CN101829694A - Production method of TC4 drawing pipes - Google Patents

Production method of TC4 drawing pipes Download PDF

Info

Publication number
CN101829694A
CN101829694A CN 201010185743 CN201010185743A CN101829694A CN 101829694 A CN101829694 A CN 101829694A CN 201010185743 CN201010185743 CN 201010185743 CN 201010185743 A CN201010185743 A CN 201010185743A CN 101829694 A CN101829694 A CN 101829694A
Authority
CN
China
Prior art keywords
pipe
pipe blank
mould
pull bar
pull rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010185743
Other languages
Chinese (zh)
Other versions
CN101829694B (en
Inventor
刘玉涛
阎东辉
鞠大文
张树军
吴德江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENYANG HESHITAI GENERAL TITANIUM INDUSTRY Co Ltd
Original Assignee
SHENYANG HESHITAI GENERAL TITANIUM INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENYANG HESHITAI GENERAL TITANIUM INDUSTRY Co Ltd filed Critical SHENYANG HESHITAI GENERAL TITANIUM INDUSTRY Co Ltd
Priority to CN2010101857432A priority Critical patent/CN101829694B/en
Publication of CN101829694A publication Critical patent/CN101829694A/en
Application granted granted Critical
Publication of CN101829694B publication Critical patent/CN101829694B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Metal Extraction Processes (AREA)

Abstract

The invention relates to a production method of TC4 drawing pipes, comprising the following steps of: taking the thin end of a pipe blank to penetrate through an inlet of a lubricating mould of a double-chain straight-pulling bed so that the pipe blank enters a drawing pipe mould, wherein the thin end of the pipe blank extends out of the other end of the drawing pipe mould and then is clamped by pulling teeth of a trolley positioned on the double-chain straight-pulling bed; charging a lubricating agent from the tail part of the pipe blank when the pipe blank is clamped, and placing pull rod core heads into the pipe blank; respectively fixing the core heads of different specifications by a pull rod; placing the lubricating agent into the pipe blank at one end of the pull rod, taking the end with the core heads to penetrate through the pipe blank from the tail part of the pipe blank, and enabling the core heads to just reach machining points inside the drawing pipe mould; fixing the other end of the pull rod on a tail holder of the double-chain straight-pulling bed so that the trolley of the double-chain straight-pulling bed pulls the pipe blank to shorten diameter, and the pull rod core heads reduce the wall thickness of the pipe blank; and manufacturing the TC4 drawing pipes of various specifications through multiple pulling. The invention has simple process; and in addition, the produced TC4 drawing pipes have high quality and low production cost.

Description

A kind of production method of TC4 drawing pipes
Technical field
The present invention relates to a kind of production method of tubing, specifically relate to a kind of preparation method of TC4 drawing pipes.
Background technology
TC4 tubing extensively should be in titanium pump and pipeline network, and it is many to produce TC4 tubing operation at present, and precision is relatively poor, the cost height.
Summary of the invention
Purpose of the present invention provides a kind of production method of TC4 drawing pipes.
The technical scheme that adopts is:
A kind of production method of TC4 drawing pipes, be that the lubricated mould inlet of the thin head end of pipe from double-stranded vertical pulling bed penetrated, enter the trombone slide mould, the thin end of pipe stretches out from the trombone slide mould other end, bite with the stretching tooth of dolly on the double-stranded vertical pulling bed again, in on the pipe card, by the pipe afterbody lubricant of packing into, and the pull bar core print put into pipe, its method is: respectively the different size core print is fixed with pull bar, at pull bar one end, will be put into lubricant in the pipe, the belt carcass head end is penetrated pipe by the pipe afterbody, and making core print just in time reach processing stand in the trombone slide mould, the pull bar other end is fixed on the broaching machine tailstock, when the broaching machine dolly spurs the pipe undergauge like this, the pull bar core print reduces the pipe wall thickness, makes all size TC4 tubing through repeatedly stretching.
When the pipe external diameter is following to φ 12, utilize the core ball that moves about to subtract wall, method and pull bar core print subtract to be moulded identically, and just core print is fixed without pull bar, and specifically technological procedure is as follows:
1, poling base: TC4 optical wand one end is got out the dark aperture of φ 25 * 100mm, fill out graphitic lubricant in the aperture, sealing utilizes chamber type electric resistance furnace to be warmed to 950~980 ℃, is incubated 1 hour, utilizes the Mannesmann piercing machine to wear into pipe then.
2, with head rolling machine pipe one end is rolled into the long thin head of 200mm, sting material with the stretching tooth on the standby stretching-machine.
3 heating of pipe blank: utilize main frequency furnace and resistance-heated furnace heating pipe, 800~850 ℃ of heating-up temperatures.
4 material loadings: the pipe that heats in the stove is inserted by broaching machine lubrication groove inlet, enter in the trombone slide mould, the pipe microcephaly stretches out from the pipe drawing mold other end, is blocked by the stretching tooth on the broaching machine dolly again.
5 cored heads: core print is fixedlyed connected with mandrel with pull bar one end, after pipe is packed mould into, the first end of belt carcass is together penetrated by the pipe afterbody together with lubricant, adjust pull bar length, make core print just arrive the place, work zone of trombone slide mould, the pull bar end is fixed on the broaching machine tailstock.
6 stretch: will lubricate and fill up lubricant in the mould, the starting broaching machine is that dolly drive pipe is at the uniform velocity pulled out pipe in the trombone slide mould, be that pipe is when passing through the stretching die undergauge, reach the purpose that reduces wall thickness, utilize the trombone slide mould of different size and the core print that matches, drawing goes out the TC4 tubing of different size.
7 tubules utilize floating core head to replace the pull bar core print when φ 12 is following, pull out the tubule that TC4 sets caliber, and drawing method is identical with said method.
Technology of the present invention is simple, the TC4 drawing pipe quality height of producing, and production cost is low.
Description of drawings
Fig. 1 is double-stranded vertical pulling bed schematic diagram.
Fig. 2 is L * C 60 Mannesmann piercing unit schematic diagrames.
Fig. 3 is the pointing machine schematic diagram.
Fig. 4 is a trombone slide mould schematic diagram.
Fig. 5 is a pull bar core print schematic diagram
Fig. 6 is the floating core head schematic diagram
The specific embodiment
A kind of production method of TC4 drawing pipes comprises following processing step:
1, gets the TC4 optical wand and be preparation pipe raw material;
2, poling base: TC4 optical wand one end is got out the dark aperture of Φ 25 * 100mm with two roller Mannesmann piercing mills, and in aperture, fill out graphitic lubricant, the sealing nose end utilizes chamber type electric resistance furnace to heat to 950-980 ℃, be incubated 1 hour, utilize the Mannesmann piercing machine to wear into pipe then;
3, with head rolling machine one end of above-mentioned pipe is rolled into the long thin head of 200mm, so that sting material with the stretching tooth on the stretching-machine;
4, heating of pipe blank; Utilize main frequency furnace or resistance-heated furnace heating pipe, be heated to 800-850 ℃;
5, material loading: the pipe after will heating is inserted by broaching machine lubrication groove inlet, enters in the trombone slide mould, and the pipe microcephaly stretches out from the pipe drawing mold other end, is blocked by the stretching tooth on the broaching machine dolly again;
6, cored head: core print is fixedlyed connected with mandrel with pull bar one end, after pipe is packed mould into, the first end of belt carcass is together penetrated by the pipe afterbody together with lubricant, adjust pull bar length, make core print just arrive the place, work zone of trombone slide mould, the pull bar end is fixed on the broaching machine tailstock;
7, stretch: will lubricate and dose lubricant in the mould, start broaching machine, broaching machine dolly pulling pipe is at the uniform velocity pulled out pipe in drawing die, pipe is when passing through the drawing die undergauge, reach the purpose that reduces wall thickness, utilize the trombone slide mould of different size and the core print that is complementary, drawing goes out the TC4 tubing of required specification; When drawing Φ 12 following path TC4 manage, utilize floating core head to replace the pull bar core print to carry out above-mentioned drawing, can obtain the TC4 tubing of required Φ 12 following specifications.

Claims (1)

1. the production method of a TC4 drawing pipes is characterized in that comprising following processing step:
(1), gets the TC4 optical wand and be preparation pipe raw material;
(2), poling base: TC4 optical wand one end is got out the dark aperture of Φ 25 * 100mm with two roller Mannesmann piercing mills, and in aperture, fill out graphitic lubricant, the sealing nose end utilizes chamber type electric resistance furnace to heat to 950-980 ℃, be incubated 1 hour, utilize the Mannesmann piercing machine to wear into pipe then;
(3), with head rolling machine one end of above-mentioned pipe is rolled into the long thin head of 200mm, so that sting material with the stretching tooth on the stretching-machine;
(4), heating of pipe blank; Utilize main frequency furnace or resistance-heated furnace heating pipe, be heated to 800-850 ℃;
(5), material loading: the pipe after will heating is inserted by broaching machine lubrication groove inlet, enters in the trombone slide mould, and the pipe microcephaly stretches out from the pipe drawing mold other end, is blocked by the stretching tooth on the broaching machine dolly again;
(6), cored head: core print is fixedlyed connected with mandrel with pull bar one end, after pipe is packed mould into, the first end of belt carcass is together penetrated by the pipe afterbody together with lubricant, adjust pull bar length, make core print just arrive the place, work zone of trombone slide mould, the pull bar end is fixed on the broaching machine tailstock;
(7), stretch: will lubricate and dose lubricant in the mould, start broaching machine, broaching machine dolly pulling pipe is at the uniform velocity pulled out pipe in drawing die, pipe is when passing through the drawing die undergauge, reach the purpose that reduces wall thickness, utilize the trombone slide mould of different size and the core print that is complementary, drawing goes out the TC4 tubing of required specification; When drawing Φ 12 following path TC4 manage, utilize floating core head to replace the pull bar core print to carry out above-mentioned drawing, can obtain the TC4 tubing of required Φ 12 following specifications.
CN2010101857432A 2010-05-28 2010-05-28 Production method of TC4 drawing pipes Active CN101829694B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101857432A CN101829694B (en) 2010-05-28 2010-05-28 Production method of TC4 drawing pipes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101857432A CN101829694B (en) 2010-05-28 2010-05-28 Production method of TC4 drawing pipes

Publications (2)

Publication Number Publication Date
CN101829694A true CN101829694A (en) 2010-09-15
CN101829694B CN101829694B (en) 2012-05-30

Family

ID=42713993

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101857432A Active CN101829694B (en) 2010-05-28 2010-05-28 Production method of TC4 drawing pipes

Country Status (1)

Country Link
CN (1) CN101829694B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104259246A (en) * 2014-08-29 2015-01-07 攀钢集团成都钢钒有限公司 Method for producing high-strength titanium alloy seamless tube
CN105396895A (en) * 2015-11-27 2016-03-16 中国船舶重工集团公司第七二五研究所 Hot rolling machining method for titanium and titanium alloy seamless oil pipe
CN105855307A (en) * 2016-05-19 2016-08-17 常熟市异型钢管有限公司 Drawing method of profiled titanium tube
CN108126994A (en) * 2017-07-27 2018-06-08 中国航发哈尔滨东安发动机有限公司 A kind of thin-wall aluminum alloy tube-drawing mold
CN109226328A (en) * 2018-11-23 2019-01-18 绍兴上虞正达管业有限公司 A kind of red copper hose processing technology

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1160522C (en) * 2002-02-22 2004-08-04 武汉重工铸锻有限责任公司 Technology for manufacturing large-diameter thick-wall seamless steel pipe
JP2004232075A (en) * 2002-03-04 2004-08-19 Sumitomo Denko Steel Wire Kk Magnesium-based alloy tube, and production method therefor
CN101007384A (en) * 2006-01-26 2007-08-01 宝山钢铁股份有限公司 Manufacturing method of 17-4PH steel pipe
CN101058142A (en) * 2007-05-29 2007-10-24 江阴新华宏铜业有限公司 Method for preparing copper and nickel alloy seamless copper tube
WO2009047688A2 (en) * 2007-10-11 2009-04-16 Robor (Pty) Ltd Steel tube drawing process and apparatus

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1160522C (en) * 2002-02-22 2004-08-04 武汉重工铸锻有限责任公司 Technology for manufacturing large-diameter thick-wall seamless steel pipe
JP2004232075A (en) * 2002-03-04 2004-08-19 Sumitomo Denko Steel Wire Kk Magnesium-based alloy tube, and production method therefor
CN101007384A (en) * 2006-01-26 2007-08-01 宝山钢铁股份有限公司 Manufacturing method of 17-4PH steel pipe
CN101058142A (en) * 2007-05-29 2007-10-24 江阴新华宏铜业有限公司 Method for preparing copper and nickel alloy seamless copper tube
WO2009047688A2 (en) * 2007-10-11 2009-04-16 Robor (Pty) Ltd Steel tube drawing process and apparatus

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《天津冶金》 20030230 曹萍 用Phi76mm穿孔机组生产Phi63mm毛管的设备改进 , 第01期 2 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104259246A (en) * 2014-08-29 2015-01-07 攀钢集团成都钢钒有限公司 Method for producing high-strength titanium alloy seamless tube
CN104259246B (en) * 2014-08-29 2016-08-24 攀钢集团成都钢钒有限公司 The method producing high strength titanium alloy seamless pipe
CN105396895A (en) * 2015-11-27 2016-03-16 中国船舶重工集团公司第七二五研究所 Hot rolling machining method for titanium and titanium alloy seamless oil pipe
CN105855307A (en) * 2016-05-19 2016-08-17 常熟市异型钢管有限公司 Drawing method of profiled titanium tube
CN108126994A (en) * 2017-07-27 2018-06-08 中国航发哈尔滨东安发动机有限公司 A kind of thin-wall aluminum alloy tube-drawing mold
CN109226328A (en) * 2018-11-23 2019-01-18 绍兴上虞正达管业有限公司 A kind of red copper hose processing technology

Also Published As

Publication number Publication date
CN101829694B (en) 2012-05-30

Similar Documents

Publication Publication Date Title
CN101829694B (en) Production method of TC4 drawing pipes
CN104259206B (en) A kind of production method of the titanium alloy seamless pipe for tubing coupling
CN102489639B (en) Fine-grain roll-forming method for large annular piece made of high alloy steel
CN105945117B (en) A kind of high temperature alloy reducer pipe shear spinning manufacturing process and device
CN104384430B (en) The Forging Technology of heavy wall high tubular ring forging
CN206028344U (en) Cold drawing device
CN103240292A (en) Production method and device for magnesium alloy thin-wall pipe
CN102873512A (en) Manufacture method of large-caliber medium-and-thick-wall seamless steel tube for nuclear power plant
CN101342568A (en) Method for manufacturing super-flat compact type chain vertical ring
CN102319783A (en) Heat-push bending method for producing pipe fittings with equal diameters and equal wall thicknesses
CN103658478B (en) The manufacture method of nuclear power evaporator transition cone forge piece
CN102632093B (en) Steel pipe cold-drawing mould with twice-reducing and twice-shaping functions
CN104826868B (en) Small-diameter seamless steel pipe floating mandrel continuous mill unit and seamless steel pipe production process
CN204817503U (en) Steel pipe cold drawing device
CN109092898B (en) Plastic processing method for long high-performance magnesium alloy seamless pipe
CN204657128U (en) Fully automatic electric wire core wire drawing machine
CN106914504A (en) A kind of middle high-strength aluminum alloy seamless pipe technological process of extruding
CN105057478B (en) The method producing Varying-thickness variable diameters steel pipe
CN104174652A (en) Equipment and technology for piercing and rolling anchor rod integrally
CN102189187A (en) Manufacturing process of thermal expansion diameter duplex seamless stainless steel pipe
CN107243720A (en) Revolve mouth manufacturing process in a kind of heavy caliber combustion chamber
CN102189188A (en) Process for manufacturing seamless stainless steel pipe with large diameter through hot expanding
CN105436382B (en) A kind of accurate core axial hole machining device of cylinder shape Forging
CN104227344B (en) Production method of GH5188 square exhaust nozzle used for aircraft engine
CN203900249U (en) Spinning necking die

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Production method of TC4 drawing pipes

Effective date of registration: 20141009

Granted publication date: 20120530

Pledgee: Yang Wa

Pledgor: Shenyang Heshitai General Titanium Industry Co., Ltd.

Registration number: 2014210000009

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PP01 Preservation of patent right

Effective date of registration: 20150618

Granted publication date: 20120530

RINS Preservation of patent right or utility model and its discharge
PD01 Discharge of preservation of patent

Date of cancellation: 20151218

Granted publication date: 20120530

PP01 Preservation of patent right

Effective date of registration: 20151218

Granted publication date: 20120530

RINS Preservation of patent right or utility model and its discharge
PD01 Discharge of preservation of patent

Date of cancellation: 20200618

Granted publication date: 20120530

PD01 Discharge of preservation of patent
PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20210818

Granted publication date: 20120530

Pledgee: Yang Wa

Pledgor: HST METALS Co.,Ltd.

Registration number: 2014210000009