CN101871348B CN2010102091435A CN201010209143A CN101871348B CN 101871348 B CN101871348 B CN 101871348B CN 2010102091435 A CN2010102091435 A CN 2010102091435A CN 201010209143 A CN201010209143 A CN 201010209143A CN 101871348 B CN101871348 B CN 101871348B
Authority
CN
China
Prior art keywords
water
wall
conducting
guiding gutter
inwall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010102091435A
Other languages
English (en)
Other versions
CN101871348A (zh
Inventor
王渭明
王磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN2010102091435A priority Critical patent/CN101871348B/zh
Publication of CN101871348A publication Critical patent/CN101871348A/zh
Application granted granted Critical
Publication of CN101871348B publication Critical patent/CN101871348B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明公开了一种导水卸压式立井复合井壁及其施工方法,它是由内壁、防水夹层和外壁组成的复合井壁,在内壁的每个渗水层高度上均预埋有一圈导水槽;导水槽是一圈封闭的管道,管道的外周侧设有多个引水孔;所有导水槽的内腔自上而下用导水管连通,连通后导水管的底端从井筒底部伸出。从而将内、外壁间的渗水导出来。本发明的积极效果是:从外壁渗入到夹层中的地层水首先通过引水孔进入导水槽,再通过导水管导入井底,从而降低水头高度,减小水压。进而减小井壁厚度,节约投资,而且还解决了冻结凿井井壁解冻后出现的渗漏水问题。

Description

导水卸压式立井复合井壁施工方法
技术领域
本发明涉及矿山立井井壁,尤其涉及采用冻结法凿井施工的井壁结构。
背景技术
现有的采用冻结法凿井施工的立井井壁,是由内壁、防水夹层和外壁组成的复合井壁结构。这种结构用来隔绝地下水,承受地层水土压力。一般500m深的立井,外壁加内壁总厚度可达1200mm,井壁结构厚度大,由此造成的立井开挖工程量大,投资大,而且施工完解冻后防水效果并不明显。经研究表明,深立井井壁承受的压力大部分为地层的水压力,如果能有效解决深冻结立井所承受的水压,不但能有效减小井壁厚度,节约投资,而且还解决了冻结凿井井壁解冻后出现的渗漏水问题。
发明内容
本发明的目的在于提供一种可有效降低复合井壁内外壁间水头高度,降低水压的导水卸压式立井复合井壁及其施工方法。
本发明的结构是,它是由内壁、防水夹层和外壁组成的复合井壁,其特征在于,在内壁的每个渗水层高度上均预埋有一圈导水槽;导水槽是一圈封闭的管道,管道的外周侧设有多个引水孔;所有导水槽的内腔自上而下用导水管连通,连通后导水管的底端从井筒底部伸出。
本发明施工方法是:
首先按传统方法施工外壁,再按传统方法自上而下铺设防水夹层和施工内壁,其特征在于:
第一步:在施工内壁时,在井筒底部留排水口,并将导水管埋设在内壁内,导水管的底端从井底的内壁上露出;
第二步:施工至导水槽的安装位置时,将导水槽固定在内壁中,并将导水管接到导水槽接口上,与导水槽内腔连通;
第三步:安装导水槽时,为防止内壁浇筑混凝土浆液从引水孔进入槽腔,将隔层覆在导水槽上部;
第四步:重复上述第二、第三步骤,将各个渗水层预埋上导水槽至内壁施工完毕。
本发明的积极效果是:从外壁渗入到夹层中的地层水首先通过引水孔进入导水槽,再通过导水管导入井底,从而降低水头高度,减小水压。进而减小井壁厚度,节约投资,而且还解决了冻结凿井井壁解冻后出现的渗漏水问题。本发明结构简单,施工方便,成本低廉而且导水卸压效果好。
附图说明
以下结合附图对本发明作进一步的详细说明。
图1是本发明实施例的示意图;
图2是A部放大图;
图3是本实施例导水槽和导水管的立体结构示意图。
图例说明:1——内壁;2——外壁;3——防水夹层;4——导水槽;5——导水管;6——引水孔;7——排水口;8——隔层。
具体实施方式
参见图1、图2和图3,本实施例是由内壁1、防水夹层3和外壁2组成的复合井壁,在内壁1的每个渗水层高度上均预埋有一圈导水槽4;导水槽4是一 圈封闭的管道,管道的外周侧设有多个引水孔6;所有导水槽4的内腔自上而下用导水管5连通,连通后导水管5的底端从井筒底部伸出。
冻结凿井立井施工内壁一般是自下而上滑膜法施工或小模板连续套壁法施工,导水卸压式复合井壁是在上述内壁施工时同时进行的。
本发明的施工方法如下:
(1)首先按传统方法施工外壁2,再按传统方法自上而下铺设防水夹层3和施工内壁1,
(2)在施工内壁1时在井筒底部留排水口7,并将导水管5埋设在内壁1内,导水管5的底端从井底的内壁1上露出。
(3)施工至导水槽4的安装位置时,将导水槽4固定在内壁1中,并将导水管5接到导水槽4接口上,与导水槽4内腔连通。
(4)安装导水槽4时为防止内壁浇筑混凝土浆液从引水孔进入槽腔,将隔层8覆在导水槽4上部。
(5)重复上述(3)、(4)步骤,将各个渗水层预埋上导水槽至内壁施工完毕。
导水卸压式复合井壁的卸压原理是,外壁2与内壁1之间的水通过引水孔6进入到导水槽4内,再经导水管5汇流由排水口7流到井筒内。

Claims (1)

1.一种导水卸压式立井复合井壁的施工方法,首先按传统方法施工外壁,再按传统方法自上而下铺设防水夹层,然后施工内壁,其特征在于:它还包括以下步骤:
第一步:在施工内壁时,在井筒底部留排水口,并将导水管埋设在内壁内,导水管的底端从井筒底部伸出;
第二步:施工至渗水层高度时,预埋上一圈导水槽;导水槽是一圈外周侧设有多个引水孔的封闭管道,并将埋设在内壁内的导水管接到导水槽接口上,与导水槽内腔连通;
第三步:安装导水槽时,为防止内壁浇筑混凝土浆液从引水孔进入槽腔,将隔层覆在导水槽上部;
第四步:重复上述第二、第三步骤,将各个渗水层预埋上导水槽;并将所有导水槽的内腔自上而下用导水管连通;至内壁施工完毕。
CN2010102091435A 2010-06-11 2010-06-11 导水卸压式立井复合井壁施工方法 Expired - Fee Related CN101871348B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102091435A CN101871348B (zh) 2010-06-11 2010-06-11 导水卸压式立井复合井壁施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102091435A CN101871348B (zh) 2010-06-11 2010-06-11 导水卸压式立井复合井壁施工方法

Publications (2)

Publication Number Publication Date
CN101871348A CN101871348A (zh) 2010-10-27
CN101871348B true CN101871348B (zh) 2011-08-10

Family

ID=42996415

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102091435A Expired - Fee Related CN101871348B (zh) 2010-06-11 2010-06-11 导水卸压式立井复合井壁施工方法

Country Status (1)

Country Link
CN (1) CN101871348B (zh)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102425421B (zh) * 2011-11-08 2014-04-16 中蓝连海设计研究院 适用于矿山竖井的防治水方法
CN103556989B (zh) * 2013-11-11 2016-05-18 煤炭工业济南设计研究院有限公司 一种冻结法施工井筒围岩水压测量及限量排水装置及其施工方法
CN104389634B (zh) * 2014-09-16 2016-08-17 中国矿业大学 一种矿山立井筛井井壁结构及其可控疏水方法
CN110552738A (zh) * 2019-09-23 2019-12-10 中建八局轨道交通建设有限公司 用于暗挖竖井初支结构的引排水系统及其施工方法
CN112647952A (zh) * 2020-12-25 2021-04-13 安徽砼宇特构科技有限公司 一种具有遇水膨胀胶的立井井壁结构
CN113775341B (zh) * 2021-11-11 2022-02-11 中国铁建重工集团股份有限公司 一种适用于竖井掘进的钢管片同步跟进施工方法

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1017459B (zh) * 1991-02-13 1992-07-15 北京大兴地基工程公司 基础降水用辐射井的施工工艺及其设备
CN1108419C (zh) * 1999-01-27 2003-05-14 武汉水利电力大学 一种大口吸水井群排水治理土体滑坡的方法
CN2561930Y (zh) * 2001-12-04 2003-07-23 北京中煤矿山工程有限公司 多层钢板叠合结构的钢板混凝土复合井壁
CN2700409Y (zh) * 2004-05-19 2005-05-18 中国矿业大学 一种双层钢板混凝土复合井壁
CN201705355U (zh) * 2010-06-11 2011-01-12 山东科技大学 导水卸压式立井复合井壁

Also Published As

Publication number Publication date
CN101871348A (zh) 2010-10-27

Similar Documents

Publication Publication Date Title
CN101871348B (zh) 导水卸压式立井复合井壁施工方法
CN103343543B (zh) 一种基坑降水井减压式封堵方法
CN204716291U (zh) 隧道泄压引排水装置
CN205012284U (zh) 建于覆盖层上的大坝坝基防渗结构
CN102635402A (zh) 隧道洞壁渗水处置的下倾钻孔虹吸排水法
CN205077461U (zh) 消力池护坦底板反滤排水结构
CN201705355U (zh) 导水卸压式立井复合井壁
CN104563145A (zh) 一种岩石地基小导管局部降水装置及其实施方法
CN204532364U (zh) 全断面岩石隧道掘进机工法地铁隧道泄压式衬砌结构
CN203925527U (zh) 一种隧道施工缝渗漏水处治系统
CN109723071B (zh) 地下室底板后浇带内置双层钢桶降排水系统的施工方法
CN105155472A (zh) 深厚覆盖层土石坝坝基防渗结构及其施工方法
CN104060622B (zh) 一种坑中坑钢桶降排水方法
CN203684179U (zh) 一种电站消力池管网暗埋式排水系统
CN211498905U (zh) 带有井壁补偿的降压井
CN203939032U (zh) 一种用于硬岩地层中上墙下桩式深基坑围护结构
CN205502044U (zh) 一种应用于建筑物下砂性含水层的降水结构
CN204402513U (zh) 一种解决地下洞室衬砌表面渗水漏水的装置
CN204252148U (zh) 高承压水厚砂卵石地层深基坑注浆封底结构
CN216739713U (zh) 一种岩溶地区灌浆帷幕结构
CN202000365U (zh) 地下连续墙防渗结构
CN214697863U (zh) 排水式山岭隧道预制衬砌环及衬砌结构
CN110878557B (zh) 一种用于基坑降水的分层双向疏水方法
CN204551507U (zh) 一种岩石地基小导管局部降水装置
CN211972919U (zh) 一种基于隧道口半路堑段基床翻浆冒泥整治系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110810