CN204551507U - 一种岩石地基小导管局部降水装置 - Google Patents

一种岩石地基小导管局部降水装置 Download PDF

Info

Publication number
CN204551507U
CN204551507U CN201520048989.3U CN201520048989U CN204551507U CN 204551507 U CN204551507 U CN 204551507U CN 201520048989 U CN201520048989 U CN 201520048989U CN 204551507 U CN204551507 U CN 204551507U
Authority
CN
China
Prior art keywords
pvc
pipe
water
foundation
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520048989.3U
Other languages
English (en)
Inventor
闫成标
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Jinguyuan Construction Co ltd
Original Assignee
Jiangsu Yancheng No2 Constructive Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Yancheng No2 Constructive Group Co Ltd filed Critical Jiangsu Yancheng No2 Constructive Group Co Ltd
Priority to CN201520048989.3U priority Critical patent/CN204551507U/zh
Application granted granted Critical
Publication of CN204551507U publication Critical patent/CN204551507U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

本实用新型涉及一种装置,特别涉及一种岩石地基小导管局部降水装置。其特征是:PVC滤水管和PVC连接管相连,PVC连接管和钢质导管相连,钢质导管和环形止水钢板相连,在钢质导管、PVC连接管和PVC滤水管相连的管内插入橡胶排水管。由于采用上述技术方案,本实用新型所具有的优点和积极效果是:操作简单,施工方便,技术难度低,对降排水区域针对性强,布置灵活;成本低,充分利用地下水压自然疏导,减少能源消耗;能有效降低地下水位,保持地基干燥不影响其它工序施工;提供基础工作面较快,有效促进工程进度;在保证施工质量的同时降低了工程成本。

Description

一种岩石地基小导管局部降水装置
技术领域
本实用新型涉及一种装置,特别涉及一种岩石地基小导管局部降水装置
背景技术
目前,由于岩石地基的不透水性,岩石地基中水的渗透是根据石缝的走向分布,石缝相隔极少的间距地下水都无法排出。采用轻型井点(多级轻型井点),降水深度为3~6m之间,对于深基坑有所限制,而对于岩石地基是无法实现的。采用深井井点降水,虽然优点是排水量大、降水深度大、降水范围大等,但对于岩石地基来讲,钻井费用高、工期长。采用明沟排水,开挖量大,施工现场应有足够的空间,但不能完全排除岩石地基的地下水。
发明内容
本实用新型所要解决的技术问题是:提供一种岩石地基小导管局部降水装置,岩石地基中水的渗透是根据石缝的走向分布,石缝相隔极少的间距地下水都无法排出时,而通过本实用新型将地下水排出基坑,并将地下水降至基础底板以下500CM外,有利于基础工程施工。
本实用新型解决其技术问题所采用的技术方案是:本实用新型是将不透水的岩石地基裂缝连通汇入导流槽,打乱岩石地基的石缝,由导流槽导入积水坑,集水坑中埋入本装置,将导流泵管插入本装置的钢质导管中,通过导流泵将水降至基础以下500mm并排出基坑。本实用新型由PVC滤水管、PVC连接管、钢质导管、环形止水钢板和橡胶排水管组成,其特征是:PVC滤水管和PVC连接管相连,PVC连接管和钢质导管相连,钢质导管和环形止水钢板相连,在钢 质导管、PVC连接管和PVC滤水管相连的管内插入橡胶排水管。
由于采用上述技术方案,本实用新型所具有的优点和积极效果是:操作简单,施工方便,技术难度低,对降排水区域针对性强,布置灵活;成本低,充分利用地下水压自然疏导,减少能源消耗;能有效降低地下水位,保持地基干燥不影响其它工序施工;提供基础工作面较快,有效促进工程进度;在保证施工质量的同时降低了工程成本。采用岩石地基小导管局部降水装置及其使用方法与深井井点降水相比可以节约工期40%,费用节约60%。
附图说明
下面结合附图和实施例对本实用新型进一步说明。
说明书附图是本实用新型的结构示意图。
图中1.PVC滤水管,2.PVC连接管,3.钢质导管,4.环形止水钢板,5.橡胶排水管。
具体实施方式
在说明书附图中,PVC滤水管(1)和PVC连接管(2)相连,PVC连接管(2)和钢质导管(3)相连,钢质导管(3)和环形止水钢板(4)相连,在钢质导管(3)、PVC连接管(2)和PVC滤水管(1)相连的管内插入橡胶排水管(5)。
本实用新型的实施方法为:
(1)、实施工艺流程
基坑开挖结束→观察渗水部位→选择导流槽走向→选择积水坑位置→开挖积水坑→开挖导流槽→制作导水管→埋设导水管→积水坑、导流槽回填20~40mm碎石滤水层→小导管降水→设置隔离层→垫层施工→基础防水施工→基础混凝土浇筑→移除降水设施→封闭钢质导管→钢质导管顶端浇筑防水混凝土;
(2)、实施操作要点
第一、岩石地基爆破开挖后首先在基坑底部四周设置明沟+集水坑排水,基坑上部四周也设置相同的排水系统;开挖至基底标高,用碎石机修整后清理,对基底岩石面层渗水情况现场观察;在有渗水的地方剔凿深挖,渗水量大的点用堵漏王封堵,最终形成小范围内一定面积的细小渗水点,根据岩石地基渗水流向确定积水坑、布置导流槽位置;每片渗水点通过剔凿沟槽通至盲沟,形成垫层下的排水网;
第二、集水坑、导流槽要具备足够的容量来保证控制降水在基础底板标高以下500mm;
第三、导水管要采用钢质,视水量确定,可选择直径为50mm或80mm的钢管并焊接环形止水钢板,导水管的长度视基础厚度确定;
第四、在导水管下部设置滤水管,滤水管采用PVC便于打眼透水(滤水管内径等同钢质导水管外径,以便于安装在钢质导水管的下部),打孔孔径8mm,间距50mm,呈梅花状分布;
第五、埋设PVC滤水管与钢质导管并回填材料粒径不宜小于20mm,以20~40mm碎石为宜,以防透水不畅,拥堵滤水管;
第六、导水槽、集水坑顶部,垫层下方防水材料铺设隔离层,确保不向上窜水;
第七、在渗水的基坑内各设一个积水井,积水井1.5×1.5×1.5米,积水井内全部填充20~40碎石滤水,渗水严重的基坑用直径80mm钢管制作导水管,渗水不严重的基坑用直径50mm的钢管制作导水管;钢管在垫层以下800mm全部打眼做透水用,钢管在垫层上面550mm处焊一道5mm厚的环形止水钢板,埋设于基坑内用导流泵抽水,浇筑筏板时将板上口留100mm二次浇筑;
第八、引水导管四周要做锥形混凝土固定根部,方便防水层施工;
第九、根据现场观察和计算水流量,选择合适功率的密闭防水潜水泵,基本采用的是流量60~80m3/h的水泵,将排水管插入导水管内,进行排水;
第十、将卷材防水做到环形止水钢板位置处封堵,在混凝土筏板浇筑后将降水井导管用掺有膨胀剂的高一级强度等级的抗渗混凝土封堵密实,导水管昼夜排水至筏板浇筑完毕为止;
第十一、基础混凝土筏板浇筑后,钢质导管顶部可用丝堵或钢板焊接,待端部堵塞或焊接结束后,检查其是否有水溢出,如没有发现溢出水,即可用比基础筏板高一级微膨胀抗渗混凝土将其筏板基础上部预留的100mm深小坑进行浇筑,浇筑后加强养护。

Claims (1)

1.一种岩石地基小导管局部降水装置,由PVC滤水管、PVC连接管、钢质导管、环形止水钢板和橡胶排水管组成,其特征是:PVC滤水管(1)和PVC连接管(2)相连,PVC连接管(2)和钢质导管(3)相连,钢质导管(3)和环形止水钢板(4)相连,在钢质导管(3)、PVC连接管(2)和PVC滤水管(1)相连的管内插入橡胶排水管(5)。
CN201520048989.3U 2015-01-21 2015-01-21 一种岩石地基小导管局部降水装置 Expired - Fee Related CN204551507U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520048989.3U CN204551507U (zh) 2015-01-21 2015-01-21 一种岩石地基小导管局部降水装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520048989.3U CN204551507U (zh) 2015-01-21 2015-01-21 一种岩石地基小导管局部降水装置

Publications (1)

Publication Number Publication Date
CN204551507U true CN204551507U (zh) 2015-08-12

Family

ID=53826640

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520048989.3U Expired - Fee Related CN204551507U (zh) 2015-01-21 2015-01-21 一种岩石地基小导管局部降水装置

Country Status (1)

Country Link
CN (1) CN204551507U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104563145A (zh) * 2015-01-21 2015-04-29 江苏盐城二建集团有限公司 一种岩石地基小导管局部降水装置及其实施方法
CN114753388A (zh) * 2022-01-13 2022-07-15 天津住宅集团建设工程总承包有限公司 重力式沉水头负压抽排水施工方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104563145A (zh) * 2015-01-21 2015-04-29 江苏盐城二建集团有限公司 一种岩石地基小导管局部降水装置及其实施方法
CN114753388A (zh) * 2022-01-13 2022-07-15 天津住宅集团建设工程总承包有限公司 重力式沉水头负压抽排水施工方法

Similar Documents

Publication Publication Date Title
CN104131575B (zh) 一种岩溶高度发育地层坝基的堵漏排水方法
CN100480475C (zh) 可控式一井分层降水施工方法
CN102797266B (zh) 一种降水井封井防水施工方法
CN103046565B (zh) 超深岩基深基坑降排水方法
CN109519150B (zh) 一种针对出水量较大的降水井封堵装置及方法
CN201896316U (zh) 岩石地基深基坑承压水降排水系统
LU500273B1 (en) New comprehensive dewatering and drainage method and drainage device for mudstone subway station
CN105544622B (zh) 一种地下建筑物的抗浮装置及其查验装置
CN109736340B (zh) 一种基础底板预留降水井保证垫层完整性的降水装置与方法
CN104563145A (zh) 一种岩石地基小导管局部降水装置及其实施方法
CN107237650A (zh) 一种用于处理隧道洞壁渗水的钻孔虹吸负压排水系统及方法
CN205152970U (zh) 一种地下结构渗排水系统
CN105484277A (zh) 一种电梯基坑或集水坑内管井降水施工用构件及施工方法
CN105484206B (zh) 消除库底土工膜防渗铺盖反向渗透压力结构的施工方法
CN209723004U (zh) 一种筏板内置式降水结构和降水井的封井结构
CN205205844U (zh) 一种电梯基坑或集水坑内管井降水施工用构件
CN114606964B (zh) 一种用于复杂地质条件下的基坑降水方法
CN103898915A (zh) 建筑物小面积深基坑抗浮止水施工方法
CN204551510U (zh) 一种填方路基集水降压井降排水结构
CN116291604A (zh) 顶管接收井洞口堵砂止水结构及施工方法
CN204551507U (zh) 一种岩石地基小导管局部降水装置
CN111042212A (zh) 一种用于大底板抗浮的后置式薄壁钢管泄水装置及方法
CN114197508A (zh) 一种易封泄水装置、制造方法及其使用方法
CN107724405A (zh) 一种地埋管施工中管地基降水施工方法
CN104846837B (zh) 一种明排水基坑中超深井坑的施工方法

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20171130

Address after: 224000 Funing County of Jiangsu province Suzhou Fucheng Road West, Hongkong North sea Jin Wenfeng Commercial District 8 (4, 5, 6)

Patentee after: Jiangsu Jinguyuan Construction Co.,Ltd.

Address before: No. 222, victory North Road, Funing County, Yancheng City, Jiangsu

Patentee before: JIANGSU YANCHENG NO.2 CONSTRUCTIVE GROUP Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150812