CN101832026B - 基础底板后浇带模板支撑体系的施工方法 - Google Patents

基础底板后浇带模板支撑体系的施工方法 Download PDF

Info

Publication number
CN101832026B
CN101832026B CN2010101480563A CN201010148056A CN101832026B CN 101832026 B CN101832026 B CN 101832026B CN 2010101480563 A CN2010101480563 A CN 2010101480563A CN 201010148056 A CN201010148056 A CN 201010148056A CN 101832026 B CN101832026 B CN 101832026B
Authority
CN
China
Prior art keywords
expanded metal
metal lath
sole plate
mould
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2010101480563A
Other languages
English (en)
Other versions
CN101832026A (zh
Inventor
易兴中
刘旭
李光
顾俊祥
汪翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANTONG CONSTRUCTION ENGINEERING GROUP Co Ltd
Original Assignee
NANTONG CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANTONG CONSTRUCTION ENGINEERING GROUP Co Ltd filed Critical NANTONG CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority to CN2010101480563A priority Critical patent/CN101832026B/zh
Publication of CN101832026A publication Critical patent/CN101832026A/zh
Application granted granted Critical
Publication of CN101832026B publication Critical patent/CN101832026B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

本发明公开了一种基础底板后浇带模板支撑体系,适用于建筑工程中地下室基础底板后浇带模板支撑使用,该模板支撑体系主要由钢板网模、斜拉螺栓与型钢背楞、预制挡浆砼条块、挡浆木方条等部件组成。本发明利用基础底板钢筋网作为主要支撑体,可有效支承后浇带两侧砼的侧压力,所形成的后浇带空腔内整洁、清晰、无砼浇筑时流浆或浮浆污染,后浇带模板支撑体系中的大部分材料可简易得到拆除并回收利用,并有效实现后浇带的设计功能。

Description

基础底板后浇带模板支撑体系的施工方法
技术领域:
本发明涉及一种土木与建筑工程施工技术,是基础底板后浇带模板支撑体系的施工方法。
背景技术:
基础底板后浇带施工模板支撑材料除起到形成后浇带空腔作用以外,没有其他作用。一般基础底板后浇带模板支撑采用钢制网模,后浇带支撑材料难以拆除,一般留置于后浇带内,其模板支撑材料是一次性消耗;为避免后浇带网模与基础底板底层钢筋保护层间隙处的漏浆导致对后浇带空腔的污染,一般采用砂浆堵塞或在基础底板钢筋绑扎前布置现浇素砼挡浆条带,后浇带空腔形成后该砂浆或素砼条带清理困难,将影响后序后浇带封闭施工时的施工质量。
发明内容:
本发明的目的在于提供一种后浇带模板支撑用大部分材料可拆除并回收利用,同时施工简便、经济实用的基础底板后浇带模板支撑体系的施工方法。
本发明的技术解决方案是:
一种基础底板后浇带模板支撑体系的施工方法,其特征是:包括下列步骤:
1)预制砼挡浆条块,制作钢板网模;钢板网模包括钢板网,每块钢板网成长方形,钢板网上通过铅丝绑扎有竖向钢筋、水平钢筋和剪刀式铅丝斜拉条,竖向钢丝的端部设置90度弯勾,钢板网模上下分别预留80-120mm钢板网余量,每块钢板网模的一侧预留180-220mm的钢板网余量;
2)在基础底板垫层砼、保护层砼或超前止水砼浇筑抹平后、砼初凝前,根据后浇带尺寸控制要求,带线放置预制砼挡浆条块;或在基础底板垫层砼或保护层砼达到一定强度后,带线间隔铺订塑料阴角止挡条,并将预制砼挡浆条块紧靠塑料止挡条铺设;
3)绑扎基础底板底层钢筋网,留设一根与钢板网模紧临的纵向钢筋不绑扎;
4)安放钢板网模,并在钢板网模块间搭接处放置型钢背楞,并将斜拉螺栓的一端通过型钢背楞与钢板网模螺栓固定,斜拉螺栓的另一端与基础底板底层钢筋采用搭接焊焊接固定;
5)剪开钢板网与底板底层钢筋相碍处,将钢板网围裹并衬垫于基础底板底层钢筋网下部角处;
6)将预留的未绑扎的一根底板纵向底层钢筋紧靠钢板网模,并与相交叉的底板底层钢筋点焊固定;
7)绑扎基础底板面层钢筋网,其中一根与钢板网模紧临的纵向钢筋与相交叉的底板面层钢筋点焊固定;
8)布置固定于基础底板面层钢筋网上的斜拉螺栓,将斜拉螺栓的一端通过型钢背楞与钢板网模螺栓固定,斜拉螺栓的另一端与基础底板面层钢筋采用搭接焊焊接固定;
9)将钢板网模上部与底板面层钢筋相碍的钢板网剪开,布置挡浆木方条,将钢板网围裹于挡浆木方条上,采用铅丝将木方条与钢板网模及紧临的基础底板面层钢筋绑扎固定;
10)后浇带两侧砼浇筑完毕,且砼达到一定强度后,拆除挡浆木方条,松开斜拉螺栓螺帽,拆出型钢背楞,然后拆除钢板网模的竖向钢筋以及水平钢筋,最后清理取出预制砼挡浆条块。
所述剪刀式铅丝斜拉条,采用8#铅丝。
本发明有效克服了传统的基础底板后浇带模板支撑体系的不足之处,后浇带模板支撑用大部分材料可拆除并回收利用,在后浇带网模与基础底板底层钢筋保护层间隙处采用预制砼条块挡浆,该预制砼条块清理简单。本发明不仅保证了后浇带的施工质量,同时施工简便、经济实用。并具有下列优点:
1)本发明后浇带模板支撑体系牢固可靠,制作与操作工艺简单,可适用于各种厚度基础底板后浇带的模板支撑布置。本发明一种基础底板后浇带模板支撑体系由钢板网模、斜拉螺栓与型钢背楞、预制砼挡浆条块、挡浆木方条等部件组成,充分利用基础底板钢筋网作为支撑体;预制砼挡浆条块在基础底板砼垫层或砼保护层浇筑时、砼表面抹压平整后、砼初凝前根据后浇带尺寸控制要求带线铺放,可保证预制砼挡浆条块与基层砼的一定粘结力,或在基础底板垫层砼或保护层砼达到一定强度,带线间隔铺订塑料阴角止挡条,预制砼挡浆条块紧靠塑料止挡条铺设;钢板网模放置于预制砼挡浆条块与基础底板纵向底层钢筋、以及挡浆木方条与基础底板纵向面层钢筋之间,该底板纵向底层钢筋与纵面层钢筋与相应交叉的底板钢筋点焊固定;斜拉螺栓一端通过型钢背楞与钢板网模螺栓固定,另一端与基础底板钢筋采用搭接焊焊接固定,与钢板网模一道可有效承载后浇带两砼浇筑时的侧压力,控制钢板网模的变形,避免钢板网因变形过大而受到破坏,如采用撑杆,因撑杆的稳定性控制要求,布置数量将太多,设置亦困难。
2)后浇带空腔内整洁、清晰,无砼浇筑时流浆对后浇带空腔的污染。后浇带下部的预制砼挡浆条块、上部的挡浆木方条与钢板网模一道有效阻挡并控制了后浇带两侧砼浇筑时的流浆或浮浆对后浇带空腔的污染,预制砼挡浆条块可简单清除,利于后序后浇带封闭施工时的施工质量控制,保证了后浇带的设计功能的实现。
3)后浇带模板支撑体系的大部分材料可拆除并回收利用,充分体现了低碳施工与绿色施工的特点。钢板网模采用钢筋、铅丝等材料通过绑扎分块制作成形,竖向钢筋设90度弯勾;钢板网模安装时充分利用基础底板钢筋网作为受力支撑体,上下与基础钢筋网铅丝绑扎连接,中间采用斜拉螺栓、配合使用用型钢背楞与基础底板钢筋网有效连接;后浇带两侧砼浇筑完成,且砼达到一定强度后,后浇带模板支撑体系中的型钢背楞、钢板网模中的钢筋等材料可简单得到拆除并回收再利用。
附图说明:
下面结合附图和实施例对本发明作进一步说明。
图1是本发明一个实施例的基础底板后浇带模板支撑体系示意图。
图2是图1的A-A示图。
图3是钢板网模示意图。
具体实施方式:
一种基础底板后浇带模板支撑体系的施工方法,包括下列步骤:
1)预制砼挡浆条块1,制作钢板网模2;钢板网模包括钢板网3,每块钢板网成长方形,钢板网上通过铅丝绑扎有竖向钢筋4、水平钢筋5和剪刀式铅丝斜拉条6,竖向钢丝的端部设置90度弯勾,是为了便于竖向钢筋及水平钢筋的拆除;钢板网模上下分别预留80-120mm钢板网余量,为后浇带角部围裹并挡浆用;每块钢板网模的一侧预留180-220mm的钢板网余量,是为便于钢板网模间的现场绑扎搭接连接;
2)在基础底板垫层砼、保护层砼或超前止水砼浇筑抹平后、砼初凝前,根据后浇带尺寸控制要求,带线放置预制砼挡浆条块1;或在基础底板垫层砼或保护层砼达到一定强度后,带线间隔铺订塑料阴角止挡条,并将预制砼挡浆条块紧靠塑料止挡条铺设;
3)绑扎基础底板底层钢筋网7,留设一根与钢板网模紧临的纵向钢筋不绑扎;
4)安放钢板网模,并在钢板网模块间搭接处放置型钢背楞8,并将斜拉螺栓11的一端通过型钢背楞与钢板网模螺栓固定,斜拉螺栓的另一端与基础底板底层钢筋采用搭接焊焊接固定;
5)剪开钢板网与底板底层钢筋相碍处,将钢板网围裹并衬垫于基础底板底层钢筋网下部角处;
6)将预留的未绑扎的一根底板纵向底层钢筋紧靠钢板网模,并与相交叉的底板底层钢筋点焊固定;
7)绑扎基础底板面层钢筋网9,其中一根与钢板网模紧临的纵向钢筋与相交叉的底板面层钢筋点焊固定;
8)布置固定于基础底板面层钢筋网上的斜拉螺栓,将斜拉螺栓的一端通过型钢背楞与钢板网模螺栓固定,斜拉螺栓的另一端与基础底板面层钢筋采用搭接焊焊接固定;
9)将钢板网模上部与底板面层钢筋相碍的钢板网剪开,布置挡浆木方条10,将钢板网围裹于挡浆木方条上,采用铅丝将木方条与钢板网模及紧临的基础底板面层钢筋绑扎固定;
10)后浇带两侧砼浇筑完毕,且砼达到一定强度后,拆除挡浆木方条,松开斜拉螺栓螺帽,拆出型钢背楞,然后拆除钢板网模的竖向钢筋以及水平钢筋,最后清理取出预制砼挡浆条块。
所述剪刀式铅丝斜拉条,采用8#铅丝。

Claims (2)

1.一种基础底板后浇带模板支撑体系的施工方法,其特征是:包括下列步骤:
1)预制砼挡浆条块,制作钢板网模;钢板网模包括钢板网,每块钢板网成长方形,钢板网上通过铅丝绑扎有竖向钢筋、水平钢筋和剪刀式铅丝斜拉条,竖向钢丝的端部设置90度弯勾,钢板网模上下分别预留80-120mm钢板网余量,每块钢板网模的一侧预留180-220mm的钢板网余量;
2)在基础底板垫层砼、保护层砼或超前止水砼浇筑抹平后、砼初凝前,根据后浇带尺寸控制要求,带线放置预制砼挡浆条块;或在基础底板垫层砼或保护层砼达到一定强度后,带线间隔铺订塑料阴角止挡条,并将预制砼挡浆条块紧靠塑料止挡条铺设;
3)绑扎基础底板底层钢筋网,留设一根与钢板网模紧临的纵向钢筋不绑扎;
4)安放钢板网模,钢板网模放置于预制砼挡浆条块与基础底板纵向底层钢筋之间、以及挡浆木方条与基础底板纵向面层钢筋之间,并在钢板网模块间搭接处放置型钢背楞,并将斜拉螺栓的一端通过型钢背楞与钢板网模螺栓固定,斜拉螺栓的另一端与基础底板底层钢筋采用搭接焊焊接固定;
5)剪开钢板网与底板底层钢筋相碍处,将钢板网围裹并衬垫于基础底板底层钢筋网下部角处;
6)将预留的未绑扎的一根底板纵向底层钢筋紧靠钢板网模,并与相交叉的底板底层钢筋点焊固定;
7)绑扎基础底板面层钢筋网,其中一根与钢板网模紧临的纵向钢筋与相交叉的底板面层钢筋点焊固定;
8)布置固定于基础底板面层钢筋网上的斜拉螺栓,将斜拉螺栓的一端通过型钢背楞与钢板网模螺栓固定,斜拉螺栓的另一端与基础底板面层钢筋采用搭接焊焊接固定;
9)将钢板网模上部与底板面层钢筋相碍的钢板网剪开,布置挡浆木方条,将钢板网围裹于挡浆木方条上,采用铅丝将木方条与钢板网模及紧临的基础底板面层钢筋绑扎固定;
10)后浇带两侧砼浇筑完毕,且砼达到一定强度后,拆除挡浆木方条,松开斜拉螺栓螺帽,拆除型钢背楞,然后拆除钢板网模的竖向钢筋以及水平钢筋,最后清理取出预制砼挡浆条块。
2.根据权利要求1所述的基础底板后浇带模板支撑体系的施工方法,其特征是:所述剪刀式铅丝斜拉条,采用8#铅丝。
CN2010101480563A 2010-04-07 2010-04-07 基础底板后浇带模板支撑体系的施工方法 Active CN101832026B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101480563A CN101832026B (zh) 2010-04-07 2010-04-07 基础底板后浇带模板支撑体系的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101480563A CN101832026B (zh) 2010-04-07 2010-04-07 基础底板后浇带模板支撑体系的施工方法

Publications (2)

Publication Number Publication Date
CN101832026A CN101832026A (zh) 2010-09-15
CN101832026B true CN101832026B (zh) 2011-07-13

Family

ID=42716224

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101480563A Active CN101832026B (zh) 2010-04-07 2010-04-07 基础底板后浇带模板支撑体系的施工方法

Country Status (1)

Country Link
CN (1) CN101832026B (zh)

Families Citing this family (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102182302B (zh) * 2011-04-13 2013-01-30 中化二建集团有限公司 建筑施工全钢模板及其制作、组装方法
CN102409852B (zh) * 2011-09-30 2013-10-23 中国二十二冶集团有限公司 采用钢筋作为横向背楞的圆形结构木模板的施工方法
CN102587554B (zh) * 2012-02-29 2015-06-03 黑龙江宇辉新型建筑材料有限公司 跨度内应用钢筋180°弯锚连接的混凝土叠合板及连接方法
CN102587555B (zh) * 2012-03-09 2015-06-03 黑龙江宇辉新型建筑材料有限公司 跨内应用钢筋180°弯锚及螺旋筋连接的叠合板及方法
CN102852337A (zh) * 2012-09-27 2013-01-02 中国化学工程第三建设有限公司 免拆除式后浇带的施工方法
CN103730869B (zh) * 2012-10-16 2016-12-21 上海建工五建集团有限公司 一种井字形固定预埋盒及其施工方法
CN103485423B (zh) * 2013-09-26 2015-12-02 中国华冶科工集团有限公司 后浇带留置的方法
CN103821178A (zh) * 2014-02-24 2014-05-28 中天建设集团有限公司 地下室外墙后浇带留置装置
CN104727549B (zh) * 2015-03-26 2016-08-31 广东电白建设集团有限公司 有限空间可升降整体装拆模板体系施工安装方法
CN104895230A (zh) * 2015-04-30 2015-09-09 南京长江都市建筑设计股份有限公司 一种预制叠合楼板的后浇带及其施工方法
CN105040743B (zh) * 2015-08-27 2016-08-24 青岛绿城建筑设计有限公司 地下结构后浇带可拆卸式换撑方法及结构
CN105839677A (zh) * 2016-03-25 2016-08-10 中国五冶集团有限公司 一种地下室侧壁后浇带超前防水施工工艺
CN107558733B (zh) * 2017-09-26 2018-10-09 中国建筑第五工程局有限公司 伸缩后浇带下模架体系与周边支模架同步拆除的施工方法
CN109629608A (zh) * 2017-10-09 2019-04-16 上海宝冶集团有限公司 防止筏板混凝土施工缝漏浆的施工方法
CN108842826B (zh) * 2018-07-05 2020-12-15 中建七局第四建筑有限公司 沉降后浇带预封闭结构及其施工方法
CN109295849A (zh) * 2018-10-31 2019-02-01 福州大学 一种带有锚固板的空心板铰缝构造及其施工方法
CN110172999B (zh) * 2019-05-21 2020-11-06 上海森信建设集团有限公司 一种地下室底板深坑支模的方法
CN111764522A (zh) * 2020-06-29 2020-10-13 中建八局华南建设有限公司 一种防渗漏建筑楼板后浇带结构及浇筑方法
CN112942823A (zh) * 2021-01-27 2021-06-11 中国建筑第八工程局有限公司 施工缝钢丝网模板的固定结构及固定方法
CN113463911B (zh) * 2021-06-25 2022-06-10 浙江宏超建设集团有限公司 基础后浇带模板及浇筑后浇带的施工方法
CN114215353A (zh) * 2021-12-31 2022-03-22 成都建工第二建筑工程有限公司 双重抗混凝土侧压力模板支撑体系
CN115532670B (zh) * 2022-10-26 2023-04-11 武汉鸣辰建设集团有限公司 一种降低后浇带渗透率的施工方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101144328A (zh) * 2007-10-17 2008-03-19 山东万鑫建设有限公司 后浇带梁板模板的施工方法
CN101205726A (zh) * 2007-12-19 2008-06-25 南通华新建工集团有限公司 基础底板后浇带防漏浆方法

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100749695B1 (ko) * 2006-11-02 2007-08-17 장성호 분리 가능한 후타설콘크리트 설치구조 및 그 설치 및해체방법

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101144328A (zh) * 2007-10-17 2008-03-19 山东万鑫建设有限公司 后浇带梁板模板的施工方法
CN101205726A (zh) * 2007-12-19 2008-06-25 南通华新建工集团有限公司 基础底板后浇带防漏浆方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
朱日新.地下室底板后浇带施工.《中国科技信息》.2010,(第1期), *
肖冠男.后浇带的应用及施工方法.《中国新技术新产品》.2009,(第21期), *

Also Published As

Publication number Publication date
CN101832026A (zh) 2010-09-15

Similar Documents

Publication Publication Date Title
CN101832026B (zh) 基础底板后浇带模板支撑体系的施工方法
CN106522561B (zh) 大跨度混凝土框架梁有粘结预应力后浇带内张拉施工方法
CN107326940B (zh) 一种地下室超前止水后浇带结构及其施工方法
CN104372890A (zh) 一种复杂结构清水混凝土预制箱梁施工工法
CN108638324A (zh) 一种预制箱梁的施工方法
CN105484391A (zh) 轻质保温grc免拆模板制作保温防水墙体的施工方法
CN103774561B (zh) 高速公路预制小箱梁工装法流水化作业施工
CN102094493A (zh) 大型泊车屋面混凝土的施工方法
CN201738463U (zh) 主体结构与填充墙体之间的竖向连接结构
CN208441138U (zh) 基于复合底板的一体化装配式管廊
CN104831932A (zh) 一种高标号混凝土柱脚的施工工艺
CN104328738A (zh) 用于桥梁建筑的连续钢构施工方法
CN110625786B (zh) 基于钢筋焊接网和水泥压力板的混凝土板建造方法
CN110469013A (zh) 水泥纤维空心条板、全现浇免拆模建筑结构及其工法
CN201531035U (zh) 基础底板后浇带、施工缝钢丝网隔离装置
CN202483061U (zh) 后浇带支护模
CN108240045A (zh) 一种外墙预制板复合后浇带结构及其施工方法
CN201649639U (zh) 基础底板后浇带模板支撑体系
CN206844138U (zh) 一种坡形独立基础的钢筋结构
CN201473974U (zh) 一种新型钢板止水带
CN204418691U (zh) 一种用于现浇竖向构件与水平构件连接处混凝土拦截装置
CN209620240U (zh) 装配整体式楼梯间
CN107044171A (zh) 丁基腻子钢板止水后浇带施工方法
CN206570961U (zh) 一种外墙预制板复合后浇带结构
CN109537738A (zh) 钢结构建筑现浇混凝土空腹楼盖自支承吊架支模工艺

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant