CN101876254A - 大倾角煤层工作面倾斜方向分区域顶煤放出量控制工艺 - Google Patents

大倾角煤层工作面倾斜方向分区域顶煤放出量控制工艺 Download PDF

Info

Publication number
CN101876254A
CN101876254A CN2009102523737A CN200910252373A CN101876254A CN 101876254 A CN101876254 A CN 101876254A CN 2009102523737 A CN2009102523737 A CN 2009102523737A CN 200910252373 A CN200910252373 A CN 200910252373A CN 101876254 A CN101876254 A CN 101876254A
Authority
CN
China
Prior art keywords
coal
work plane
top coal
support
stability
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2009102523737A
Other languages
English (en)
Inventor
黄国春
伍永平
周强文
廖由俊
毛新红
李明
周登辉
唐宗良
吕文胜
苟新建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baosteel Group Xinjiang Bayi Iron and Steel Co Ltd
Original Assignee
Baosteel Group Xinjiang Bayi Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baosteel Group Xinjiang Bayi Iron and Steel Co Ltd filed Critical Baosteel Group Xinjiang Bayi Iron and Steel Co Ltd
Priority to CN2009102523737A priority Critical patent/CN101876254A/zh
Publication of CN101876254A publication Critical patent/CN101876254A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Auxiliary Methods And Devices For Loading And Unloading (AREA)

Abstract

本发明公开了一种大倾角煤层工作面倾斜方向分区域顶煤放出量控制工艺,工作面在倾斜方向上分为倾斜下部区域、倾斜中部区域和倾斜上部区域,在倾斜下部区域,充分放出顶煤;在倾斜中部区域,应尽量放出顶煤,但应严格控制放煤量,在倾斜上部区域,应少量放出顶煤,以便既能提高顶煤的放出率又能保障工作面支护的稳定。

Description

大倾角煤层工作面倾斜方向分区域顶煤放出量控制工艺
技术领域
本发明涉及一种煤炭开采放出控制工艺,特别是大倾角煤层工作面倾斜方向分区域顶煤放出量控制工艺。
背景技术
放顶煤采煤法是一种近年迅速发展和推广的厚及特厚煤层采煤技术,特别是综合机械化放顶煤是后及特厚煤层开采技术的新发展。在中国发展和推广放顶煤开采的矿区,在装备配套改进、放顶煤工艺改革、优化巷道布置、改善运输方式、瓦斯排放系统、工作面除尘、防止煤层自燃、提高顶煤回收率,以及放顶煤生产措施与管理办法配套等方面,进行了一系列的探索实践,取得了良好的效果。大倾角煤层走向长壁综放开采技术是近年来国内少数矿井初次尝试的一种新技术,由于走向长壁工作面倾角大、顶板活动规律复杂等,对放顶煤技术要求高,放顶煤过程中,在提高顶煤回收率的同时,也要保证工作面支护系统的稳定性。因此,优化大倾角煤层放顶煤工艺亟待解决。
发明内容
本发明的目的在于提供一种大倾角煤层工作面倾斜方向分区域顶煤放出量控制工艺,在大倾角煤层放顶煤开采时既能保证支架稳定性,又能提高顶煤回收率,使得工作面倾斜方向不同区域的顶煤得到有效、合理地放出。
本发明解决其技术问题所采用的技术方案是:工作面在倾斜方向上由下到上分为三个区域,在工作面下部区域,上覆岩层活动空间受限,支架-围岩系统稳定性较好,可以充分放出该区域顶煤,提高顶煤的放出量;在工作面中部区域,上覆岩层有比较充分的活动空间,支架-围岩系统稳定性随着回采工序的不同而变化,在机采过程中,支架-围岩系统稳定性较好,在放顶煤过程中,支架-围岩系统稳定性变化较大,由于该区域内顶煤的冒放性好于下部区域,顶煤放出比较容易,但应严格控制放煤量;在工作面上部区域,上覆岩层活动剧烈,支架-围岩系统的稳定性低于中部,应少量放煤;即工作面上部区域内的顶煤放出量少于工作面下部区域内的顶煤放出量。
本发明工艺充分考虑了顶煤放出过程中,工作面上覆岩层的活动烈度对顶煤放出过程的影响,采用沿着工作面由下到上依次减少放煤量的控制工艺,既可以提高大倾角煤层综放工作面的顶煤回收率,同时又可以保证支架系统的稳定性,提高顶煤回收率,使得工作面倾斜方向不同区域的顶煤得到有效、合理地放出。
附图说明
下面结合附图和实施例对本发明进一步说明。
图中1、工作面;2、运输巷;3、回风巷;4、顶煤;5、工作面下部区域;6、工作面中部区域;7、工作面上部区域、8、顶板,9、底板,10、液压支架。
具体实施方式
如附图所示,位于运输巷2与回风巷3之间的工作面1在倾斜方向上由下到上分为三个区域,工作面1内均布间隔设置着液压支架10,三个区域位于顶板8与底板9之间,三个区域沿倾斜方向上的长度均为40m。在工作面下部区域5,上覆岩层活动空间受限,支架-围岩系统稳定性较好,可以充分放出该区域顶煤4,提高顶煤4的放出量;在工作面中部区域6,上覆岩层有比较充分的活动空间,支架-围岩系统稳定性随着回采工序的不同而变化,在机采过程中,支架-围岩系统稳定性较好,在放顶煤4过程中,支架-围岩系统稳定性变化较大,由于该区域内顶煤4的冒放性好于下部区域,顶煤4放出比较容易,但应严格控制放煤量;在工作面上部区域7,上覆岩层活动剧烈,支架-围岩系统的稳定性低于中部,应少量放煤;即工作面上部区域7内的顶煤放出量少于工作面中部区域6内的顶煤放出量,工作面中部区域6内的顶煤放出量少于工作面下部区域5内的顶煤放出量。

Claims (1)

1.一种大倾角煤层工作面倾斜方向分区域顶煤放出量控制工艺,其特征是:工作面在倾斜方向上由下到上分为三个区域,在工作面下部区域,上覆岩层活动空间受限,支架-围岩系统稳定性较好,可以充分放出该区域顶煤,提高顶煤的放出量;在工作面中部区域,上覆岩层有比较充分的活动空间,支架-围岩系统稳定性随着回采工序的不同而变化,在机采过程中,支架-围岩系统稳定性较好,在放顶煤过程中,支架-围岩系统稳定性变化较大,由于该区域内顶煤的冒放性好于下部区域,顶煤放出比较容易,但应严格控制放煤量;在工作面上部区域,上覆岩层活动剧烈,支架-围岩系统的稳定性低于中部,应少量放煤;即工作面上部区域内的顶煤放出量少于工作面下部区域内的顶煤放出量。
CN2009102523737A 2009-04-29 2009-11-27 大倾角煤层工作面倾斜方向分区域顶煤放出量控制工艺 Pending CN101876254A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009102523737A CN101876254A (zh) 2009-04-29 2009-11-27 大倾角煤层工作面倾斜方向分区域顶煤放出量控制工艺

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN200910113303.3 2009-04-29
CN200910113303 2009-04-29
CN2009102523737A CN101876254A (zh) 2009-04-29 2009-11-27 大倾角煤层工作面倾斜方向分区域顶煤放出量控制工艺

Publications (1)

Publication Number Publication Date
CN101876254A true CN101876254A (zh) 2010-11-03

Family

ID=43018913

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009102523737A Pending CN101876254A (zh) 2009-04-29 2009-11-27 大倾角煤层工作面倾斜方向分区域顶煤放出量控制工艺

Country Status (1)

Country Link
CN (1) CN101876254A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104929641A (zh) * 2015-05-27 2015-09-23 四川川煤华荣能源股份有限公司花山煤矿 用于大倾角煤层顶板灾害的治理方法
CN106948818A (zh) * 2017-05-12 2017-07-14 河南理工大学 一种多轮分层放煤法
CN111551084A (zh) * 2020-06-05 2020-08-18 华北科技学院 一种大倾角煤层深孔爆破落煤方法
CN112983422A (zh) * 2021-03-17 2021-06-18 西安科技大学 倾斜层状固体矿床放矿开采方法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104929641A (zh) * 2015-05-27 2015-09-23 四川川煤华荣能源股份有限公司花山煤矿 用于大倾角煤层顶板灾害的治理方法
CN104929641B (zh) * 2015-05-27 2017-05-10 四川川煤华荣能源股份有限公司花山煤矿 用于大倾角煤层顶板灾害的治理方法
CN106948818A (zh) * 2017-05-12 2017-07-14 河南理工大学 一种多轮分层放煤法
CN111551084A (zh) * 2020-06-05 2020-08-18 华北科技学院 一种大倾角煤层深孔爆破落煤方法
CN112983422A (zh) * 2021-03-17 2021-06-18 西安科技大学 倾斜层状固体矿床放矿开采方法

Similar Documents

Publication Publication Date Title
CN101915101B (zh) 一种急倾斜厚煤层采煤方法
CN108868771B (zh) 一种水平中深孔回采倾斜中厚矿体的采矿方法
CN102635356B (zh) 急倾斜薄矿脉多爆破自由面中深孔采矿法
CN104533416B (zh) 极厚大矿体大规模机械化无底柱分段崩落采矿方法
CN101975064B (zh) 一种缓倾斜薄矿体机械化连续开采方法
CN101942999A (zh) 一种急倾斜薄煤层采煤方法
CN103161492A (zh) 一种基于上覆岩层裂隙壳的瓦斯抽采钻孔布置方法
CN110173264A (zh) 断顶与常规卸压防治坚硬顶板留巷冲击地压方法
CN104481543A (zh) 阶段留矿崩落采矿法
CN105649630A (zh) 一种金矿的采矿工艺
CN104088638B (zh) 大倾角煤层长壁大采高工作面煤壁片帮及冒顶控制技术
CN109322670B (zh) 双巷道上向扇形炮孔爆破拉底采矿系统
CN109577979A (zh) 一种高地应力大型矿体下向分段充填采矿方法
CN103939135A (zh) 一种综采工作面撤架通道快速施工方法
CN101876254A (zh) 大倾角煤层工作面倾斜方向分区域顶煤放出量控制工艺
CN103104260A (zh) 复杂地质条件下综—机对拉面采煤方法
CN102011590B (zh) 一种矿山井下双采场底部结构
CN103557001B (zh) 一种低段高无底柱留矿嗣后充填采矿法
CN109630168A (zh) 综采放顶煤工作面巷道沿底板岩层布置及支护方式
CN101725351A (zh) 充填法采场底柱回收采矿法
CN210829265U (zh) 特大倾角中厚煤层放顶煤开采系统
CN110578523A (zh) 特大倾角中厚煤层放顶煤开采方法及系统
CN101737051A (zh) 一种盲矿体覆盖层形成方法
CN103982185B (zh) 垂直孔与水平孔协同回采的机械化分段充填采矿法
CN105422100A (zh) 一种急倾斜煤层水平分段高采出率巷道布置与放煤方式

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20101103