US3698070A - Method of fabricating seamless steel pipes - Google Patents

Method of fabricating seamless steel pipes Download PDF

Info

Publication number
US3698070A
US3698070A US75273A US3698070DA US3698070A US 3698070 A US3698070 A US 3698070A US 75273 A US75273 A US 75273A US 3698070D A US3698070D A US 3698070DA US 3698070 A US3698070 A US 3698070A
Authority
US
United States
Prior art keywords
billets
heating
tubes
blanks
seamless
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US75273A
Inventor
Jacques Sejournet
Jose Ignacio Martinez Garin
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cefilac SA
Original Assignee
Cefilac SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cefilac SA filed Critical Cefilac SA
Application granted granted Critical
Publication of US3698070A publication Critical patent/US3698070A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C23/00Extruding metal; Impact extrusion
    • B21C23/02Making uncoated products
    • B21C23/04Making uncoated products by direct extrusion
    • B21C23/08Making wire, bars, tubes
    • B21C23/085Making tubes
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10STECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10S29/00Metal working
    • Y10S29/047Extruding with other step
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T29/00Metal working
    • Y10T29/49Method of mechanical manufacture
    • Y10T29/4998Combined manufacture including applying or shaping of fluent material
    • Y10T29/49988Metal casting
    • Y10T29/49989Followed by cutting or removing material

Definitions

  • seamless steel tubing was generally produced by breaking down an ingot through hot working into a bloom and then in subsequent operations reducing the bloom ultimately into a round billet which was then directed through various piercing mills, plug rolling mills, reeling machines and sizing machines. Depending on the size of the end product some operations were repeated, e.g., two piercing mills, and there were many intermediate heating operations as well as other operations such as rotary. rolling mills which were employed.
  • One solution included cutting the cast bar into billets, heating the billets and then forming round blanks which are made hollow by hot piercing, elongating the blanks on known equipment to reduce mainly the outside diameter and to a lesser extent the wall thickness, cutting the hollow product in several parts which are rolled on mandrel mills to reduce mainly wall thickness and to a lesser extent the outside diameter, and then sizing the outside diameter on a stretch reducing mill.
  • Various push benches, rolling mills and extrusion presses were employed to obtain the product for the mandrel mills.v
  • Our invention avoids all the drawbacks of the previously tried processes for producing seamless tubing and results in a high quality product manufactured with a minimum of processing steps and with a maximum yield of metal from the cast bar to the finish product. Therefore, not only is a cost savings realized by the use of the continuous cast bar, but the cost savings is substantially increased by the high metal yield, good quality product and the elimination of the many processing steps employed heretofore.
  • our process includes continuous casting a bar, cutting the bar into billets, heating the billets, upsetting and piercing the billets into hollow circular blanks, hot extruding the blanks into tubes and reducing the diameter of the tubes on a stretch reducing mill where necessary.
  • Our invention permits the utilization of all steels which can be continuously cast for manufacture into seamless steel tubes having diameters greater than .8 inches and wall thicknesses above .120 inches. It is understood' that continuous casting produces bars of square or rectangular cross-section and as used herein, rectangular cross-section is employed to cover both cross-sections.
  • the steel is continuous cast into rectangular bars which are cut into billets. This cutting can be done by flame cutting on the casting machine with the length corresponding to the weight to be extruded.
  • the billets are then heated to a temperature of about l830 to 2280 F as is appropriate for the particular steel type and then descaled.
  • the billets can be immediately reheated from the casting step, thereby retaining the casting heat and minimizing the amount of additional heat input from the reheating operation.
  • the reheated billets are then inserted into a round container of a piercing press where they are first upset and then pierced and severed from the piercing discard.
  • the upsetting-piercing operations are advantageously carried out with the aid of a glass-like lubricant.
  • the resultant blank is cylindrical, thatis, circular in cross-section and hollow.
  • the blanks can then be sent to the extrusion press without intermediate heating, provided the extrusion press is of sufficient power to handle them.
  • the larger the blanks the slower the cooling rate, and this, along with efficient handling techniques and proper positioning of equipment, further aids in eliminating any intermediate heating.
  • the blanks are hot extruded into seamless tubes of relatively large diameter.
  • the product from the extrusion press is sent into a stretch reducing mill to reduce the diameter and adjust the wall thickness to the precise desired size.
  • the temperature of the tube running into the stretch reducing mill may be maintained and kept as a constant value by employing an in line furnace at the exit end of the extrusion press.
  • Our process therefore, takes advantage of the upsetting, piercing and extrusion operation to admit as starting material a rectangular billet with an internal cast structure. It can be seen this process is conducted with a single reheat step and since there is a minim um of processing steps, the cast bar to seamless tube metal yield is high. In addition, the metallurgical properties are excellent and the surface condition is improved because of the elimination of handling and various mechanical processing steps.
  • the modern industrial extrusion press is capable of handling heavy blanks and the hourly output compares advantageously with the various large tubing mills, as well as welded tubing in stallations.
  • the hourly output from the upsetting piercing press and the extrusion press may be high enough and tube sizing critical enough that it may be advisable to operate two stretch reducing mills in parallel downstream of the extrusion press.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Forging (AREA)
  • Extrusion Of Metal (AREA)
  • Metal Extraction Processes (AREA)
  • Heat Treatment Of Steel (AREA)
  • Continuous Casting (AREA)

Abstract

A process for the manufacture of seamless steel tubing comprising continuous casting rectangular cross-section bars, cutting the bars into billets, heating the billets, upsetting and piercing the billets into hollow circular cross-sectioned blanks, hot extruding the blanks into seamless tubes and stretch reducing the seamless tubes where necessary.

Description

United States Patent Sejournet et a]. 51 Oct. 17, 1972 METHOD OF FABRICATING 2,083,466 6/1937 McLay ..29/527.6
SEAMLESS STEEL PIPES 3,365,791 1/1968 Olsson ..29/527.6 1 2,107,510 2/1938 Skinner et al ..29/527.5 [72] 93R?" 3: 313 2,218,458 10/1940 Wright ..29/527.7 S g 3,581,384 6/1971 Petersen et a1. ..29/527.7 3,038,250 6/1962 Porterfield ..164/76 x [73] Assignee: Cefilac, Paris, France Primary Examiner-John F. Campbell [22] Sept 1970 Assistant Examiner-Donald C. Reiley, Ill [2]] Appl. No.: 75,273 Attorney-Webb, Burden, Robinson & Webb [57] ABSTRACT [30] Foreign Application Priority Data A process for the manufacture of seamless steel tub1ng Sept. 25, France comprising continuous casting rectangular cross-section bars, cutting the bars into billets, heating the bil- Cl I 47, 164/76, lets, upsetting and piercing the billets into hollow cir- 164/82 I cular crosssectioned blanks hot extrudingthe blanks [51] Int. Cl. ..B23k 19/00 into seamless tubes and stretch reducing the seamless [5 8] Field of Search ..29/527.5, 527.6, tubes where necessary. DIG.47; 164/7 6,82,270 [56] References Cited 7 Claims, No Drawings UNITED STATES PATENTS I V 3,636,605 l/l972 Vitcha et a1. 29/5275 METHOD OF FABRICATING SEAMLESS STEEL PIPES BACKGROUND OF THE INVENTION Our invention is directed to an improved process for obtaining seamless steel tubing and, more particularly, a process for converting continuous cast bars into seamless steel tubing of substantial length and with a minimum number of processing steps.
Prior to the substantial developments in continuous casting, seamless steel tubing was generally produced by breaking down an ingot through hot working into a bloom and then in subsequent operations reducing the bloom ultimately into a round billet which was then directed through various piercing mills, plug rolling mills, reeling machines and sizing machines. Depending on the size of the end product some operations were repeated, e.g., two piercing mills, and there were many intermediate heating operations as well as other operations such as rotary. rolling mills which were employed.
With the advent of continuous casting, a rectangular cast bar of generally 4 to 12 inches in cross-section is produced. Because of the cast structure and rectangular cross-section and the previously known operations which employed a wrought structure and a rounded cross-section, it was reasonable to produce seamless tubing by breaking down the cast bar into a round bar of wrought structure through rolling operations and proceed with the operations employed prior to continuous casting.
Attempts have been made to employ the cast bar as a starting material and eliminate some of the conventional processing steps. One solution included cutting the cast bar into billets, heating the billets and then forming round blanks which are made hollow by hot piercing, elongating the blanks on known equipment to reduce mainly the outside diameter and to a lesser extent the wall thickness, cutting the hollow product in several parts which are rolled on mandrel mills to reduce mainly wall thickness and to a lesser extent the outside diameter, and then sizing the outside diameter on a stretch reducing mill. Various push benches, rolling mills and extrusion presses were employed to obtain the product for the mandrel mills.v
Such a solution with its many operational steps results in cummulative problems. Tool wear occurs in each operation and since the requisite intermediate beatings and descalings increase as the number of mechanical processing steps increase, the metal yield is very low. These cummulative problems raise the cost of manufacture to the point that any gain obtained by the continuous casting is lost in the modified processing. Of equal importance is that the quality of the products suffers since the more operational steps, the more chance for internal and external damage to the product.
Our invention avoids all the drawbacks of the previously tried processes for producing seamless tubing and results in a high quality product manufactured with a minimum of processing steps and with a maximum yield of metal from the cast bar to the finish product. Therefore, not only is a cost savings realized by the use of the continuous cast bar, but the cost savings is substantially increased by the high metal yield, good quality product and the elimination of the many processing steps employed heretofore.
Briefly stated, our process includes continuous casting a bar, cutting the bar into billets, heating the billets, upsetting and piercing the billets into hollow circular blanks, hot extruding the blanks into tubes and reducing the diameter of the tubes on a stretch reducing mill where necessary.
Our invention permits the utilization of all steels which can be continuously cast for manufacture into seamless steel tubes having diameters greater than .8 inches and wall thicknesses above .120 inches. It is understood' that continuous casting produces bars of square or rectangular cross-section and as used herein, rectangular cross-section is employed to cover both cross-sections.
Initially the steel is continuous cast into rectangular bars which are cut into billets. This cutting can be done by flame cutting on the casting machine with the length corresponding to the weight to be extruded. i
The billets are then heated to a temperature of about l830 to 2280 F as is appropriate for the particular steel type and then descaled. The billets can be immediately reheated from the casting step, thereby retaining the casting heat and minimizing the amount of additional heat input from the reheating operation.
The reheated billets are then inserted into a round container of a piercing press where they are first upset and then pierced and severed from the piercing discard. The upsetting-piercing operations are advantageously carried out with the aid of a glass-like lubricant. The resultant blank is cylindrical, thatis, circular in cross-section and hollow.
The blanks can then be sent to the extrusion press without intermediate heating, provided the extrusion press is of sufficient power to handle them. Of course, the larger the blanks, the slower the cooling rate, and this, along with efficient handling techniques and proper positioning of equipment, further aids in eliminating any intermediate heating. The blanks are hot extruded into seamless tubes of relatively large diameter.
Where the desired diameter of the product is small, the product from the extrusion press is sent into a stretch reducing mill to reduce the diameter and adjust the wall thickness to the precise desired size. The temperature of the tube running into the stretch reducing mill may be maintained and kept as a constant value by employing an in line furnace at the exit end of the extrusion press. I
Where the long tube exiting the extrusion press has the desired diameter for the final product the stretch reducing mill is not needed.
Our process, therefore, takes advantage of the upsetting, piercing and extrusion operation to admit as starting material a rectangular billet with an internal cast structure. It can be seen this process is conducted with a single reheat step and since there is a minim um of processing steps, the cast bar to seamless tube metal yield is high. In addition, the metallurgical properties are excellent and the surface condition is improved because of the elimination of handling and various mechanical processing steps. The modern industrial extrusion press is capable of handling heavy blanks and the hourly output compares advantageously with the various large tubing mills, as well as welded tubing in stallations.
In fact, the hourly output from the upsetting piercing press and the extrusion press may be high enough and tube sizing critical enough that it may be advisable to operate two stretch reducing mills in parallel downstream of the extrusion press.
Our process can be applied to all the various steels produced by continuous casting and for this reason and all the reasons set forth heretofore, it will be recognized that an improved seamless tube can be manufactured at a cost rate below that achieved heretofore.
We claim:
1. A process for manufacturing seamless tubes in all grades of steel from cross-sectionally rectangular bars I having a cast structure and not a wrought structure,
2. The process of claim 1 wherein the transforming of the billet into the circular cross-sectioned and hollow blanks includes initially upsetting and then piercmg.
3. The process of claim 1 including after hot extruding the steps of stretch reducing the seamless tubes on a stretch reducing mill to reduce the diameter of the tubes and adjust the wall thickness to obtain precision tolerances of the tubes.
4. The process of claim 1 wherein the cutting step A and the heating step B taken place immediately after the continuous casting operation, so that the majority of the casting heat is retained and the heating step B is minimized.
5. The process of claim 1 wherein a glass lubricant is employed in at least one of the transforming step C and the hot extruding step D.
6. The process of claim 1 including the step of heating the hollow blanks before hot extruding.
7. The process of claim 3 including the step of passing the seamless tube through a heating furnace before stretch reducing.
UNITED STATES PATENT OFFICE CERTIFICATE OF CORRECTION Patent No. g bog 7a Dated October 17,1972
Inventor(s) Jacques Sejournet et a1.
It is eertified that error appears in the above-identified patent and that said Letters Patent are hereby corrected asshown below:
Under item 30 the priority date should read --Sept. 25, l969--. Y v v Signed and sealed this 1st day of May 1973.
(SEAL) Attest:
EDi-JARD M. FLETCHER, JR. ROBERT GOTTSCHALK Attesting Officer Commissioner of Patents USCOMM-DC 60376-P69 v Q IJ.S. GOVERNMENT PRINTING OFFjCE: [969 0-356-334

Claims (7)

1. A process for manufacturing seamless tubes in all grades of steel from cross-sectionally rectangular bars having a cast structure and not a wrought structure, which bars issue from a continuous casting installation and have not been subjected to any intermediate metalworking steps, said process comprising in sequence: A. cutting the bars into billets of a desired weight; B. heating the billets to deformation temperature; C. transforming the billets into circular cross-sectioned and clear through hollow blanks in an upsetting-piercing press; and D. hot extruding the blanks into seamless tubes of desired dimension.
2. The process of claim 1 wherein the transforming of the billet into the circular cross-sectioned and hollow blanks includes initially upsetting and then piercing.
3. The process of claim 1 including after hot extruding the steps of stretch reducing the seamless tubes on a stretch reducing mill to reduce the diameter of the tubes and adjust the wall thickness to obtain precision tolerances of the tubes.
4. The process of claim 1 wherein the cutting step A and the heating step B taken place immediately after the continuous casting operation, so that the majority of the casting heat is retained and the heating step B is minimized.
5. The process of claim 1 wherein a glass lubricant is employed in at least one of the transforming step C and the hot extruding step D.
6. The process of claim 1 including the step of heating the hollow blanks before hot extruding.
7. The process of claim 3 including the step of passing the seamless tube through a heating furnace before stretch reducing.
US75273A 1969-09-25 1970-09-24 Method of fabricating seamless steel pipes Expired - Lifetime US3698070A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR6932680A FR2058777A5 (en) 1969-09-25 1969-09-25

Publications (1)

Publication Number Publication Date
US3698070A true US3698070A (en) 1972-10-17

Family

ID=9040588

Family Applications (1)

Application Number Title Priority Date Filing Date
US75273A Expired - Lifetime US3698070A (en) 1969-09-25 1970-09-24 Method of fabricating seamless steel pipes

Country Status (12)

Country Link
US (1) US3698070A (en)
AT (1) AT308498B (en)
AU (1) AU2021370A (en)
CA (1) CA932293A (en)
DE (1) DE2044815B2 (en)
ES (1) ES383918A1 (en)
FR (1) FR2058777A5 (en)
GB (1) GB1318607A (en)
LU (1) LU61742A1 (en)
RO (1) RO56792A (en)
SE (1) SE380189B (en)
ZA (1) ZA706157B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4043023A (en) * 1975-05-13 1977-08-23 Lombard Daniel L Method for making seamless pipe
US4899712A (en) * 1983-06-21 1990-02-13 Gerard De Bruyn Fuel injection rail manufacturing means and process
US4991419A (en) * 1988-11-18 1991-02-12 Sumitomo Metal Industries, Ltd. Method of manufacturing seamless tube formed of titanium material
US6164517A (en) * 1998-10-19 2000-12-26 Sun Kwang Brazing Filler Metal Co., Ltd. Seamless, ring-shaped brazing material and method for producing same
CN102371288A (en) * 2010-08-27 2012-03-14 北京有色金属研究总院 Preparation method of high-precision and high-strength titanium alloy seamless tube
US10118208B2 (en) 2007-03-14 2018-11-06 Shinko Metal Products Co., Ltd. Hollow spring utilizing seamless steel pipe
CN113976658A (en) * 2021-10-22 2022-01-28 西部金属材料股份有限公司 Preparation method of oversized titanium alloy pipe

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19520833C2 (en) * 1994-06-16 1998-06-04 Mannesmann Ag Process for the production of a seamless hot-worked pipe

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2083466A (en) * 1935-04-05 1937-06-08 Wellman Seaver Rolling Mill Co Manufacture of tubes
US2107510A (en) * 1936-05-23 1938-02-08 Chame D Skinner Method of manufacturing extruded articles
US2218458A (en) * 1939-10-07 1940-10-15 Nat Tube Co Making of seamless steel tubes
US3038250A (en) * 1958-07-07 1962-06-12 Coors Porcelain Co Method of continuously casting strips from molten metal and making slugs therefrom
US3365791A (en) * 1964-10-15 1968-01-30 Olsson Ag Erik Metal casting and rolling
US3581384A (en) * 1967-06-28 1971-06-01 Mannesmann Ag Method of producing seamless metal tubes
US3636605A (en) * 1967-10-24 1972-01-25 Trw Inc Method of making forged valves from cast slugs

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2083466A (en) * 1935-04-05 1937-06-08 Wellman Seaver Rolling Mill Co Manufacture of tubes
US2107510A (en) * 1936-05-23 1938-02-08 Chame D Skinner Method of manufacturing extruded articles
US2218458A (en) * 1939-10-07 1940-10-15 Nat Tube Co Making of seamless steel tubes
US3038250A (en) * 1958-07-07 1962-06-12 Coors Porcelain Co Method of continuously casting strips from molten metal and making slugs therefrom
US3365791A (en) * 1964-10-15 1968-01-30 Olsson Ag Erik Metal casting and rolling
US3581384A (en) * 1967-06-28 1971-06-01 Mannesmann Ag Method of producing seamless metal tubes
US3636605A (en) * 1967-10-24 1972-01-25 Trw Inc Method of making forged valves from cast slugs

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4043023A (en) * 1975-05-13 1977-08-23 Lombard Daniel L Method for making seamless pipe
US4899712A (en) * 1983-06-21 1990-02-13 Gerard De Bruyn Fuel injection rail manufacturing means and process
US4991419A (en) * 1988-11-18 1991-02-12 Sumitomo Metal Industries, Ltd. Method of manufacturing seamless tube formed of titanium material
US6164517A (en) * 1998-10-19 2000-12-26 Sun Kwang Brazing Filler Metal Co., Ltd. Seamless, ring-shaped brazing material and method for producing same
US10118208B2 (en) 2007-03-14 2018-11-06 Shinko Metal Products Co., Ltd. Hollow spring utilizing seamless steel pipe
EP2703097B1 (en) * 2007-03-14 2019-05-01 Shinko Metal Products Co., Ltd. Process for manufacturing seamless steel pipe
CN102371288A (en) * 2010-08-27 2012-03-14 北京有色金属研究总院 Preparation method of high-precision and high-strength titanium alloy seamless tube
CN113976658A (en) * 2021-10-22 2022-01-28 西部金属材料股份有限公司 Preparation method of oversized titanium alloy pipe

Also Published As

Publication number Publication date
AU2021370A (en) 1972-03-23
ZA706157B (en) 1971-06-30
SE380189B (en) 1975-11-03
AT308498B (en) 1973-07-10
ES383918A1 (en) 1973-03-01
LU61742A1 (en) 1971-01-18
DE2044815B2 (en) 1973-04-26
DE2044815A1 (en) 1971-04-08
RO56792A (en) 1974-06-01
CA932293A (en) 1973-08-21
GB1318607A (en) 1973-05-31
FR2058777A5 (en) 1971-05-28

Similar Documents

Publication Publication Date Title
JP4633122B2 (en) Method for producing seamless hot-finished steel pipe and apparatus for carrying out this method
DE102013219310A1 (en) Process for hot forging a seamless hollow body made of material that is difficult to form, in particular of steel
US3698070A (en) Method of fabricating seamless steel pipes
US6089066A (en) Process for the production of seamless tubes
US4043023A (en) Method for making seamless pipe
JP3853214B2 (en) Method and related apparatus for manufacturing industrial tubes or shaped bars from metal
RU2036031C1 (en) Method for producing seamless hot rolled tubes with outer diameter less than 170 mm
CN107790493A (en) A kind of milling method of stud
US3581384A (en) Method of producing seamless metal tubes
ITMI970338A1 (en) METAL BAR PRODUCTION PROCESS
WO2011030273A2 (en) Plant for rolling tubes
EP2521626B1 (en) Tube rolling plant and method for rolling seamless tubes
GB2128121A (en) Producing seamless pipes by rolling
JP4182556B2 (en) Seamless steel pipe manufacturing method
US2032917A (en) Apparatus for drawing
US1983934A (en) Method and apparatus for making seamless tubes
US1789721A (en) Production of seamless tubes
US2819790A (en) Process for the manufacture of seamless tubes by the thrust bench method from open and perforated blanks
SU829284A1 (en) Production line for producing hollow die rolled section
CN114260314B (en) Manufacturing method of titanium alloy seamless tube blank with diameter-thickness ratio larger than 20
DE102017105582A1 (en) Method and plant for producing a seamless hot-rolled tube and rolled centrifugally cast tube and the use of a hollow block produced by centrifugal casting
US1970570A (en) Method and apparatus for tube manufacture
GB2099346A (en) Tube rolling mill
SU1726080A1 (en) Roll manufacturing method
SU829286A1 (en) Method of producing bimetallic hollow and solid semifabricates