CN101392659A - Method for directly utilizing downhole gangue - Google Patents
Method for directly utilizing downhole gangue Download PDFInfo
- Publication number
- CN101392659A CN101392659A CNA2008101387779A CN200810138777A CN101392659A CN 101392659 A CN101392659 A CN 101392659A CN A2008101387779 A CNA2008101387779 A CN A2008101387779A CN 200810138777 A CN200810138777 A CN 200810138777A CN 101392659 A CN101392659 A CN 101392659A
- Authority
- CN
- China
- Prior art keywords
- spoil
- mixer
- goaf
- waste
- delivery pump
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Air Transport Of Granular Materials (AREA)
Abstract
The invention discloses a method for directly utilizing underground waste rocks. A waste rock pumping and treatment system is established under mine, and the underground waste rocks are directly crushed in the field, are conveyed to a stirring machine by a conveyor, are stirred evenly into a slurry state by adding water in the stirring machine, then are unloaded to a waste rock conveying pump, and are directly filled into a mined-out area through a conveying pipe. The method directly backfills the waste rocks to the mined-out area under mine, solves the reutilization problem of the underground waste rocks, and avoids a series of problems caused by long-term stacking after the waste rocks are conveyed to the ground. The method is adopted to treat the waste rocks under mine and fill the mined-out area, which can effectively reduce the settlement of a crest slab.
Description
Technical field
The present invention relates to the reutilization technology of coal mine waste rock, especially downhole gangue directly utilizes method.
Background technology
Spoil is the solid waste of association in coal production and the process, all is at present to transport to ground to deposit.A large amount of spoils are stored up ground for a long time, and land occupation causes spontaneous combustion simultaneously, atmosphere pollution and groundwater quality.The goaf is the down-hole maximum space behind the extraction coal, directly spoil is backfilling into the goaf in the down-hole, can realize that not only spoil do not go up well, does not take up an area of, and reduces environment pollution, and can reduce the surface subsidence amount, can liberate coal reserves significantly.
Summary of the invention
The present invention is for solving the technical problem that the spoil solid waste is utilized again, the method that provides a kind of downhole gangue directly to utilize.
For addressing the above problem, the technical scheme that the present invention takes is: set up pumping spoil treatment system in the down-hole, with the direct bashing of downhole gangue, concrete steps are as follows:
The first step: take supporting measure to reserve at the actual mining face goaf side and carry and fill out the cash space;
Second step: arrange a waste bin in the outside appropriate location of stope, the spoil that the down-hole produces is transported in the waste bin, at waste bin exit breaker mounting, is used to pulverize spoil;
The 3rd step: in the middle of the stope lane or on the lane mixer and spoil delivery pump are installed, fill out the cash space from spoil delivery pump to goaf and connect and go up carrier pipe;
The 4th step: spoil is broken into stone flour and granule, again spoil powder and granule is transported to mixer by conveyer, the mixer poach unloads to the spoil delivery pump after becoming pulpous state, is filled to the goaf through carrier pipe.
For making the goaf more substantial, add the blast reducer pipe in the carrier pipe termination, filling effect is better.
The present invention directly is backfilling into the goaf with spoil in the down-hole, and what solved downhole gangue utilizes problem again, has avoided spoil fortune is deposited that ground is stored up for a long time and a series of problems of bringing.And adopt this invention at the down-hole treatment spoil, bashing can effectively reduce and crush.The realization spoil is not gone up well, will produce huge economic benefit, environmental benefit and social benefit.Also can use this technology in the place of three unders in coal mining and Pillar Recovery and carry out backfill.
Description of drawings
Fig. 1 is a pumping spoil treatment system layout;
Fig. 2 is a pumping spoil treatment system flow chart.
Among the figure: 1-crushing engine, 2-charging belt, 3-mixer, 4-delivery pump, cash space, 7-waste bin, 8-stope are filled out in 5-carrier pipe, 6-goaf.
The specific embodiment
As Fig. 1, shown in Figure 2, during the invention process, at first take supporting measure to reserve and carry and fill out cash space 6 at stope 8 goaf sides, at stope 8 disposed outside one waste bin 7, the spoil that the down-hole produces is transported in the waste bin 7, at waste bin 7 exit breaker mountings 1, in the middle of stope 8 lanes or on the lane mixer 3 and spoil delivery pump 4 are installed, fill out cash space 6 from spoil delivery pump 4 to goaf and connect carrier pipe 5, arrange charging belt 2 at crushing engine 1 to mixer 3, spoil enters charging belt 2 after by crushing engine 1 fragmentation and is delivered to mixer 3, stir the back by mixer 3 and slip delivery pump 4, abandon by carrier pipe 5 and be filled to the goaf and fill out cash space 6.Add the blast reducer pipe in carrier pipe 5 terminations, make filling effect better.
The said equipment technical data is: delivery pump adopts the HBTS-16-90 type, conveying capacity 50-90t/h, fed distance: vertical 300m, horizontal 1200m, suitable particles of aggregates≤20mm, power 90kw.Two in mixer: productivity ratio 55-65m
3/ h, single-machine capacity 18.5kw.One of crushing engine, productivity ratio 60-90m
3/ h, power 75kw.One in charging belt machine, power 30kw.
Note during enforcement following some:
When carrying out the conveying of spoil pump,, must adopt high voltage bearing pipe-line system because the manifold pressure maximum can reach 8Mpa.So must adopt wall thickness is the above ultra-high pressure pipeline of 6mm, ensures the antiknock ability of pipeline.High pressure pipe clamp and high-pressure seal ring are adopted in the connection of pipeline enclosure, prevent that liquid from extruding from two pipe clamp cracks, guarantee that sealing is reliable, and the more little then transporting resistance of carrier pipe caliber is big more, and should select diameter for use is that the carrier pipe of 125mm is better.Should use bend pipe and flexible pipe less according to the spoil transportation scheme when arranging pipeline as far as possible, shorten length of pipeline as far as possible.The slump of the spoil slurry after the stirring should be controlled at 180~200mm.
The part of answering the hopper, pump chamber, conveyance conduit etc. of the moistening pump of water contact with spoil before before the turn on pump can be carried after the inspection pipeline is no abnormal.
The pump machine should be in the low-speed running state during beginning pumping, notes observing the pressure and the each several part working condition of pump, treats can bring up to normal transporting velocity after the smooth pumping.
Can cause pipeline to produce vibration when the pressure that difficulty of transportation, pump take place raises suddenly, available mallet knocks pipeline, finds out the pipeline section of obstruction, adopts positive and negative pump crawl to handle or the dismounting cleaning, confirms that on inspection not having the back of obstruction continues pumping, in order to avoid damage the pump machine.
Claims (2)
1, the method directly utilized of a kind of downhole gangue is characterized in that it is to set up pumping spoil treatment system in the down-hole, and with the direct bashing of downhole gangue, concrete steps are as follows:
The first step: take supporting measure to reserve at the actual mining face goaf side and carry and fill out the cash space;
Second step: arrange a waste bin in the outside appropriate location of stope, the spoil that the down-hole produces is transported in the waste bin, at waste bin exit breaker mounting, is used to pulverize spoil;
The 3rd step: in the middle of the stope lane or on the lane mixer and spoil delivery pump are installed, fill out the cash space from spoil delivery pump to goaf and connect and go up carrier pipe;
The 4th step: spoil is broken into stone flour and granule, again spoil powder and granule is transported to mixer by conveyer, the mixer poach unloads to the spoil delivery pump after becoming pulpous state, is filled to the goaf through carrier pipe.
2, the method directly utilized of downhole gangue as claimed in claim 1 is characterized in that, is provided with the blast reducer pipe in the carrier pipe termination.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2008101387779A CN101392659A (en) | 2008-08-05 | 2008-08-05 | Method for directly utilizing downhole gangue |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2008101387779A CN101392659A (en) | 2008-08-05 | 2008-08-05 | Method for directly utilizing downhole gangue |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101392659A true CN101392659A (en) | 2009-03-25 |
Family
ID=40493149
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNA2008101387779A Pending CN101392659A (en) | 2008-08-05 | 2008-08-05 | Method for directly utilizing downhole gangue |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101392659A (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101858215A (en) * | 2010-04-30 | 2010-10-13 | 河南理工大学 | Road retained method for extrusion molding of waste rock |
CN101864988A (en) * | 2010-04-30 | 2010-10-20 | 中国恩菲工程技术有限公司 | Potash salt ore goaf filling method |
CN101871363A (en) * | 2010-06-04 | 2010-10-27 | 新汶矿业集团有限责任公司孙村煤矿 | Time-sharing transporting and filling system for underground coal and waste rock |
CN102011610A (en) * | 2010-10-28 | 2011-04-13 | 山东科技大学 | Supporting method of no-pillar mining mode for medium-thick coal seams |
CN102162364A (en) * | 2011-03-21 | 2011-08-24 | 山东新阳能源有限公司 | Layout method for underground dense-medium shallow-slot coal preparation in coal mine |
CN102200026A (en) * | 2011-04-26 | 2011-09-28 | 王世洋 | Method for filling gob formed after mining by using gangue |
CN102536313A (en) * | 2012-02-15 | 2012-07-04 | 新汶矿业集团有限责任公司协庄煤矿 | Gangue filling pneumatic conveying system |
CN102808624A (en) * | 2012-08-21 | 2012-12-05 | 安徽理工大学 | System and method for simultaneous mining of coal gangue |
CN110454218A (en) * | 2019-08-28 | 2019-11-15 | 河北工程大学 | A kind of waste filling accurate quantization control method under the conditions of adaptation strata pressure laws |
CN110714759A (en) * | 2019-10-14 | 2020-01-21 | 山西鸿太旭飞能源科技有限公司 | Method for mining lost coal |
CN114233375A (en) * | 2021-11-12 | 2022-03-25 | 中煤科工开采研究院有限公司 | Pure gangue slurry filling material for mine filling and application thereof |
-
2008
- 2008-08-05 CN CNA2008101387779A patent/CN101392659A/en active Pending
Cited By (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101858215B (en) * | 2010-04-30 | 2012-10-03 | 河南理工大学 | Road retained method for extrusion molding of waste rock |
CN101864988A (en) * | 2010-04-30 | 2010-10-20 | 中国恩菲工程技术有限公司 | Potash salt ore goaf filling method |
CN101858215A (en) * | 2010-04-30 | 2010-10-13 | 河南理工大学 | Road retained method for extrusion molding of waste rock |
CN101864988B (en) * | 2010-04-30 | 2012-02-01 | 中国恩菲工程技术有限公司 | Potash salt ore goaf filling method |
CN101871363A (en) * | 2010-06-04 | 2010-10-27 | 新汶矿业集团有限责任公司孙村煤矿 | Time-sharing transporting and filling system for underground coal and waste rock |
CN102011610A (en) * | 2010-10-28 | 2011-04-13 | 山东科技大学 | Supporting method of no-pillar mining mode for medium-thick coal seams |
CN102011610B (en) * | 2010-10-28 | 2013-01-16 | 山东科技大学 | Supporting method of no-pillar mining mode for medium-thick coal seams |
CN102162364A (en) * | 2011-03-21 | 2011-08-24 | 山东新阳能源有限公司 | Layout method for underground dense-medium shallow-slot coal preparation in coal mine |
CN102162364B (en) * | 2011-03-21 | 2012-12-12 | 山东新阳能源有限公司 | Layout method for underground dense-medium shallow-slot coal preparation in coal mine |
CN102200026A (en) * | 2011-04-26 | 2011-09-28 | 王世洋 | Method for filling gob formed after mining by using gangue |
CN102536313A (en) * | 2012-02-15 | 2012-07-04 | 新汶矿业集团有限责任公司协庄煤矿 | Gangue filling pneumatic conveying system |
CN102808624A (en) * | 2012-08-21 | 2012-12-05 | 安徽理工大学 | System and method for simultaneous mining of coal gangue |
CN102808624B (en) * | 2012-08-21 | 2016-02-03 | 安徽理工大学 | Bastard coal is with extraction system and method |
CN110454218A (en) * | 2019-08-28 | 2019-11-15 | 河北工程大学 | A kind of waste filling accurate quantization control method under the conditions of adaptation strata pressure laws |
CN110454218B (en) * | 2019-08-28 | 2020-10-20 | 河北工程大学 | Accurate quantitative control method for gangue filling under condition of mine pressure rule |
CN110714759A (en) * | 2019-10-14 | 2020-01-21 | 山西鸿太旭飞能源科技有限公司 | Method for mining lost coal |
CN110714759B (en) * | 2019-10-14 | 2021-05-14 | 山西鸿太旭飞能源科技有限公司 | Method for mining lost coal |
CN114233375A (en) * | 2021-11-12 | 2022-03-25 | 中煤科工开采研究院有限公司 | Pure gangue slurry filling material for mine filling and application thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101392659A (en) | Method for directly utilizing downhole gangue | |
CN101899976B (en) | Continuous coal mining process method of open-pit coal mine | |
CN103133034A (en) | Method and equipment for backfilling underground goaf with waste rock on well | |
CN101215976B (en) | Down-hole gangue pump packing system and method | |
CN103216238A (en) | Open pit coal mine mining process | |
CN112343651A (en) | Process and equipment for filling mining by using coal gangue | |
CA2453697A1 (en) | At the mine site oil sands processing | |
CN111365067A (en) | Paste filling mining method | |
CN112796829A (en) | Underground original gangue filling system and method for caving area of fully mechanized caving face | |
CN102661170A (en) | Process and device for continuously stirring and filling paste-like body for mine manufactured by use of building waste | |
CN104763467B (en) | Obturation and its placement method and system for Hazard in Deep Metal Mines goaf | |
CN207813647U (en) | Coordinative composition of equipments system for pumped downhole waste filling exploitation | |
CN111520156B (en) | Energy-gathering jet rock breaking and fluidization carrying system and method | |
KR20090030088A (en) | Shield tunneling apparatus and constructing method thereof | |
CN113339058A (en) | Fluidized gangue layer adjacent surface subsequent filling system and method | |
CN201424960Y (en) | Rise type centralized waste filling system | |
US6715610B2 (en) | Slurry treatment | |
CN110645044A (en) | Grouting filling system | |
CN116378750A (en) | Underground dynamic filling method for gangue paste | |
CN202467923U (en) | Continuous stirring and filling device for preparing mining paste by utilizing building wastes | |
CN201424959Y (en) | Diphead type centralized waste filling system | |
CN104948223B (en) | Down-hole gob-side roadway filling system and method | |
CN215109018U (en) | Filling device and filling system | |
CN211900690U (en) | Paste filling and mining complete equipment | |
CN113339053B (en) | Fully-mechanized caving mining and filling process for coal mine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Open date: 20090325 |