CN101864825B - 一种钢筋混凝土预制柱定位装置及其施工方法 - Google Patents

一种钢筋混凝土预制柱定位装置及其施工方法 Download PDF

Info

Publication number
CN101864825B
CN101864825B CN2010102156533A CN201010215653A CN101864825B CN 101864825 B CN101864825 B CN 101864825B CN 2010102156533 A CN2010102156533 A CN 2010102156533A CN 201010215653 A CN201010215653 A CN 201010215653A CN 101864825 B CN101864825 B CN 101864825B
Authority
CN
China
Prior art keywords
reinforced concrete
prefabricated column
concrete prefabricated
positioning device
steel plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010102156533A
Other languages
English (en)
Other versions
CN101864825A (zh
Inventor
彭小林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foundation Design Group Co., Ltd of Guangdong Province
Original Assignee
GUANGDONG PROV FOUNDATION ENGINEERING Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGDONG PROV FOUNDATION ENGINEERING Co filed Critical GUANGDONG PROV FOUNDATION ENGINEERING Co
Priority to CN2010102156533A priority Critical patent/CN101864825B/zh
Publication of CN101864825A publication Critical patent/CN101864825A/zh
Application granted granted Critical
Publication of CN101864825B publication Critical patent/CN101864825B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明公开了一种钢筋混凝土预制柱定位装置及其施工方法,其施工步骤如下:1)在施工挖孔桩护壁时,首先预埋钢板,再将工字钢焊接在钢板上进行固定;2)将定位器测量定位,将托架钢板固定在工字钢上;3)浇注混凝土至定位器顶部,将定位器进行定位;4)在钢筋混凝土预制柱的顶部焊接上柱尖;5)把钢筋混凝土预制柱的柱尖插入定位器的圆筒体内,微调预制柱,以保证精确定位;本产品能够有效将钢筋混凝土预制柱准确定位在桩孔内,具有结构简单、操作方便,施工速度快的特点,还能有效保证施工质量和精度要求,从而可以广泛应用于钢筋混凝土预制柱的安装定位上。

Description

一种钢筋混凝土预制柱定位装置及其施工方法
技术领域
本发明涉及一种钢筋混凝土预制柱定位装置,以及将这种定位装置应用在地下结构工程逆作施工的施工方法。
背景技术
目前,地下结构工程逆作施工中间支承柱通常采用钢管柱或现浇式钢筋混凝土柱,钢管柱造价较高,在承载力相对不大时采用钢筋混凝土柱。但是现浇式钢筋混凝土柱方法具有工序繁杂、施工工期长、耗费资金大、操作环境差、施工人员危险性大的缺陷,所以采用了钢筋混凝土预制柱来替代现浇式钢筋混凝土柱,由于钢筋混凝土预制柱采用在工厂预制,批量制作,施工速度快,质量容易保证,但是由于钢筋混凝土预制柱质量较大,在吊放过程中下端摆动难于控制,因此,其下端无法与基础桩快速准确定位,最终仍不能保证钢筋混凝土预制柱的施工质量和精度要求。
发明内容
为了克服现有技术的不足,本发明提供一种有效保证钢筋混凝土预制柱的施工质量和精度要求的定位装置及其施工方法。
本发明解决其技术问题所采用的技术方案是:
一种钢筋混凝土预制柱定位装置,其包括用于插装钢筋混凝土预制柱的圆筒体,圆筒体底部设置有底板,圆筒体上端圆周上均匀分布有托架钢板,所述底板上焊接有垂直向下的锚拉钢板;
一种应用上述钢筋混凝土预制柱定位装置的施工方法,其施工步骤如下:
1):在施工挖孔桩护壁时,首先预埋钢板,再将工字钢焊接在钢板上进行固定;
2):将定位器测量定位,将托架钢板固定在工字钢上;
3):浇注混凝土至定位器顶部,将定位器进行定位;
4):在钢筋混凝土预制柱的顶部焊接上柱尖;
5):把钢筋混凝土预制柱的柱尖插入定位器的圆筒体内,微调预制柱,以保证精确定位;
本发明的有益效果是:本产品能够有效将钢筋混凝土预制柱准确定位在桩孔内,具有结构简单、操作方便,施工速度快的特点,还能有效保证施工质量和精度要求,从而可以广泛应用于钢筋混凝土预制柱的安装定位上。
附图说明
下面结合附图和实施例对本发明进一步说明。
图1是本发明的结构示意图;
图2是图1的俯视图;
图3是图1的仰视图;
图4是本发明的安装状态示意图;
图5是图4的俯视图;
图6是本发明的使用状态参考图。
具体实施方式
参照图1、图2、图3,一种钢筋混凝土预制柱定位装置,其包括用于插装钢筋混凝土预制柱6的圆筒体1,圆筒体1底部设置有底板11,所述圆筒体1内径比钢筋混凝土预制柱6的柱尖小20mm左右,从而便于预制柱6可以在定位器进行转动,微调预制柱6,以精确定位;同时,所述圆筒体1的高度比钢筋混凝土预制柱6的柱尖低出150mm左右,以便二次浇注混凝土注入定位器内,使定位器内填充混凝土,预制柱6与桩身混凝土结合紧密。所述圆筒体1上端圆周上均匀分布有托架钢板2,所述托架钢板2为四根,其截面为倒“T”或“I”字型等,当然根据实际需要,托架钢板2的数量还可以是3根或5根以上;另外,所述底板11上焊接有垂直向下的锚拉钢板3,所述锚拉钢板3截面为十字型结构,钢板的侧面为齿状31。当然,锚拉钢板3以及托架钢板2的截面也不限于上述的结构形式,也可以采用其他常见的结构进行替代,总之只要其以基本相同的手段达到本发明的技术效果,都应属于本发明的保护范围。
参照图4、图5、图6,一种应用上述钢筋混凝土预制柱定位装置的施工方法,其施工步骤如下:
1):在施工挖孔桩护壁时,首先预埋钢板4,再将工字钢5焊接在钢板4上进行固定;
2):将定位器测量定位,将托架钢板2固定在工字钢5上;
3):浇注混凝土至定位器顶部,将定位器进行定位;
4):在钢筋混凝土预制柱6的顶部焊接上柱尖61;所述柱尖61截面为十字型结构,其顶端并设置为斜面,以便于进行插接安装。
5):把钢筋混凝土预制柱6的柱尖61插入定位器的圆筒体1内,微调预制柱6,以保证精确定位;
6):向孔桩内进行混凝土浇注,使得预制柱6与桩身混凝土结合紧密。
本产品能够有效将钢筋混凝土预制柱6准确定位在桩孔内,具有结构简单、操作方便,施工速度快的特点,还能有效保证施工质量和精度要求,从而可以广泛应用于钢筋混凝土预制柱的安装定位上。

Claims (1)

1.一种应用钢筋混凝土预制柱定位装置的施工方法,所述钢筋混凝土预制柱定位装置包括用于插装钢筋混凝土预制柱(6)的圆筒体(1),圆筒体(1)底部设置有底板(11),圆筒体(1)上端圆周上均匀分布有托架钢板(2),所述底板(11)上焊接有垂直向下的锚拉钢板(3);其特征在于:施工步骤如下:
1):在施工挖孔桩护壁时,首先预埋钢板(4),再将工字钢(5)焊接在钢板(4)上进行固定;
2):将钢筋混凝土预制柱定位装置测量定位,将托架钢板(2)固定在工字钢(5)上;
3):浇注混凝土至钢筋混凝土预制柱定位装置顶部,将钢筋混凝土预制柱定位装置进行定位;
4):在钢筋混凝土预制柱(6)的顶部焊接上柱尖(61);
5):把钢筋混凝土预制柱(6)的柱尖(61)插入钢筋混凝土预制柱定位装置的圆筒体(1)内,微调钢筋混凝土预制柱(6),以保证精确定位;
6):向孔桩内进行混凝土浇注,使得钢筋混凝土预制柱(6)与桩身混凝土结合紧密。
CN2010102156533A 2010-06-30 2010-06-30 一种钢筋混凝土预制柱定位装置及其施工方法 Expired - Fee Related CN101864825B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102156533A CN101864825B (zh) 2010-06-30 2010-06-30 一种钢筋混凝土预制柱定位装置及其施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102156533A CN101864825B (zh) 2010-06-30 2010-06-30 一种钢筋混凝土预制柱定位装置及其施工方法

Publications (2)

Publication Number Publication Date
CN101864825A CN101864825A (zh) 2010-10-20
CN101864825B true CN101864825B (zh) 2012-01-04

Family

ID=42956734

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102156533A Expired - Fee Related CN101864825B (zh) 2010-06-30 2010-06-30 一种钢筋混凝土预制柱定位装置及其施工方法

Country Status (1)

Country Link
CN (1) CN101864825B (zh)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102912993B (zh) * 2012-11-16 2015-05-20 孟凡林 保障预制混凝土构件安装精度的方法
CN104196056B (zh) * 2014-08-26 2016-06-08 中国建筑第八工程局有限公司 地下基础的定位结构及其定位方法
CN104328799B (zh) * 2014-11-17 2016-04-27 中建交通建设集团有限公司 一种盖挖逆作法地铁车站钢管柱精确定位方法
CN105220771B (zh) * 2015-09-21 2017-10-10 中铁上海工程局集团有限公司 一种预制清水柱湿接缝连接方法
CN105239725A (zh) * 2015-11-17 2016-01-13 中建二局第三建筑工程有限公司 超高倾斜混凝土圆柱的施工方法及施工模板
CH714909A1 (fr) * 2018-04-17 2019-10-31 Ustinov Igor Système de construction d'un module d'un bâtiment.
CN109518683B (zh) * 2018-11-26 2021-01-15 五冶集团上海有限公司 一种人工挖孔桩的桩心定位方法
CN113235654B (zh) * 2021-05-15 2022-06-28 中铁十一局集团第一工程有限公司 一种盖挖逆作法永久钢管柱定位装置及施工方法

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5532872A (en) * 1978-08-31 1980-03-07 Matsushita Electric Works Ltd Foundation unit for pole
CN1054414C (zh) * 1994-05-30 2000-07-12 北京市第三市政工程公司 地下预制钢管柱与灌注桩定位连接工艺
JP3129676B2 (ja) * 1997-05-21 2001-01-31 株式会社熊谷組 杭を柱に利用した建築構造物に於ける杭柱の建込み方法
JP3728728B2 (ja) * 2001-12-28 2005-12-21 Jfeスチール株式会社 柱と鋼管杭の位置決め装置
CN100585098C (zh) * 2006-02-21 2010-01-27 上海建工(集团)总公司 地下预埋立柱高精度智能调垂系统及安装施工方法
CN101280560B (zh) * 2008-05-15 2010-06-16 广州市建筑集团有限公司 格构柱组件及其安装方法
CN201747071U (zh) * 2010-06-30 2011-02-16 广东省基础工程公司 一种钢筋混凝土预制柱定位装置

Also Published As

Publication number Publication date
CN101864825A (zh) 2010-10-20

Similar Documents

Publication Publication Date Title
CN101864825B (zh) 一种钢筋混凝土预制柱定位装置及其施工方法
CN105525625A (zh) 一种固定型钢柱脚预埋螺杆的施工方法及装置
CN203247603U (zh) 一种高位地脚螺栓定位装置
CN210216479U (zh) 用于预埋大型地脚螺栓群的定位装置
CN201059070Y (zh) 钢结构柱底预埋螺栓群精确定位模板
CN206503141U (zh) 一种桥梁桩柱基础施工中的超长护筒精确定位安装工装
CN111502095B (zh) 大直径钢管柱柱脚的连接结构及其施工方法
CN105804110A (zh) 一种铁路接触网地脚螺栓的施工方法以及安装支架
CN205894490U (zh) 钢管混凝土柱与桩基连接结构
CN103061249A (zh) 一种桥梁钢管立柱快速定位施工装置及施工方法
CN208650087U (zh) 用于逆作法的钢管柱快速定位装置
CN202866304U (zh) 逆作法钢管柱底部定位器
CN206589121U (zh) 一种用于预制梁、板的横隔板水平钢筋安装定位装置
CN201747071U (zh) 一种钢筋混凝土预制柱定位装置
CN103061454A (zh) 一种钢管混凝土柱在地下深孔内的安装定位方法
CN202265906U (zh) 埋入式钢管混凝土柱脚锚栓固定装置
CN202266034U (zh) 埋入式菱形钢骨混凝土柱脚锚栓固定装置
JPH08120673A (ja) 逆建築工法の地面下鉄骨柱の精確な直立方法及びそれに用いる装置
CN201277861Y (zh) 设备基础预埋地脚螺栓安装测量控制平台
CN213773301U (zh) 一种侧向土压力盒埋设固定装置
CN102995653B (zh) 旁侧式地脚螺栓高精度快速定位器
CN202416339U (zh) 一种塔式起重机固定基础
CN212477455U (zh) 一种桥梁斜拉索锚筒预埋定位装置
CN202039379U (zh) 用于盖挖逆作法施工中钢管柱安装的自动定位器
CN108571014A (zh) 一种固定格构柱的地下室逆作法施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: GUANGDONG FOUNDATION ENGINEERING GROUP CO., LTD.

Free format text: FORMER NAME: GUANGDONG PROV. FOUNDATION ENGINEERING CO.

CP01 Change in the name or title of a patent holder

Address after: 19-20, No. 510620, Tianhe Road, 99 Tianhe Road, Guangdong, Guangzhou

Patentee after: Foundation Design Group Co., Ltd of Guangdong Province

Address before: 19-20, No. 510620, Tianhe Road, 99 Tianhe Road, Guangdong, Guangzhou

Patentee before: Guangdong Prov. Foundation Engineering Co.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120104

Termination date: 20200630