CN101824997A - Arrangement method for double-uphill air return of mining areas of mine - Google Patents

Arrangement method for double-uphill air return of mining areas of mine Download PDF

Info

Publication number
CN101824997A
CN101824997A CN 201010131926 CN201010131926A CN101824997A CN 101824997 A CN101824997 A CN 101824997A CN 201010131926 CN201010131926 CN 201010131926 CN 201010131926 A CN201010131926 A CN 201010131926A CN 101824997 A CN101824997 A CN 101824997A
Authority
CN
China
Prior art keywords
uphill
coal
return
air
mine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201010131926
Other languages
Chinese (zh)
Inventor
莫技
张传恕
田昌栋
仉学利
巩庆刚
王涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201010131926 priority Critical patent/CN101824997A/en
Publication of CN101824997A publication Critical patent/CN101824997A/en
Pending legal-status Critical Current

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The invention discloses an arrangement method for the double-uphill air return of the mining areas of a mine. In the arrangement method, two groups of a front group coal mining area and a back group coal mining area which have a close distance in a mining level are firstly provided with a main haulage roadway in a united way, the front group coal mining area and the back group coal mining area are respectively provided with a coal-transporting uphill roadway, a track uphill roadway and an air-return uphill roadway, a crossdrift is dug between the air-return uphill roadways of the front group coal mining area and the back group coal mining area, and the air-return uphill roadways of the two mining areas are mutually communicated. Under the condition that the total exploitation quantity of the roadways of the mining areas of the mine is not changed basically, the invention solves the problem of insufficient ventilation quantity, lowers the temperature of the underground mining areas effectively and improves the underground working environment.

Description

A kind of method for arranging of double-uphill air return of mining areas of mine
Technical field
The present invention relates to the down-hole coal excavation arrangement system, relate in particular to the method for arranging of return aircourse.
Background technology
At present when coal mining multilayer coal, situation is deposited in tax according to the coal seam, usually preceding group of coal exploiting fields that two groups of distances is close and group coal exploiting field, back are united and are arranged a main haulage roadway in a mining level, every layer of coal arranged the exploiting field, and each exploiting field is arranged a fortune coal bord-up, a ginney tunnel and a return air bord-up at least.The coal that is positioned at the upper strata is called preceding group coal, and the coal that is positioned at lower floor is called back group coal.The group coal also can be adopted earlier and afterwards organize coal before also can adopting earlier, also can exploit simultaneously by forward and backward group of coal.
Along with the deepening of the mine degree of depth, ground temperature increases, and the section of original return aircourse seems too small, and flowing resistance is excessive, causes the ventilation deficiency, makes temperature rising in the exploiting field, and operating environment is poor, and the staff easily produces fatigue, influences ordinary production.If strengthen the problem that return air bord-up section solves the ventilation deficiency, will increase the construction volume in tunnel greatly.
Summary of the invention
The objective of the invention is provides a kind of method for arranging of double-uphill air return for solving the problem of above-mentioned mining areas of mine ventilation deficiency.
A kind of method for arranging of double-uphill air return of mining areas of mine: at first in a mining level, main haulage roadway of layout is united with group coal exploiting field, back in two groups of preceding group of close coal exploiting fields of distance, preceding group coal exploiting field and group coal exploiting field, back are respectively arranged a fortune coal bord-up, a ginney tunnel and a return air bord-up respectively, it is characterized in that, with crossdrift of digging between the return air bord-up in preceding group of coal exploiting field and group coal exploiting field, back, two exploiting field return air bord-ups are connected mutually.
When organizing coal before the exploitation, make return aircourse, two exploiting fields return air simultaneously.When exploiting back group coal, the return air bord-up while return air of group coal before also can using.Therefore, exploit preceding group coal or back group coal two return aircoursies while return air arranged side by side are all arranged.
Advantage of the present invention is, under the situation of developing amount always constant substantially (only increasing a developing amount that connects crossdrift), solved the problem of ventilation deficiency in the mining areas of mine tunnel, and the temperature in exploiting field, down-hole is effectively reduced, and improved the underground work environment.
Description of drawings
Fig. 1 is that section of the present invention is arranged schematic diagram, do not draw among the figure fortune coal bord-up and ginney tunnel.
Among the figure: 1-main haulage roadway, 2, the 3-return aircourse, 4-crossdrift.
The specific embodiment
As shown in Figure 1, the present invention at first unites main haulage roadway 1 of layout with two groups of preceding group of close coal exploiting fields of distance with group coal exploiting field, back in a mining level, before group coal exploiting field and group coal exploiting field, back each arrange a fortune coal bord-up, ginney tunnel and return air bord-up 2 and 3 respectively, with crossdrift 4 of digging between return air bord-up 2 and 3, two exploiting field return air bord-ups are connected mutually again.
When organizing coal before the exploitation, make return aircourse, two exploiting fields 2 and 3 return air simultaneously.When exploiting back group coal, 2 while of the return air bord-up return air of group coal before also can using.Therefore, exploit preceding group coal or back group coal two return aircoursies while return air arranged side by side are all arranged.
The bord-up of indication among the present invention, the appellation of the mining type that refers to go up a hill is called go-downhill roadway when going down the hill mining type in the colliery, and this is that those skilled in the art know altogether.So " double-uphill air return " of appellation of the present invention also can be " two go down the hill return air ".
In the technical scheme of the present invention, only described the situation of the preceding group of first exploitation coal, when the group coal of exploitation back, method for arranging as hereinbefore.

Claims (1)

1. the method for arranging of a double-uphill air return of mining areas of mine, it at first unites main haulage roadway of layout with two groups of preceding group of close coal exploiting fields of distance with group coal exploiting field, back in a mining level, preceding group coal exploiting field and group coal exploiting field, back are respectively arranged a fortune coal bord-up, a ginney tunnel and a return air bord-up respectively, it is characterized in that, with crossdrift of digging between the return air bord-up in preceding group of coal exploiting field and group coal exploiting field, back, two exploiting field return air bord-ups are connected mutually.
CN 201010131926 2010-03-25 2010-03-25 Arrangement method for double-uphill air return of mining areas of mine Pending CN101824997A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010131926 CN101824997A (en) 2010-03-25 2010-03-25 Arrangement method for double-uphill air return of mining areas of mine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010131926 CN101824997A (en) 2010-03-25 2010-03-25 Arrangement method for double-uphill air return of mining areas of mine

Publications (1)

Publication Number Publication Date
CN101824997A true CN101824997A (en) 2010-09-08

Family

ID=42689135

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010131926 Pending CN101824997A (en) 2010-03-25 2010-03-25 Arrangement method for double-uphill air return of mining areas of mine

Country Status (1)

Country Link
CN (1) CN101824997A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103362508A (en) * 2013-07-31 2013-10-23 六盘水师范学院 Mine development method
CN103953378A (en) * 2014-04-29 2014-07-30 中国矿业大学(北京) High temperature mine ventilation method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3712677A (en) * 1971-03-10 1973-01-23 Atlantic Richfield Co Mining method
CN1165237A (en) * 1997-04-24 1997-11-19 张中科 Boundary go up (down) hill along ampty tunnelling type mining method
US6796616B2 (en) * 2002-06-26 2004-09-28 Jeffrey K. Harman Mining system
CN1676877A (en) * 2005-04-26 2005-10-05 淮南矿业(集团)有限责任公司 Adjacent coal face alternating layout coal-mining method
CN201103402Y (en) * 2007-12-04 2008-08-20 牛玉泉 Mine down-hole tunnel ventilating device
CN100494627C (en) * 2005-03-03 2009-06-03 开滦(集团)有限责任公司 Coal-mining method of high-dipping thick seam

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3712677A (en) * 1971-03-10 1973-01-23 Atlantic Richfield Co Mining method
CN1165237A (en) * 1997-04-24 1997-11-19 张中科 Boundary go up (down) hill along ampty tunnelling type mining method
US6796616B2 (en) * 2002-06-26 2004-09-28 Jeffrey K. Harman Mining system
CN100494627C (en) * 2005-03-03 2009-06-03 开滦(集团)有限责任公司 Coal-mining method of high-dipping thick seam
CN1676877A (en) * 2005-04-26 2005-10-05 淮南矿业(集团)有限责任公司 Adjacent coal face alternating layout coal-mining method
CN201103402Y (en) * 2007-12-04 2008-08-20 牛玉泉 Mine down-hole tunnel ventilating device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103362508A (en) * 2013-07-31 2013-10-23 六盘水师范学院 Mine development method
CN103362508B (en) * 2013-07-31 2015-04-15 六盘水师范学院 Mine development method
CN103953378A (en) * 2014-04-29 2014-07-30 中国矿业大学(北京) High temperature mine ventilation method
CN103953378B (en) * 2014-04-29 2016-02-03 中国矿业大学(北京) A kind of high-temperature mine method of ventilation

Similar Documents

Publication Publication Date Title
CN103628877B (en) A kind of multilayer gentle dip is thin-in thick mineral deposit filling mining method
CN104100270B (en) A kind of low-angle dip mineral ore Truckless mining method
CN104060991B (en) A kind of for ramp upward ut and fill stoping in the arteries and veins of Gently inclined thin vein
CN107762515B (en) A kind of gently inclined medium thick orebody panel filling mining method
CN103758560B (en) A kind of multiple topping packet zone mash gas harnessing method that goes forward one by one
CN102080518A (en) Method for extracting gas from coal seam roof complex branched well
CN101915118A (en) Method for progressive gas drainage in high gas medium-hard coal seam
CN105464700A (en) Method for determining length of filling segment of fully mechanized mining and filling mixed mining working face
CN103939137B (en) The drift-sand barnyard placement method of western desertification mining area shallow buried coal seam
CN101725350A (en) Footwall vein rock drilling vein-passing access road ore removal stope caving method
CN101634227A (en) Flat-bottomed trench shallow hole shrinkage method
CN106761902A (en) A kind of stereo synthesis pressure relief gas pumping mining method suitable for soft rock protective coat extracted
CN108756875A (en) The continuous quarrying apparatus of row's open coal mine medium-thickness seam and method in a kind of
CN1317483C (en) Method of entering target geologic body and system
CN108506000A (en) A kind of projecting coal bed gallery speedy drivage method
CN102305074B (en) Flat-bottomed pillar sublevel caving method of reinforced concrete structure artificial roof
CN101824997A (en) Arrangement method for double-uphill air return of mining areas of mine
CN104179505B (en) A kind of underground mining method of phosphorus ore
CN105370285A (en) Method for preventing decline of underground water level in uranium mining through in-situ leaching
CN104343454B (en) A kind of mechanization point pillar house column mining method
CN109736876A (en) It adopts kinetoplast and gushes out gas top plate major diameter directional long borehole pumping method
CN101469612B (en) Mining method for segmented metallic ore
CN104563971B (en) Mining system and the mining methods in the overlapping mining area of resource
CN205422717U (en) Cut -and -fill mining method wall formula structure
CN205858370U (en) A kind of tunnel structure of colliery system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20100908