CN101864975A - 后架变前架式连续支护超前支架及其移架方法 - Google Patents

后架变前架式连续支护超前支架及其移架方法 Download PDF

Info

Publication number
CN101864975A
CN101864975A CN 201010198456 CN201010198456A CN101864975A CN 101864975 A CN101864975 A CN 101864975A CN 201010198456 CN201010198456 CN 201010198456 CN 201010198456 A CN201010198456 A CN 201010198456A CN 101864975 A CN101864975 A CN 101864975A
Authority
CN
China
Prior art keywords
frame
group
laneway
moved
supporting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010198456
Other languages
English (en)
Other versions
CN101864975B (zh
Inventor
孙如钢
王建
刘国柱
钱洋喜
张守祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chinacoal Beijing Coal Mining Machinery Co Ltd
Original Assignee
Chinacoal Beijing Coal Mining Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chinacoal Beijing Coal Mining Machinery Co Ltd filed Critical Chinacoal Beijing Coal Mining Machinery Co Ltd
Priority to CN2010101984565A priority Critical patent/CN101864975B/zh
Publication of CN101864975A publication Critical patent/CN101864975A/zh
Application granted granted Critical
Publication of CN101864975B publication Critical patent/CN101864975B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • Protection Of Plants (AREA)

Abstract

本发明公开了一种后架变前架式连续支护超前支架及其移架方法,包括沿巷道纵向布置的多个支架,每两个支架为一组分别布置在巷道的两侧,每个支架的纵向长度为1-2个采煤机截深的距离。移架时,首先靠近采煤机端的后架组的两个支架相互为支点移架至巷道断面中部;然后依靠巷道前方的拉移点,将该后架组移架至远离采煤机端的前架组的前侧;之后该后架组的两个支架相互为支点移架至巷道断面两侧,并对巷道顶板进行支护,完成一个循环。后架变前架交替移架,改变原有支架多次反复移架,对巷道顶板破坏,实现了超前支架支护过程中对顶板仅支撑一次,彻底解决了超前支架因对巷道顶板的反复支撑而造成顶板破碎的难题。

Description

后架变前架式连续支护超前支架及其移架方法
技术领域
本发明涉及一种煤矿巷道支护的液压支架,尤其涉及一种后架变前架式连续支护超前支架及其移架方法。
背景技术
在井下采煤工作面,井下对顺槽的支护采用人工单体支柱的形式,随着采煤工作面的推进,井下工人不断撤、撑单体支柱,如此往复,效率低、安全性差。
现有技术中,采用超前支架对顺槽巷道进行支护,并通过推移千斤顶进行移架,受推移千斤顶行程限制,推移千斤顶行程不可能做的特别大。这就必须反复移架、循环支护,按照规范要求,支护范围大于20米,以常用的865mm推移步距为例计算,需要约24次循环支护(其它推移步距如900mm,800mm等均可以此类推)。
上述现有技术至少存在以下缺点:
对巷道顶板因反复支撑,容易造成顶板破碎,且移架效率低。
发明内容
本发明的目的是提供一种不易造成顶板破碎,且移架效率高的后架变前架式连续支护超前支架及其移架方法。
本发明的目的是通过以下技术方案实现的:
本发明的后架变前架式连续支护超前支架,包括沿巷道纵向布置的多个支架,每两个支架为一组分别布置在巷道的两侧,每个支架的纵向长度为1-2个采煤机截深的距离。
本发明的上述的后架变前架式连续支护超前支架的移架方法,按照以下步骤移架:
首先,靠近采煤机端的后架组的两个支架相互为支点移架至巷道断面中部;
然后,依靠巷道前方的拉移点,将该后架组移架至远离采煤机端的前架组的前侧;
之后,该后架组的两个支架相互为支点移架至巷道断面两侧,并对巷道顶板进行支护,完成一个循环;
按照上述后架变前架的移架次序,从后向前依次移架。
由上述本发明提供的技术方案可以看出,本发明所述的后架变前架式连续支护超前支架及其移架方法,由于多个支架每两个支架为一组分别布置在巷道的两侧,每个支架的纵向长度为1-2个采煤机截深的距离。移架方式为后架变前架交替移架,改变原有支架多次反复移架,对巷道顶板破坏,实现了超前支架支护过程中对顶板仅支撑一次,彻底解决了超前支架因对巷道顶板的反复支撑而造成顶板破碎的难题。
附图说明
图1为本发明的超前支架的初始状态布置示意图;
图2为本发明的超前支架的移架状态示意图一;
图3为本发明的超前支架的移架状态示意图二;
图4为本发明的超前支架的移架状态示意图三。
具体实施方式
本发明的后架变前架式连续支护超前支架,其较佳的具体实施方式如图1所示:
包括沿巷道纵向布置的多个支架,每两个支架为一组分别布置在巷道的两侧,每个支架的纵向长度为1-2个采煤机截深的距离。采煤机截深的距离一般为800-900mm。
本发明的上述的后架变前架式连续支护超前支架的移架方法,其较佳的具体实施方式如图1-4所示:按照以下步骤移架:
首先,如图2所示,靠近采煤机端的后架组的两个支架相互为支点移架至巷道断面中部;
然后,如图3所示,依靠巷道前方的拉移点,将该后架组移架至远离采煤机端的前架组的前侧;
之后,如图4所示,该后架组的两个支架相互为支点移架至巷道断面两侧,并对巷道顶板进行支护,回到图1所示的初始状态,完成一个循环;
按照上述后架变前架的移架次序,从后向前依次移架。
本发明的超前支架为沿巷道纵向布置,两架一组,可以根据实际情况确定超前支架组数量;移架方式为后架变前架交替移架,改变原有支架多次反复移架,对巷道顶板破坏。实现了超前支架支护过程中对顶板仅支撑一次,彻底解决了超前支架因对巷道顶板的反复支撑而造成顶板破碎的难题。
以上所述,仅为本发明较佳的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,可轻易想到的变化或替换,都应涵盖在本发明的保护范围之内。

Claims (3)

1.一种后架变前架式连续支护超前支架,其特征在于,包括沿巷道纵向布置的多个支架,每两个支架为一组分别布置在巷道的两侧,每个支架的纵向长度为1-2个采煤机截深的距离。
2.根据权利要求1所述的后架变前架式连续支护超前支架,其特征在于,所述采煤机截深的距离为800-900mm。
3.一种权利要求1或2所述的后架变前架式连续支护超前支架的移架方法,其特征在于,按照以下步骤移架:
首先,靠近采煤机端的后架组的两个支架相互为支点移架至巷道断面中部;
然后,依靠巷道前方的拉移点,将该后架组移架至远离采煤机端的前架组的前侧;
之后,该后架组的两个支架相互为支点移架至巷道断面两侧,并对巷道顶板进行支护,完成一个循环;
按照上述后架变前架的移架次序,从后向前依次移架。
CN2010101984565A 2010-06-04 2010-06-04 后架变前架式连续支护超前支架及其移架方法 Expired - Fee Related CN101864975B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101984565A CN101864975B (zh) 2010-06-04 2010-06-04 后架变前架式连续支护超前支架及其移架方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101984565A CN101864975B (zh) 2010-06-04 2010-06-04 后架变前架式连续支护超前支架及其移架方法

Publications (2)

Publication Number Publication Date
CN101864975A true CN101864975A (zh) 2010-10-20
CN101864975B CN101864975B (zh) 2012-06-27

Family

ID=42956880

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101984565A Expired - Fee Related CN101864975B (zh) 2010-06-04 2010-06-04 后架变前架式连续支护超前支架及其移架方法

Country Status (1)

Country Link
CN (1) CN101864975B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104712356A (zh) * 2015-02-04 2015-06-17 郑东风 一种液压自移循环支撑巷道组合支架及施工方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3434389A (en) * 1965-01-21 1969-03-25 Gewerk Eisenhuette Westfalia Automatic sequence cycle controlled advanceable mining prop arrangement
CN2189645Y (zh) * 1993-12-02 1995-02-15 中国矿业大学 掘进头临时支护特种液压支架
DE19513998C1 (de) * 1995-04-13 1996-05-23 Bergbau Technik Gmbh & Co Deut Schreitausbau zur Unterstützung der Streckenfirste an Strebrand im Übergangsbereich Streb/Strecke
RU2193665C2 (ru) * 2001-02-08 2002-11-27 Южно-Российский государственный технический университет (Новочеркасский политехнический институт) Механизированная крепь
CN101025088A (zh) * 2006-02-22 2007-08-29 沈阳天安矿山机械科技有限公司 新型自移式巷道超前支护支架
CN101191419A (zh) * 2006-11-30 2008-06-04 兖州煤业股份有限公司 综放工作面轨顺端头支架

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3434389A (en) * 1965-01-21 1969-03-25 Gewerk Eisenhuette Westfalia Automatic sequence cycle controlled advanceable mining prop arrangement
CN2189645Y (zh) * 1993-12-02 1995-02-15 中国矿业大学 掘进头临时支护特种液压支架
DE19513998C1 (de) * 1995-04-13 1996-05-23 Bergbau Technik Gmbh & Co Deut Schreitausbau zur Unterstützung der Streckenfirste an Strebrand im Übergangsbereich Streb/Strecke
RU2193665C2 (ru) * 2001-02-08 2002-11-27 Южно-Российский государственный технический университет (Новочеркасский политехнический институт) Механизированная крепь
CN101025088A (zh) * 2006-02-22 2007-08-29 沈阳天安矿山机械科技有限公司 新型自移式巷道超前支护支架
CN101191419A (zh) * 2006-11-30 2008-06-04 兖州煤业股份有限公司 综放工作面轨顺端头支架

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104712356A (zh) * 2015-02-04 2015-06-17 郑东风 一种液压自移循环支撑巷道组合支架及施工方法

Also Published As

Publication number Publication date
CN101864975B (zh) 2012-06-27

Similar Documents

Publication Publication Date Title
CN102444416B (zh) 综采工作面液压支架梁式回撤装置
CN202882972U (zh) 顺槽迈步分体式超前液压支架组
CN104775819A (zh) 一种深部倾斜煤层回采巷道矿压控制开采方法
CN105041357A (zh) 单轨吊运尾变首式超前支护系统
CN101463730A (zh) 掩护支架自移动装置
CN203362198U (zh) 履带行走式综掘巷道及时支护装置
CN103775117A (zh) 采矿工作面挡矸切顶挂模沿空留巷液压支架
CN107882569A (zh) 一种可同时进行掘进与拼装的盾构机及施工工法
CN104047627A (zh) 回采巷道框架式超前支护支架
CN103104260A (zh) 复杂地质条件下综—机对拉面采煤方法
CN203403900U (zh) 吊装自移式锚杆锚索支护设备
CN101871354A (zh) 大步距连续支护式超前支架及其移架方法
CN203925556U (zh) 循环式掘进及时支护装置
CN101864975B (zh) 后架变前架式连续支护超前支架及其移架方法
CN202402030U (zh) 矩形全断面连采机
CN204098910U (zh) 新型采运煤一体机
CN203050708U (zh) 矿用多功能掘进机
CN102410016B (zh) 矩形全断面连采机
CN207847640U (zh) 一种可同时进行掘进与拼装的盾构机
CN103362527B (zh) 快速掘进用移动装置及其移动方法
CN103643991A (zh) 支架配合模板的膏体充填综采装置及方法
CN203962017U (zh) 回采巷道框架式超前支护支架
CN114233334A (zh) 一种巷道铺网辅助装置
CN107826664B (zh) 一种用于煤矿主运输系统的皮带机尾大跨度支撑与快移方法
CN103670506B (zh) 一种龙门式转载系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120627

Termination date: 20160604