CN101900801B - Intelligent electric energy meter field test device and test method thereof - Google Patents

Intelligent electric energy meter field test device and test method thereof Download PDF

Info

Publication number
CN101900801B
CN101900801B CN 201010227042 CN201010227042A CN101900801B CN 101900801 B CN101900801 B CN 101900801B CN 201010227042 CN201010227042 CN 201010227042 CN 201010227042 A CN201010227042 A CN 201010227042A CN 101900801 B CN101900801 B CN 101900801B
Authority
CN
China
Prior art keywords
electric energy
energy meter
intelligent electric
data
phase
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201010227042
Other languages
Chinese (zh)
Other versions
CN101900801A (en
Inventor
田卫华
王占元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Institute of Engineering
Original Assignee
Shenyang Institute of Engineering
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Institute of Engineering filed Critical Shenyang Institute of Engineering
Priority to CN 201010227042 priority Critical patent/CN101900801B/en
Publication of CN101900801A publication Critical patent/CN101900801A/en
Application granted granted Critical
Publication of CN101900801B publication Critical patent/CN101900801B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention relates to an intelligent electric energy meter field test device and a test method thereof. The test device comprises a micro controller, a metering unit, a communication interface unit, a memorizer, an input part, a current acquisition channel and a voltage acquisition channel, a clock module and a pulse input unit; wherein the micro controller receives a control instruction of the input part and sends out an operation signal to the communication interface unit, the memorizer, a displaying part and the clock module; the metering unit carries out filtering, amplifying, sampling and digital signal processing on analogue signals transmitted by the current acquisition channel and the voltage acquisition channel, so as to convert the analogue signals into digital signals, and the digital signals are sent to the micro controller; the communication interface unit carries out data communication with an electric energy meter and downloads a user file from a server, and the user file is uploaded to the micro controller, and data of field test is uploaded and recorded into the server. The invention has the advantage that whether all the functions of intelligent electric energy meter are in normal operation or not can be determined by virtue of field test and diagnosis without interruption of power supply, modifying field primary and secondary loops or changing the state of the relay of the electric energy meter.

Description

Intelligent electric energy meter on-site detecting device and detection method
Technical field
The present invention relates to a kind of pick-up unit, relate in particular to a kind of intelligent electric energy meter on-site detecting device and detection method.
Background technology
In recent years, China pays much attention to the intelligent grid construction.Premier Wen Jiabao stresses in the government work report in 2010, " develop low carbon technique energetically, promote high-efficiency energy-saving technology, develop actively new and renewable sources of energy, the construction of reinforcement intelligent grid.”
Intelligent grid will promote the realization of " interaction " electricity consumption---power grid enterprises and user interaction are regulated the peak of power consumption load.The power mode of this interaction requires electric energy meter to possess functions such as bidirectional measuring, rate control, communication, and therefore, intelligent electric energy meter arises at the historic moment.
In October, 2009, State Grid Corporation of China has formulated " intelligent electric energy meter technical manual ".Meet the electric energy meter 26 provinces all-round popularization in the national grid scope of " intelligent electric energy meter technical manual " at present.Intelligent electric energy meter is development on the electronic electric energy meter basis, except original unidirectional function of measuring, has also expanded a lot of new functions.The function of the intelligent electric energy meter that " intelligent electric energy meter technical manual " requires comprises: the bidirectional measuring function, take the control function, and measure and monitoring function event recording function; The tariff period function, Presentation Function, warning function; Freezing function, clocking capability, pulse output function.
Intelligent electric energy meter is as the product of newly developing; Though passed through the DianKeYuan detection that national grid is arranged, all not through the test of on-the-spot operation, especially part producer is the economic pursuit interests; Reduce the electric energy meter cost, brought a series of operation hidden danger for some field erected intelligent electric energy meters.Because intelligent electric energy meter has multinomial operation function; Wherein one or multinomial function break down; If function of measuring is talked about normally, existing on-site detecting device can not carry out other Function detection and the fault diagnosis of intelligent electric energy meter like devices such as electric energy meter on-site calibrators.Some intelligent electric energy meters move in spite of illness, and the electricity metering data are inaccurate, the unnecessary economic loss of all bringing for electric company and power consumer.
Summary of the invention
In order to solve the problems of the technologies described above the present invention a kind of intelligent electric energy meter on-site detecting device and detection method are provided; Purpose is that the intelligent electric energy meter of scene operation is done comprehensive Function detection; The on-the-spot electric energy meter of operation in spite of illness of in time finding; Make electric energy meter really realize intellectuality, improve the utilization ratio of electric energy.
For reaching above-mentioned purpose intelligent electric energy meter on-site detecting device of the present invention; Constitute by following structure: microcontroller, the steering order of reception input part is to communications interface unit, storer, display part and clock module operation signal; And the raw measurement data of collection metering units; And the data that the measurement data of gathering and communications interface unit are received electric energy meter are compared, judge whether the electric energy meter measurement data is overproof, and comparing result is shown at display part; Metering units current acquisition passage and the next simulating signal of voltage acquisition channel transfer, converts the measurement data of digital signal to after process filtering, amplification, sampling and the digital signal processing, and offers microcontroller; Communications interface unit, carry out data communication with electric energy meter and from server the download user archives, and send microcontroller to, the data of uploading on-the-spot test with record in the server; Storer is stored the files on each of customers that microcontroller receives, and to microcontroller the files on each of customers of storage is provided with field electric energy table detection data and record; Input part is to the microcontroller input control order; Display part shows the testing result of microcontroller and the parameter of importing to microcontroller that is provided with; Current acquisition passage and voltage acquisition passage are gathered the electric current and the voltage signal of electric energy meter; Clock module provides clock signal to microcontroller, and proofreads according to the clock signal that microcontroller provides; The pulse input block receives the pulse input signal of electric energy meter, and pulse input signal is sent to microcontroller.
The intelligent electric energy meter on-site detecting device also comprises following structure: the ESAM module: be used for the message exchange safety certification, to the data encryption and decryption to guarantee safety of data transmission and integrality; The IC-card module is sent to microcontroller with the information of CPU card, and according to the control of microcontroller to CPU card writing information; Alarm unit is reported to the police according to the alerting signal of microcontroller, and wherein alarm unit comprises warning LED lamp and hummer.
Described communications interface unit comprises electric energy meter communications interface unit and computing machine/printer communication interface portion, and the electric energy meter communications interface unit comprises infrared communication circuit and RS485 circuit.
Described electric energy meter communications interface unit also comprises the carrier communication circuit; Computing machine/printer communication interface portion comprises USB circuit, RS232 circuit or RS485 circuit.
Described input part comprises numerical key, directionkeys, ESC Escape, acknowledgement key, start key, printing key, shutter key and key backlight; Current acquisition passage and voltage acquisition passage are respectively current clamp and voltage clamp; The pulse input block is light pulse input detecting circuit or electric pulse input detecting circuit; Files on each of customers is the operational factor and the data of electric energy meter; The raw measurement data of metering units 6 is electric flux, active power, reactive power, power factor, branch phase voltage, divides phase current, frequency, harmonic wave, phase sequence, electric current and instantaneous voltage.
The detection method of intelligent electric energy meter on-site detecting device is made up of following step: communicate through communications interface unit and server earlier, download user's to be measured files on each of customers, be stored in the storer; Detect behind the scene be divided into that the electric energy meter measuring accuracy detects, the detection of electric energy meter communication function and the detection of electric energy meter operational factor and data; Wherein the electric energy meter measuring accuracy detects and is: whether metering electric energy and the resultant metering electric energy of metering units that the pulse signal that microcontroller receives according to the pulse input block obtains electric energy meter compare overproof; The detection of electric energy meter communication function: the communications interface unit of communications interface unit and electric energy meter is communicated test, judge whether normally to receive and dispatch message; The detection of electric energy meter operational factor and data is to judge whether normally from communications interface unit reception electric energy meter operational factor and data according to microcontroller.
Described user to be measured suspects unusual user is arranged or need the user of generaI investigation regularly for the big community user of line loss, the long-range user that can't check meter, meter reading data.
During described electric energy meter measuring accuracy detects; Metering units is passed to microcontroller with the analog signal conversion electric quantity data of current clamp and voltage clamp collection; Microcontroller calculates the electrical energy meter accuracy error to the impulse electric charge data contrast of these data and electric energy meter input; When tested electric energy meter is the three-phase four-wire system electric energy meter; Yellow, green, red, black four voltage clamps connect respectively on A, B, C three-phase phase line and the zero line of electric energy meter, and A, B, C three-phase current pincers are clipped in respectively on electric energy meter A, B, the C phase current lambda line; When tested electric energy meter is the three-phase three-wire system electric energy meter; Yellow, green, red, black four voltage clamps connect respectively on A, B, C three-phase phase line and the zero line of electric energy meter; Green voltage clamp and black voltage pincers also connect, and A phase and C phase current pincers are clipped in respectively on electric energy meter A, the C phase current lambda line; When tested electric energy meter is the single-phase intelligent electric energy meter, the phase line lambda line of A phase current cramp joint electric energy meter, yellow, black two voltage clamps are the phase line and the zero line of order phase electric energy meter respectively.
Communication test when described electric energy meter communication function detects comprises the test of infrared communication circuit, RS485 circuit and carrier communication circuit.
The detection of described electric energy meter operational factor and data comprises: read electric energy meter active power, reactive power, power factor, branch phase voltage, divide phase current, frequency measured data, with the measured value contrast, judge whether the measured value of electric energy meter is overproof; If overproof ± 1%, this electric energy meter are bug list; Read freezing data: read the time and the electric quantity data that regularly freeze, draw regularly freezing curve, differentiate the rationality of the timing freezing data of electric energy meter; Read the time and the electric quantity data that freeze of day, draw a day freezing curve, differentiate electric energy meter day freezing data rationality; Read instantaneous time of freezing and electric quantity data, according to freezing day and the time and the electric quantity data that regularly freeze, differentiate instantaneous freeze whether reasonable; Read the agreement time and the electric quantity data that freeze, according to freezing day and the time and the electric quantity data that regularly freeze, differentiate agreement and whether freeze rationality; Read time and electric quantity data that integral point freezes, draw the integral point freezing curve, differentiate the rationality of the integral point freezing data of electric energy meter; Read logout: read game clock lid record, analyze generation, the finish time of game clock lid incident, whether the section of declaring electric energy meter exists unusual game clock to cover artificial electricity filching behavior; Read the power down record, analyze the moment that power down takes place and finishes, whether the section of declaring electric energy meter exists powered-off fault; Record when reading the school, the moment and operator's code when analyzing the school are when judging whether to exist unusual school; Read Long-distance Control drawing lock logout, analysis is drawn, the combined floodgate incident takes place to judge whether to exist unusual drawing lock incident constantly; Read electric energy meter zero clearing logout, the electric energy data when the generation moment of analysis zero clearing incident and zero clearing judges whether to exist unusual zero clearing incident; Read the electric energy meter programming record, analyze the moment, operator's code, the programming item of programming, judged whether illegal programming; If tested electric energy meter is a three-phase electric energy meter, read each phase decompression record, each phase phase failure record, each phase defluidization record, full decompression record and negative phase sequence logout etc., be convenient to the management of power use and statistical study; Read rate, period and electricity price data: read two cover time zones and the time segment data, with this files on each of customers contrast of storing in the on-site detecting device, judge whether time zone and period operational factor that electric energy meter stores correct; Read the electric energy meter running status, according to this table rate and period parameter, judge the operation that electric energy meter is present point, peak, put down, whether paddy rate value correct; Read the data of two cover rate electricity prices and two cover ladder electricity prices; With this files on each of customers contrast of storing in the on-site detecting device; Whether the electricity price operational factor of judging the electric energy meter storage is correct; If these data are misdata, need read programmed recording profiling error reason, judge whether it is that the people is for changing by mistake operational factor or cheating electricity filching behavior; If not artificial change, then this electric energy meter is a bug list; Read clock of power meter,, judge whether clock of power meter is overproof with the system clock contrast of on-site detecting device, if clock is overproof, record when reading the school, the correctness when analyzing the school, record is errorless during like the school, and this electric energy meter is a bug list; ESAM module with publicly-owned key; Message is sent to electric energy meter through microcontroller and communications interface unit; The message that returns according to the ESAM security module of electric energy meter; The ESAM security module of judging electric energy meter denys the message that identification has publicly-owned key ESAM module, confirms whether the ESAM security module work of electric energy meter is normal; Multifunctional signal output detects: multifunctional signal output is set to the output time signal, utilizes the pulse mouth of pulse input block and tested electric energy meter to join, and detects the time pulse of electric energy meter, and whether the time pulse of differentiating tested electric energy meter is overproof; Multifunctional signal output is set to export period switching signal, and on-site detecting device detects tested electric energy meter period switching signal before and after switching time period, and whether differentiate tested intelligent electric energy meter period switching signal correct.
Advantageous effect of the present invention: need not have a power failure; Electric energy meter ear envelope once and secondary circuit is not opened in the moved scene, does not revise the electric energy meter operational factor; Do not change under the situation of electric energy meter relay status, whether on-the-spot detection and intelligent diagnosis electric energy meter each item function are moved normally.The project that can detect has: the field diagnostic hardware fault comprises whether infrared communication circuit, RS485 circuit, carrier communication circuit, ESAM module and clock module etc. have hardware fault; Whether detect the various freezing data of electric energy meter unusual; Detect point, peak, put down, paddy tariff data and time zone, the time segment data whether unusual; Whether the inspection logout has exception record, judges artificial the intrusion and other electricity filching behavior; Whether the operation of diagnosis clock is normal; The electric energy meter measuring accuracy is detected, judge whether overproof; Whether operational factors such as the active power that the diagnosis electric energy meter is measured, reactive power, power factor, branch phase voltage, branch phase current, frequency are overproof; Whether on-the-spot detection current transformer actual measurement no-load voltage ratio is consistent with nameplate.The on-the-spot electric energy meter of operation in spite of illness of in time finding makes electric energy meter really realize intellectuality, improves the utilization ratio of electric energy.Electric energy meter electric weight freezing data is copied and accepted at the scene; Obtaining the time and date that electric energy meter can on-the-spot be set; Electric energy meter electric weight data are copied and accepted at the scene, and storage and print data are as the foundation of remedying the electricity charge.
Description of drawings
Fig. 1 is a structural representation of the present invention.
Among the figure: 1, microcontroller; 2, communications interface unit; 3, storer; 4, display part; 5, clock module; 6, metering units; 7, input part; 8, pulse input block; 9, ESAM module; 10, IC-card module; 11, alarm unit; 12, current clamp; 13, voltage clamp; 14, computing machine/printer communication interface portion.
Embodiment
Below in conjunction with accompanying drawing the present invention is described further.
Intelligent electric energy meter on-site detecting device of the present invention as shown in the figure; Constitute by following structure: microcontroller 1, the steering order of reception input part is to communications interface unit 2, storer 3, display part 4 and clock module 5 operation signal; And the raw measurement data of collection metering units 6; And the data that the measurement data of gathering and communications interface unit are received electric energy meter compare, and judge whether the electric energy meter measurement data overproof, and with comparing result in display part 4 demonstrations; Metering units 6 current acquisition passage and the next simulating signal of voltage acquisition channel transfer, converts the measurement data of digital signal to after process filtering, amplification, sampling and the digital signal processing, and offers microcontroller 1; Communications interface unit 2; Receive the signal of electric energy meter transmission and download user archives from server; And send microcontroller 1 to, the data of uploading on-the-spot test with record in the server, the server of indication of the present invention is the various database of information of electric company's leading subscriber; Storer 3 is stored the files on each of customers that microcontroller 1 receives, and to microcontroller 1 files on each of customers of storage is provided with field electric energy table detection data and record; Input part 7 is to microcontroller 1 input control order; Display part 4 shows the testing result of microcontroller 1 and the parameter of importing to microcontroller 1 that is provided with; Current acquisition passage and voltage acquisition passage are gathered the electric current and the voltage signal of electric energy meter; Clock module 5 provides clock signal to microcontroller 1, and proofreads according to the clock signal that microcontroller 1 provides; Pulse input block 8 receives the pulse input signal of electric energy meter, and pulse input signal is sent to microcontroller; ESAM module 9: be used for the message exchange safety certification, carry out encryption and decryption with the data of microcontroller 1 transmission and handle; IC-card module 10 is sent to microcontroller 1 with the information of CPU card, and according to the control of microcontroller 1 to CPU card writing information; Alarm unit 11 is reported to the police according to the alerting signal of microcontroller 1, and wherein alarm unit 11 comprises warning LED lamp and hummer.
Display part is a liquid crystal display; Liquid crystal display shows that metering units is through calculating energy value, active power, reactive power, power factor, branch phase voltage, dividing phase current, frequency, harmonic wave, phase sequence and electric current, instantaneous voltage; These data and the electric energy meter corresponding data contrast of gathering through the electric energy meter communications interface unit; Judge whether the electric energy meter measurement data is overproof, measurement result shows through liquid crystal display;
Communications interface unit 2 comprises electric energy meter communications interface unit 15 and computing machine/printer communication interface portion 14, and electric energy meter communications interface unit 15 comprises infrared communication circuit, RS485 circuit and carrier communication circuit; Computing machine/printer communication interface portion 14 comprises USB circuit, RS232 circuit or RS485 circuit; Be used for and Computer Data Communication; From the downloaded files on each of customers, upload field test data and record, when being used for external printer; Can print files on each of customers, test data, testing result, the record data of storage before also can printing.
Input part 7 comprises numerical key, directionkeys, ESC Escape, acknowledgement key, start key, printing key, shutter key and key backlight; Current acquisition passage and voltage acquisition passage are respectively current clamp 12 and voltage clamp 13; Pulse input block 8 is light pulse input detecting circuit or electric pulse input detecting circuit; Files on each of customers is the operational factor and the data of electric energy meter; The raw measurement data of metering units 6 is electric flux, active power, reactive power, power factor, branch phase voltage, divides phase current, frequency, harmonic wave, phase sequence, electric current and instantaneous voltage.
The detection method of intelligent electric energy meter on-site detecting device is characterized in that being made up of following step: communicate through communications interface unit and server earlier, download user's to be measured files on each of customers, be stored in the storer; Detect behind the scene be divided into that the electric energy meter measuring accuracy detects, the detection of electric energy meter communication function and the detection of electric energy meter operational factor and data; Wherein the electric energy meter measuring accuracy detects and is: whether metering electric energy and the resultant metering electric energy of metering units that the pulse signal that microcontroller receives according to the pulse input block obtains electric energy meter compare overproof; The detection of electric energy meter communication function: the communications interface unit of communications interface unit and electric energy meter is communicated test, judge whether normally to receive and dispatch message; The detection of electric energy meter operational factor and data is to judge whether normally from communications interface unit reception electric energy meter operational factor and data according to microcontroller.
User to be measured suspects unusual user is arranged or need the user of generaI investigation regularly for the big community user of line loss, the long-range user that can't check meter, meter reading data.
During the electric energy meter measuring accuracy detects; Metering units is passed to microcontroller with the analog signal conversion electric quantity data of current clamp and voltage clamp collection; Microcontroller calculates the electrical energy meter accuracy error to the impulse electric charge data contrast of these data and electric energy meter input; When tested electric energy meter is the three-phase four-wire system electric energy meter; Yellow, green, red, black four voltage clamps connect respectively on A, B, C three-phase phase line and the zero line of electric energy meter, and A, B, C three-phase current pincers are clipped in respectively on electric energy meter A, B, the C phase current lambda line; When tested electric energy meter is the three-phase three-wire system electric energy meter; Yellow, green, red, black four voltage clamps connect respectively on A, B, C three-phase phase line and the zero line of electric energy meter; Green voltage clamp and black voltage pincers also connect, and A phase and C phase current pincers are clipped in respectively on electric energy meter A, the C phase current lambda line; When tested electric energy meter is the single-phase intelligent electric energy meter, the phase line lambda line of A phase current cramp joint electric energy meter, yellow, black two voltage clamps are the phase line and the zero line of order phase electric energy meter respectively.
Communication test when the electric energy meter communication function detects comprises the test of infrared communication circuit, RS485 circuit and carrier communication circuit.
The detection of described electric energy meter operational factor and data comprises:
Read electric energy meter active power, reactive power, power factor, branch phase voltage, divide phase current, frequency measured data,, judge whether the measured value of electric energy meter is overproof with the measured value contrast; If overproof ± 1%, this electric energy meter are bug list;
Read freezing data: read the time and the electric quantity data that regularly freeze, draw regularly freezing curve, differentiate the rationality of the timing freezing data of electric energy meter; Read the time and the electric quantity data that freeze of day, draw a day freezing curve, differentiate electric energy meter day freezing data rationality; Read instantaneous time of freezing and electric quantity data, according to freezing day and the time and the electric quantity data that regularly freeze, differentiate instantaneous freeze whether reasonable; Read the agreement time and the electric quantity data that freeze, according to freezing day and the time and the electric quantity data that regularly freeze, differentiate agreement and whether freeze rationality; Read time and electric quantity data that integral point freezes, draw the integral point freezing curve, differentiate the rationality of the integral point freezing data of electric energy meter;
Read logout: read game clock lid record, analyze generation, the finish time of game clock lid incident, whether the section of declaring electric energy meter exists unusual game clock to cover artificial electricity filching behavior; Read the power down record, analyze the moment that power down takes place and finishes, whether the section of declaring electric energy meter exists powered-off fault; Record when reading the school, the moment and operator's code when analyzing the school are when judging whether to exist unusual school; Read Long-distance Control drawing lock logout, analysis is drawn, the combined floodgate incident takes place to judge whether to exist unusual drawing lock incident constantly; Read electric energy meter zero clearing logout, the electric energy data when the generation moment of analysis zero clearing incident and zero clearing judges whether to exist unusual zero clearing incident; Read the electric energy meter programming record, analyze the moment, operator's code, the programming item of programming, judged whether illegal programming; If tested electric energy meter is a three-phase electric energy meter, read each phase decompression record, each phase phase failure record, each phase defluidization record, full decompression record and negative phase sequence logout etc., be convenient to the management of power use and statistical study;
Read rate, period and electricity price data: read two cover time zones and the time segment data, with this files on each of customers contrast of storing in the on-site detecting device, judge whether time zone and period operational factor that electric energy meter stores correct; Read the electric energy meter running status, according to this table rate and period parameter, judge the operation that electric energy meter is present point, peak, put down, whether paddy rate value correct; Read the data of two cover rate electricity prices and two cover ladder electricity prices; With this files on each of customers contrast of storing in the on-site detecting device; Whether the electricity price operational factor of judging the electric energy meter storage is correct; If these data are misdata, need read programmed recording profiling error reason, judge whether it is that the people is for changing by mistake operational factor or cheating electricity filching behavior; If not artificial change, then this electric energy meter is a bug list;
Read clock of power meter,, judge whether clock of power meter is overproof with the system clock contrast of on-site detecting device, if clock is overproof, record when reading the school, the correctness when analyzing the school, record is errorless during like the school, and this electric energy meter is a bug list;
Have the ESAM module of publicly-owned key, message is sent to electric energy meter through microcontroller and communications interface unit, the message that returns according to the ESAM security module of electric energy meter; The ESAM security module of judging electric energy meter denys that identification has the message that publicly-owned key ESAM module is sent; Microcontroller receives the message that electric energy meter ESAM security module is returned, if expressly, microcontroller is directly judged; If need the message of translation; Microcontroller is sent to the ESAM module with the message that returns and translates, and delivers to microcontroller again after the translation of ESAM module and further judges, confirms whether the ESAM security module work of electric energy meter is normal;
Multifunctional signal output detects: multifunctional signal output is set to the output time signal, utilizes the pulse mouth of pulse input block and tested electric energy meter to join, and detects the time pulse of electric energy meter, and whether the time pulse of differentiating tested electric energy meter is overproof; Multifunctional signal output is set to export period switching signal, and on-site detecting device detects tested electric energy meter period switching signal before and after switching time period, and whether differentiate tested intelligent electric energy meter period switching signal correct.

Claims (10)

1. intelligent electric energy meter on-site detecting device; It is characterized in that constituting by following structure: microcontroller, the steering order of reception input part is to communications interface unit, storer, display part and clock module operation signal; And the raw measurement data of collection metering units; And the data that the raw measurement data gathered and communications interface unit are received intelligent electric energy meter are compared, judge whether the intelligent electric energy meter raw measurement data is overproof, and comparing result is shown at display part; Metering units current acquisition passage and the next simulating signal of voltage acquisition channel transfer, converts the raw measurement data of digital signal to after process filtering, amplification, sampling and the digital signal processing, and offers microcontroller; Communications interface unit, carry out data communication with intelligent electric energy meter and from server the download user archives, and send microcontroller to, upload the site intelligent electric energy meter and detect data and record in the server; Storer is stored the files on each of customers that microcontroller receives, and to microcontroller the files on each of customers of storage is provided with site intelligent electric energy meter detection data and record; Input part is to the microcontroller input control order; Display part shows the comparing result of microcontroller and the parameter of importing to microcontroller that is provided with; Current acquisition passage and voltage acquisition passage are gathered the electric current and the voltage signal of intelligent electric energy meter; Clock module provides clock signal to microcontroller, and proofreads according to the clock signal that microcontroller provides; The pulse input block receives the pulse input signal of intelligent electric energy meter, and pulse input signal is sent to microcontroller.
2. intelligent electric energy meter on-site detecting device according to claim 1 is characterized in that also comprising following structure: the ESAM module: be used for the message exchange safety certification, to the data encryption and decryption to guarantee safety of data transmission and integrality; The IC-card module is sent to microcontroller with the information of CPU card, and according to the control of microcontroller to CPU card writing information; Alarm unit is reported to the police according to the alerting signal of microcontroller, and wherein alarm unit comprises warning LED lamp and hummer.
3. intelligent electric energy meter on-site detecting device according to claim 1; It is characterized in that described communications interface unit comprises intelligent electric energy meter communications interface unit and computing machine/printer communication interface portion, the intelligent electric energy meter communications interface unit comprises infrared communication circuit and RS485 circuit.
4. intelligent electric energy meter on-site detecting device according to claim 3 is characterized in that described intelligent electric energy meter communications interface unit also comprises the carrier communication circuit; Computing machine/printer communication interface portion comprises USB circuit, RS232 circuit or RS485 circuit.
5. intelligent electric energy meter on-site detecting device according to claim 1 is characterized in that described input part comprises numerical key, directionkeys, ESC Escape, acknowledgement key, start key, printing key, shutter key and key backlight; Current acquisition passage and voltage acquisition passage are respectively current clamp and voltage clamp; The pulse input block is light pulse input detecting circuit or electric pulse input detecting circuit; Files on each of customers is the operational factor and the data of intelligent electric energy meter; The raw measurement data of metering units is electric flux, active power, reactive power, power factor, branch phase voltage, divides phase current, frequency, harmonic wave and phase sequence.
6. the detection method of intelligent electric energy meter on-site detecting device according to claim 1 is characterized in that being made up of following step: communicate through communications interface unit and server earlier, download user's to be measured files on each of customers, be stored in the storer; Detect behind the scene be divided into that the intelligent electric energy meter measuring accuracy detects, the detection of intelligent electric energy meter communication function and the detection of intelligent electric energy meter operational factor and data; Wherein the intelligent electric energy meter measuring accuracy detects and is: whether metering electric energy and the resultant metering electric energy of metering units that the pulse signal that microcontroller receives according to the pulse input block obtains intelligent electric energy meter compare overproof; The detection of intelligent electric energy meter communication function: the communications interface unit of communications interface unit and intelligent electric energy meter is communicated test, judge whether normally to receive and dispatch message; The detection of intelligent electric energy meter operational factor and data is to judge whether normally from communications interface unit reception intelligent electric energy meter operational factor and data according to microcontroller.
7. the detection method of intelligent electric energy meter on-site detecting device according to claim 6 is characterized in that current acquisition passage and voltage acquisition passage are respectively current clamp and voltage clamp; During described intelligent electric energy meter measuring accuracy detects; Metering units is passed to microcontroller with the analog signal conversion electric quantity data of current clamp and voltage clamp collection; Microcontroller calculates the intelligent electric energy meter trueness error to the impulse electric charge data contrast of these data and intelligent electric energy meter input; When tested intelligent electric energy meter is the three-phase four-wire system intelligent electric energy meter; Yellow, green, red, black four voltage clamps connect respectively on A, B, C three-phase phase line and the zero line of three-phase four-wire system intelligent electric energy meter, and A, B, C three-phase current pincers are clipped in respectively on three-phase four-wire system intelligent electric energy meter A, B, the C phase current lambda line; When tested intelligent electric energy meter is the three-phase three-wire system intelligent electric energy meter; Yellow, green, red, black four voltage clamps connect respectively on A, B, C three-phase phase line and the zero line of three-phase three-wire system intelligent electric energy meter; Green voltage clamp and black voltage pincers also connect, and A phase and C phase current pincers are clipped in respectively on three-phase three-wire system intelligent electric energy meter A, the C phase current lambda line; When tested intelligent electric energy meter is the single-phase intelligent electric energy meter, the phase line lambda line of A phase current cramp joint single-phase intelligent electric energy meter, yellow, black two voltage clamps are the phase line and the zero line of order phase intelligent electric energy meter respectively.
8. the detection method of intelligent electric energy meter on-site detecting device according to claim 6 is characterized in that communication test when described intelligent electric energy meter communication function detects comprises the test of infrared communication circuit, RS485 circuit and carrier communication circuit.
9. the detection method of intelligent electric energy meter on-site detecting device according to claim 6 is characterized in that the detection of described intelligent electric energy meter operational factor and data comprises:
Read intelligent electric energy meter active power, reactive power, power factor, branch phase voltage, divide phase current, frequency measured data,, judge whether the measured value of intelligent electric energy meter is overproof with the measured value contrast; If overproof ± 1%, this intelligent electric energy meter are bug list;
Read freezing data: read the time and the electric quantity data that regularly freeze, draw regularly freezing curve, differentiate the rationality of the timing freezing data of intelligent electric energy meter; Read the time and the electric quantity data that freeze of day, draw a day freezing curve, differentiate intelligent electric energy meter day freezing data rationality; Read instantaneous time of freezing and electric quantity data, according to freezing day and the time and the electric quantity data that regularly freeze, differentiate instantaneous freeze whether reasonable; Read the agreement time and the electric quantity data that freeze, according to freezing day and the time and the electric quantity data that regularly freeze, differentiate agreement and whether freeze rationality; Read time and electric quantity data that integral point freezes, draw the integral point freezing curve, differentiate the rationality of the integral point freezing data of intelligent electric energy meter;
Read logout: read game clock lid record, analyze generation, the finish time of game clock lid incident, whether the section of declaring intelligent electric energy meter exists unusual game clock to cover artificial electricity filching behavior; Read the power down record, analyze the moment that power down takes place and finishes, whether the section of declaring intelligent electric energy meter exists powered-off fault; Record when reading the school, the moment and operator's code when analyzing the school are when judging whether to exist unusual school; Read Long-distance Control drawing lock logout, analysis is drawn, the combined floodgate incident takes place to judge whether to exist unusual drawing lock incident constantly; Read intelligent electric energy meter zero clearing logout, the electric energy data when the generation moment of analysis zero clearing incident and zero clearing judges whether to exist unusual zero clearing incident; Read the intelligent electric energy meter programmed recording, analyze the moment, operator's code, the programming item of programming, judged whether illegal programming; If tested intelligent electric energy meter is the three-phase intelligent electric energy meter, read each phase decompression record, each phase phase failure record, each phase defluidization record, full decompression record and negative phase sequence logout etc., be convenient to the management of power use and statistical study;
Read rate, period and electricity price data: read two cover time zones and the time segment data, with this files on each of customers contrast of storing in the on-site detecting device, judge whether time zone and period operational factor that intelligent electric energy meter stores correct; Read the intelligent electric energy meter running status, according to intelligent electric energy meter rate and period parameter, judge the operation that intelligent electric energy meter is present point, peak, flat, whether paddy rate value correct; Read the data of two cover rate electricity prices and two cover ladder electricity prices; With this files on each of customers contrast of storing in the on-site detecting device; Whether the electricity price operational factor of judging the intelligent electric energy meter storage is correct; If these data are misdata, need read programmed recording profiling error reason, judge whether it is that the people is for changing by mistake operational factor or cheating electricity filching behavior; If not artificial change, then this intelligent electric energy meter is a bug list;
Read the intelligent electric energy meter clock,, judge whether the intelligent electric energy meter clock is overproof with the system clock contrast of on-site detecting device, if clock is overproof, record when reading the school, the correctness when analyzing the school, record is errorless during like the school, and this intelligent electric energy meter is a bug list.
10. the detection method of intelligent electric energy meter on-site detecting device according to claim 6; It is characterized in that also comprising following detection step: to having the ESAM module of publicly-owned key; Message is sent to intelligent electric energy meter through microcontroller and communications interface unit; The message that returns according to the ESAM security module of intelligent electric energy meter; The ESAM security module of judging intelligent electric energy meter denys the message that identification has publicly-owned key ESAM module, confirms whether the ESAM security module work of intelligent electric energy meter is normal;
Multifunctional signal output detects: multifunctional signal output is set to the output time signal, utilizes the pulse mouth of pulse input block and intelligent electric energy meter to join, and detects the time pulse of intelligent electric energy meter, and whether the time pulse of differentiating intelligent electric energy meter is overproof; Multifunctional signal output is set to export period switching signal, and on-site detecting device detects intelligent electric energy meter period switching signal before and after switching time period, and whether differentiate intelligent electric energy meter period switching signal correct.
CN 201010227042 2010-07-15 2010-07-15 Intelligent electric energy meter field test device and test method thereof Expired - Fee Related CN101900801B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010227042 CN101900801B (en) 2010-07-15 2010-07-15 Intelligent electric energy meter field test device and test method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010227042 CN101900801B (en) 2010-07-15 2010-07-15 Intelligent electric energy meter field test device and test method thereof

Publications (2)

Publication Number Publication Date
CN101900801A CN101900801A (en) 2010-12-01
CN101900801B true CN101900801B (en) 2012-11-07

Family

ID=43226495

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010227042 Expired - Fee Related CN101900801B (en) 2010-07-15 2010-07-15 Intelligent electric energy meter field test device and test method thereof

Country Status (1)

Country Link
CN (1) CN101900801B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106918798A (en) * 2017-03-31 2017-07-04 中国电力科学研究院 Electrical energy meter fault method of testing

Families Citing this family (69)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102121977A (en) * 2010-12-14 2011-07-13 华北电网有限公司计量中心 Method and device for detecting IC (Integrate Circuit) card electric energy meter
CN102142171A (en) * 2011-01-30 2011-08-03 宁波迦南电子有限公司 Transmission media of intelligent charge-controlled electricity meter and electricity purchasing method by using same
CN102176680A (en) * 2011-01-30 2011-09-07 重庆电力科学试验研究院 Detection device for electricity information acquisition system
CN102305922B (en) * 2011-05-25 2013-09-04 湖南省电力公司科学研究院 On-load detection method and device for intelligent optical fiber electric energy meter in substation
CN102901851A (en) * 2011-07-25 2013-01-30 南京能瑞自动化设备股份有限公司 Single-phase remote-cost control intelligent ammeter with RS485 control signal output
CN102353927A (en) * 2011-09-25 2012-02-15 安徽省电力公司宣城供电公司 Filed tester for acquisition system for electricity consumption information and test method thereof
CN102435838A (en) * 2011-10-18 2012-05-02 中国电力科学研究院 Basic electric quantity type energy-efficiency data collecting terminal
CN102411090A (en) * 2011-12-15 2012-04-11 华立仪表集团股份有限公司 Self-checking electronic energy meter and self-checking method thereof
CN102744728B (en) * 2012-07-20 2015-06-10 重庆市电力公司电力科学研究院 Manipulator for verifying electric energy meter
CN102879619B (en) * 2012-09-07 2015-04-01 上海申瑞继保电气有限公司 Method for identifying full-scale jump of active electric measure
CN103792422A (en) * 2012-11-02 2014-05-14 苏州工业园区新宏博通讯科技有限公司 Electric energy meter
CN103323809B (en) * 2013-06-18 2016-08-10 国家电网公司 A kind of electric energy meter test equipment
CN103400491A (en) * 2013-08-19 2013-11-20 孙蕾 Mobile hand-held data collection terminal based on MBUS protocol
CN103425124B (en) * 2013-08-20 2015-11-18 重庆长安汽车股份有限公司 Based on car electrics connectivity pick-up unit and the method for current detecting
CN105699932B (en) * 2013-11-22 2017-10-17 国网江苏省电力公司常州供电公司 High-precision intelligent substation digital electric energy meter calibration device
CN105676162B (en) * 2013-11-22 2017-10-17 国网江苏省电力公司常州供电公司 Low-cost intelligent substation digital electric energy meter calibration device
CN103616659B (en) * 2013-12-02 2016-08-17 国家电网公司 Intelligent electric energy meter transient voltage interrupts automatic testing equipment and the method for lower reliability
CN103744050A (en) * 2014-01-23 2014-04-23 国家电网公司 Field detection device of intelligent electric energy meter
CN104062496B (en) * 2014-07-03 2017-03-22 江苏省电力公司宿迁供电公司 Portable mobile electric testing recorder and optimization method therefor
CN104267374B (en) * 2014-10-17 2017-09-26 成都思晗科技股份有限公司 Metering device on-line checking and status assessing system
CN104267373A (en) * 2014-10-17 2015-01-07 成都思晗科技有限公司 Gateway meter assessment device
CN104316895A (en) * 2014-10-28 2015-01-28 哈尔滨电工仪表研究所 Single-phase and three-phase power meter detector
CN104392603B (en) * 2014-11-20 2017-09-01 国家电网公司 A kind of live power information collecting device intelligent diagnosis system
CN104655926B (en) * 2015-02-10 2018-04-03 南京正泰龙科技有限公司 A kind of built-in terminal and its monitoring method that can monitor power information and electricity charge data
CN104678349A (en) * 2015-03-26 2015-06-03 国家电网公司 Interface detection device for electric energy meter and system of interface detection device
CN104950151A (en) * 2015-07-10 2015-09-30 成都天兴电气有限公司 Device for automatically switching three-wire and four-wire metering modes of three-phase electric energy meter
WO2017031701A1 (en) * 2015-08-25 2017-03-02 深圳市思达仪表有限公司 Single/three-phase electronic prepaid step tariff electric energy meter with cpu card
CN105044657B (en) * 2015-09-11 2017-12-19 成都思晗科技股份有限公司 Gate energy meter monitoring system
CN105425200A (en) * 2015-11-30 2016-03-23 中电装备山东电子有限公司 Automatic testing apparatus for independent pulse mantissa metering of intelligent electric energy meter
CN105510868A (en) * 2015-12-21 2016-04-20 国网四川省电力公司电力科学研究院 Smart electric meter electricity-selling communication detection system
CN105610520B (en) * 2015-12-21 2018-09-07 国网四川省电力公司电力科学研究院 A kind of intelligent electric meter sale of electricity communication check terminal
CN105550945A (en) * 2016-01-27 2016-05-04 董冬 Portable on-site electricity inspection apparatus and electricity acquisition method
CN105866490B (en) * 2016-03-29 2018-10-02 航天中电科技(北京)有限公司 Based on long-range high in the clouds and the double Intelligent ammeter boxes authorized of low coverage bluetooth
CN105842652B (en) * 2016-06-01 2018-12-25 国网重庆市电力公司电力科学研究院 A kind of digital electricity meter on-line testing method
CN105974355A (en) * 2016-06-13 2016-09-28 国网辽宁省电力有限公司朝阳供电公司 Electric energy metering device comprehensive operation detector and use method thereof
CN105845007A (en) * 2016-06-13 2016-08-10 国网辽宁省电力有限公司朝阳供电公司 Intelligent electric energy meter simulation application test stand and use method thereof
CN106251599A (en) * 2016-08-05 2016-12-21 中国南方电网有限责任公司电网技术研究中心 Take remote control function method of testing and the system of control electric energy meter
CN106297256A (en) * 2016-08-17 2017-01-04 国网青海省电力公司海东供电公司 A kind of power information gathers O&M field failure determination methods and system
CN106093841A (en) * 2016-08-25 2016-11-09 海盐星创电子有限公司 A kind of hand-held electric energy meter on-site calibrator
CN106405476A (en) * 2016-09-28 2017-02-15 国家电网公司 Electric energy meter monitoring and analysis method and system utilizing mobile terminal
CN106353544A (en) * 2016-10-12 2017-01-25 黑龙江省电工仪器仪表工程技术研究中心有限公司 COG (Chip on Glass) single-phase intelligent ammeter
CN106569166B (en) * 2016-10-17 2019-08-13 中国电力科学研究院 A kind of test method in twin-core electric energy meter legality measurement portion
CN106501599B (en) * 2016-10-17 2019-04-23 国家电网公司 Twin-core electric energy meter data exchange validity determines method and system and twin-core electric energy meter
CN106959428B (en) * 2017-03-31 2021-11-02 中国电力科学研究院 Fault excitation testing device for electric energy meter
CN107144809A (en) * 2017-05-15 2017-09-08 中国电力科学研究院 A kind of portable system and method for being used to carry out digitalized electrical energy meter live on-line testing
CN107121659A (en) * 2017-06-22 2017-09-01 国网辽宁省电力有限公司锦州供电公司 A kind of three-phase electric energy meter on-site detection means and detection method
CN107328968B (en) * 2017-06-27 2020-04-21 威胜集团有限公司 Freezing and event record data storage method for electric energy meter
CN107515380A (en) * 2017-07-20 2017-12-26 国网安徽省电力公司亳州供电公司 A kind of single-phase zone load electric energy table on-site calibrator
CN107422175B (en) * 2017-08-25 2020-12-25 中国电力科学研究院有限公司 Method and system for judging clock abnormity of power consumption information acquisition system
CN107995058B (en) * 2017-11-03 2019-01-22 黄河科技学院 The internet of things functional detection circuit of internet of things home appliance
CN107957570A (en) * 2017-11-15 2018-04-24 国网辽宁省电力有限公司朝阳供电公司 A kind of intelligent electric energy meter check system based on PLC distributed I/Os
CN107884653B (en) * 2017-12-03 2023-06-02 国网江西省电力有限公司南昌供电分公司 Electricity inspection equipment for extensible module
CN108109363A (en) * 2018-01-31 2018-06-01 深圳市锦熹科技有限公司 Check instrument and application method in a kind of intelligent electric meter scene based on infrared communication
CN108445436B (en) * 2018-03-01 2020-04-10 宁波迦南智能电气股份有限公司 Electric energy meter with double cores for mutual detection of running states
CN108469725B (en) * 2018-03-27 2020-06-26 国网河北省电力有限公司电力科学研究院 Clock timing method and terminal equipment
CN108717173B (en) * 2018-05-15 2020-12-18 黑龙江省电工仪器仪表工程技术研究中心有限公司 Intelligent electric energy meter data tracing method
CN109407037B (en) * 2018-06-29 2021-05-04 宁波三星智能电气有限公司 Test method of intelligent electric meter
CN109241132B (en) * 2018-08-06 2022-05-13 宁波三星智能电气有限公司 Method for retrieving daily time table rate of electric energy meter
CN109212462A (en) * 2018-11-15 2019-01-15 国网四川省电力公司电力科学研究院 A kind of fault detection method of single-phase intelligent electric energy meter residual amount exception
CN110045267A (en) * 2019-05-05 2019-07-23 珠海国测电能仪表科技有限公司 A kind of intelligence multi-loop electric minor guide rail meter route board detecting method and detection device
CN112147560A (en) * 2019-06-26 2020-12-29 浙江共同电子科技有限公司 Simple carrier module detection method based on inversion technology and split-phase detection technology
CN110174636B (en) * 2019-07-09 2021-02-02 郑州万特电气股份有限公司 Detection method and system for time-interval switching of electric energy meter and readable storage medium
CN111077491B (en) * 2019-11-20 2022-02-22 国网浙江宁波市鄞州区供电有限公司 Error self-diagnosis processing method for single-phase electric energy meter
CN110907678A (en) * 2019-12-16 2020-03-24 杭州海兴电力科技股份有限公司 Rate electric energy compensation metering method for IR46 multi-core modular intelligent electric energy meter
CN112230175A (en) * 2019-12-20 2021-01-15 青岛鼎信通讯股份有限公司 Electric energy meter full-function test platform based on script language
CN111415559B (en) * 2020-05-28 2022-03-29 广东电网有限责任公司培训与评价中心 Series-type low-voltage three-phase four-wire electric energy metering simulation wiring training cabinet
CN112087300B (en) * 2020-07-30 2023-04-28 宁波三星医疗电气股份有限公司 Key distribution method for electric power field device
CN116560454A (en) * 2023-05-04 2023-08-08 深圳市通测检测技术有限公司 Pulse generation system
CN116430300B (en) * 2023-06-08 2023-08-25 石家庄科林电气股份有限公司 Method, device and system for identifying clock faults of electric energy meter

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101408603A (en) * 2008-11-25 2009-04-15 湖北省电力公司咸宁供电公司 Method for detecting electricity theft-proof electric energy meter
CN101498777A (en) * 2009-03-19 2009-08-05 重庆电力科学试验研究院 Detection apparatus for carrier wave electric energy meter
CN201383000Y (en) * 2009-03-19 2010-01-13 重庆电力科学试验研究院 Electric energy meter detecting device
CN201716409U (en) * 2010-07-15 2011-01-19 田卫华 On-site testing device for intelligent electric energy meter

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5366418B2 (en) * 2008-03-24 2013-12-11 東光東芝メーターシステムズ株式会社 Current detector and watt-hour meter using the same

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101408603A (en) * 2008-11-25 2009-04-15 湖北省电力公司咸宁供电公司 Method for detecting electricity theft-proof electric energy meter
CN101498777A (en) * 2009-03-19 2009-08-05 重庆电力科学试验研究院 Detection apparatus for carrier wave electric energy meter
CN201383000Y (en) * 2009-03-19 2010-01-13 重庆电力科学试验研究院 Electric energy meter detecting device
CN201716409U (en) * 2010-07-15 2011-01-19 田卫华 On-site testing device for intelligent electric energy meter

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
JP特开2009-229300A 2009.10.08

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106918798A (en) * 2017-03-31 2017-07-04 中国电力科学研究院 Electrical energy meter fault method of testing

Also Published As

Publication number Publication date
CN101900801A (en) 2010-12-01

Similar Documents

Publication Publication Date Title
CN101900801B (en) Intelligent electric energy meter field test device and test method thereof
CN201716409U (en) On-site testing device for intelligent electric energy meter
CN102761173B (en) Intelligent electric meter with functions of leakage remote monitoring and protection
CN103499806B (en) For portable detector and the method for electric energy measuring equipment
CN202870226U (en) Electric energy quality analyzer
CN101876694B (en) Configuration software based function detection device of multifunctional electric energy meter and method thereof
CN102749549B (en) A kind of transformer station AC current-voltage secondary circuit Smart Verify system
CN102663857B (en) Non-contact IC card mechanical film type gas meter and control system thereof
CN204101112U (en) Based on the intelligent gas-meter system of STM32
CN102879661A (en) Method and system for detecting distribution network automatic terminal
CN204855786U (en) From measurement formula ammeter accuracy testing check table
CN201886042U (en) Smart electricity meter for state grid single-phase carrier long-distance prepayment
CN102174807A (en) Ropeless static penetrometer and method for acquiring and processing data
CN102707133B (en) The device of the alternating voltage that a kind of survey frequency is variable, system and method
CN202534055U (en) Prepayment electric energy meter site detector
CN203811737U (en) Direct-current electric-leakage monitoring and warning device
CN200989926Y (en) Radio digital nuclear phase system
CN202153235U (en) Bidirectional direct current electric energy meter
TWI461710B (en) Power Quality Analyzer System
CN102608423B (en) Detection method of harmonic energy
CN201319049Y (en) High-tension current mutual-inductor transformation ratio tester
CN201637772U (en) Remote fault diagnosis system for infrared shaft temperature detection station
CN202486308U (en) Harmonic electric quantity measuring system
CN203616390U (en) Remote charge-control three-phase intelligent electricity meter
CN102645581A (en) Low-tension electricity metering device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: SHENYANG ENGINEERING COLLEGE

Free format text: FORMER OWNER: TIAN WEIHUA

Effective date: 20120829

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 110003 SHENYANG, LIAONING PROVINCE TO: 110136 SHENYANG, LIAONING PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20120829

Address after: Shenbei New Area Puchang road Shenyang City, Liaoning province 110136 No. 18

Applicant after: Shenyang Engineering College

Address before: 25, building 96, Lane 671, Heping South Avenue, Heping District, Liaoning, Shenyang 110003

Applicant before: Tian Weihua

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121107

Termination date: 20140715

EXPY Termination of patent right or utility model