CN201924343U - 水冲、分解桥桩基破桩头的新装置 - Google Patents
水冲、分解桥桩基破桩头的新装置 Download PDFInfo
- Publication number
- CN201924343U CN201924343U CN2010201860943U CN201020186094U CN201924343U CN 201924343 U CN201924343 U CN 201924343U CN 2010201860943 U CN2010201860943 U CN 2010201860943U CN 201020186094 U CN201020186094 U CN 201020186094U CN 201924343 U CN201924343 U CN 201924343U
- Authority
- CN
- China
- Prior art keywords
- pile
- water
- bridge
- water pipe
- decomposing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Foundations (AREA)
Abstract
本实用新型公开了一种水冲、分解桥桩基破桩头的新装置,桥板(15)装置在角铁(2)中部,阻桥台阶(18)装置在角铁(2)两侧及护筒(1)顶面内侧,桥板(15)的放置方向应根据破桩头装置的出水管扁弯头(4)所处的方向平行,阻管活动盖(16)用拧紧螺栓(17)装置在桥板(15)一侧,水管(3)镶嵌在阻管活动盖(16)中部,出水管扁弯头(4)装置在水管(3)下底部。本实用新型可深入桩头内部用喷水孔压力进行水冲、分解,在基坑开挖完毕以后,不用破桩头,只要简单的凿除处理一下桩头上的松散碎石,就可以直接浇筑垫层混凝土,省工、省时、效益高,可提前工期提高了工程质量,节约资金,大大降低了工程成本。
Description
技术领域:本实用新型涉及一种水冲、分解桥桩基破桩头的新装置。
背景技术:自有桩基混凝土建设桥梁以来,便有了桩基混凝土需要破桩头的近百年历史。破桩头这一专业术语,在别人眼里可能不熟悉,但在桥梁建设工程师们的脑海里并不陌生。为了满足规范、达到技术质量标准、把桩底的淤泥翻倒桩顶,浇筑桩基混凝土时必须高出桩顶一米左右,所以就产生了桩头。破桩头给施工带来了很大的负面影响,如:阻碍钩机开挖基坑,钩机在桩头之间挖土非常不方便,时不时碰撞桩头,造成时间的浪费和流失。破桩头一样给工程造成工期的延长和负增值。
发明内容:本实用新型解决了原常规破桩头存在的弊端,提供了一种不用破桩头,只要简单的凿除处理一下桩头上的松散碎石,然后就可以直接浇筑垫层混凝土,省工、省时、效益高的水冲、分解桥桩基破桩头的新装置。本实用新型解决技术问题所采用的技术方案是:所述的桥板15装置在角铁2中部,阻桥台阶18装置在角铁2两侧及护筒1顶面内侧,桥板15的放置方向应根据破桩头装置的出水管扁弯头4所处的方向平行,阻管活动盖16用拧紧螺栓17装置在桥板15一侧,水管3镶嵌在阻管活动盖16中部,出水管扁弯头4装置在水管3下底部。
本实用新型的有益效果是:由于设计了水冲、分解桥桩基破桩头的新装置,可深入桩头内部用喷水孔压力进行水冲、分解,在基坑开挖完毕以后,不用破桩头,钩机不受阻碍,方便快捷,只要简单的凿除处理一下桩头上的松散碎石, 就可以直接浇筑垫层混凝土,省工、省时、效益高,提高了工程质量,还可提前完成工期1-3天。节约资金,大大降低了工程成本,每根桩头至少节约资金300-1000元。
附图说明:图1是本实用新型的主视图
图2是图1的俯视图
图3是图1的仰视图
图4是图1的水管旋转扳手放大图
具体实施方式:实施例1:如图1、图2、图3、图4所示,所述的桥板15装置在角铁2中部,阻桥台阶18装置在角铁2两侧及护筒1顶面内侧,桥板15的放置方向应根据破桩头装置的出水管扁弯头4所处的方向平行,阻管活动盖16用拧紧螺栓17装置在桥板15一侧,水管3镶嵌在阻管活动盖16中部,出水管扁弯头4装置在水管3下底部。
实施例2:如图1、图2、图3、图4所示,所述的破桩头装置的水管旋转卡扣10设置在水管3上中部,水管旋转扳手23活动安装在水管旋转卡扣10上,变径接头8的大口径端接在水管3上端,小口径端接在泥浆泵的软水管22上,吊环14固定装置在变径接头8的上侧部,扭曲支撑板19用抱箍5、抱箍螺栓6固定在水管3下部,防挂护板7上、下、左、右均呈弧状,装置在扭曲支撑板19顶端,且用紧固螺栓13固定在出水管扁弯头4顶部,水管3用抱箍5和抱箍螺栓6装置在出水管扁弯头4底口上。
实施例3:如图1、图2、图3、图4所示,所述的出水管扁弯头4的一侧呈锥面,另一侧呈平面,垂直于水管3轴线,水冲分解出水孔11钻制在垂直面上,出水管扁弯头4端部钻制弯头端头扁出水孔12,出水管扁弯头4外侧包裹一层 橡胶皮20,在两水冲分解出水孔11之间拧一或两道缠制橡胶皮铁丝21。
操作时,应在桩基混凝土浇筑完毕后,安装桥板,桥板装置在角铁及阻桥台阶中部,以防止桥板在护筒内串动,导管装置在桥板中部,用钢丝绳吊着导管及出水管扁弯头下放到桩顶高程时注水加压,水从桩头混凝土中流过,会带走水泥浆,留下碎石。水冲、分解桩头混凝土应分层进行,每层厚约30-50厘米,应充分水冲、分解混凝土。水冲、分解一层后,把导管向上提一层,直至最后一层应延长时间,因为最后一层含淤泥量大,从而实现了水冲、分解破桩头。
Claims (4)
1.一种水冲、分解桥桩基破桩头的新装置,其特征在于桥板(15)装置在角铁(2)中部,阻桥台阶(18)装置在角铁(2)两侧及护筒(1)顶面内侧,桥板(15)的放置方向应根据破桩头装置的出水管扁弯头(4)所处的方向平行,阻管活动盖(16)用拧紧螺栓(17)装置在桥板(15)一侧,水管(3)镶嵌在阻管活动盖(16)中部,出水管扁弯头(4)装置在水管(3)下底部。
2.根据权利要求1所述的水冲、分解桥桩基破桩头的新装置,其特征是破桩头装置的水管旋转卡扣(10)设置在水管(3)上中部,水管旋转扳手(23)活动安装在水管旋转卡扣(10)上,变径接头(8)的大口径端接在水管(3)上端,小口径端接在泥浆泵的软水管(22)上,吊环(14)固定装置在变径接头(8)的上侧部,扭曲支撑板(19)用抱箍(5)、抱箍螺栓(6)固定在水管(3)下部,防挂护板(7)装置在扭曲支撑板(19)顶端,且用紧固螺栓(13)固定在出水管扁弯头(4)顶部,水管(3)用抱箍(5)和抱箍螺栓(6)装置在出水管扁弯头(4)底口上。
3.根据权利要求2所述的水冲、分解桥桩基破桩头的新装置,其特征是出水管扁弯头(4)的一侧呈锥面,另一侧呈平面,垂直于水管(3)轴线,水冲分解出水孔(11)钻制在垂直面上,出水管扁弯头(4)端部钻制弯头端头扁出水孔(12),出水管扁弯头(4)外侧包裹一层橡胶皮(20),在两水冲分解出水孔(11)之间拧一或两道缠制橡胶皮铁丝(21)。
4.根据权利要求2所述的水冲、分解桥桩基破桩头的新装置,其特征是防挂护板(7)上、下、左、右均呈弧状。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010201860943U CN201924343U (zh) | 2010-04-29 | 2010-04-29 | 水冲、分解桥桩基破桩头的新装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010201860943U CN201924343U (zh) | 2010-04-29 | 2010-04-29 | 水冲、分解桥桩基破桩头的新装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201924343U true CN201924343U (zh) | 2011-08-10 |
Family
ID=44428202
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010201860943U Expired - Fee Related CN201924343U (zh) | 2010-04-29 | 2010-04-29 | 水冲、分解桥桩基破桩头的新装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201924343U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110700259A (zh) * | 2019-11-06 | 2020-01-17 | 陕西建工第八建设集团有限公司 | 一种超前破除地下连续墙超灌混凝土的破除装置及其方法 |
-
2010
- 2010-04-29 CN CN2010201860943U patent/CN201924343U/zh not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110700259A (zh) * | 2019-11-06 | 2020-01-17 | 陕西建工第八建设集团有限公司 | 一种超前破除地下连续墙超灌混凝土的破除装置及其方法 |
CN110700259B (zh) * | 2019-11-06 | 2024-05-31 | 陕西建工第八建设集团有限公司 | 一种超前破除地下连续墙超灌混凝土的破除装置及其方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5529892B2 (ja) | シールド機械の密閉状態での発進及び到達のための装置 | |
CN100535261C (zh) | 一种用拔桩机进行拔桩的施工方法 | |
CN202450537U (zh) | 一种真空管井复合降水装置 | |
CN204475334U (zh) | 大直径钢管桩沉桩用抱桩装置 | |
CN102808413B (zh) | 代筋内活塞分段注浆管及其施工方法 | |
CN201486566U (zh) | 采矿工作面沿空留巷浇筑混凝土连续墙的装置 | |
CN207017270U (zh) | 陆上钢管桩送桩器 | |
CN107542093A (zh) | 一种冲孔灌注桩清底方法 | |
CN201924343U (zh) | 水冲、分解桥桩基破桩头的新装置 | |
CN101876171B (zh) | 一种水冲、分解桥桩基破桩头的方法 | |
CN100557145C (zh) | Phc桩内冲内排辅助沉桩施工方法 | |
CN201087421Y (zh) | 一种拔桩机 | |
CN205242414U (zh) | 用于桥梁桩基芯孔排水的提水桶 | |
CN201201866Y (zh) | 一种多功能塔吊 | |
CN105696468B (zh) | 水中桥梁施工中的水下混凝土浇筑方法 | |
CN205677667U (zh) | 一种煤矿井下排水装置 | |
CN203947477U (zh) | 一种利用气囊进行双壁钢围堰拆除的装置 | |
CN204551494U (zh) | 一种钢板桩围堰内支撑叠加下放施工装置 | |
CN203783631U (zh) | 一种穿对拉锚杆的柔性充填袋 | |
CN204604563U (zh) | 一种水泥管浇注设备 | |
CN202323934U (zh) | 用于现浇三角形复合地基桩的成孔器 | |
CN202265826U (zh) | 一种套管咬合桩套管护口 | |
CN202175951U (zh) | 拔桩装置 | |
CN201924345U (zh) | 钢筋混凝土桩网施工用反插钢筋笼 | |
CN102261073A (zh) | 拔桩装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
DD01 | Delivery of document by public notice | ||
DD01 | Delivery of document by public notice |
Addressee: BEIJING ENGINEERING COMPANY OF CCCC TUNNEL ENGINEERING CO.,LTD. Document name: Notification to Pay the Fees |
|
DD01 | Delivery of document by public notice | ||
DD01 | Delivery of document by public notice |
Addressee: BEIJING ENGINEERING COMPANY OF CCCC TUNNEL ENGINEERING CO.,LTD. Document name: Notification of Termination of Patent Right |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110810 Termination date: 20180429 |