CN104062496B - Portable mobile electric testing recorder and optimization method therefor - Google Patents

Portable mobile electric testing recorder and optimization method therefor Download PDF

Info

Publication number
CN104062496B
CN104062496B CN201410314640.XA CN201410314640A CN104062496B CN 104062496 B CN104062496 B CN 104062496B CN 201410314640 A CN201410314640 A CN 201410314640A CN 104062496 B CN104062496 B CN 104062496B
Authority
CN
China
Prior art keywords
module
phase
voltage
clamp
current
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410314640.XA
Other languages
Chinese (zh)
Other versions
CN104062496A (en
Inventor
戴绍勇
王洪寅
张越
钱光明
许兴海
张雷
张少云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU SUQIAN POWER SUPPLY Co
Suqian Electric Power Design Institute Co Ltd
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Original Assignee
Suqian Electric Power Design Institute Co Ltd
JIANGSU SUQIAN POWER SUPPLY Co
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suqian Electric Power Design Institute Co Ltd, JIANGSU SUQIAN POWER SUPPLY Co, State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd filed Critical Suqian Electric Power Design Institute Co Ltd
Priority to CN201410314640.XA priority Critical patent/CN104062496B/en
Publication of CN104062496A publication Critical patent/CN104062496A/en
Application granted granted Critical
Publication of CN104062496B publication Critical patent/CN104062496B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Measurement Of Resistance Or Impedance (AREA)
  • Measurement Of Current Or Voltage (AREA)

Abstract

The invention discloses a portable mobile electric testing recorder and an optimization method therefor, and relates to electric measurement. The recorder and the optimization method are used for power generation management of a power system, and achieve measurement. More specifically, the invention discloses the recorder which is convenient and portable, and has functions of storage and calculation. The recorder comprises a current clamp, a voltage clamp, a housing, and a control circuit board. The current clamp and the voltage clamp are movably inserted in the housing. The control circuit board is provided with a collection and analysis module, a memory database, a central processor, a storage module, and a display module. The other end of the current clamp and the other end of the voltage clamp are connected with a power distribution network, and a basic signal of the power distribution network is collected. The input end of the collection and analysis module is connected with the output end of the current clamp and the output end of the voltage clamp. The memory database is connected with the output end of the collection and analysis module and the central processor. The output end of the central processor is connected with the display module and the storage module.

Description

A kind of Portable electric quantity test monitor and its optimization method
Technical field
A kind of Portable electric quantity test monitor of the present invention and its optimization method are related to electrical measurement, are to be applied to electricity Force system plays the device and optimization method of measurement effect in power production management, more specifically, being a kind of Portable, band Storage and the electric quantity test monitor of computing function.
Background technology
Power system theoretical line loss caluclation is required:All basic electric quantity datas are all synchronizations, and one per hour Value.Its purpose is to reach fine-grained management, lower loss, energy saving.See have according to current power system applicable cases Employing walkie ammeter, per manually going to scene to make a copy of once every other hour, artificial copy data is not precisely, error is big, work Amount is big, human cost is high.What is had is direct in platform area installation ammeter, when needing data, manually arrives at scene and often makes a copy of every other hour Once, the method also add the input of Utilities Electric Co. in addition to drawbacks described above.
The content of the invention
The purpose of the present invention is to provide a kind of Portable electric quantity test monitor and its excellent for above-mentioned weak point Change method, using modularized design, at utmost simplifies the degree of coupling between module, to realize the interval to platform area charge circuit Property real time measurement of electric values, statistics and storage.
A kind of Portable electric quantity test monitor and its optimization method take technical scheme below to realize:
A kind of Portable electric quantity test monitor includes pincerlike current clamp, voltage clamp, housing and control board, electricity Stream pincers and voltage clamp activity are plugged in housing, are provided with collection analysises module, memory database, centre in control board The other end of reason device, memory module and display module, pincerlike current clamp and voltage clamp is connected with power distribution network, gathers the base of power distribution network This signal;The baseband signal includes A phase voltages, B phase voltages, C phase voltages, A phase currents, B phase currents and C phase currents;Collection The input of analysis module is connected with the outfan of current clamp and voltage clamp, and memory database is defeated with collection analysises module respectively Go out end and central processing unit is connected, the outfan of central processing unit is connected with display module and memory module.
The big voltage signal of input is converted into small voltage signal from voltage clamp by collection analysises module, and current clamp is by A phases The high current signal of electric current, B phase currents and C phase currents changes into small current signal in proportion, then by a high-precision sampling Resistance changes into voltage signal;Digital signal is changed into by the analog-digital converter in collection analysises module, three are analyzed Phase voltage and three-phase current numerical value are simultaneously stored in memory database;The three-phase electricity that central processing unit will be read from memory database Pressure and three-phase current numerical value and time integral, calculate electric quantity data;By the numerical value and curve transmission of electric quantity data to display mould Block shown, and statistical result is transferred to memory module is stored.
The big voltage signal is 57.7V voltages, and small voltage signal is 5V voltages.
The high current signal is 5A, and small current signal is 5mA.
The central processing unit adopts commercially available TMS320F2812PGFA processors.
Described electric quantity data includes the total of positive active electrical degree, peak, flat, paddy, sharp value, the total of reverse active electrical degree, peak, Flat, paddy, sharp value, positive the total of idle electric degree, peak, flat, paddy, point value, reverse the total of idle electric degree, peak, flat, paddy, point value, time The power consumption of section.
The computing formula of the power consumption is:Power consumption=active electrical degree difference × flow ratio × pressure ratio, wherein flow ratio It is the ratio (such as 300/5=60) of electric current primary side and secondary side;Pressure ratio be the ratio of voltage primary side and secondary side (such as 100000/100=1000)。
The storage module by bus is connected with central processing unit, and long-time storing electricity data.
The display module is connected with central processing unit by bus, receives and show the numerical value and curve of electric quantity data.
The bus adopts 485 buses.
The housing, pincerlike current clamp and voltage clamp adopt PVC material, it is ensured that safe, light.Using pincerlike current clamp Obtaining current safety, human body do not contact energized conductor, operate it is very safe, without disconnecting circuit, process is very easy.Using voltage Cramp joint line is convenient and swift.
A kind of data optimization methods of Portable electric quantity test monitor, comprise the steps:
1)The current clamp that is connected with power distribution network, voltage clamp gather the baseband signal of power distribution network net, and by the baseband signal Send collection analysises module to;The baseband signal includes A phase voltages, B phase voltages, C phase voltages, A phase currents, B phase currents and C Phase current;
2)Collection analysises module is by step(1)In the baseband signal that collects be analyzed, and analysis result is transmitted to Memory database;And stored using optimization method, optimization formula is:(1+ molecule factor ÷ denominator factors)× basic numerical value, its Middle molecule factor 2 byte representations, 4 byte representations of denominator factor, 8 byte representations of basic numerical value;
3)Central processing unit reads three-phase voltage and three-phase current numerical value in memory database, then each by calculating Electric quantity data is planted, and is transmitted to memory module and display module;
4)Central processing unit reads the electric energy data in memory database in real time;
5)The data that memory module is transmitted according to central processing unit, and these data are preserved for a long time;
6)The information that display module is transmitted according to central processing unit, real-time update show these data.
The present invention reduces the error of electric quantity data with facilitating line loss calculation, being easy to carry and in-site installation;Improve The accuracy of electric quantity data;Save human cost, reduce labor intensity;Solve band metering, statistics electricity and temporally The testing recorder of storage.
Description of the drawings
Below with reference to accompanying drawing, the invention will be further described:
Fig. 1 is the schematic flow sheet of a kind of Portable electric quantity test monitor of the invention and its optimization method.
Specific embodiment
Referring to the drawings 1, a kind of Portable electric quantity test monitor includes pincerlike current clamp, voltage clamp, housing and control Circuit board processed, current clamp and voltage clamp activity are plugged in housing, are provided with collection analysises module, interior poke in control board It is connected with power distribution network according to the other end of storehouse, central processing unit, memory module and display module, pincerlike current clamp and voltage clamp, adopts The baseband signal of collection power distribution network;The baseband signal includes A phase voltages, B phase voltages, C phase voltages, A phase currents, B phase currents and C Phase current;The input of collection analysises module is connected with the outfan of current clamp and voltage clamp, memory database respectively with collection The outfan and central processing unit of analysis module is connected, outfan and display module and the memory module phase of central processing unit Even.
The big voltage signal of input is converted into small voltage signal from voltage clamp by collection analysises module, and current clamp is by A phases The high current signal of electric current, B phase currents and C phase currents changes into small current signal in proportion, then by a high-precision sampling Resistance changes into voltage signal;Digital signal is changed into by the analog-digital converter in collection analysises module, three are analyzed Phase voltage and three-phase current numerical value are simultaneously stored in memory database;The three-phase electricity that central processing unit will be read from memory database Pressure and three-phase current numerical value and time integral, calculate electric quantity data;By the numerical value and curve transmission of electric quantity data to display mould Block shown, and statistical result is transferred to memory module is stored.
The big voltage signal is 57.7V voltages, and small voltage signal is 5V voltages.
The high current signal is 5A, and small current signal is 5mA.
The central processing unit adopts commercially available TMS320F2812PGFA processors.
Described electric quantity data includes the total of positive active electrical degree, peak, flat, paddy, sharp value, the total of reverse active electrical degree, peak, Flat, paddy, sharp value, positive the total of idle electric degree, peak, flat, paddy, point value, reverse the total of idle electric degree, peak, flat, paddy, point value, time The power consumption of section.
The computing formula of the power consumption is:Power consumption=active electrical degree difference × flow ratio × pressure ratio, wherein flow ratio It is the ratio (such as 300/5=60) of electric current primary side and secondary side;Pressure ratio be the ratio of voltage primary side and secondary side (such as 100000/100=1000)。
The storage module by bus is connected with central processing unit, and long-time storing electricity data.
The display module is connected with central processing unit by bus, receives and show the numerical value and curve of electric quantity data.
The bus adopts 485 buses.
The housing, pincerlike current clamp and voltage clamp adopt PVC material, it is ensured that safe, light.Using pincerlike current clamp Obtaining current safety, human body do not contact energized conductor, operate it is very safe, without disconnecting circuit, process is very easy.Using voltage Cramp joint line is convenient and swift.
A kind of data optimization methods of Portable electric quantity test monitor, comprise the steps:
1)The current clamp that is connected with power distribution network, voltage clamp gather the baseband signal of power distribution network net, and by the baseband signal Send collection analysises module to;The baseband signal includes A phase voltages, B phase voltages, C phase voltages, A phase currents, B phase currents and C Phase current;
2)Collection analysises module is by step(1)In the baseband signal that collects be analyzed, and analysis result is transmitted to Memory database;And stored using optimization method, optimization formula is:(1+ molecule factor ÷ denominator factors)× basic numerical value, its Middle molecule factor 2 byte representations, 4 byte representations of denominator factor, 8 byte representations of basic numerical value;One monitoring Point once needs the data for storing to have 20, needs within one day storage 288 times, and according to conventional storage, each data is with 8 bytes Floating number represents that then memory space is:20 × 288 × 8=46080 bytes.And adopt optimization method to store, then memory space For:20×(2 × 288+4+8)=11760 bytes.Actual to save 34320 bytes, saving percentage ratio is:(46080- 11760)46080 × 100%=74.48% of ÷;
3)Central processing unit reads three-phase voltage and three-phase current numerical value in memory database, then each by calculating Electric quantity data is planted, and is transmitted to memory module and display module;
4)Central processing unit reads the electric energy data in memory database in real time;
5)The data that memory module is transmitted according to central processing unit, and these data are preserved for a long time;
6)The information that display module is transmitted according to central processing unit, real-time update show these data messages.

Claims (6)

1. a kind of Portable electric quantity test monitor, it is characterised in that:Including pincerlike current clamp, voltage clamp, housing and control Circuit board processed, current clamp and voltage clamp activity are plugged in housing, are provided with collection analysises module, interior poke in control board It is connected with power distribution network according to the other end of storehouse, central processing unit, memory module and display module, current clamp and voltage clamp, collection is matched somebody with somebody The baseband signal of electrical network;The baseband signal includes that A phase voltages, B phase voltages, C phase voltages, A phase currents, B phase currents are electric with C phases Stream;The input of collection analysises module is connected with the outfan of current clamp and voltage clamp, memory database respectively with collection analysises The outfan and central processing unit of module is connected, and the outfan of central processing unit is connected with display module and memory module;
The big voltage signal of input is converted into small voltage signal from voltage clamp by collection analysises module, current clamp by A phase currents, The high current signal of B phase currents and C phase currents changes into small current signal in proportion, then is turned by a high-precision sampling resistor Into voltage signal;Digital signal is changed into by the analog-digital converter in collection analysises module, three-phase voltage is analyzed With three-phase current numerical value and it is stored in memory database;Central processing unit is by the three-phase voltage and three read from memory database Phase current numerical value and time integral, calculate electric quantity data;The numerical value and curve transmission of electric quantity data are carried out to display module Show, and statistical result is transferred to into memory module and stored;
The data optimization methods of Portable electric quantity test monitor, comprise the steps:
1)The current clamp that is connected with power distribution network, voltage clamp gather the baseband signal of power distribution network net, and the baseband signal is transmitted Give collection analysises module;The baseband signal includes A phase voltages, and B phase voltages, C phase voltages, A phase currents, B phase currents are electric with C phases Stream;
2)Collection analysises module is by step 1)In the baseband signal that collects be analyzed, and analysis result is transmitted to into interior poke According to storehouse;And stored using optimization method, optimization formula is:(1+ molecule factor ÷ denominator factors)× basic numerical value, wherein molecule Factor 2 byte representations, 4 byte representations of denominator factor, 8 byte representations of basic numerical value;
3)Central processing unit reads three-phase voltage and three-phase current numerical value in memory database, then various by calculating Electric quantity data, and it is transmitted to memory module and display module;
4)Central processing unit reads the electric energy data in memory database in real time;
5)The data that memory module is transmitted according to central processing unit, preserve these data for a long time;
6)The information that display module is transmitted according to central processing unit, real-time update show these data messages.
2. Portable electric quantity test monitor according to claim 1, it is characterised in that:The big voltage signal is 57.7V voltages, small voltage signal are 5V voltages.
3. Portable electric quantity test monitor according to claim 1, it is characterised in that:The high current signal is 5A, small current signal are 5mA.
4. Portable electric quantity test monitor according to claim 1, it is characterised in that:The central processing unit is adopted Use TMS320F2812PGFA processors.
5. Portable electric quantity test monitor according to claim 1, it is characterised in that:Described electric quantity data bag Include the total of positive active electrical degree, peak, flat, paddy and sharp value, the total of reverse active electrical degree, peak, flat, paddy and point value, positive idle electricity The total of degree, peak, flat, paddy and point value, reverse the total of idle electric degree, peak, flat, paddy and point value, the power consumption of time period.
6. Portable electric quantity test monitor according to claim 5, it is characterised in that:The calculating of the power consumption Formula is:Power consumption=active electrical degree difference × flow ratio × pressure ratio, wherein flow ratio are the ratios of electric current primary side and secondary side Value;Pressure ratio is the ratio of voltage primary side and secondary side.
CN201410314640.XA 2014-07-03 2014-07-03 Portable mobile electric testing recorder and optimization method therefor Active CN104062496B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410314640.XA CN104062496B (en) 2014-07-03 2014-07-03 Portable mobile electric testing recorder and optimization method therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410314640.XA CN104062496B (en) 2014-07-03 2014-07-03 Portable mobile electric testing recorder and optimization method therefor

Publications (2)

Publication Number Publication Date
CN104062496A CN104062496A (en) 2014-09-24
CN104062496B true CN104062496B (en) 2017-03-22

Family

ID=51550300

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410314640.XA Active CN104062496B (en) 2014-07-03 2014-07-03 Portable mobile electric testing recorder and optimization method therefor

Country Status (1)

Country Link
CN (1) CN104062496B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107632222A (en) * 2017-11-17 2018-01-26 广东电网有限责任公司清远供电局 A kind of portable load Analysis warning system and method
CN108918995A (en) * 2018-06-12 2018-11-30 六盘水金星机电设备有限公司 A kind of portable three-phase power load monitor
CN110346748A (en) * 2019-07-05 2019-10-18 国网福建省电力有限公司电力科学研究院 A kind of electric power metering system fault testing optimization method
CN113075449A (en) * 2021-03-26 2021-07-06 国网江苏省电力有限公司镇江供电分公司 Portable electric quantity measuring instrument

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0752590A2 (en) * 1995-07-07 1997-01-08 Industrie-Technik Fröschl GmbH Contacts for electricity meter
CN101900801A (en) * 2010-07-15 2010-12-01 田卫华 Intelligent electric energy meter field test device and test method thereof
CN102162842A (en) * 2011-05-25 2011-08-24 重庆电力科学试验研究院 Online check meter of high-voltage electric energy metering device
CN102539910A (en) * 2012-01-13 2012-07-04 西南交通大学 Intelligent electricity meter capable of analyzing quality of electric energy and method for metering and analyzing quality by using intelligent electricity meter
CN202372592U (en) * 2011-12-21 2012-08-08 上海利思电气有限公司 Electric energy quality monitoring instrument
CN102636717A (en) * 2012-04-27 2012-08-15 江苏省电力公司徐州供电公司 Portable three-phase load acquisition recorder for low-pressure multipath outgoing cable
CN202548244U (en) * 2012-04-27 2012-11-21 江苏省电力公司徐州供电公司 Portable three-phase load acquisition recording device for low-voltage multi-path outgoing cable
CN103269129A (en) * 2013-05-30 2013-08-28 国家电网公司 Electric energy monitoring data optimizing device and optimizing method thereof
CN103439606A (en) * 2013-08-28 2013-12-11 徐州润泽电气有限公司 Portable low-voltage multi-path outgoing cable three-phase load collecting recorder
CN103439614A (en) * 2013-09-03 2013-12-11 苏州太谷电力股份有限公司 Electric power monitoring device and monitoring method
CN103454530A (en) * 2013-09-03 2013-12-18 苏州太谷电力股份有限公司 Detection device and detection method for power quality

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007003358A (en) * 2005-06-24 2007-01-11 Hitachi Ltd System, method and program for processing electric energy information

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0752590A2 (en) * 1995-07-07 1997-01-08 Industrie-Technik Fröschl GmbH Contacts for electricity meter
CN101900801A (en) * 2010-07-15 2010-12-01 田卫华 Intelligent electric energy meter field test device and test method thereof
CN102162842A (en) * 2011-05-25 2011-08-24 重庆电力科学试验研究院 Online check meter of high-voltage electric energy metering device
CN202372592U (en) * 2011-12-21 2012-08-08 上海利思电气有限公司 Electric energy quality monitoring instrument
CN102539910A (en) * 2012-01-13 2012-07-04 西南交通大学 Intelligent electricity meter capable of analyzing quality of electric energy and method for metering and analyzing quality by using intelligent electricity meter
CN102636717A (en) * 2012-04-27 2012-08-15 江苏省电力公司徐州供电公司 Portable three-phase load acquisition recorder for low-pressure multipath outgoing cable
CN202548244U (en) * 2012-04-27 2012-11-21 江苏省电力公司徐州供电公司 Portable three-phase load acquisition recording device for low-voltage multi-path outgoing cable
CN103269129A (en) * 2013-05-30 2013-08-28 国家电网公司 Electric energy monitoring data optimizing device and optimizing method thereof
CN103439606A (en) * 2013-08-28 2013-12-11 徐州润泽电气有限公司 Portable low-voltage multi-path outgoing cable three-phase load collecting recorder
CN103439614A (en) * 2013-09-03 2013-12-11 苏州太谷电力股份有限公司 Electric power monitoring device and monitoring method
CN103454530A (en) * 2013-09-03 2013-12-18 苏州太谷电力股份有限公司 Detection device and detection method for power quality

Also Published As

Publication number Publication date
CN104062496A (en) 2014-09-24

Similar Documents

Publication Publication Date Title
CN102590609B (en) The method of mobile terminal and measurement mobile terminal power consumption
CN104062496B (en) Portable mobile electric testing recorder and optimization method therefor
CN202583318U (en) Three-phase harmonic wave electric energy meter based on ADE7878 chip
CN107105056A (en) A kind of cloud control electric meter system based on WiFi communication
CN104569846B (en) A kind of single battery test system
CN204008812U (en) A kind of current-leaking measuring device
CN202025832U (en) Charging battery and charging system
CN102636715B (en) Integrated electrical test comprehensive testing system
CN109921499A (en) Power supply device and speed regulating method for fan in power supply device
CN206506517U (en) A kind of isolating device of d. c. voltage signal sampling
CN109904903A (en) Power supply device and charging method
CN202693010U (en) Expandable general sensor interface
CN203720256U (en) Distributed load analyzer used for power distribution system unbalanced branch circuit
CN206905924U (en) A kind of space multipoint temperature measuring system
CN202583352U (en) Integrated electrical test comprehensive testing system
CN205068076U (en) Battery data acquisition device
CN102778666A (en) Wire connector for rapid verification of intelligent electric meter
CN203688663U (en) Power collection system
CN203107142U (en) Positron emission computed tomography (PET) device power supply adapter plate, PET device power supply and PET device
CN202330699U (en) Simple electric energy meter testing device
CN206223861U (en) Power consumption harvester
CN206792391U (en) A kind of electronic thermometer with MicroUSB probe interfaces
CN203101502U (en) Intelligent electric meter based on electric power line network transmission
CN105158700B (en) Microbiological fuel cell and microelectronic data acquisition device
CN202333870U (en) Portable lithium-ion power supply capable of displaying dynamic current

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB02 Change of applicant information

Inventor after: Dai Shaoyong

Inventor after: Wang Hongyin

Inventor after: Zhang Yue

Inventor after: Qian Guangming

Inventor after: Xu Xinghai

Inventor after: Zhang Lei

Inventor after: Zhang Shaoyun

Inventor before: Dai Shaoyong

Inventor before: Zhang Lei

Inventor before: Zhang Shaoyun

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20161215

Address after: No. 58 Suqian City, Jiangsu province 223800 Avenue development Sucheng District

Applicant after: Jiangsu Suqian Power Supply Company

Applicant after: Suqian Electric Power Design Institute Co., Ltd.

Applicant after: Jiangsu Electric Power Company

Applicant after: State Power Networks Co

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant before: State Power Networks Co

Applicant before: Jiangsu Electric Power Company

Applicant before: Jiangsu Suqian Power Supply Company

C14 Grant of patent or utility model
GR01 Patent grant