CN101871363A - Time-sharing transporting and filling system for underground coal and waste rock - Google Patents

Time-sharing transporting and filling system for underground coal and waste rock Download PDF

Info

Publication number
CN101871363A
CN101871363A CN 201010200906 CN201010200906A CN101871363A CN 101871363 A CN101871363 A CN 101871363A CN 201010200906 CN201010200906 CN 201010200906 CN 201010200906 A CN201010200906 A CN 201010200906A CN 101871363 A CN101871363 A CN 101871363A
Authority
CN
China
Prior art keywords
coal
waste rock
transportation
spoil
waste
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010200906
Other languages
Chinese (zh)
Other versions
CN101871363B (en
Inventor
莫技
朱德跃
巩庆刚
孔令江
王慧琴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XINWEN MINING GROUP CO Ltd SUNCUN COAL MINE
Original Assignee
XINWEN MINING GROUP CO Ltd SUNCUN COAL MINE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XINWEN MINING GROUP CO Ltd SUNCUN COAL MINE filed Critical XINWEN MINING GROUP CO Ltd SUNCUN COAL MINE
Priority to CN201010200906XA priority Critical patent/CN101871363B/en
Publication of CN101871363A publication Critical patent/CN101871363A/en
Application granted granted Critical
Publication of CN101871363B publication Critical patent/CN101871363B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a time-sharing transporting and filling system for underground coal and waste rock. A waste rock discharge pit and a discharge device are built by downward digging at a vehicle entrance end of a mining area transportation park, a waste rock crusher is arranged on the upper port of a lower coal bunker of a primary coal transportation belt machine, and a scraper conveyer is arranged between the bottom of the waste rock discharge pit and the waste rock crusher; a waste rock bin is built in an old tunnel nearby a board-up tunnel outlet of the primary coal transportation belt, and a coal supplier of an upper coal bunker of the primary coal transportation belt machine is changed into bidirectional discharge mode; one waste rock discharge end of the coal supplier is provided with a conveyor to the waste rock bin; and a loading device is arranged at the bottom of the waste rock bin, and crushed waste rocks are filled into a mine car and transported to a gob. The system improves the transportation capability and realizes continuous transportation of the waste rocks by promoting the waste rocks to the upper transportation tunnel of the gob through the primary coal transportation belt machine.

Description

Down-hole coal and spoil timesharing transportation filling system
Technical field
The present invention relates to transportation system under the coal mine, relate in particular to spoil transportation filling system.
Background technology
At present, well is not gone up in order to realize spoil in the colliery, reduces the environment pollution of transit link and ground hillock, has adopted the waste filling system.Waste filling is exactly the spoil of underground tunneling roadway output, pulverizes the back conveying and is filled to the goaf.The arrangement of waste filling system is: the spoil of the output mine car of packing into from digging laneway, be transported to the spoil parking lot through main haulage roadway, converting winch again to promotes, with waste bin that is promoted to a last section of mine car, again by transport channel be filled to goaf after the pulverizing by the ginney tunnel.Because the transport capacity in ginney tunnel is limited, can not at short notice all mine cars all be promoted, thereby influence driving speed.In order to make driving speed unaffected, a part of spoil must be mentioned on the ground by auxiliary shaft, make the spoil can not be all in the down-hole backfill.
Summary of the invention
For the not enough problem of lifting capacity that solves the waste filling system, the present invention proposes a kind of transportation filling system that utilizes the timesharing of existing fortune coal conveyor to promote spoil.
Technical scheme is: 1, the car end that advances in the transport park, exploiting field excavates downwards and sets up one and unload the cash hole, unload on the cash hole and be furnished with discharge mechanism, at spoil crushing engine of the bottom coal bunker of original fortune coal conveyor layout suitable for reading, unloading drag conveyor of layout between bottom, cash hole and the spoil feed of crusher mouth.
2. near the old working original fortune coal belt bord-up outlet, build a waste bin again, change the feeder of original fortune coal conveyor top coal bunker into two-way unload-type, unload coal when just changeing, unload cash during counter-rotating, feeder unloads an end of cash and arranges that a conveyer is to waste bin.
3. truck-loading facilities is arranged in waste bin bottom, will pulverize the spoil mine car of packing into and be transported to the goaf.
Good effect of the present invention is: utilize original fortune coal conveyor bord-up to promote spoil to top, goaf haulage drift, improved moving Movement Capabilities, realized that spoil transports continuously, can be the free time of fortune coal transportation spoil (because the fortune coal time be to carry out at interval).Thereby reduced the special-purpose spoil of cover transportation system, can transport spoil as long as on former fortune coal measures system, transform a little.
Description of drawings
Fig. 1 is a schematic diagram of the present invention.
Marginal data: 1-unloads the cash hole; The 2-drag conveyor; 3-spoil crushing engine; 4-bottom coal bunker; 5-fortune coal conveyor; 6-top coal bunker; The 7-feeder; The 8-transporter; The 9-waste bin; The 10-truck-loading facilities; The 11-mine car; 12-unloads the cash device; The 13-mine car.
The specific embodiment
Those skilled in the art can implement according to technical scheme and accompanying drawing.1 the spoil transportation is described with reference to the accompanying drawings more below, thereby understands content of the present invention more.
The spoil mine car 13 that comes from driving face is discharged into cash hole 1 by unloading cash device 12 (as cardump), send into spoil crushing engine 3 by drag conveyor 2 again, carry out fragmentation, spoil after the fragmentation falls into bottom coal bunker 4, and the broken spoil in the bottom coal bunker 4 is carried to top coal bunker 6 on fortune coal conveyor 5, starts feeder 7 counter-rotatings, deliver to waste bin 9 through conveyer 8 transhipments, by truck-loading facilities 10 mine car 11 of packing into, deliver to the goaf, carry out filling.

Claims (1)

1. down-hole coal and spoil timesharing transportation filling system, it is characterized in that, it is that the car end that advances in the transport park, exploiting field excavates downwards and sets up one and unload the cash hole, unload on the cash hole and be furnished with discharge mechanism, at spoil crushing engine of the bottom coal bunker of original fortune coal conveyor layout suitable for reading, unloading drag conveyor of layout between bottom, cash hole and the spoil feed of crusher mouth; In near original fortune coal belt bord-up outlet the old working, build a waste bin again, change the feeder of original fortune coal conveyor top coal bunker into two-way unload-type, unload coal when just changeing, unload cash during counter-rotating, feeder unloads an end of cash and arranges that a conveyer is to waste bin; Truck-loading facilities is arranged in waste bin bottom, will pulverize the spoil mine car of packing into and be transported to the goaf.
CN201010200906XA 2010-06-04 2010-06-04 Time-sharing transporting and filling system for underground coal and waste rock Expired - Fee Related CN101871363B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010200906XA CN101871363B (en) 2010-06-04 2010-06-04 Time-sharing transporting and filling system for underground coal and waste rock

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010200906XA CN101871363B (en) 2010-06-04 2010-06-04 Time-sharing transporting and filling system for underground coal and waste rock

Publications (2)

Publication Number Publication Date
CN101871363A true CN101871363A (en) 2010-10-27
CN101871363B CN101871363B (en) 2011-12-14

Family

ID=42996430

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010200906XA Expired - Fee Related CN101871363B (en) 2010-06-04 2010-06-04 Time-sharing transporting and filling system for underground coal and waste rock

Country Status (1)

Country Link
CN (1) CN101871363B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102305101A (en) * 2011-06-08 2012-01-04 中煤第七十一工程处 Storage and transportation system of temporary coal bunker at the bottom of vertical shaft
CN102505962A (en) * 2011-10-09 2012-06-20 中煤张家口煤矿机械有限责任公司 Stripping, backfilling and conveying system for open-pit mines
WO2012155531A1 (en) * 2011-05-17 2012-11-22 山东新煤机械设备股份有限公司 Technology and equipment for separating coal and gangue and refilling gangue.
CN104453998A (en) * 2014-10-30 2015-03-25 中国矿业大学 Coal mine solid filling coal mining ground material throwing system and technology
CN105221184A (en) * 2015-10-26 2016-01-06 枣庄矿业集团新安煤业有限公司 A point cash system is arranged in crossheading two storehouse in colliery
CN105736045A (en) * 2016-04-20 2016-07-06 山东科技大学 Bag type filling system and filling method for controlling water inrush from gob floor
CN109985436A (en) * 2019-04-11 2019-07-09 河南万合机械有限公司 Underground water coal separation system and water coal separation method
CN112145225A (en) * 2020-09-22 2020-12-29 中煤能源研究院有限责任公司 Underground in-situ pulping and backfilling system and method for coal mine tunneling gangue
CN115744046A (en) * 2022-12-07 2023-03-07 中国煤炭科工集团太原研究院有限公司 Method for transferring gangue on underground working face
CN117027844A (en) * 2023-10-09 2023-11-10 中国矿业大学 Coal gangue separation and bottom laying integrated device suitable for tunnel excavation
CN109985436B (en) * 2019-04-11 2024-05-17 河南万合机械有限公司 Underground water-coal separation system and water-coal separation method

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105298498B (en) * 2015-11-02 2017-06-20 中国恩菲工程技术有限公司 The back production of ore, transport and backfill system and method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1112427A (en) * 1964-10-23 1968-05-08 Coal Industry Patents Ltd Improvements in or relating to mine conveyors
DE19511018A1 (en) * 1995-03-25 1996-09-26 Bochumer Eisen Heintzmann Extraction and conveying machine of coal layers in underground mine
CN2758490Y (en) * 2004-12-03 2006-02-15 北京中矿机电工程技术研究所 Gangue pipe line transfer and tunnel slurry filling system and device
CN1782326A (en) * 2004-12-03 2006-06-07 河北金牛能源股份有限公司 Method for treating waste rock in coal mine
CN101245710A (en) * 2007-09-12 2008-08-20 中国矿业大学(北京) Vertical shaft bucket conveyer and its unmanned work face coal mining method
CN101392659A (en) * 2008-08-05 2009-03-25 山东华恒矿业有限公司 Method for directly utilizing downhole gangue
CN101463732A (en) * 2009-01-05 2009-06-24 杨洪涛 Continuous waste rock back-filling system for coal mine down-hole goaf
CN201424959Y (en) * 2009-05-19 2010-03-17 山东华恒矿业有限公司 Diphead type centralized waste filling system
CN201424960Y (en) * 2009-05-19 2010-03-17 山东华恒矿业有限公司 Rise type centralized waste filling system

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1112427A (en) * 1964-10-23 1968-05-08 Coal Industry Patents Ltd Improvements in or relating to mine conveyors
DE19511018A1 (en) * 1995-03-25 1996-09-26 Bochumer Eisen Heintzmann Extraction and conveying machine of coal layers in underground mine
CN2758490Y (en) * 2004-12-03 2006-02-15 北京中矿机电工程技术研究所 Gangue pipe line transfer and tunnel slurry filling system and device
CN1782326A (en) * 2004-12-03 2006-06-07 河北金牛能源股份有限公司 Method for treating waste rock in coal mine
CN101245710A (en) * 2007-09-12 2008-08-20 中国矿业大学(北京) Vertical shaft bucket conveyer and its unmanned work face coal mining method
CN101392659A (en) * 2008-08-05 2009-03-25 山东华恒矿业有限公司 Method for directly utilizing downhole gangue
CN101463732A (en) * 2009-01-05 2009-06-24 杨洪涛 Continuous waste rock back-filling system for coal mine down-hole goaf
CN201424959Y (en) * 2009-05-19 2010-03-17 山东华恒矿业有限公司 Diphead type centralized waste filling system
CN201424960Y (en) * 2009-05-19 2010-03-17 山东华恒矿业有限公司 Rise type centralized waste filling system

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012155531A1 (en) * 2011-05-17 2012-11-22 山东新煤机械设备股份有限公司 Technology and equipment for separating coal and gangue and refilling gangue.
AU2012255582B2 (en) * 2011-05-17 2015-08-13 Shandong Xinmei Machinery Equipment Co., Ltd Technology and equipment for separating coal and gangue and refilling gangue.
CN102305101A (en) * 2011-06-08 2012-01-04 中煤第七十一工程处 Storage and transportation system of temporary coal bunker at the bottom of vertical shaft
CN102505962A (en) * 2011-10-09 2012-06-20 中煤张家口煤矿机械有限责任公司 Stripping, backfilling and conveying system for open-pit mines
CN104453998A (en) * 2014-10-30 2015-03-25 中国矿业大学 Coal mine solid filling coal mining ground material throwing system and technology
CN105221184A (en) * 2015-10-26 2016-01-06 枣庄矿业集团新安煤业有限公司 A point cash system is arranged in crossheading two storehouse in colliery
CN105736045A (en) * 2016-04-20 2016-07-06 山东科技大学 Bag type filling system and filling method for controlling water inrush from gob floor
CN105736045B (en) * 2016-04-20 2018-09-11 山东科技大学 A kind of the pocket type filling system and its placement method of control gob floor gushing water
CN109985436A (en) * 2019-04-11 2019-07-09 河南万合机械有限公司 Underground water coal separation system and water coal separation method
CN109985436B (en) * 2019-04-11 2024-05-17 河南万合机械有限公司 Underground water-coal separation system and water-coal separation method
CN112145225A (en) * 2020-09-22 2020-12-29 中煤能源研究院有限责任公司 Underground in-situ pulping and backfilling system and method for coal mine tunneling gangue
CN115744046A (en) * 2022-12-07 2023-03-07 中国煤炭科工集团太原研究院有限公司 Method for transferring gangue on underground working face
CN117027844A (en) * 2023-10-09 2023-11-10 中国矿业大学 Coal gangue separation and bottom laying integrated device suitable for tunnel excavation
CN117027844B (en) * 2023-10-09 2023-12-19 中国矿业大学 Coal gangue separation and bottom laying integrated device suitable for tunnel excavation

Also Published As

Publication number Publication date
CN101871363B (en) 2011-12-14

Similar Documents

Publication Publication Date Title
CN101871363B (en) Time-sharing transporting and filling system for underground coal and waste rock
CN104533429B (en) Double-roadway combined rapid tunneling gangue discharge system and method
CN102889084B (en) Continuous mining technique for thin coal layer of opencast coal mine
AU2014223132B2 (en) Method and device for using gangue aboveground to backfill mine goaf
CN102269013B (en) Method for mechanically filling gangue on single support working surface under complex coal seam condition
CN102444401B (en) Coal mining method by filling on blasting mining face of thin coal seam and relevant equipment
CN201269103Y (en) Drift driving construction system
CN103590851A (en) Underground waste-rock concrete preparation, pumping and filling system and method
CN101660414B (en) Method for conveying coal in end slope laneway in open pit coal mine
CN104234714B (en) A kind of underground coal mine green high-efficient transporting method
CN101463732A (en) Continuous waste rock back-filling system for coal mine down-hole goaf
CN201424960Y (en) Rise type centralized waste filling system
CN201671655U (en) Downhole coal and waste time-sharing transporting and filling system
CN108915680A (en) Girdle bastard coal sorts fully mechanized mining and fully mechanized mining system
CN104564139A (en) Dense filling system and filling method
CN202544921U (en) Gangue discharging device in rock gangway rapid tunneling process
CN103086149A (en) Double working face belt conveying mechanism for composite-bench mining way of crushing station
CN207229102U (en) A kind of semicontinuous mining system of opencut
CN201424959Y (en) Diphead type centralized waste filling system
CN104453998A (en) Coal mine solid filling coal mining ground material throwing system and technology
CN205135700U (en) Continuous conveyor system of waste rock
CN201339484Y (en) Continuous gangue back-filling system for coal mine down-hole goaf
CN106311389A (en) Gate roadway loader raw coal transporting and crushing system for underground coal mining
CN102619558A (en) Rock roadway rapid excavation and gangue elimination system and gangue elimination method
CN208718652U (en) Girdle bastard coal sorts fully mechanized mining system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111214

Termination date: 20140604