CN101886545A - Method for treating bottom heave of soft rock roadway by using micro broken stone pipe cast pile - Google Patents

Method for treating bottom heave of soft rock roadway by using micro broken stone pipe cast pile Download PDF

Info

Publication number
CN101886545A
CN101886545A CN 201010225781 CN201010225781A CN101886545A CN 101886545 A CN101886545 A CN 101886545A CN 201010225781 CN201010225781 CN 201010225781 CN 201010225781 A CN201010225781 A CN 201010225781A CN 101886545 A CN101886545 A CN 101886545A
Authority
CN
China
Prior art keywords
stake
broken stone
pipe
soft
micro
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010225781
Other languages
Chinese (zh)
Other versions
CN101886545B (en
Inventor
王金安
纪洪广
李翼
张少杰
郭俊男
李飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
University of Science and Technology Beijing USTB
Original Assignee
University of Science and Technology Beijing USTB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by University of Science and Technology Beijing USTB filed Critical University of Science and Technology Beijing USTB
Priority to CN2010102257816A priority Critical patent/CN101886545B/en
Publication of CN101886545A publication Critical patent/CN101886545A/en
Application granted granted Critical
Publication of CN101886545B publication Critical patent/CN101886545B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention belongs to the mine field, relates to a mine roadway treatment method, and particularly relates to a construction method for treating bottom heave of a bottom plate of a mine soft rock roadway. The construction method mainly comprises the following two parts of: setting and constructing a micro broken stone pipe cast pile, and dropping water at the same time; and casting the bottom plate during secondary support. Based on the mechanical principle of the bottom heave of the bottom plate and the water-swelling physical principle of the soft rock, the method ensures better effect of treating the bottom heave of the bottom plate of the soft rock roadway and lower treatment cost.

Description

A kind of micro broken stone pipe is annotated the method that the soft-rock tunnel pucking is administered in stake
Technical field
The invention belongs to the field, mine, relate to mine laneway improvement method, particularly a kind of job practices that is used for the improvement of mine soft-rock tunnel base plate pucking.
Background technology
When the coal-mine soft-rock tunnel is subjected to seam mining and influences, because therefore the stress changes that the tunnel exploitation produces and the characteristic of Swelling of Soft Rocks Meeting with Water very easily cause the serious pucking in tunnel.Concerning some are equipped with the tunnel of big scale fixed equipments, if bigger pucking takes place, will cause the fixed equipment basic slope, influence the use of equipment, bring serious threat to the safety in production of mine.At this class problem, the main at present measure of adopting has: add methods such as anchor pole (rope), floor grouting, concrete anti-arch, joint-cutting, boring at base plate and reinforce or release, for example: publication number is prior aries such as CN10164130A, CN200946515Y and the flat 8-4468A of TOHKEMY.Though these methods can obtain the effect of certain control surrouding rock deformation, but owing to only considered the mechanical mechanism of base plate pucking, and do not consider the Physical Mechanism of Swelling of Soft Rocks Meeting with Water, underground water still is present in the middle of the base plate, thereby control pucking effect is relatively poor, especially for the bigger soft-rock tunnel of rock expansion rate, said method is poorer to the control effect of pucking, and the cost of improvement pucking is very high.
Summary of the invention
The objective of the invention is in order to solve soft-rock tunnel base plate pucking problem, and a kind of job practices of utilizing micro broken stone pipe to annotate stake is provided.
A kind of method that is used for the improvement of mine soft-rock tunnel base plate pucking, concrete job practices is as follows: (1) ground: obstruction and the foreign material of removing the job site; (2) unwrapping wire and definite drain hole and broken stone pile stake position: according to the design scheme unwrapping wire, find the stake position accurately, rig is placed on the stake site that will punch; The described stake position employing rhombus mode that lays out pile is provided with 8-9 campshed position in the tunnel on vertically; (3) pore-forming: start rig, make it vertically pierce the stratum to projected depth, vertical outermost stake hole is to 20 ° of both sides offset from perpendicular along the tunnel; (4) joint bar: behind the pore-forming, common stake position insertion tube cornice has the steel pipe in some holes, inserts pvc pipe in the drain hole, and carries out the drainage pipe connection according to conventional method; Described drain hole is vertical outermost and central stake hole along the tunnel, and described common stake position is the stake hole except drain hole; (5) reinforced: all piles hole and tube wall have in the gap of the steel pipe in some holes or pvc pipe the filling rubble to the aperture; (6) precipitation: described pvc pipe connects water pump, carries out draining, is reduced to below the broken stone pile until water level; (7) slip casting: adopt grouting pump that the steel pipe that the tube wall in the stake hole has some holes is carried out slip casting, final grouting pressure is controlled at 3~5MPa, forms micro broken stone pipe and annotates stake; (8) base plate reinforcing bar binding: after the stake of micro broken stone pipe notes was finished, the distortion through after a while absorbed, and carried out the base plate reinforcing bar binding after stablizing; (9) the anchoring broken stone pipe is annotated the stake joint bar: the steel tube end part that tube wall is had some holes is anchored at reinforcing cage top; (10) bottom board: formwork, and to base plate cast C30 concrete; (11) finish micro broken stone pipe and annotate the whole construction course that soft-rock tunnel base plate pucking is administered in stake.
Wherein the diameter in drain hole and broken stone pile stake hole is 200mm in the step (2), and the degree of depth is 3000mm, and spacing is 600~800mm.
The specification that the described tube wall of step (4) has the steel pipe in some holes is φ 26 * 3200mm; The specification of described pvc pipe is φ 50 * 3200mm, and the pipe bottom adds filter screen.
The described rubble of step (5) is unweathered clean gravel or rolls rubble and form that particle diameter is controlled at 20-50mm, and mud content is not more than 5%.
The described grouting pump of step (7) is a 2TGZ-60/210 type biliquid speed governing high-pressure injection pump; Slurries during slip casting adopt single liquid cement-sodium silicate slurries, and water/binder ratio is 1: 1, mix the 40BE water glass of 3% weight portion.
The present invention has following beneficial effect: the water permeability that (1) is good.Micro broken stone pipe is annotated stake because pile body is exactly to be made up of the fabulous rubble of permeability, and one of reason of distension is exactly the rock stratum water-swellable at the bottom of the soft-rock tunnel base plate, the coefficient of expansion is bigger, micro broken stone pipe is annotated stake and at work progress and use king-pile cognition surrounding rock body is produced compacted effect, make the water in the rock mass see through the pile body discharge, thereby weaken the distortion that causes because of the rock stratum water-swellable.(2) improve the base plate lithology, absorb horizontal distortion.By being set, the base plate micro broken stone pipe annotates stake, can displace a part of base plate soft rock by the less pile body of enough distortion, reduce rock mass deformation from measuring, the ratio of rigidity base plate soft rock of micro broken stone pipe notes stake is big simultaneously, but it is littler than steel and concrete, it can adapt to bigger distortion in loading process, can absorb a part of rock mass horizontal distortion, makes base plate bulk deformation amount reduce.(3) bear ground rail and equipment vertical load.What form after base plate is provided with the stake of micro broken stone pipe notes is a kind of composite foundation, when upper load is delivered on the ground, the stress redistribution will take place, concentrate thereby cause partial pressure to be annotated on the pile body to the bigger micro broken stone pipe of rigidity, this pressure can promote the total bearing capacity of base plate.(4) uniform Bottom Pressure.The base plate micro broken stone pipe is annotated and will be formed the composite bearing structure with rock mass after stake is finished, and Bottom Pressure is evenly distributed, and avoids stress to concentrate, and load finally is passed to the steel bar stress carrying.
Description of drawings
Fig. 1 is the soft rock roadway support profile;
Fig. 2 is stake position plane of arrangement figure;
Fig. 3 is a gutter connected node vertical view in 1-1 place among Fig. 2;
Wherein: 1-drain hole pvc pipe, 2-broken stone pile tube wall has the steel pipe in some holes, 3-tee pipe coupling, 4-rubble, 5-anchor pole pallet, 6-nut
The specific embodiment
The horizontal shaft station of secondary vertical+786m, tunnel, secondary vertical shaft station, certain colliery is designed to wear a layer tunnel, pass two coal seam floors and two coals, the physical characteristic of two coals is black, bulk, half phaeism coal, weak pitch gloss, joint and cranny development, ature of coal is softer, is the regular coal seam of simple structure.The coal seam totally presents from west to east, by the north orientation south trend of attenuation gradually; Two coal seam floors are light grey packsand, argillaceous agglutination, and rock strength is low, and is easily softening, causes the base plate distension to rise, and maximum end distension amount 1400mm causes track deformation, and head-room is not enough.Normally carry out for guaranteeing to produce, need administer, the roadway floor deflection is reduced, unlikely orbital motion and the production safety of influencing floor lift in gallery.
The stake of micro broken stone pipe notes is made up of discrete material itself, and itself does not have adhesion strength, and pile body bears the intensity of vertical load mainly by the constraint of surrounding rock body and the friction of pile shaft material, and field of load concentrates on stake and pushes up near about the 4 times stake footpath scope.Construction mainly is divided into following two parts and carries out: at first carry out setting and construction that micro broken stone pipe is annotated stake, carry out precipitation work simultaneously, carry out the base plate cast then when secondary supporting.
Do below in conjunction with 1~3 couple of the present invention of Figure of description and to describe in further detail:
(1) ground: obstruction and the foreign material of removing the job site;
(2) unwrapping wire and definite stake position: according to the design scheme unwrapping wire, find the stake position accurately, rig is placed on the site that will punch; The described stake position employing rhombus mode that lays out pile is provided with 8-9 campshed position in the tunnel on vertically;
(3) pore-forming: start rig, make it vertically pierce the stratum to projected depth, vertical outermost stake hole is to 20 ° of both sides offset from perpendicular along the tunnel, and the diameter in stake hole is 200mm, and the degree of depth is 3000mm, and spacing is 800mm;
(4) joint bar: behind the pore-forming, common stake position insertion tube cornice has the steel pipe 2 in some holes, inserts pvc pipe 1 in the drain hole; Described drain hole is vertical outermost and central stake hole along the tunnel, and described common stake position is the stake hole except drain hole; Wherein, to have the specification of the steel pipe in some holes be φ 26 * 3200mm to tube wall; The specification of pvc pipe is φ 50 * 3200mm, and the pipe bottom adds filter screen;
(5) reinforced: all piles hole and tube wall have in the gap of the steel pipe in some holes or pvc pipe filling rubble 4 to the aperture, and rubble is unweathered clean gravel or rolls rubble and form that particle diameter is controlled at 20-50mm, and mud content is not more than 5%;
(6) precipitation: pvc pipe 1 connects horizontal drain pipe by tee pipe coupling 3, and horizontal drain pipe connects water pump, carries out draining, is reduced to below the broken stone pile until water level;
(7) slip casting: adopt 2TGZ-60/210 type biliquid speed governing high-pressure injection pump that the steel pipe that the tube wall in the stake hole has some holes is carried out slip casting, final grouting pressure is controlled at 3~5MPa, slurries during slip casting adopt single liquid cement-sodium silicate slurries, water/binder ratio is 1: 1, mixes the 40BE water glass of 3% weight portion.
(8) base plate reinforcing bar binding: after the stake of micro broken stone pipe notes was finished, the distortion through after a while absorbed, and carried out the base plate reinforcing bar binding after stablizing;
(9) the anchoring broken stone pipe is annotated the stake joint bar: the steel tube end part that tube wall is had some holes is anchored at reinforcing cage top by anchor pole pallet 5 and nut 6;
(10) bottom board: formwork, and to base plate cast C30 concrete;
(11) finish micro broken stone pipe and annotate the whole construction course that soft-rock tunnel base plate pucking is administered in stake.
The above only is the schematic specific embodiment of the present invention, is not in order to limit scope of the present invention.Any those skilled in the art, equivalent variations and the modification done under the prerequisite that does not break away from design of the present invention and principle all should belong to the scope of protection of the invention.

Claims (5)

1. a micro broken stone pipe is annotated the method that the soft-rock tunnel pucking is administered in stake, it is characterized in that: may further comprise the steps: (1) ground: obstruction and the foreign material of removing the job site;
(2) unwrapping wire and definite drain hole and broken stone pile stake position: according to the design scheme unwrapping wire, find the stake position accurately, rig is placed on the stake site that will punch; The described stake position employing rhombus mode that lays out pile is provided with 8-9 campshed position in the tunnel on vertically;
(3) pore-forming: start rig, make it vertically pierce the stratum to projected depth, vertical outermost stake hole is to 20 ° of both sides offset from perpendicular along the tunnel;
(4) joint bar: behind the pore-forming, common stake position insertion tube cornice has the steel pipe in some holes, inserts pvc pipe in the drain hole, and carries out the drainage pipe connection according to conventional method; Described drain hole is vertical outermost and central stake hole along the tunnel, and described common stake position is the stake hole except drain hole;
(5) reinforced: all piles hole and tube wall have in the gap of the steel pipe in some holes or pvc pipe the filling rubble to the aperture;
(6) precipitation: described pvc pipe connects water pump, carries out draining, is reduced to below the broken stone pile until water level;
(7) slip casting: utilize grouting pump that the steel pipe that the tube wall in the stake hole has some holes is carried out slip casting, final grouting pressure is controlled at 3~5MPa, forms micro broken stone pipe and annotates stake;
(8) base plate reinforcing bar binding: after the stake of micro broken stone pipe notes was finished, the distortion through after a while absorbed, and carried out the base plate reinforcing bar binding after stablizing;
(9) the anchoring broken stone pipe is annotated the stake joint bar: the steel tube end part that tube wall is had some holes is anchored at reinforcing cage top;
(10) bottom board: formwork, and to base plate cast C30 concrete;
(11) finish micro broken stone pipe and annotate the whole construction course that soft-rock tunnel base plate pucking is administered in stake.
2. micro broken stone pipe according to claim 1 is annotated the method that the soft-rock tunnel pucking is administered in stake, it is characterized in that: the diameter in drain hole and broken stone pile stake hole is 200mm in the step (2), and the degree of depth is 3000mm, and spacing is 600~800mm.
3. micro broken stone pipe according to claim 2 is annotated the method that the soft-rock tunnel pucking is administered in stake, and it is characterized in that: the specification that the described tube wall of step (4) has the steel pipe in some holes is φ 26 * 3200mm; The specification of described pvc pipe is φ 50 * 3200mm, and the pipe bottom adds filter screen.
4. micro broken stone pipe according to claim 1 is annotated the method that the soft-rock tunnel pucking is administered in stake, it is characterized in that: the described rubble of step (5) is unweathered clean gravel or rolls rubble and form that particle diameter is controlled at 20-50mm, and mud content is not more than 5%.
5. micro broken stone pipe according to claim 1 is annotated the method that the soft-rock tunnel pucking is administered in stake, and it is characterized in that: described step (7) grouting pump is a 2TGZ-60/210 type biliquid speed governing high-pressure injection pump; Slurries during slip casting adopt single liquid cement-sodium silicate slurries, and water/binder ratio is 1: 1, mix the 40BE water glass of 3% weight portion.
CN2010102257816A 2010-07-05 2010-07-05 Method for treating bottom heave of soft rock roadway by using micro broken stone pipe cast pile Expired - Fee Related CN101886545B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102257816A CN101886545B (en) 2010-07-05 2010-07-05 Method for treating bottom heave of soft rock roadway by using micro broken stone pipe cast pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102257816A CN101886545B (en) 2010-07-05 2010-07-05 Method for treating bottom heave of soft rock roadway by using micro broken stone pipe cast pile

Publications (2)

Publication Number Publication Date
CN101886545A true CN101886545A (en) 2010-11-17
CN101886545B CN101886545B (en) 2011-11-30

Family

ID=43072612

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102257816A Expired - Fee Related CN101886545B (en) 2010-07-05 2010-07-05 Method for treating bottom heave of soft rock roadway by using micro broken stone pipe cast pile

Country Status (1)

Country Link
CN (1) CN101886545B (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102797478A (en) * 2012-08-27 2012-11-28 中国矿业大学 Method for preventing bottom squeeze of soft rock roadway by using distributed shear-resistant slip-resistant reinforced concrete pile
CN102852528A (en) * 2012-04-01 2013-01-02 中国矿业大学 Method for controlling floor heave through inverted arch anchoring beam
CN102953372A (en) * 2012-11-14 2013-03-06 福建工程学院 Steel pipe pile and construction method thereof
CN103089304A (en) * 2012-12-21 2013-05-08 太原理工大学 Heaving floor monitoring method
CN103291327A (en) * 2013-05-07 2013-09-11 中国矿业大学 Steel pile method for controlling floor heave of gob-side entry retaining
CN103557009A (en) * 2013-11-15 2014-02-05 山东科技大学 Row pile retaining and protecting method for preventing roadway floor heaving
CN103628898A (en) * 2013-11-15 2014-03-12 山东科技大学 Continuous wall supporting method for preventing floor heaving of roadway
CN104481556A (en) * 2014-11-25 2015-04-01 安徽理工大学 Method for treating floor heave of inclined tunnel in coal mine
CN104500099A (en) * 2014-11-25 2015-04-08 安徽理工大学 Treatment method for colliery roadway floor heaves
CN106522983A (en) * 2017-01-10 2017-03-22 山东科技大学 Method for preventing and treating bottom heaving of strong-water-swelling soft rock roadway
CN106907170A (en) * 2017-04-29 2017-06-30 陕西省建筑职工大学 A kind of roadway floor supporting construction and construction method
CN106968159A (en) * 2017-04-01 2017-07-21 徐冲 A kind of bridge structure of town airbus
CN108756930A (en) * 2018-05-31 2018-11-06 天地科技股份有限公司 A method of administering Floor Heave in Roadway and bottom plate bump using townhouse pile foundation
CN108979666A (en) * 2018-07-11 2018-12-11 河北工程大学 A kind of method of steel tube concrete pile control Floor Heave in Roadway
CN109139057A (en) * 2018-10-29 2019-01-04 六盘水师范学院 A kind of coal cutting roadway bottom plate water suction pucking administering method
WO2021082410A1 (en) * 2019-10-29 2021-05-06 中国矿业大学 Supporting structure and supporting method for preventing roadway floor from heaving
CN114457782A (en) * 2022-02-25 2022-05-10 中交四航工程研究院有限公司 Anti-liquefaction composite drainage structure suitable for high-fine-grain-content sand layer and construction method of anti-liquefaction composite drainage structure

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102797480A (en) * 2012-08-27 2012-11-28 中国矿业大学 Method for controlling bottom squeeze deformation of high-stress soft rock roadway by using discontinuous pressure-bearing grating concrete wall
CN103266899A (en) * 2013-05-31 2013-08-28 山东科技大学 Method for controlling floor heave deformation of soft rock roadway by means of anchor pile continuous wall
CN105863668A (en) * 2016-04-14 2016-08-17 中煤科工集团武汉设计研究院有限公司 Mine tunnel heaving prevention support method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2797634Y (en) * 2005-11-07 2006-07-19 郭国政 Sealed type I steel composite supporting
CN1865660A (en) * 2006-06-16 2006-11-22 中国矿业大学 Construction method for weakening zone of floor plate wall rock
CN201254993Y (en) * 2008-07-24 2009-06-10 义马煤业(集团)有限责任公司 O-shaped composite supporting construction for tunnel
CN101614130A (en) * 2009-07-31 2009-12-30 抚顺矿业集团有限责任公司 Method for preventing rock-burst of roadway support

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2797634Y (en) * 2005-11-07 2006-07-19 郭国政 Sealed type I steel composite supporting
CN1865660A (en) * 2006-06-16 2006-11-22 中国矿业大学 Construction method for weakening zone of floor plate wall rock
CN201254993Y (en) * 2008-07-24 2009-06-10 义马煤业(集团)有限责任公司 O-shaped composite supporting construction for tunnel
CN101614130A (en) * 2009-07-31 2009-12-30 抚顺矿业集团有限责任公司 Method for preventing rock-burst of roadway support

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《煤炭科学技术》 20100430 李文峰等 孤岛煤柱下沿空掘巷底鼓机理及控制技术 第17-20页 第38卷, 第04期 2 *

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102852528A (en) * 2012-04-01 2013-01-02 中国矿业大学 Method for controlling floor heave through inverted arch anchoring beam
CN102797478A (en) * 2012-08-27 2012-11-28 中国矿业大学 Method for preventing bottom squeeze of soft rock roadway by using distributed shear-resistant slip-resistant reinforced concrete pile
CN102797478B (en) * 2012-08-27 2015-03-11 中国矿业大学 Method for preventing bottom squeeze of soft rock roadway by using distributed shear-resistant slip-resistant reinforced concrete pile
CN102953372A (en) * 2012-11-14 2013-03-06 福建工程学院 Steel pipe pile and construction method thereof
CN103089304A (en) * 2012-12-21 2013-05-08 太原理工大学 Heaving floor monitoring method
CN103089304B (en) * 2012-12-21 2015-03-25 太原理工大学 Heaving floor monitoring method
CN103291327A (en) * 2013-05-07 2013-09-11 中国矿业大学 Steel pile method for controlling floor heave of gob-side entry retaining
CN103557009A (en) * 2013-11-15 2014-02-05 山东科技大学 Row pile retaining and protecting method for preventing roadway floor heaving
CN103628898A (en) * 2013-11-15 2014-03-12 山东科技大学 Continuous wall supporting method for preventing floor heaving of roadway
CN103628898B (en) * 2013-11-15 2016-01-20 山东科技大学 A kind of for preventing the diaphragm wall supporting method of Floor Heave in Roadway
CN104500099A (en) * 2014-11-25 2015-04-08 安徽理工大学 Treatment method for colliery roadway floor heaves
CN104481556A (en) * 2014-11-25 2015-04-01 安徽理工大学 Method for treating floor heave of inclined tunnel in coal mine
CN104500099B (en) * 2014-11-25 2016-08-24 安徽理工大学 The administering method of distension at the bottom of the gallery of a kind of colliery
CN106522983A (en) * 2017-01-10 2017-03-22 山东科技大学 Method for preventing and treating bottom heaving of strong-water-swelling soft rock roadway
CN106968159A (en) * 2017-04-01 2017-07-21 徐冲 A kind of bridge structure of town airbus
CN106907170A (en) * 2017-04-29 2017-06-30 陕西省建筑职工大学 A kind of roadway floor supporting construction and construction method
CN106907170B (en) * 2017-04-29 2023-03-03 陕西省建筑职工大学 Roadway bottom plate supporting structure and construction method
CN108756930A (en) * 2018-05-31 2018-11-06 天地科技股份有限公司 A method of administering Floor Heave in Roadway and bottom plate bump using townhouse pile foundation
CN108979666A (en) * 2018-07-11 2018-12-11 河北工程大学 A kind of method of steel tube concrete pile control Floor Heave in Roadway
CN108979666B (en) * 2018-07-11 2024-04-02 河北工程大学 Method for controlling tunnel floor heave by concrete filled steel tube pile
CN109139057A (en) * 2018-10-29 2019-01-04 六盘水师范学院 A kind of coal cutting roadway bottom plate water suction pucking administering method
WO2021082410A1 (en) * 2019-10-29 2021-05-06 中国矿业大学 Supporting structure and supporting method for preventing roadway floor from heaving
CN114457782A (en) * 2022-02-25 2022-05-10 中交四航工程研究院有限公司 Anti-liquefaction composite drainage structure suitable for high-fine-grain-content sand layer and construction method of anti-liquefaction composite drainage structure

Also Published As

Publication number Publication date
CN101886545B (en) 2011-11-30

Similar Documents

Publication Publication Date Title
CN101886545B (en) Method for treating bottom heave of soft rock roadway by using micro broken stone pipe cast pile
CN105422170B (en) Middle deep goaf grouting reinforcing and processing method under a kind of building foundation
CN105239586B (en) Method for supporting foundation pit by adopting support structure
CN108194132B (en) A kind of pier formula multi-arch type Mined-out Area control method
CN105240047A (en) Filling reinforcement method for managing underground mined area of open-pit mine
CN105525627B (en) A kind of two-way anchor fixed board retaining wall and its construction method
CN102277880B (en) Large-sized box jacking control construction method capable of enhancing accuracy
CN103899351B (en) A kind of filling reinforcement means of processing complicated cavity
CN103866694A (en) Deep water silt layer geological large-span multi-line reinforcing system and jacking culvert construction method
CN104612695A (en) Repairing and reinforcing method for vertical shaft wall collapsed fiercely
CN105155602B (en) A kind of many fulcrums foundation stabilization synthesis inclination correction method
CN107201908A (en) A kind of construction method of the regional buried Central drain in tunnel of bitter cold
CN103291326A (en) Reconstructed bearing layer control technology of large-deformation roadway surrounding rock
CN104790412B (en) Big width foundation pit supporting construction in the case of artesian water
CN108915700A (en) A kind of association type Floor Heave in Roadway administering method
CN103572680B (en) The roadbed filling construction method of coal mine gob
KR101746654B1 (en) Method for constructing pile for reinforce of mine hole
CN108150175A (en) Shaft of vertical well passes through the supporting construction of the old dead zone in coal seam
CN105421449A (en) Construction method of composite pile composed of nail-shaped active material plastic sleeve and concrete stiffened core
CN111395060A (en) Karst area existing cutting widened roadbed structure and design and construction method
CN107165173A (en) A kind of foundation pit supporting system and its construction method
CN102864945A (en) Reinforced structure of mortar anchor rod masonry and reinforcement method thereof
CN208472713U (en) A kind of composite structure mini pile for administering small-sized landslide
CN106283966A (en) Medium-and low-speed maglev single line embankment location detached pier pillar support rail beam transition section structure
CN106437780B (en) For administering the steel reinforced concrete antiarch and the construction method of the combining structure of anchor pole and the combining structure of floor lift in gallery

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111130

Termination date: 20170705