CN101737051A - 一种盲矿体覆盖层形成方法 - Google Patents

一种盲矿体覆盖层形成方法 Download PDF

Info

Publication number
CN101737051A
CN101737051A CN200910218350A CN200910218350A CN101737051A CN 101737051 A CN101737051 A CN 101737051A CN 200910218350 A CN200910218350 A CN 200910218350A CN 200910218350 A CN200910218350 A CN 200910218350A CN 101737051 A CN101737051 A CN 101737051A
Authority
CN
China
Prior art keywords
covering layer
gobs
roof
ore
caving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200910218350A
Other languages
English (en)
Inventor
周宗红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunming University of Science and Technology
Original Assignee
Kunming University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunming University of Science and Technology filed Critical Kunming University of Science and Technology
Priority to CN200910218350A priority Critical patent/CN101737051A/zh
Publication of CN101737051A publication Critical patent/CN101737051A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

本发明公开了一种顶板围岩稳固厚大盲矿体应用无底柱分段崩落法覆盖层的形成方法。利用本方法可显著降低放顶工程量,放顶费用低、矿石贫化小,提高矿山的生产效率和经济效益。本发明技术方案的要点是:第一分段回采巷道布置在矿体里,利用第一分段回采后提供的连续采空区诱导顶板岩石冒落;随回采工作的进行,采空区面积不断扩大,当采空区的面积达到临界暴露面积时,空区顶板岩石在应力和重力作用下,逐渐失稳、冒落,形成覆盖层。所述第一分段回采巷道布置炮孔时要求把进路之间矿体崩透,完全切掉顶板围岩的支撑,形成连续暴露面积的采空区。本发明适用于顶板围岩较稳固、厚大盲矿体覆盖层的形成。

Description

一种盲矿体覆盖层形成方法
技术领域
本发明涉及一种地下采矿技术,尤其涉及一种顶板围岩稳固厚大盲矿体应用无底柱分段崩落法形成覆盖层的方法。
背景技术
目前,已知顶板围岩稳固的厚大盲矿体应用无底柱分段崩落法时,其覆盖层的形成通常采用强制崩落方法,即在顶板围岩里布置放顶工程,采用深孔或中深孔强制崩落顶板围岩形成覆盖岩层。由于放顶工程均布置在岩石里,工程量大、时间长、投资多,放顶费用大;崩落岩石的块度小、流动性好,矿石贫化大。
发明内容
本发明的目的是克服现有的盲矿体覆盖层形成方法放顶费用高、矿石贫化大的不足,提供一种改进了的无底柱分段崩落法覆盖层形成方法,该方法取消了布置在顶板围岩里的放顶工程,不仅能降低放顶费用,而且可以有效控制矿石贫化。
本发明的技术方案是:第一分段回采巷道布置在矿体里,利用第一分段回采后提供的连续采空区诱导顶板岩石冒落;随回采工作的进行,采空区面积不断扩大,当采空区的面积达到临界暴露面积时,空区顶板岩石在应力和重力作用下,逐渐失稳、冒落,形成覆盖层。
所述第一分段回采巷道的爆破工作要求把进路之间矿体崩透,完全切掉顶板围岩的支撑,形成连续暴露面积的采空区。
所述第一分段与上部矿体边界的距离为12.5~25米,回采巷道间距为12.5~20米。
与现有技术相比,本发明的有益效果是,取消布置在顶板围岩的专用放顶工程,利用第一分段正常回采作业形成的连续采空区诱导顶板围岩冒落,采场结构简单,大幅降低放顶工程费用和爆破成本;诱导冒落的覆盖岩层块度大,可有效控制放矿过程中的废石混入,减少矿石贫化。
附图说明
下面结合附图和实施例对本发明作进一步的说明,但本发明的内容并不限于此。
图1、图2和图3是实施例的无底柱分段崩落法覆盖层形成方法三面视图。
图1是正视图。
图2是实施例图1的II-II俯视图。
图3是实施例图1的I-I左视图。
图1、图2和图3中:1.顶板岩石,2.上部矿体边界,3.回采巷道(进路),4.切割平巷,5.切割天井,6.分段联络平巷,7.矿石溜井,8.上向扇形中深孔,9.阶段沿脉运输巷道,10.采空区,11.矿石垫层。
具体实施方式
在巷道内凿岩、爆破,不设专用放顶工程,第一分段回采巷道布置在矿体里,利用第一分段回采后提供的连续采空区诱导顶板岩石冒落;所述采空区的面积达到临界暴露面积时,空区顶板岩石在应力和重力作用下,逐渐失稳、冒落,形成覆盖层。第一分段爆破工作时要求把回采巷道之间矿体崩透,完全切掉顶板围岩的支撑,形成连续暴露面积的采空区。
实施例1
下面以实例进一步说明本发明的实质内容
图1~图3中一盲矿体,平均水平厚度100米,顶板岩石1稳固性较好。
采用无底柱分段崩落法开采,阶段高度50米,分段高度12.5米,进路间距12.5米,利用第一分段回采巷道回采形成的连续采空区诱导顶板岩石冒落,形成覆盖层。
在图1和图3中第一分段(-112.5米)布置在矿体内,与上部矿体边界2的距离为12.5米,-125米、-137.5米等分段自上而下依次布置。
图2中-112.5米~-150米水平掘进回采巷道3,回采巷道间距12.5米,在回采巷道中进行凿岩、爆破、出矿等作业。采用中深孔落矿方式,钎头直径60mm,排距1.5米,爆破工作要求把回采巷道3之间矿体崩透,完全切掉顶板围岩的支撑,形成连续的采空区10,出矿时为保证作业安全留下5米厚度的矿石垫层11,矿石垫层在下分段进行回收。随回采工作进行,采空区10的长度和宽度逐渐扩大,当采空区面积达到临界暴露面积后,顶板岩石1在应力和重力作用下,逐渐失稳、冒落,形成覆盖层。

Claims (3)

1.一种盲矿体覆盖层形成方法,包括无底柱分段崩落,在巷道内凿岩、爆破,其特征是:不设专用放顶工程,第一分段回采巷道布置在矿体里,利用第一分段回采后提供的连续采空区诱导顶板岩石冒落;所述采空区的面积达到临界暴露面积时,空区顶板岩石在应力和重力作用下,逐渐失稳、冒落,形成覆盖层。
2.根据权利要求1所述的一种盲矿体覆盖层形成方法,其特征是所述第一分段爆破工作时要求把回采巷道之间矿体崩透,完全切掉顶板围岩的支撑,形成连续暴露面积的采空区。
3.根据权利要求1所述的一种盲矿体覆盖层形成方法,其特征是所述第一分段与上部矿体边界的距离为12.5~25米,回采巷道间距为12.5~20米。
CN200910218350A 2009-12-14 2009-12-14 一种盲矿体覆盖层形成方法 Pending CN101737051A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910218350A CN101737051A (zh) 2009-12-14 2009-12-14 一种盲矿体覆盖层形成方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910218350A CN101737051A (zh) 2009-12-14 2009-12-14 一种盲矿体覆盖层形成方法

Publications (1)

Publication Number Publication Date
CN101737051A true CN101737051A (zh) 2010-06-16

Family

ID=42461018

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910218350A Pending CN101737051A (zh) 2009-12-14 2009-12-14 一种盲矿体覆盖层形成方法

Country Status (1)

Country Link
CN (1) CN101737051A (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102031971A (zh) * 2010-11-18 2011-04-27 河北联合大学(原河北理工大学) 露天转地下覆盖层结构与厚度的确定方法
CN102261248A (zh) * 2011-08-15 2011-11-30 辽宁科技大学 一种挑檐式结构的无底柱阶段崩落采矿法
CN102383801A (zh) * 2011-06-07 2012-03-21 中钢集团马鞍山矿山研究院有限公司 崩落采矿法覆盖岩层合理厚度的定量化确定方法
CN102865080A (zh) * 2012-10-08 2013-01-09 中南大学 高地应力硬岩诱导致裂工程布置及非爆破回采工艺
CN106522955A (zh) * 2016-12-05 2017-03-22 广西大学 空区废石充填与顶部围岩崩落协同再造覆盖层的间柱回收方法
CN111350506A (zh) * 2020-03-13 2020-06-30 海南矿业股份有限公司 一种采空区顶板处理炮孔布置方法

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102031971A (zh) * 2010-11-18 2011-04-27 河北联合大学(原河北理工大学) 露天转地下覆盖层结构与厚度的确定方法
CN102031971B (zh) * 2010-11-18 2012-10-31 河北联合大学(原河北理工大学) 露天转地下覆盖层结构与厚度的确定方法
CN102383801A (zh) * 2011-06-07 2012-03-21 中钢集团马鞍山矿山研究院有限公司 崩落采矿法覆盖岩层合理厚度的定量化确定方法
CN102383801B (zh) * 2011-06-07 2013-03-06 中钢集团马鞍山矿山研究院有限公司 崩落采矿法覆盖岩层合理厚度的定量化确定方法
CN102261248A (zh) * 2011-08-15 2011-11-30 辽宁科技大学 一种挑檐式结构的无底柱阶段崩落采矿法
CN102261248B (zh) * 2011-08-15 2013-04-03 辽宁科技大学 一种挑檐式结构的无底柱阶段崩落采矿法
CN102865080A (zh) * 2012-10-08 2013-01-09 中南大学 高地应力硬岩诱导致裂工程布置及非爆破回采工艺
CN106522955A (zh) * 2016-12-05 2017-03-22 广西大学 空区废石充填与顶部围岩崩落协同再造覆盖层的间柱回收方法
CN111350506A (zh) * 2020-03-13 2020-06-30 海南矿业股份有限公司 一种采空区顶板处理炮孔布置方法

Similar Documents

Publication Publication Date Title
CN108612530B (zh) 一种上盘围岩破碎倾斜中厚矿体的采矿方法
CN102635356B (zh) 急倾斜薄矿脉多爆破自由面中深孔采矿法
CN104989404B (zh) 急倾斜薄矿体脉内伪倾斜落矿中深孔采矿法
CN103590831B (zh) 一种缓倾斜薄-中厚矿体的新型采矿方法
CN104481539B (zh) 自拉槽挤压爆破崩落采矿法
CN104533416B (zh) 极厚大矿体大规模机械化无底柱分段崩落采矿方法
CN101975064B (zh) 一种缓倾斜薄矿体机械化连续开采方法
CN105626071B (zh) 一种缓倾斜薄矿体采矿方法
CN107829742B (zh) 一种崩落-充填-空场-崩落采矿方法
CN108547618A (zh) 一种两步骤采矿方法遗留间柱的回收工艺
CN104481543B (zh) 阶段留矿崩落采矿法
CN102953732A (zh) 房柱式大直径深孔倒台阶状分段侧向崩矿嗣后充填采矿法
CN110030013B (zh) 一种过渡支架区三缝周期切顶自成巷帮的沿空留巷方法
CN101403304A (zh) 一种大型空区残矿回收方法
CN105952450A (zh) 一种地下矿山井下双采场协同开采的新方法
CN101737051A (zh) 一种盲矿体覆盖层形成方法
CN114215530B (zh) 一种坚硬顶板定向水压致裂沿空巷道快速掘巷方法
CN108590649A (zh) 一种缓倾斜破碎薄矿脉中深孔开采方法
CN104533419B (zh) 一种部分回收大煤柱残煤的方法
CN106150504B (zh) 一种超前切顶爆力运矿分段采矿法
CN107829741A (zh) 一种缓倾斜薄矿体开采方法
CN106640080A (zh) 一种深部高应力环境下自稳窿形采场布置采矿方法
CN114856563B (zh) 破碎矿岩下向阶段深孔预裂矿石自重落矿采矿方法
CN110359910B (zh) 煤矿铁路下厚煤层条带综放高位充填开采方法
CN107939402A (zh) 一种回采矿岩中等以上稳固的急倾斜厚矿体的采矿方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20100616