CN101876171A - 一种水冲、分解桥桩基破桩头的新方法 - Google Patents
一种水冲、分解桥桩基破桩头的新方法 Download PDFInfo
- Publication number
- CN101876171A CN101876171A CN2010101706199A CN201010170619A CN101876171A CN 101876171 A CN101876171 A CN 101876171A CN 2010101706199 A CN2010101706199 A CN 2010101706199A CN 201010170619 A CN201010170619 A CN 201010170619A CN 101876171 A CN101876171 A CN 101876171A
- Authority
- CN
- China
- Prior art keywords
- water
- pipe
- pile
- elbow
- water pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Foundations (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
本发明公开了一种水冲、分解桥桩基破桩头的新方法。所述的在桩基混凝土浇筑完毕后安装桥板(15),桥板(15)的放置方向应根据破桩头装置的出水管扁弯头(4)水冲、分解时所处的方向平行,应随出水管扁弯头(4)旋转而旋转,然后打开阻管活动盖(16),把水管(3)镶嵌在里边,拧紧螺栓(17),最后按照下放控制工艺用钢丝绳吊着水管(3),慢慢放到出水管扁弯头(4)底面后进行水冲、分解破桩头。由于本发明采用了水冲、分解桩头新方法,基坑开挖完毕以后,不用破桩头,只要简单的凿除处理一下桩头上的松散碎石,就可以直接浇筑垫层混凝土,省工、省时、效益高,可提前工期,提高了工程质量,节约资金,大大降低了工程成本。
Description
技术领域:本发明涉及一种水冲、分解桥桩基破桩头的新方法。
背景技术:自有桩基混凝土建设桥梁以来,便有了桩基混凝土需要破桩头的近百年历史。破桩头这一专业术语,在别人眼里可能不熟悉,但在桥梁建设工程师们的脑海里并不陌生。为了满足规范、达到混凝土强度、刚度及技术质量标准、把桩底的淤泥翻倒桩顶,浇筑桩基混凝土时必须高出桩顶一米左右,所以就产生了桩头。破桩头给施工带来了很大的负面影响,如:阻碍钩机开挖基坑,钩机在桩头之间挖土非常不方便,时不时碰撞桩头,造成时间的浪费和流失。破桩头一样给工程造成工期的延长和负增值。
发明内容:本发明解决了原常规破桩头存在的弊端,提供了一种不用破桩头,只要简单的凿除处理一下桩头上的松散碎石,然后就可以直接浇筑垫层混凝土,省工、省时、效益高的一种水冲、分解桥桩基破桩头的新方法。本发明解决技术问题所采用的技术方案是:所述的在桩基混凝土浇筑完毕后,在护筒1的顶面内侧安装事先制作好的桥板15,桥板15装置在角铁2中部,阻桥台阶18装置在角铁2两侧,桥板15的放置方向应根据破桩头装置的出水管扁弯头4水冲、分解时所处的方向平行,应随出水管扁弯头4旋转而旋转,然后打开阻管活动盖16,把事先制作好的水管3镶嵌在里边,拧紧螺栓17,最后按照下放控制工艺用钢丝绳吊着水管3,慢慢把出水管扁弯头4放到桩基混凝土中进行水冲、分解破桩头。
本发明的有益效果是:由于采用了水冲、分解桩头新方法,水冲、分解桩头混凝土以后,桩顶上剩下的只有碎石,开挖基坑时,钩机不受阻碍,方便快捷,基坑开挖完毕以后,不用破桩头,只要简单的凿除处理一下,就可以直接浇筑垫层混凝土,省工、省时、效益高,还可提前完成工期1-3天,每根桩头至少节约资金300-1000元,降低了工程成本,同时提高了工程质量。
附图说明:图1是本发明的主视图
图2是图1的俯视图
图3是图1的仰视图
图4是图1的水管旋转扳手放大图
具体实施方式:实施例1:如图1、图2、图3、图4所示,所述的在桩基混凝土浇筑完毕后,在护筒1的顶面内侧安装事先制作好的桥板15,桥板15装置在角铁2中部,阻桥台阶18装置在角铁2两侧,防止桥板15在护筒1内窜动,桥板15的放置方向应根据破桩头装置的出水管扁弯头4水冲、分解时所处的方向平行,应随出水管扁弯头4旋转而旋转,然后打开阻管活动盖16,把事先制作好的水管3镶嵌在里边,拧紧螺栓17,最后按照下放控制工艺用钢丝绳吊着水管3,慢慢把出水管扁弯头4放到桩基混凝土中进行水冲、分解破桩头。放置底面应比桩基混凝土顶面23设计高程略高为宜,在基坑开挖后凿除。
实施例2:如图1、图2、图3、图4所示,所述的破桩头装置的水管旋转卡扣10设置在水管3上中部,水管旋转扳手24安装在水管旋转卡扣10上,手握水管旋转扳手24使之旋转,接头8的大口径端接在水管3上端,小口径端接在泥浆泵的软水管22上,吊环14固定装置在变径接头8的上侧部,扭曲支撑板19用抱箍5、抱箍螺栓6固定在水管3下部,防挂护板7做成上、下、左、右均是弧的形状,装置在扭曲支撑板19顶端,且用紧固螺栓13固定在出水管扁弯头4顶部,在水管3底口安装上出水管扁弯头4,用抱箍5和抱箍螺栓6把出水管扁弯头4牢牢的固定在水管3底口上(也可直接焊接在水管底口上)。
实施例3:如图1、图2、图3、图4所示,所述的出水管扁弯头4的一侧应制作成锥面,另一侧制作成平面,垂直于水管3轴线,在垂直面上钻制水冲分解出水孔11,在出水管扁弯头4端部钻制弯头端头扁出水孔12,出水管扁弯头4外侧应包裹一层橡胶皮20,在水冲分解出水孔11与水冲分解出水孔11之间,拧一或两道缠制橡胶皮铁丝21。
实施例4:如图1、图2、图3、图4所示,所述的下放控制工艺实施时如果下水管3遇到阻力,应合上泥浆泵的电源闸刀,泥浆泵往水管3里注水加压,缓解水管3内空产生的浮力,水管3管面下放到桩顶高程23,水源会经过水管3从出水管扁弯头4里流到水冲分解出水孔11及弯头端头扁出水孔12拥挤流出。
实施例5:如图1、图2、图3、图4所示,所述的下放控制工艺实施时如果下放水管3无阻力,可等水管3下放至桩顶高程23时注水加压;水从桩头混凝土中流过,会带走水泥浆,留下碎石;在这其中应不断的360度旋转水管3,每旋转一个角度应停留3-5分钟,在这期间应在吊环14上拴上绳索,稍用力拽向弯头端头扁出水孔12相反的方向,使弯头端头扁出水孔12紧挨桩基钢筋笼,使其充分分解桩基混凝土保护层。
实施例6:如图1、图2、图3、图4所示,所述的水冲、分解桩头混凝土应分层进行,每层厚约30-50厘米,应充分水冲、分解混凝土;水冲、分解一层后,把水管3向上提一层,直至最后一层应延长时间,因为最后一层含淤泥量大。
Claims (6)
1.一种水冲、分解桥桩基破桩头的新方法,其特征在于在桩基混凝土浇筑完毕后,在护筒(1)的顶面内侧安装事先制作好的桥板(15),桥板(15)装置在角铁(2)中部,阻桥台阶(18)装置在角铁(2)两侧,桥板(15)的放置方向应根据破桩头装置的出水管扁弯头(4)水冲、分解时所处的方向平行,应随出水管扁弯头(4)旋转而旋转,然后打开阻管活动盖(16),把事先制作好的水管(3)镶嵌在里边,拧紧螺栓(17),最后按照下放控制工艺用钢丝绳吊着水管(3),慢慢把出水管扁弯头(4)放到桩基混凝土中进行水冲、分解破桩头。
2.根据权利要求1所述的一种水冲、分解桥桩基破桩头的新方法,其特征是破桩头装置的水管旋转卡扣(10)设置在水管(3)上中部,水管旋转扳手(24)安装在水管旋转卡扣(10)上,手握水管旋转扳手(24)使之旋转,变径接头(8)的大口径端接在水管(3)上端,小口径端接在泥浆泵的软水管(22)上,吊环(14)固定装置在变径接头(8)的上侧部,扭曲支撑板(19)用抱箍(5)、抱箍螺栓(6)固定在水管(3)下部,防挂护板(7)做成上、下、左、右均是弧的形状,装置在扭曲支撑板(19)顶端,且用紧固螺栓(13)固定在出水管扁弯头(4)顶部,在水管(3)底口安装上出水管扁弯头(4),用抱箍(5)和抱箍螺栓(6)把出水管扁弯头(4)牢牢的固定在水管(3)底口上。
3.根据权利要求2所述的一种水冲、分解桥桩基破桩头的新方法,其特征是出水管扁弯头(4)的一侧应制作成锥面,另一侧制作成平面,垂直于水管(3)轴线,在垂直面上钻制水冲分解出水孔(11),在出水管扁弯头(4)端部钻制弯头端头扁出水孔(12),出水管扁弯头(4)外侧应包裹一层橡胶皮(20),在水冲分解出水孔(11)与水冲分解出水孔(11)之间,拧一或两道缠制橡胶皮铁丝(21)。
4.根据权利要求1所述的一种水冲、分解桥桩基破桩头的新方法,其特征是下放控制工艺实施时如果下水管(3)遇到阻力,应合上泥浆泵的电源闸刀,泥浆泵往水管(3)里注水加压,缓解水管(3)内空产生的浮力,水管(3)管面下放到桩顶高程(23),水源会经过水管(3)从出水管扁弯头(4)里流到水冲分解出水孔(11)及弯头端头扁出水孔(12)拥挤流出。
5.根据权利要求1所述的一种水冲、分解桥桩基破桩头的新方法,其特征是下放控制工艺实施时如果下放水管(3)无阻力,可等水管(3)下放至桩顶高程(23)时注水加压;水从桩头混凝土中流过,会带走水泥浆,留下碎石;在这其中应不断的360度旋转水管(3),每旋转一个角度应停留3-5分钟,在这期间应在吊环(14)上拴上绳索,稍用力拽向弯头端头扁出水孔(12)相反的方向,使弯头端头扁出水孔(12)紧挨桩基钢筋笼,使其充分分解桩基混凝土保护层。
6.根据权利要求1所述的一种水冲、分解桥桩基破桩头的新方法,其特征是水冲、分解桩头混凝土应分层进行,每层厚约30-50厘米,应充分水冲、分解混凝土;水冲、分解一层后,把水管(3)向上提一层,直至最后一层应延长时间。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010170619.9A CN101876171B (zh) | 2010-04-29 | 2010-04-29 | 一种水冲、分解桥桩基破桩头的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010170619.9A CN101876171B (zh) | 2010-04-29 | 2010-04-29 | 一种水冲、分解桥桩基破桩头的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101876171A true CN101876171A (zh) | 2010-11-03 |
CN101876171B CN101876171B (zh) | 2014-10-22 |
Family
ID=43018839
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201010170619.9A Active CN101876171B (zh) | 2010-04-29 | 2010-04-29 | 一种水冲、分解桥桩基破桩头的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101876171B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102304915A (zh) * | 2011-06-29 | 2012-01-04 | 中铁四局集团第一工程有限公司 | 钻孔桩桩顶质量控制新方法 |
CN102926385A (zh) * | 2012-11-21 | 2013-02-13 | 江苏省交通工程集团有限公司 | 桥梁大直径灌注桩成桩夹泥缺陷的处理方法 |
CN105089055A (zh) * | 2015-09-09 | 2015-11-25 | 中国铁建大桥工程局集团有限公司 | 一种送风装置及应用送风装置清理桥梁钻孔桩桩头的方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6192213A (ja) * | 1984-10-09 | 1986-05-10 | Matsui Kensetsu Kk | 杭頭処理装置 |
JPH06192213A (ja) * | 1992-10-14 | 1994-07-12 | C R Bard Inc | pH指示薬としてのアミノ置換フェノールレッドおよび製法 |
JPH06318756A (ja) * | 1993-05-06 | 1994-11-15 | Toshiba Corp | レ−ザ装置 |
CN1101392A (zh) * | 1993-10-06 | 1995-04-12 | 刘孝先 | 灌注钢筋混凝土桩的工艺方法 |
CN1727580A (zh) * | 2005-05-31 | 2006-02-01 | 刘思谋 | 射水破桩头 |
-
2010
- 2010-04-29 CN CN201010170619.9A patent/CN101876171B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6192213A (ja) * | 1984-10-09 | 1986-05-10 | Matsui Kensetsu Kk | 杭頭処理装置 |
JPH06192213A (ja) * | 1992-10-14 | 1994-07-12 | C R Bard Inc | pH指示薬としてのアミノ置換フェノールレッドおよび製法 |
JPH06318756A (ja) * | 1993-05-06 | 1994-11-15 | Toshiba Corp | レ−ザ装置 |
CN1101392A (zh) * | 1993-10-06 | 1995-04-12 | 刘孝先 | 灌注钢筋混凝土桩的工艺方法 |
CN1727580A (zh) * | 2005-05-31 | 2006-02-01 | 刘思谋 | 射水破桩头 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102304915A (zh) * | 2011-06-29 | 2012-01-04 | 中铁四局集团第一工程有限公司 | 钻孔桩桩顶质量控制新方法 |
CN102926385A (zh) * | 2012-11-21 | 2013-02-13 | 江苏省交通工程集团有限公司 | 桥梁大直径灌注桩成桩夹泥缺陷的处理方法 |
CN105089055A (zh) * | 2015-09-09 | 2015-11-25 | 中国铁建大桥工程局集团有限公司 | 一种送风装置及应用送风装置清理桥梁钻孔桩桩头的方法 |
Also Published As
Publication number | Publication date |
---|---|
CN101876171B (zh) | 2014-10-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206721958U (zh) | 一种大直径全自动沉井挖掘系统 | |
CN202220340U (zh) | 水下混凝土浇筑导管 | |
CN101876171B (zh) | 一种水冲、分解桥桩基破桩头的方法 | |
CN202627006U (zh) | 地下室底板下降水井的封堵钢套管 | |
CN201321628Y (zh) | 管道分层取水装置 | |
CN207260148U (zh) | 预埋套管桩头整体破除装置 | |
CN201165420Y (zh) | 落料管防堵塞装置 | |
CN203768925U (zh) | 一种基坑内降水井的封堵装置 | |
CN205242414U (zh) | 用于桥梁桩基芯孔排水的提水桶 | |
CN210975559U (zh) | 可周转使用的桥梁泄水孔预埋装置 | |
CN201649099U (zh) | 注浆器金属铸件 | |
CN201924343U (zh) | 水冲、分解桥桩基破桩头的新装置 | |
CN105696468B (zh) | 水中桥梁施工中的水下混凝土浇筑方法 | |
CN107587476A (zh) | 一种设有预制反弧鹰嘴结构的挡浪墙及其设计施工方法 | |
CN201495548U (zh) | 人工挖孔灌注桩护壁混凝土接料平台 | |
CN212294953U (zh) | 一种多功能型的环保防水结构 | |
CN209620300U (zh) | 叠合剪力墙板及叠合剪力墙 | |
CN203080573U (zh) | 一种绞吸式挖灰船 | |
CN208109596U (zh) | Pccp管线试压工具管 | |
CN202139624U (zh) | 一种耙吸挖泥船用粘土耙头 | |
CN105756063A (zh) | 一种简易桩头破除辅助施工方法 | |
CN206746088U (zh) | 一种矿山采矿回填可无限连接式钢筋环绕型滤水管 | |
CN104110037B (zh) | 一种快捷灌浆装置及其灌浆方法 | |
CN218622235U (zh) | 灌注桩后注浆辅助工具 | |
CN203947480U (zh) | 一种快捷灌浆装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhang Xiuhe Inventor before: Sun Xiuguo |
|
COR | Change of bibliographic data |