WO2009047688A2 - Steel tube drawing process and apparatus - Google Patents

Steel tube drawing process and apparatus Download PDF

Info

Publication number
WO2009047688A2
WO2009047688A2 PCT/IB2008/054079 IB2008054079W WO2009047688A2 WO 2009047688 A2 WO2009047688 A2 WO 2009047688A2 IB 2008054079 W IB2008054079 W IB 2008054079W WO 2009047688 A2 WO2009047688 A2 WO 2009047688A2
Authority
WO
WIPO (PCT)
Prior art keywords
tube
drawn
die
steel
process according
Prior art date
Application number
PCT/IB2008/054079
Other languages
French (fr)
Other versions
WO2009047688A3 (en
Inventor
Leon Mcdougall Bell
Michael R Corbett
Original Assignee
Robor (Pty) Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Robor (Pty) Ltd filed Critical Robor (Pty) Ltd
Publication of WO2009047688A2 publication Critical patent/WO2009047688A2/en
Publication of WO2009047688A3 publication Critical patent/WO2009047688A3/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C1/00Manufacture of metal sheets, metal wire, metal rods, metal tubes by drawing
    • B21C1/16Metal drawing by machines or apparatus in which the drawing action is effected by other means than drums, e.g. by a longitudinally-moved carriage pulling or pushing the work or stock for making metal sheets, bars, or tubes
    • B21C1/22Metal drawing by machines or apparatus in which the drawing action is effected by other means than drums, e.g. by a longitudinally-moved carriage pulling or pushing the work or stock for making metal sheets, bars, or tubes specially adapted for making tubular articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C1/00Manufacture of metal sheets, metal wire, metal rods, metal tubes by drawing
    • B21C1/16Metal drawing by machines or apparatus in which the drawing action is effected by other means than drums, e.g. by a longitudinally-moved carriage pulling or pushing the work or stock for making metal sheets, bars, or tubes
    • B21C1/22Metal drawing by machines or apparatus in which the drawing action is effected by other means than drums, e.g. by a longitudinally-moved carriage pulling or pushing the work or stock for making metal sheets, bars, or tubes specially adapted for making tubular articles
    • B21C1/24Metal drawing by machines or apparatus in which the drawing action is effected by other means than drums, e.g. by a longitudinally-moved carriage pulling or pushing the work or stock for making metal sheets, bars, or tubes specially adapted for making tubular articles by means of mandrels
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C9/00Cooling, heating or lubricating drawing material

Definitions

  • THIS invention relates to a steel tube drawing process and apparatus.
  • the process and apparatus of the invention may be used to produce steel tube suitable for use in the production of extension drill steel, typically for use in rotary drilling operations, although other applications, for example hydraulic tube, are also envisaged by the invention.
  • a conventional seamless tube mill is currently used to produce, from a steel billet, high alloyed, hot rolled seamless hollow steel bar, i.e. steel tube, stock which can used in the production of extension drill steel.
  • the hot rolling process produces a hot rolled tube with an OD (outside diameter) and wall thickness nominally suitable for use in the production of extension drill steel.
  • the tube produced by the known hot rolling process may be dimensionally inaccurate. It may for instance have an irregular cross-sectional shape with a non-round, possibly generally polygonal internal cross-sectional profile, non-concentric inner and outer profiles and an inconsistent wall thickness.
  • the irregular shape can give rise to stress concentration points which may contribute to early failure when the final product is used under load, for example as an extension drill steel in a drilling operation. To avoid such problems, it may be necessary to machine the rolled tube in order to achieve the required concentricity and dimensional accuracy, but this increases the final cost of the product.
  • the hot rolled tube may have a grain structure and mechanical properties which make it less than optimal for use in the production of extension drill steel.
  • the tube may for instance be rather brittle with limited toughness and fatigue resistance.
  • Attempts have also been made to modify hot rolled steel tube stock by cold drawing it to the required, reduced OD and wall thickness so that it can be used in the production of extension drill steel.
  • the cold drawing process involves a multi-stage procedure with the tube being drawn down to a smaller OD and wall thickness in each stage.
  • the cold drawn tube must be annealed after each stage in order to reduce undesirable work hardening effects.
  • a considerable period of time, possibly several days, is required for annealing between the successive drawing stages. As a result the cold drawing process is undesirably costly and time-consuming.
  • a steel tube drawing process in which a hot rolled seamless steel tube of relatively large OD and wall thickness is drawn down to a smaller OD and wall thickness, the process comprising at least one drawing stage in which the tube is located over a mandrel, the tube is induction heated and simultaneously drawn over the mandrel and through a drawing die which reduces the OD of the tube, and the drawn tube is thereafter cooled.
  • the tube may be drawn over the mandrel and through the die at a constant speed, possibly in the range 1.5m/min to 15m/min.
  • the tube may be allowed to cool to ambient temperature in the absence of forced cooling.
  • the tube is induction heated to a temperature selected to allow normalisation of the steel during cooling.
  • the tube is induction heated to a temperature selected, for the carbon content of the steel, to be at or just above the A3 line on the iron-carbon equilibrium diagram.
  • the tube will be induction heated to a temperature in the range 79O 0 C to 820 0 C.
  • the tube is drawn through the die on a draw bench and induction heating is applied to the tube as it enters the die.
  • hot rolled seamless steel tube of 73mm OD and 14mm wall thickness may be drawn down in multiple stages to produce steel tube of 39,2mm OD and 15mm ID or 32mm OD and 9mm ID.
  • Another aspect of the invention provides an apparatus for use in a steel tube drawing process in which a hot rolled seamless steel tube of relatively large OD and wall thickness is drawn down to a smaller OD and wall thickness, the apparatus comprising a drawing die through which the tube can be drawn, a mandrel over which the steel tube can be drawn and which extends into the drawing die, an induction heater located adjacent an input side of the drawing die and which is operable to heat the tube as it enters the die, and means for drawing the tube over the mandrel and through the die, thereby to draw the tube down to a smaller OD and wall thickness.
  • Figure 1 diagrammatically illustrates apparatus used in a process according to the invention, at the commencement of a drawing operation
  • Figure 2 diagrammatically illustrates the same apparatus during the drawing operation
  • Figure 3 shows a cross-sectional view of the drawing die used in the apparatus seen in Figures 1 and 2; and Figure 4 shows a conventional iron-carbon phase diagram.
  • the numeral 10 indicates a length of high alloyed, hot rolled seamless, hollow steel bar stock, i.e. tube, which in this example has an OD of 73mm, an ID (internal diameter) of 45mm and a radial wall thickness of 14mm.
  • OD OD
  • ID internal diameter
  • radial wall thickness 14mm.
  • the process of the invention is carried out on a draw bench 12 which is generally of a type used in cold tube drawing processes.
  • the illustrated draw bench 12 includes a carriage 14 which can be driven by means of a chain 16 and which is fitted with a clamping apparatus 18.
  • the clamping apparatus is clamped to a smaller diameter extension piece 20 which is welded to a leading end of the tube 10 and which projects through a drawing die 22.
  • the tube 10 is located on a fixed mandrel 24 and is supported for axial movement by means of rollers 26.
  • the coil 28 of a high frequency induction heating unit 30 is arranged about the tube 10 close to the die 22.
  • the tube 10 has a significant nickel and molybdenum content, and has an ultimate tensile strength of approximately 900MPa and a yield strength of about 400MPa.
  • the induction heater operates at suitable power output to elevate the temperature of the steel of the tube 10 to a value above the A3 line on the iron-carbon equilibrium diagram.
  • the carriage 14 is driven at a suitable drawing speed, in the direction of the arrow 32, so the steel tube 10 is accordingly pulled or drawn over the mandrel and through the die at this speed.
  • Figure 1 illustrates the tube 10 at the commencement of the drawing procedure and Figure 2 illustrates it during the drawing procedure.
  • the external surface of the tube 10 is lubricated with a suitable lubricant.
  • Lubricant may also be applied to the mandrel.
  • the fixed mandrel 24 has a mandrel rod 24.1 carrying a slightly enlarged mandrel head 24.2 which extends to a position flush with the output side 22.1 of the drawing die 22 and which has an external diameter 24.3 corresponding to the ID of the drawn tube.
  • the die itself has an arcuately tapered die passage 22.2 with an internal diameter 22.3 corresponding to the OD of the drawn tube.
  • the tube 10 is drawn through the die 22 at a constant speed, i.e. the carriage 14 moves at a constant velocity throughout the drawing operation.
  • the drawing speed may be varied during the drawing operation. The drawing speed may for instance be increased or decreased at the beginning and end of the operation compared to an intermediate period during which the major part of the tube is drawn through the die.
  • the drawn tube emerges from the output side of the die 22 it immediately commences cooling in the ambient air.
  • the tube is allowed to cool in air to ambient temperature with no forced cooling applied. This may be achieved by rotating the tube on support rollers (not shown) to ensure that ambient cooling is applied uniformly to the external surface of the tube.
  • forced cooling may be applied to the drawn tube in order to create special properties, depending on the final use to which the tube is to be put.
  • extension drill steel it may for example be desired to draw the initial tube 10 down to an OD of 39,2mm or 32mm, with an ID of 15mm or 9mm and a wall thickness of 12.1mm or 11.5mm respectively, since these are dimensions commonly used in extension drill steels employed in rotary core drilling operations.
  • the draw bench is re-equipped with a smaller die and mandrel prior to a repetition of the drawing process in the next stage.
  • An added advantage of the process of the invention as exemplified above is the fact that the initial, irregular cross-section of the standard hot drawn seamless hollow bar stock, i.e. the tube 10, is converted by the dies and mandrels used in the successive drawing stages to a regular cross-section in which the OD and ID are within close tolerances.
  • the regular cross- section which is produced can reduce the creation of stress concentration points which could perhaps give rise to premature failure under load of, for instance, extension drill steel produced from the drawn tube.
  • the steel tube 10 is subjected to heating by a single induction coil 28 as it enters the die 22.
  • two or more induction heaters may be arranged, typically in series, to elevate the steel temperature to the required level for hot drawing and subsequent normalisation to take place when the tube is cooled to ambient temperature.
  • the induction heater may be arranged to elevate the temperature of the tube 10, as it enters the drawing die, to a value in the range 79O 0 C to 820 0 C and a constant drawing speed in the range 1.5 to 15 m/min is used.
  • These parameters may however vary depending on the carbon content of the steel and the required mechanical properties.
  • steel tube produced by the process exemplified above has a surface finish and close tolerance geometry superior to that of hot rolled products.
  • the steel tube produced by the process of the invention also has a fine grain structure allowing the drawn product to exhibit higher levels of toughness and fatigue resistance than hot rolled products.
  • the rapid, substantially instantaneous heating of the steel tube 10 to the required temperature as it enters the die 22, by means of high frequency induction heating has the advantage that undesirable carburisation, surface hardening and/or surface oxidation effects are limited.
  • the resulting, normalised drawn steel product is accordingly more tractable to any subsequent heat treatment which may be required in producing extension drill steel or other final product.

Abstract

One aspect of the invention concerns a steel tube drawing process in which a hot rolled seamless steel tube (10) of relatively large outside diameter and wall thickness is drawn down to a smaller outside diameter and wall thickness. The process of the invention comprises at least one drawing stage in which the tube (10) is located over a mandrel (24), the tube (10) is induction heated and drawn over the mandrel (24) and through a drawing die (22) which reduces the outside diameter of the tube, and the drawn tube is thereafter cooled. Another aspect of the invention concerns an apparatus which is used in the process.

Description

"STEEL TUBE DRAWING PROCESS AND APPARATUS"
FIELD OF THE INVENTION
THIS invention relates to a steel tube drawing process and apparatus. In one application the process and apparatus of the invention may be used to produce steel tube suitable for use in the production of extension drill steel, typically for use in rotary drilling operations, although other applications, for example hydraulic tube, are also envisaged by the invention.
BACKGROUND TO THE INVENTION
A conventional seamless tube mill is currently used to produce, from a steel billet, high alloyed, hot rolled seamless hollow steel bar, i.e. steel tube, stock which can used in the production of extension drill steel. The hot rolling process produces a hot rolled tube with an OD (outside diameter) and wall thickness nominally suitable for use in the production of extension drill steel. However the tube produced by the known hot rolling process may be dimensionally inaccurate. It may for instance have an irregular cross-sectional shape with a non-round, possibly generally polygonal internal cross-sectional profile, non-concentric inner and outer profiles and an inconsistent wall thickness. The irregular shape can give rise to stress concentration points which may contribute to early failure when the final product is used under load, for example as an extension drill steel in a drilling operation. To avoid such problems, it may be necessary to machine the rolled tube in order to achieve the required concentricity and dimensional accuracy, but this increases the final cost of the product.
In addition, the hot rolled tube may have a grain structure and mechanical properties which make it less than optimal for use in the production of extension drill steel. The tube may for instance be rather brittle with limited toughness and fatigue resistance. Attempts have also been made to modify hot rolled steel tube stock by cold drawing it to the required, reduced OD and wall thickness so that it can be used in the production of extension drill steel. The cold drawing process involves a multi-stage procedure with the tube being drawn down to a smaller OD and wall thickness in each stage. However the cold drawn tube must be annealed after each stage in order to reduce undesirable work hardening effects. In the known process, a considerable period of time, possibly several days, is required for annealing between the successive drawing stages. As a result the cold drawing process is undesirably costly and time-consuming.
SUMMARY OF THE INVENTION
According to the present invention there is provided a steel tube drawing process in which a hot rolled seamless steel tube of relatively large OD and wall thickness is drawn down to a smaller OD and wall thickness, the process comprising at least one drawing stage in which the tube is located over a mandrel, the tube is induction heated and simultaneously drawn over the mandrel and through a drawing die which reduces the OD of the tube, and the drawn tube is thereafter cooled.
The tube may be drawn over the mandrel and through the die at a constant speed, possibly in the range 1.5m/min to 15m/min.
The tube may be allowed to cool to ambient temperature in the absence of forced cooling.
Preferably the tube is induction heated to a temperature selected to allow normalisation of the steel during cooling. Typically the tube is induction heated to a temperature selected, for the carbon content of the steel, to be at or just above the A3 line on the iron-carbon equilibrium diagram. For an equivalent carbon content of approximately 0.7% by weight the tube will be induction heated to a temperature in the range 79O0C to 8200C. Conveniently the tube is drawn through the die on a draw bench and induction heating is applied to the tube as it enters the die.
In one application of the process, when used to produce drawn tube for use in the production of extension drill steel, hot rolled seamless steel tube of 73mm OD and 14mm wall thickness may be drawn down in multiple stages to produce steel tube of 39,2mm OD and 15mm ID or 32mm OD and 9mm ID.
Another aspect of the invention provides an apparatus for use in a steel tube drawing process in which a hot rolled seamless steel tube of relatively large OD and wall thickness is drawn down to a smaller OD and wall thickness, the apparatus comprising a drawing die through which the tube can be drawn, a mandrel over which the steel tube can be drawn and which extends into the drawing die, an induction heater located adjacent an input side of the drawing die and which is operable to heat the tube as it enters the die, and means for drawing the tube over the mandrel and through the die, thereby to draw the tube down to a smaller OD and wall thickness.
BRIEF DESCRIPTION OF THE DRAWINGS
The invention will now be described in more detail, by way of example only, with reference to the accompanying drawings in which:
Figure 1 diagrammatically illustrates apparatus used in a process according to the invention, at the commencement of a drawing operation;
Figure 2 diagrammatically illustrates the same apparatus during the drawing operation;
Figure 3 shows a cross-sectional view of the drawing die used in the apparatus seen in Figures 1 and 2; and Figure 4 shows a conventional iron-carbon phase diagram.
DESCRIPTION WITH REFERENCE TO THE DRAWINGS
In Figure 1 the numeral 10 indicates a length of high alloyed, hot rolled seamless, hollow steel bar stock, i.e. tube, which in this example has an OD of 73mm, an ID (internal diameter) of 45mm and a radial wall thickness of 14mm. Using the process of the invention, it is desired to draw the tube 10 down to a smaller OD and wall thickness which will render it suitable for the production of extension drill steel to be used in rotary earth drilling operations, for example core drilling operations.
The process of the invention is carried out on a draw bench 12 which is generally of a type used in cold tube drawing processes. The illustrated draw bench 12 includes a carriage 14 which can be driven by means of a chain 16 and which is fitted with a clamping apparatus 18. In use, the clamping apparatus is clamped to a smaller diameter extension piece 20 which is welded to a leading end of the tube 10 and which projects through a drawing die 22.
The tube 10 is located on a fixed mandrel 24 and is supported for axial movement by means of rollers 26. The coil 28 of a high frequency induction heating unit 30 is arranged about the tube 10 close to the die 22.
In this example, the tube 10 has a significant nickel and molybdenum content, and has an ultimate tensile strength of approximately 900MPa and a yield strength of about 400MPa.
The induction heater operates at suitable power output to elevate the temperature of the steel of the tube 10 to a value above the A3 line on the iron-carbon equilibrium diagram. A typical iron-carbon phase diagram, in which the A3 line is indicated by the numeral 27, is shown in Figure 4. The carriage 14 is driven at a suitable drawing speed, in the direction of the arrow 32, so the steel tube 10 is accordingly pulled or drawn over the mandrel and through the die at this speed. Figure 1 illustrates the tube 10 at the commencement of the drawing procedure and Figure 2 illustrates it during the drawing procedure.
Prior to the commencement of the drawing operation, the external surface of the tube 10 is lubricated with a suitable lubricant. Lubricant may also be applied to the mandrel.
Referring to Figure 3 it can be seen that the fixed mandrel 24 has a mandrel rod 24.1 carrying a slightly enlarged mandrel head 24.2 which extends to a position flush with the output side 22.1 of the drawing die 22 and which has an external diameter 24.3 corresponding to the ID of the drawn tube. The die itself has an arcuately tapered die passage 22.2 with an internal diameter 22.3 corresponding to the OD of the drawn tube. In this example the diameter 22.3 defines a bearing length 22.4 which is approximately equal to 40% of the OD, i.e the bearing length 22.4 = 0.4OD.
In this example, the tube 10 is drawn through the die 22 at a constant speed, i.e. the carriage 14 moves at a constant velocity throughout the drawing operation. In other examples, the drawing speed may be varied during the drawing operation. The drawing speed may for instance be increased or decreased at the beginning and end of the operation compared to an intermediate period during which the major part of the tube is drawn through the die.
As the drawn tube emerges from the output side of the die 22 it immediately commences cooling in the ambient air. In this example, after the tube has been drawn fully through the die it is allowed to cool in air to ambient temperature with no forced cooling applied. This may be achieved by rotating the tube on support rollers (not shown) to ensure that ambient cooling is applied uniformly to the external surface of the tube. In other examples, forced cooling may be applied to the drawn tube in order to create special properties, depending on the final use to which the tube is to be put.
In the case of extension drill steel it may for example be desired to draw the initial tube 10 down to an OD of 39,2mm or 32mm, with an ID of 15mm or 9mm and a wall thickness of 12.1mm or 11.5mm respectively, since these are dimensions commonly used in extension drill steels employed in rotary core drilling operations. In order to achieve the desired final dimensions it will typically be necessary to drawn the original tube down in several successive stages with the OD, ID and wall thickness of the tube being incrementally reduced during each stage. In practice, after a series of tubes have been drawn down in each stage and have cooled down thereafter, the draw bench is re-equipped with a smaller die and mandrel prior to a repetition of the drawing process in the next stage.
Persons skilled in the art will recognise that the selection of the steel temperature to be just above the A3 line in a conventional iron-carbon equilibrium diagram allows a hot drawing procedure to take place but also permits normalisation of the steel during the subsequent cooling step, thereby reducing undesirable work hardening effects. It is accordingly believed that the process of the invention will produce drawn steel tube which is less brittle and generally has better mechanical properties, for example ultimate tensile strength and yield strength than that produced by the known cold drawing process described above.
An added advantage of the process of the invention as exemplified above is the fact that the initial, irregular cross-section of the standard hot drawn seamless hollow bar stock, i.e. the tube 10, is converted by the dies and mandrels used in the successive drawing stages to a regular cross-section in which the OD and ID are within close tolerances. The regular cross- section which is produced can reduce the creation of stress concentration points which could perhaps give rise to premature failure under load of, for instance, extension drill steel produced from the drawn tube. In the example described above, the steel tube 10 is subjected to heating by a single induction coil 28 as it enters the die 22. In other embodiments, two or more induction heaters may be arranged, typically in series, to elevate the steel temperature to the required level for hot drawing and subsequent normalisation to take place when the tube is cooled to ambient temperature.
In one particular example of the invention, where the steel of the tube 10 has an equivalent carbon content of the order of 0.7% by weight, the induction heater may be arranged to elevate the temperature of the tube 10, as it enters the drawing die, to a value in the range 79O0C to 8200C and a constant drawing speed in the range 1.5 to 15 m/min is used. These parameters may however vary depending on the carbon content of the steel and the required mechanical properties.
It has been found that steel tube produced by the process exemplified above has a surface finish and close tolerance geometry superior to that of hot rolled products. The steel tube produced by the process of the invention also has a fine grain structure allowing the drawn product to exhibit higher levels of toughness and fatigue resistance than hot rolled products.
In addition to the above-mentioned advantages, it is pointed out that the rapid, substantially instantaneous heating of the steel tube 10 to the required temperature as it enters the die 22, by means of high frequency induction heating, has the advantage that undesirable carburisation, surface hardening and/or surface oxidation effects are limited. The resulting, normalised drawn steel product is accordingly more tractable to any subsequent heat treatment which may be required in producing extension drill steel or other final product.
It should also be noted that while specific mention has been made of a chain drive system to draw the tube through the die, other examples may employ other drawing mechanisms, such as hydraulic or rack and pinion mechanisms.

Claims

1.
A steel tube drawing process in which a hot rolled seamless steel tube of relatively large OD and wall thickness is drawn down to a smaller OD and wall thickness, the process comprising at least one drawing stage in which the tube is located over a mandrel, the tube is induction heated and drawn over the mandrel and through a drawing die which reduces the OD of the tube, and the drawn tube is thereafter cooled.
2.
A process according to claim 1 wherein the tube is drawn over the mandrel and through the die at a constant speed.
3.
A process according to claim 2 wherein the constant speed is in the range
1.5m/min to 15m/min.
3.
A process according to claim 1 or claim 2 wherein, after drawing, the tube is allowed to cool to ambient temperature in the absence of forced cooling.
4.
A process according to any one of the preceding claims wherein the tube is induction heated to a temperature selected to allow normalisation of the steel during cooling.
5.
A process according to claim 4 wherein the tube is induction heated to a temperature selected, for the carbon content of the steel, to be at or just above the A3 line on the iron-carbon equilibrium diagram.
6.
A process according to claim 5 wherein the equivalent carbon content of the steel is approximately 0.7% by weight and the tube is induction heated to a temperature in the range 7900C to 8200C.
7.
A process according to any one of the preceding claims wherein the tube is drawn through the die on a draw bench and induction heating is applied to the tube as it enters the die.
8.
A process according to any one of the preceding claims when used to produce drawn tube for use in the production of extension drill steel.
9.
A process according to claim 8 wherein hot rolled seamless steel tube of 73mm OD and 14mm wall thickness is drawn down in multiple stages to produce steel tube of 39,2mm OD and 15mm ID.
10.
A process according to claim 8 wherein hot rolled seamless steel tube of 73mm OD and 14mm wall thickness is drawn down in multiple stages to produce steel tube of 32mm OD and 9mm ID.
11.
An apparatus for use in a steel tube drawing process in which a hot rolled seamless steel tube of relatively large OD and wall thickness is drawn down to a smaller OD and wall thickness, the apparatus comprising a drawing die through which the tube can be drawn, a mandrel over which the steel tube is located and which extends into the drawing die, an induction heater located adjacent an input side of the drawing die and which is operable to heat the tube as it enters the die, and means for drawing the tube over the mandrel and through the die, thereby to draw the tube down to a smaller OD and wall thickness.
PCT/IB2008/054079 2007-10-11 2008-10-06 Steel tube drawing process and apparatus WO2009047688A2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
ZA200708693 2007-10-11
ZA2007/08693 2007-10-11

Publications (2)

Publication Number Publication Date
WO2009047688A2 true WO2009047688A2 (en) 2009-04-16
WO2009047688A3 WO2009047688A3 (en) 2009-08-06

Family

ID=40549674

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/IB2008/054079 WO2009047688A2 (en) 2007-10-11 2008-10-06 Steel tube drawing process and apparatus

Country Status (1)

Country Link
WO (1) WO2009047688A2 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101829694A (en) * 2010-05-28 2010-09-15 沈阳和世泰通用钛业有限公司 Production method of TC4 drawing pipes
CN102133582A (en) * 2011-05-04 2011-07-27 北京科技大学 Mold/non-mode combined pulling process and device
CN102172655A (en) * 2011-01-27 2011-09-07 江苏龙城洪力液压设备有限公司 Steel pipe online head manufacturing device
CN103252348A (en) * 2013-05-09 2013-08-21 新兴铸管股份有限公司 Hot rolling forming method of stainless steel seamless steel tube
WO2014169366A3 (en) * 2013-08-23 2014-12-31 Vallourec Tubos Do Brasil S.A. Process for producing a multilayer pipe having a metallurgical bond by drawing, and multilayer pipe produced by this process
DE102016111591A1 (en) * 2016-06-24 2017-12-28 Sandvik Materials Technology Deutschland Gmbh A method of forming a ferromagnetic FeCrAl alloy billet into a pipe
DE102018133034A1 (en) * 2018-12-20 2020-06-25 Benteler Steel/Tube Gmbh Process for producing a pipe and pipe product

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB691887A (en) * 1951-05-22 1953-05-20 Rheinische Rohrenwerke Ag Improvements in tube-drawing benches

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1294407A1 (en) * 1985-01-08 1987-03-07 Нижнеднепровский Трубопрокатный Завод Им.Карла Либкнехта Method of drawing tubes on short mandrel
SU1493345A1 (en) * 1987-05-15 1989-07-15 Кременчугский Филиал Харьковского Политехнического Института Им.В.И.Ленина Apparatus for drawing pipes

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB691887A (en) * 1951-05-22 1953-05-20 Rheinische Rohrenwerke Ag Improvements in tube-drawing benches

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
DATABASE WPI Thomson Scientific, London, GB; AN 1987-276420 XP002529989 -& SU 1 294 407 A (NIZHNEDNEPROVSKIJ TRUBOPROKATN) 7 March 1987 (1987-03-07) *
DATABASE WPI Thomson Scientific, London, GB; AN 1990-130879 XP002529990 -& SU 1 493 345 A (KREMENCHUGSK KH POLT) 15 July 1989 (1989-07-15) *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101829694A (en) * 2010-05-28 2010-09-15 沈阳和世泰通用钛业有限公司 Production method of TC4 drawing pipes
CN102172655A (en) * 2011-01-27 2011-09-07 江苏龙城洪力液压设备有限公司 Steel pipe online head manufacturing device
CN102133582A (en) * 2011-05-04 2011-07-27 北京科技大学 Mold/non-mode combined pulling process and device
CN103252348A (en) * 2013-05-09 2013-08-21 新兴铸管股份有限公司 Hot rolling forming method of stainless steel seamless steel tube
WO2014169366A3 (en) * 2013-08-23 2014-12-31 Vallourec Tubos Do Brasil S.A. Process for producing a multilayer pipe having a metallurgical bond by drawing, and multilayer pipe produced by this process
US10941885B2 (en) 2013-08-23 2021-03-09 Vallourec Soluções Tubulares Do Brasil S.A. Process for producing a multilayer pipe having a metallurgical bond by drawing, and multilayer pipe produced by this process
DE102016111591A1 (en) * 2016-06-24 2017-12-28 Sandvik Materials Technology Deutschland Gmbh A method of forming a ferromagnetic FeCrAl alloy billet into a pipe
WO2017220757A1 (en) * 2016-06-24 2017-12-28 Sandvik Materials Technology Deutschland Gmbh A method for forming a hollow of a ferritic fecral alloy into a tube
CN109328120A (en) * 2016-06-24 2019-02-12 山特维克原料技术德国公开股份有限公司 Method for the ducted body of ferrite FeCrAl alloy to be shaped to pipe
US10882090B2 (en) 2016-06-24 2021-01-05 Sandvik Materials Technology Deutschland Gmbh Method for forming a hollow of a ferritic FeCrAl alloy into a tube
DE102018133034A1 (en) * 2018-12-20 2020-06-25 Benteler Steel/Tube Gmbh Process for producing a pipe and pipe product

Also Published As

Publication number Publication date
WO2009047688A3 (en) 2009-08-06

Similar Documents

Publication Publication Date Title
WO2009047688A2 (en) Steel tube drawing process and apparatus
CN1127383C (en) Seamless steel pipe manufacturing method and equipment
WO2020253550A1 (en) Novel hollow shaft manufacturing method
US20060070688A1 (en) Alpha-beta titanium alloy tubes and methods of flowforming the same
CA2299499A1 (en) Method for producing steel rolling bearing rings
CN112475806B (en) QCr0.8 alloy large-size conical-cylindrical ring forming process
JP4871209B2 (en) Metal material forging method and forging apparatus
WO1996012574A1 (en) Method of manufacturing seamless steel pipes and manufacturing equipment therefor
EP3812056A1 (en) Medium/small-diameter thick-walled metal tube and preparation method therefor
CN101912880A (en) Novel planetary tube rolling mill and planetary rolling method for copper alloy tubes
SK134297A3 (en) Method of manufacturing hot-worked elongated products, in particular bar or pipe, from high-alloy or hypereutectoid steel
DE102008036237B3 (en) Method and plant for inline forming, tempering and straightening rod-shaped metal parts
CN109092898B (en) Plastic processing method for long high-performance magnesium alloy seamless pipe
US3698070A (en) Method of fabricating seamless steel pipes
WO2011030273A2 (en) Plant for rolling tubes
JP5615938B2 (en) Tube rolling plant
CN105057478A (en) Method for producing variable-thickness variable-diameter steel pipes
JPS6348603B2 (en)
US7181847B2 (en) Process for manufacturing a cylindrical hollow body and hollow body made thereby
EP3106240A1 (en) Rotary extrusion machine
JP4182556B2 (en) Seamless steel pipe manufacturing method
RU2110600C1 (en) Method for producing articles from zirconium alloys
US10040108B2 (en) Tubular structure support with variable dimensions and mechanical properties
CN112894276B (en) Deep blind hole cylindrical component and manufacturing method thereof
RU2052305C1 (en) Method for manufacture of variable-section cold-deformed pipes

Legal Events

Date Code Title Description
NENP Non-entry into the national phase in:

Ref country code: DE

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 08807891

Country of ref document: EP

Kind code of ref document: A2

122 Ep: pct application non-entry in european phase

Ref document number: 08807891

Country of ref document: EP

Kind code of ref document: A2