 作业机械的驱动控制方法
CN103909836A (zh) * 2014-02-24 2014-07-09 北京三兴汽车有限公司 大功率电容辅助供电动力装置
CN104163097A (zh) * 2014-08-01 2014-11-26 清华大学 一种并联式混合动力挖掘机的耦合控制方法
CN104674877A (zh) * 2015-02-12 2015-06-03 徐州徐工挖掘机械有限公司 一种电动液压挖掘机控制系统
CN105518225A (zh) * 2014-01-07 2016-04-20 日立建机株式会社 混合动力式轮式装载机
CN105518224A (zh) * 2013-11-01 2016-04-20 日立建机株式会社 作业机械
CN107657076A (zh) * 2017-08-24 2018-02-02 厦门金龙旅行车有限公司 一种插电式混合动力系统动力匹配方法
CN110685310A (zh) * 2019-10-11 2020-01-14 徐州徐工基础工程机械有限公司 基于神经网络的发动机极载控制方法、系统及工程车辆
CN111255006A (zh) * 2020-01-20 2020-06-09 广西玉柴重工有限公司 一种挖掘机液压泵、发动机集成同步控制方法及装置

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10103112A (ja) * 1996-09-26 1998-04-21 Daikin Ind Ltd 油圧駆動装置
JPH1113548A (ja) * 1997-06-23 1999-01-19 Honda Motor Co Ltd ガス燃料エンジン用レギュレータ
JPH1198607A (ja) * 1997-09-22 1999-04-09 Mitsubishi Motors Corp ハイブリッド電気自動車
WO2001000935A1 (fr) * 1999-06-28 2001-01-04 Kobelco Construction Machinery Co., Ltd. Dispositif de commande d'une machine de chantier
CN101225668A (zh) * 2008-01-14 2008-07-23 浙江大学 并联式混合动力液压挖掘机的控制方法
CN101636543A (zh) * 2007-03-28 2010-01-27 株式会社小松制作所 混合动力建筑机械的控制方法及混合动力建筑机械
CN101761104A (zh) * 2010-01-28 2010-06-30 江麓机电科技有限公司 新型混合动力挖掘机系统构型

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10103112A (ja) * 1996-09-26 1998-04-21 Daikin Ind Ltd 油圧駆動装置
JPH1113548A (ja) * 1997-06-23 1999-01-19 Honda Motor Co Ltd ガス燃料エンジン用レギュレータ
JPH1198607A (ja) * 1997-09-22 1999-04-09 Mitsubishi Motors Corp ハイブリッド電気自動車
WO2001000935A1 (fr) * 1999-06-28 2001-01-04 Kobelco Construction Machinery Co., Ltd. Dispositif de commande d'une machine de chantier
CN101636543A (zh) * 2007-03-28 2010-01-27 株式会社小松制作所 混合动力建筑机械的控制方法及混合动力建筑机械
CN101225668A (zh) * 2008-01-14 2008-07-23 浙江大学 并联式混合动力液压挖掘机的控制方法
CN101761104A (zh) * 2010-01-28 2010-06-30 江麓机电科技有限公司 新型混合动力挖掘机系统构型

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
《中国机械工程》 20080315 肖清等 液压挖掘机电容蓄能式并联混合动力系统结构及控制策略研究 625-629 第19卷, 第5期 2 *
《机械工程师》 20100430 庹福幸等 挖掘机并联式混合动力系统建模及控制策略研究 27-30 , 2 *

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103080435A (zh) * 2010-12-17 2013-05-01 川崎重工业株式会社 作业机械的驱动控制方法
CN103080435B (zh) * 2010-12-17 2015-04-22 川崎重工业株式会社 作业机械的驱动控制方法
CN102535566A (zh) * 2010-12-31 2012-07-04 上海派芬自动控制技术有限公司 主动式铲运车控制系统
CN102535556A (zh) * 2012-01-09 2012-07-04 三一重工股份有限公司 用于提升挖掘机动力响应特性的系统和方法、挖掘机
CN102535556B (zh) * 2012-01-09 2014-11-19 三一重工股份有限公司 用于提升挖掘机动力响应特性的系统和方法、挖掘机
CN105518224B (zh) * 2013-11-01 2018-08-28 日立建机株式会社 作业机械
CN105518224A (zh) * 2013-11-01 2016-04-20 日立建机株式会社 作业机械
CN105518225A (zh) * 2014-01-07 2016-04-20 日立建机株式会社 混合动力式轮式装载机
CN105518225B (zh) * 2014-01-07 2017-11-24 株式会社Kcm 混合动力式轮式装载机
CN103909836A (zh) * 2014-02-24 2014-07-09 北京三兴汽车有限公司 大功率电容辅助供电动力装置
CN104163097A (zh) * 2014-08-01 2014-11-26 清华大学 一种并联式混合动力挖掘机的耦合控制方法
CN104163097B (zh) * 2014-08-01 2016-09-21 清华大学 一种并联式混合动力挖掘机的耦合控制方法
CN104674877A (zh) * 2015-02-12 2015-06-03 徐州徐工挖掘机械有限公司 一种电动液压挖掘机控制系统
CN107657076A (zh) * 2017-08-24 2018-02-02 厦门金龙旅行车有限公司 一种插电式混合动力系统动力匹配方法
CN110685310A (zh) * 2019-10-11 2020-01-14 徐州徐工基础工程机械有限公司 基于神经网络的发动机极载控制方法、系统及工程车辆
CN111255006A (zh) * 2020-01-20 2020-06-09 广西玉柴重工有限公司 一种挖掘机液压泵、发动机集成同步控制方法及装置

Also Published As

Publication number Publication date
CN101906796B (zh) 2012-02-01

Similar Documents

Publication Publication Date Title
CN101906796B (zh) 一种并联式混合动力液压挖掘机的主动控制策略
CN105839689B (zh) 多能源多电机液压挖掘机电液混合驱动系统及控制方法
CN102869838B (zh) 用于混合动力挖掘机的控制系统
CN101909962B (zh) 用于控制混合能量系统的系统
CN102021926B (zh) 一种提高挖掘机效率的智能控制方法
CN105189233B (zh) 用于优化混合动力电动车中功率消耗的系统和方法
CN103119226B (zh) 混合式工作机械
CN102245911B (zh) 混合动力建设机械的控制装置
EP2527219A1 (en) Drive control device for working vehicle
CN101987620A (zh) 用于混合动力施工机械的控制系统和方法
CN106661869B (zh) 混合动力式工程机械
US10233949B2 (en) Accumulator assisted hydrostatic driveline and optimization method thereof
CN105517868B (zh) 混合动力式工程机械
CN105143685A (zh) 作业机械的驱动装置
CN102312827A (zh) 混凝土泵及其泵送控制装置与泵送控制方法
CN103180520A (zh) 动力传动装置
CN104358284A (zh) 一种液压挖掘机油电液混合驱动系统
CN104080981A (zh) 工程机械的燃料效率信息提供系统
CN204266284U (zh) 一种液压挖掘机油电液混合驱动系统
Zimmerman et al. Optimal control for the series-parallel displacement controlled hydraulic hybrid excavator
CN106223393A (zh) 一种数字化电动液压挖掘机
CN106133252A (zh) 用于管理机器动力系统的系统和方法
CN104947732A (zh) 混合动力工程机械
CN101225668A (zh) 并联式混合动力液压挖掘机的控制方法
CN104005446A (zh) 挖掘机的正流量控制方法和系统及挖掘机

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120201

Termination date: 20190709