CN101844604B - 管架结构整体吊装定位方法 - Google Patents
管架结构整体吊装定位方法 Download PDFInfo
- Publication number
- CN101844604B CN101844604B CN 200910048067 CN200910048067A CN101844604B CN 101844604 B CN101844604 B CN 101844604B CN 200910048067 CN200910048067 CN 200910048067 CN 200910048067 A CN200910048067 A CN 200910048067A CN 101844604 B CN101844604 B CN 101844604B
- Authority
- CN
- China
- Prior art keywords
- deck
- partial
- integral hoisting
- positioning method
- pipe frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200910048067 CN101844604B (zh) | 2009-03-24 | 2009-03-24 | 管架结构整体吊装定位方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200910048067 CN101844604B (zh) | 2009-03-24 | 2009-03-24 | 管架结构整体吊装定位方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101844604A CN101844604A (zh) | 2010-09-29 |
CN101844604B true CN101844604B (zh) | 2012-12-26 |
Family
ID=42769457
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200910048067 Expired - Fee Related CN101844604B (zh) | 2009-03-24 | 2009-03-24 | 管架结构整体吊装定位方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101844604B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102328727B (zh) * | 2011-06-01 | 2014-03-12 | 江苏熔盛造船有限公司 | 深水铺管起重船的重型海洋工程起重机底座的分段方法 |
CN102795318A (zh) * | 2012-08-31 | 2012-11-28 | 上海海事大学 | 一种海洋工程浮式网架结构 |
CN104802924B (zh) * | 2014-05-27 | 2018-04-03 | 烟台中集来福士海洋工程有限公司 | 悬臂梁顶层管甲板及其建造方法 |
CN104259808B (zh) * | 2014-09-12 | 2016-07-06 | 上海船厂船舶有限公司 | 海上井架拼装及整吊上船方法 |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5609441A (en) * | 1995-03-15 | 1997-03-11 | Khachaturian; Jon E. | Method and apparatus for the offshore installation of multi-ton prefabricated deck packages on partially submerged offshore jacket foundations |
-
2009
- 2009-03-24 CN CN 200910048067 patent/CN101844604B/zh not_active Expired - Fee Related
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5609441A (en) * | 1995-03-15 | 1997-03-11 | Khachaturian; Jon E. | Method and apparatus for the offshore installation of multi-ton prefabricated deck packages on partially submerged offshore jacket foundations |
Non-Patent Citations (2)
Title |
---|
JP昭59-45286A 1984.03.14 |
JP昭64-30900A 1989.02.01 |
Also Published As
Publication number | Publication date |
---|---|
CN101844604A (zh) | 2010-09-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101646493B1 (ko) | 해상풍력 지지구조물 및 그 자켓형 하부구조물의 설치 방법 | |
CN101844604B (zh) | 管架结构整体吊装定位方法 | |
CN103422482B (zh) | 一种拼装桁架式桩腿装置 | |
CN104386219A (zh) | 自升式平台桩靴后续入坞工艺 | |
CN104120802B (zh) | 一种隔震支座安装定位简易方法 | |
CN101264790A (zh) | 一种艉人架的安装方法 | |
CN103255778A (zh) | 用于海上风机导管架基础安装灌浆的定位、调平方法 | |
CN205380476U (zh) | 一种精密焊管加工用夹具 | |
CN103225311A (zh) | 用于海上风机导管架基础安装的固定调平结构 | |
CN104476055B (zh) | 一种米字型撑管的桩腿制作方法 | |
CN204282228U (zh) | 一种箱式钢拱梁整体卧式组对专用胎架 | |
CN103215915B (zh) | 一种浮动码头 | |
CN202416324U (zh) | 基坑工程逆梁顺板施工叠加梁板结构 | |
CN103938755A (zh) | 一种井道下挂式转换梁的隔震结构及其施工方法 | |
CN203808281U (zh) | 一种井道下挂式转换牛腿的隔震结构 | |
CN204979132U (zh) | 一种船舶艉轴安装用辅助装置 | |
CN204876084U (zh) | 钢柱脚锚栓固定支架 | |
CN104389348B (zh) | 一种带蒙皮拱结构的安装方法 | |
CN203834448U (zh) | 一种新型6腿平台导管架 | |
CN207405876U (zh) | 一种用于柱构件的固定底座 | |
CN207129101U (zh) | 一种抛石塔基座 | |
CN113356263A (zh) | 一种导管架-桩灌浆连接结构 | |
CN202440828U (zh) | 分离式导管架装置 | |
CN202430700U (zh) | 大吨位海洋平台上部组块连续提升装置 | |
CN205348139U (zh) | 导管架 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: SHANGHAI WAIGAOQIAO SHIPBUILDING CO., LTD. Effective date: 20140610 Owner name: SHANGHAI JIANGNAN CHANGXING HEAVY INDUSTRY CO., LT Free format text: FORMER OWNER: SHANGHAI WAIGAOQIAO SHIPBUILDING CO., LTD. Effective date: 20140610 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 200137 PUDONG NEW AREA, SHANGHAI TO: 201913 PUDONG NEW AREA, SHANGHAI |
|
TR01 | Transfer of patent right |
Effective date of registration: 20140610 Address after: 201913, room 1, 2203 Pudong Avenue, Shanghai, Pudong New Area Patentee after: Shanghai Jiangnan Changxing Heavy Industry Co.,Ltd. Patentee after: Shanghai Waigaoqiao Shipbuilding Co., Ltd. Address before: 200137 Shanghai city Pudong New Area Zhouhai Road No. 3001 Patentee before: Shanghai Waigaoqiao Shipbuilding Co., Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20121226 Termination date: 20160324 |