CN205135700U - Continuous conveyor system of waste rock - Google Patents

Continuous conveyor system of waste rock Download PDF

Info

Publication number
CN205135700U
CN205135700U CN201520978322.3U CN201520978322U CN205135700U CN 205135700 U CN205135700 U CN 205135700U CN 201520978322 U CN201520978322 U CN 201520978322U CN 205135700 U CN205135700 U CN 205135700U
Authority
CN
China
Prior art keywords
waste bin
spoil
ribbon conveyer
waste
conveyor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520978322.3U
Other languages
Chinese (zh)
Inventor
王勇
闫红新
董玉革
秦强
罗延歆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HEFEI DESIGN RESEARCH INSTITUTE FOR COAL INDUSTRY
Original Assignee
HEFEI DESIGN RESEARCH INSTITUTE FOR COAL INDUSTRY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEFEI DESIGN RESEARCH INSTITUTE FOR COAL INDUSTRY filed Critical HEFEI DESIGN RESEARCH INSTITUTE FOR COAL INDUSTRY
Priority to CN201520978322.3U priority Critical patent/CN205135700U/en
Application granted granted Critical
Publication of CN205135700U publication Critical patent/CN205135700U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model discloses a continuous conveyor system of waste rock. The exploiting field waste rock transports exploiting field waste bin pan feeding mouth through belt conveyor, exploiting field waste bin discharge gate below is equipped with slat feeder, de -ironing separator and breaker, the breaker end opening is equipped with conveyor belt, conveyor belt other end below is equipped with the shaft bottom waste bin, slat feeder has been met under the waste bin of shaft bottom, belt conveyor, the belt conveyor other end is to measuring loading device, the measurement connects the skip under the loading device, the skip can promote the waste rock to the well head waste bin and uninstall, well head waste bin end opening connects the batcher, belt conveyor, conveyor belt other end below is equipped with the loading waste bin, termination waste rock conveying equipment under the loading waste bin, carry out interim mound design with the waste rock. The utility model relates to an it is rationally distributed, realize the waste rock continuous transportation, adopt shaft bottom waste rock belt conveyor + skip hoisting + ground belt conveyor directly to play mountain mound design or outward transport, will guarantee the higher production efficiency and the reliability of production process.

Description

A kind of spoil continuous haulage system
Technical field
The utility model relates to coal production technical field, specifically belongs to a kind of spoil continuous haulage system.
Background technology
At present, the mine of domestic and international vertical exploitation, its spoil means of transportation is still down-hole and adopts car-haul, is unloaded after assisted Extraction gug is in column to ground marshalling by cage hoisting by locomotive haulage to spoil car dumper shed, cash car is turned in three faces that are loaded into again, draws mountain of having gone up a hill stack by winch.Or transported outward by automobile to waste bin after being unloaded by dumptruct.From the actual conditions of domestic and international mine main, for producing the high mine of cash rate, cash technique put forward by employing mine car fortune cash, auxiliary shaft cage, become the bottleneck that restriction mine capacity improves.
With regard to the large-scale Jing Gongkuangjing of part, as adopted traditional spoil transport, hoisting way, pit shaft and lifting means must be established more, the requirement of mine spoil lifting capacity could be met, transit link is many, vehicle and personnel many, a large amount of spoil haulage vehicles and other materials car, equipment vehicle interfere with each other, the serious efficiency that have impact on spoil and other assistant conveyance and safety.In addition, tradition fortune cash technology investment is large, and auxiliary shaft ground configuration floor space is large.
Along with the raising of mine output, traditional spoil Transportation Model has been difficult to the requirement meeting mine safety, High-efficient Production, constrains the raising of pit mining ability, constrains realization and the development of mine automation and centralization control.Therefore, in the urgent need to improving spoil, serialization and automatization level are transported to large-scale mine.
Utility model content
For the problems referred to above, the purpose of this utility model there is provided a kind of spoil continuous haulage system, overcome the deficiencies in the prior art, layout is reasonable, realize spoil continuative transport, adopt shaft bottom spoil belt conveying+skip hoisting+ground ribbon conveyer directly to play mountain mound design or outward transport, system layout rationally will ensure the reliability of higher production efficiency and manufacturing process, and construction investment and operation and maintenance cost also must be considered simultaneously.
The technical solution adopted in the utility model is as follows:
A kind of spoil continuous haulage system, comprise ribbon conveyer, crushing engine, feeder, skip bucket, measure hopper and multiple waste bin, exploiting field spoil by ribbon conveyer to exploiting field waste bin feeding mouth, apron feeder is provided with below described exploiting field waste bin discharging opening, tramp iron separator and crushing engine, crushing engine end opening is provided with ribbon conveyer, shaft bottom waste bin is provided with below the ribbon conveyer other end, apron feeder is connected under the waste bin of shaft bottom, ribbon conveyer, the ribbon conveyer other end is to metering charging appliance, metering charging appliance is undertaken determining heavily to control by single-point hydraulic weighing device and PLC automatic control system, skip bucket is connect under metering charging appliance, spoil can be promoted to the unloading of well head waste bin by skip bucket, well head waste bin end opening connects feeder, ribbon conveyer, be provided with entrucking waste bin below the ribbon conveyer other end, under entrucking waste bin, spoil is used for interim mound design or outward transport by termination spoil conveying equipment.
The gate of described metering charging appliance is by Driven by Hydraulic Cylinder opening and closing.
Compared with the prior art, the beneficial effects of the utility model are as follows:
The utility model realizes spoil continuative transport, shaft bottom spoil belt conveying+skip hoisting+ground ribbon conveyer is adopted directly to play mountain mound design or outward transport, system layout rationally will ensure the reliability of higher production efficiency and manufacturing process, and construction investment, operation and maintenance cost, labour cost etc. all can reduce simultaneously.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
See accompanying drawing, a kind of spoil continuous haulage system, comprise ribbon conveyer, crushing engine, feeder, skip bucket, measure hopper and multiple waste bin, exploiting field spoil can directly be transported to exploiting field waste bin through loader by spoil ribbon conveyer, or by car-haul, through dumptruct upset loading exploiting field waste bin; Exploiting field waste bin divides into apron feeder, tramp iron separator, crushing engine, spoil can temporary reservoir, deironing, bulk spoil can be broken at this; Exploiting field waste bin end opening connects ribbon conveyer, and the spoil after fragmentation, deironing is transported to Large Copacity shaft bottom waste bin, and spoil can store at this, alleviates spoil and transports uneven pressure; Be connected to apron feeder, ribbon conveyer under the waste bin of shaft bottom, spoil can be sent to spoil metering charging appliance, metering charging appliance is undertaken determining heavily to control by single-point hydraulic weighing device and PLC automatic control system; The skip bucket gate of metering charging appliance is by Driven by Hydraulic Cylinder opening and closing, and be arranged in parallel in pit shaft 2 skip bucket quantitative loading equipment; Connect skip bucket under metering charging appliance, spoil can be promoted to the unloading of well head waste bin by skip bucket, after skip hoisting to well head unloading position, being opened by skip bucket gate by corresponding opening and closing device and unload, the spoil after unloading enters well head waste bin; After completion of discharge, skip bucket runs, and skip bucket gate resets, and skip bucket enters next circularly enhancing; Well head waste bin end opening connects feeder, ribbon conveyer, spoil is transported to ground waste bin by it, this storehouse accepts coal preparation plant by ribbon conveyer simultaneously and carrys out cash, connect from moving the continuous mound design ribbon conveyer of unload-type under the waste bin of ground, for interim mound design, or tipping brake door, to be transported outward at this dress cash by automobile and is reclaimed in spoil landfill Subsidence Area, or wait other to fully utilize for repairing the roads.
The spoil that shaft bottom spoil enters before well head waste bin transports the uncertainty that need meet in actual production process, retains Orbital Transport Systems thus, increases the flexibility of system; In the gangue treatment mode of ground, consider spoil mound design and automobile fortune cash two outlets too, increase the flexibility of system, thus farthest ensure the reliability service of whole production link.
More than show and describe general principle of the present utility model, principal character and advantage of the present utility model.The technician of the industry should understand; the utility model is not restricted to the described embodiments; what describe in above-described embodiment and manual just illustrates principle of the present utility model; under the prerequisite not departing from the utility model spirit and scope; the utility model also has various changes and modifications, and these changes and improvements all fall within the scope of claimed the utility model.The claimed scope of the utility model is defined by appending claims and equivalent thereof.

Claims (2)

1. a spoil continuous haulage system, comprise ribbon conveyer, crushing engine, feeder, skip bucket, measure hopper and multiple waste bin, it is characterized in that: exploiting field spoil is transported to exploiting field waste bin feeding mouth by ribbon conveyer, apron feeder is provided with below described exploiting field waste bin discharging opening, tramp iron separator and crushing engine, crushing engine end opening is provided with ribbon conveyer, shaft bottom waste bin is provided with below the ribbon conveyer other end, apron feeder is connected under the waste bin of shaft bottom, ribbon conveyer, the ribbon conveyer other end is to metering charging appliance, metering charging appliance is undertaken determining heavily to control by single-point hydraulic weighing device and PLC automatic control system, skip bucket is connect under metering charging appliance, spoil can be promoted to the unloading of well head waste bin by skip bucket, well head waste bin end opening connects feeder, ribbon conveyer, entrucking waste bin is provided with below the ribbon conveyer other end, under entrucking waste bin, termination spoil conveying equipment, carries out interim mound design or outward transport by spoil.
2. a kind of spoil continuous haulage system according to claim 1, is characterized in that: the gate of described metering charging appliance is by Driven by Hydraulic Cylinder opening and closing.
CN201520978322.3U 2015-11-27 2015-11-27 Continuous conveyor system of waste rock Expired - Fee Related CN205135700U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520978322.3U CN205135700U (en) 2015-11-27 2015-11-27 Continuous conveyor system of waste rock

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520978322.3U CN205135700U (en) 2015-11-27 2015-11-27 Continuous conveyor system of waste rock

Publications (1)

Publication Number Publication Date
CN205135700U true CN205135700U (en) 2016-04-06

Family

ID=55621505

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520978322.3U Expired - Fee Related CN205135700U (en) 2015-11-27 2015-11-27 Continuous conveyor system of waste rock

Country Status (1)

Country Link
CN (1) CN205135700U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112576300A (en) * 2020-12-12 2021-03-30 山东泰山能源有限责任公司协庄煤矿 Intensive underground coal and gangue separation system and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112576300A (en) * 2020-12-12 2021-03-30 山东泰山能源有限责任公司协庄煤矿 Intensive underground coal and gangue separation system and construction method
CN112576300B (en) * 2020-12-12 2022-04-12 山东泰山能源有限责任公司协庄煤矿 Intensive underground coal and gangue separation system and construction method

Similar Documents

Publication Publication Date Title
CN101871363B (en) Time-sharing transporting and filling system for underground coal and waste rock
CN104653182B (en) A kind of coal-mining method that the bastard coal of coal seam containing thick dirt band point is adopted
CN104533429A (en) Double-roadway combining speedy drivage waste rock exhaust system and method
CN104033153A (en) Coal mine underground mining, dress and filling integral method
CN102269013B (en) Method for mechanically filling gangue on single support working surface under complex coal seam condition
CN102444401B (en) Coal mining method by filling on blasting mining face of thin coal seam and relevant equipment
CN105565130B (en) A kind of coal mine shaft lining mixed lifting system
CN111322073A (en) Combined mine exploitation system based on vertical shaft and adhesive tape inclined shaft
CN204746555U (en) Colliery is two washing systems in pit
CN205135700U (en) Continuous conveyor system of waste rock
CN104234714B (en) A kind of underground coal mine green high-efficient transporting method
CN103821530A (en) Continuous excavating equipment and process for roadways
CN212440613U (en) New burnt supplementary system of active burnt gas cleaning technology
CN201424960Y (en) Rise type centralized waste filling system
CN104948227B (en) A kind of underground coal mine washing process dual system method for arranging
CN203783634U (en) Mineral powder recycling structure for underground mine
CN205638536U (en) Carry out automatic recovery unit who carries to fine material in pit
CN202765879U (en) Unloading system for dump truck with indicating device
CN205638538U (en) Device of fine material is retrieved to metal mine
CN203531952U (en) Skip bucket well ore rock separate-loading and separate-carrying system
CN204057128U (en) Loaded material device
CN104948223B (en) Down-hole gob-side roadway filling system and method
CN103043077B (en) Quick shunting system for tunneling slag discharge mining cars in underground roadway of mine
CN204844501U (en) A cement conveying system for mine
CN201671655U (en) Downhole coal and waste time-sharing transporting and filling system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160406

Termination date: 20181127