CN105464700A - Method for determining length of filling segment of fully mechanized mining and filling mixed mining working face - Google Patents

Method for determining length of filling segment of fully mechanized mining and filling mixed mining working face Download PDF

Info

Publication number
CN105464700A
CN105464700A CN201510925707.8A CN201510925707A CN105464700A CN 105464700 A CN105464700 A CN 105464700A CN 201510925707 A CN201510925707 A CN 201510925707A CN 105464700 A CN105464700 A CN 105464700A
Authority
CN
China
Prior art keywords
filling
work plane
mining
day
adopt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510925707.8A
Other languages
Chinese (zh)
Other versions
CN105464700B (en
Inventor
张吉雄
孙强
张强
闫浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201510925707.8A priority Critical patent/CN105464700B/en
Publication of CN105464700A publication Critical patent/CN105464700A/en
Application granted granted Critical
Publication of CN105464700B publication Critical patent/CN105464700B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/005Methods or devices for placing filling-up materials in underground workings characterised by the kind or composition of the backfilling material

Abstract

Provided is a method for determining length of a filling segment of a fully mechanized mining and filling mixed mining working face. The method comprises: firstly, according to production capacity requirement of a mine, determining total length of a fully mechanized mining and filling mixed mining working face, then, according to a principle that waste rock output of a rock protective layer working face in each day is equal to mass of a filling material which is filled in a goaf of the filling segment of the fully mechanized mining and filling mixed working face, initially determining a length range of the filling segment working face, finally, according to overlying strata fracture development of the fully mechanized mining and filling mixed mining working face on site and stratum moving characteristic requirements, determining the length of the filling segment working face. The determining method is simple and practical, and provides engineering technical guidance for popularization and application of a fully mechanized mining and filling mixed mining technology, and further promotes an integrated green mining circulating mode of mining, selecting, filling, and mining of efficient filling coal mining, in the integrated green mining circulating mode, waste rocks of an underground coal mine do rise, and the waste rocks are selected by washing and are refilled in the goaf. The method expands popularization and application range of the filling coal mining.

Description

Combine and adopt-filling mixed mining work plane filling segment length defining method
Technical field
The present invention relates to filling coal mining technical field, particularly one be applicable to combine adopt-filling mixed mining work plane filling segment length defining method.
Background technology
In recent years, solid filling coal-mining technique has obtained popularization and application as the Green Technique in Coal Mining of one liberation " three times " pressure coal in the multiple mining area of China, a large amount of coal resources are successfully liberated, downhole gangue not gug simultaneously, reduce ground spoil stacking and pollute green idea and strengthen further, employing down-hole, increasing mining area coal preparation technology, realizes downhole gangue washing, the green circulatory exploitation integrated technique in washing gangue refill goaf.But along with the high tension coal mining of coal resource, a lot of colliery is when next stage coal seam extends exploitation, and run into hyposmosis high methane dangerous seam with potential, the exploitation in this type of coal seam has safety hazard, and seam mining cost is high, has had a strong impact on mine service-life.Therefore; rock topping in exploitation; take out protected coal seam gas in advance; rock topping spoil is backfilling in protected seam goaf as filler; realize spoil not gug; for the purpose of coal and gas power phenomenon, technology is arisen at the historic moment, and considers mine output and gas drainage under suction effect in this technology, and protected seam adopts to combine adopts-filling hybrid working face exploitation.
Appropriate design is combined and is adopted-timely the process of filling mixed mining work plane filling segment length for downhole gangue, the smooth enforcement of filling coal mining, and gas drainage under suction effect etc. has important influence.Therefore, a kind of combining of research adopts-filling mixed mining work plane filling segment length defining method, combines to adopt-the filling mixed mining research means that could not lack and research method, have important practical significance and wide application prospect under becoming conditions of similarity.
Summary of the invention
The object of the invention is for Problems existing in prior art, provide that a kind of method is simple, safe and reliable, engineer applied is strong comprehensively adopts-filling mixed mining work plane filling segment length defining method.
Of the present invention combining adopts-filling mixed mining work plane filling segment length defining method: first; according to mine capacity Demand Design hybrid working face total length; then; produce cash amount according to rock topping work plane spoil every day and adopt-principle that the attal quality that is filled with of filling mixed mining work plane filling section goaf is equal with comprehensive; preliminary design is combined and is adopted-filling mixed mining work plane filling segment length scope; finally; according to on-the-spot mixed mining work plane overlying strata cranny development and strata movement feature requirement, determine filling section face length.
Described rock protective coat extracted spoil every day goes out cash amount and is drawn by following formula:
M 2=μv 2L 2H yη(1)
In formula:
M 2-rock topping produces cash amount every day, t/ day;
μ-washing rate under waste shaft, %;
V 2-topping work plane advance rate every day, m/ day, is determined by coal winning machine cutting bit and coal cutting number of times;
L 2-topping stope face length, m, is determined by firedamp taking-out discharging drilling length;
H y-topping stope rock stratum height, m, is determined by floor crack Growth Depth;
η-rock density, t/m 3.
Described combine adopt-attal that filling mixed mining work plane filling section is filled with obtains by following formula:
M 1=v 1L 1ctH 1ctη c(2)
In formula:
M 1-combine adopt-filling mixed mining work plane consumes cash amount, t/ day every day;
V 1-combine and adopt-filling mixed mining work plane advance rate every day, m/ day, determined by annual production;
L 1ct-combine and adopt-filling mixed mining work plane filling segment length, m, determined by product cash amount and scraper plate conveying capacity;
H 1ct-can packed height, m, shifts to an earlier date deflection by conveyer suspension height and top board and determines;
η c-loose spoil apparent density, t/m 3.
Described preliminary design combine adopt-filling mixed mining work plane filling segment length scope is according to M 1>=M 2, simultaneous formula formula (1) and (2), draw to combine and adopt-filling mixed mining work plane filling segment length L 1ctscope is:
L 1 c t ≥ μv 2 L 2 H y η v 1 H 1 c t η c - - - ( 3 ) .
Described filling section face length has moving characteristic to determine according to site work face overlying strata cranny development and rock stratum.
Beneficial effect: the present invention combines and adopts-filling mixed mining working face mining filling segment length, be analysis and design combine adopt-filling mixed mining technology in an one of important parameter.-filling mixed mining work plane total length is adopted by determining to combine; produce cash amount according to rock protective coat extracted spoil every day again and adopt-principle that the attal quality that is filled with of filling mixed mining work plane filling section is equal with comprehensive; tentatively determine filling section face length scope; combine according to scene again and adopt-filling mixed mining work plane overlying strata cranny development and strata movement feature requirement, finally determine filling section face length.Its method simple practical, can be combine adopt-applying of filling mixed mining technology provide engineering to instruct, further promotion gangue in coal mine not gug, washing gangue refill goaf, " selecting and purchasing is filled and adopted " integrated lasting exploit circulation mode of efficient filling coal mining, expands the extent of spreading amd application of filling coal mining.Adopt-filling mixed mining work plane filling segment length owing to can design rationally, exactly to combine, thus can adopt for combining under conditions of similarity-filling mixed mining work plane filling segment length provides Theoretical Determination.The method is simple, and test effect is good, has extremely strong engineering practicability and use value.
Accompanying drawing explanation
Fig. 1 adopts-filling mixed mining work plane filling segment length method design flow chart for combining.
Fig. 2 adopts-filling mixed mining work plane layout plan for combining.
Fig. 3 is that topping work plane adopts-filling mixed mining work plane coal mining schematic diagram with comprehensive.
In figure: 1-self-moving reversed loader, 2-filling ribbon conveyer, 3-drag conveyor, 4-bottom-dump conveyer, 5-dumping pit, 6-filling hydraulic support, 7-coal-winning machine, 8-Yun Gan lane, 9-transports coal road, L 1-filling section face length, L 2-the section of being caving face length, L-combines and adopts-filling hybrid working face total length, 10-rock topping work plane, and 11-combines and adopts-filling mixed mining work plane.
Detailed description of the invention
Below in conjunction with the embodiment in accompanying drawing, the invention will be further described:
As shown in figures 1 and 3, of the present invention combining adopts-filling mixed mining work plane 11 filling segment length L 1defining method; first according to mining geological conditions determination mine coal-cutting parameter; again according to mine capacity; design is combined and is adopted-filling mixed mining work plane 11 total length L; then; produce cash amount with combining according to rock topping work plane 10 spoil every day and adopt-filling mixed mining work plane 11 filling section spoil every day consumption, adopt-principle that filling mixed mining work plane attal quality is equal according to topping work plane with combining, tentatively determine comprehensively to adopt-filling mixed mining work plane 11 filling segment length L 1scope, finally, combines according to scene and adopts-filling mixed mining work plane 11 overlying strata cranny development height and gas drainage under suction effect, determines to combine to adopt-filling segment length the L of filling mixed mining work plane 11 1; Concrete steps are as follows:
1. combine according to mine capacity Demand Design and adopt-the total length L of filling mixed mining work plane 11;
2. calculate rock topping work plane 10 spoil every day by following formula and go out cash amount:
M 2=μv 2L 2H yη(1)
In formula:
M 2-rock topping produces cash amount every day, t/ day;
μ-washing rate under waste shaft, %;
V 2-topping work plane advance rate every day, m/ day, is determined by coal winning machine cutting bit and coal cutting number of times;
L 2-topping stope face length, m, is determined by firedamp taking-out discharging drilling length;
H y-topping stope rock stratum height, m, is determined by floor crack Growth Depth;
η-rock density, t/m 3.
3. calculated to combine by following formula and adopt-filling segment length the L of filling mixed mining work plane 11 1the charges doses be filled with:
M 1=v 1L 1ctH 1ctη c(2)
In formula:
M 1-combine adopt-filling mixed mining work plane consumes cash amount, t/ day every day;
V 1-combine and adopt-filling mixed mining work plane advance rate every day, m/ day, determined by annual production;
L 1ct-combine and adopt-filling mixed mining work plane filling segment length, m, determined by product cash amount and scraper plate conveying capacity;
H 1ct-can packed height, m, shifts to an earlier date deflection by conveyer suspension height and top board and determines;
η c-loose spoil apparent density, t/m 3.
4. according to the principle of mass conservation, combine adopt-filling mixed mining work plane 11 charging quantity and rock topping work plane 10 produce cash amount M 1>=M 2relation, calculates to combine and adopts-filling mixed mining work plane 11 length, convolution formula (1) and (2), draws to combine and adopts-filling mixed mining work plane 11 filling segment length L 1scope is:
L 1 ≥ μv 2 L 2 H y η v 1 H 1 η c - - - ( 3 ) ;
5. combine according to scene and adopt-filling mixed mining work plane 11 overlying strata cranny development and gas pumping effect demand, determine the filling section face length L be applicable to 1.
Embodiment 1: certain ore deposit is own 15coal seam is hypotonic gas permeability high gas layer, and coal seam thickness is 3.2m, and upper protection coal seam is own 14coal seam average thickness 0.5m, distance is own 15coal seam 13.5m, this mine design topping face length 150m, mining height is 1.9m, adopts 1.4m lithosphere, takes out protected seam coal-bed gas in advance, gangue refill protected seam filling section goaf.Protected seam face length 218m, adopts to combine and adopts-filling hybrid working face exploitation.Wherein combine adopt-filling hybrid working face exploitation filling segment length design procedure is as follows:
1, own 14-31050 work planes go out the calculating formula of cash amount every day:
M 2=μv 2L 2H yη(1)
In formula:
M 2-oneself 14-31010 every days produce cash amount, t/ day;
μ-washing rate under waste shaft, 65% ~ 100%;
V 2-every day advance rate, 2.4m/ day;
L 2-work plane face length, 150m;
H y-rock stratum height, 1.4m;
η-rock density, 2.4t/m 3.
2, own 15-31010 work planes need consumes least spoil gauge formula:
M 1=v 1L 1H 1η c(2)
In formula:
M 1-oneself 15-31010 work planes consume cash amount, t/ day every day;
V 1-oneself 15-31010 work plane advance rates every day, 2.4m/ day;
L 1-work plane filling segment length, m;
H 1-can packed height, 2.3m;
η c-loose spoil apparent density, 1.85t/m 3
According to designing requirement, oneself 15-31010 work planes need consume and be greater than oneself 14-31010 work planes go out cash amount, that is: M every day 1>=M 2;
Simultaneous formula formula (1) ~ (2), then own 15-31010 work plane filling segment length H 1expression formula:
L 1 = μv 2 L 2 H y η v 1 H 1 η c - - - ( 3 )
Spoil washing rate calculates by 90%, brings above calculating into, draws to combine to adopt-filling mixed mining work plane filling segment length L 1ctminimum is 106m, in conjunction with the on-the-spot applicable cases of porous bottom-dump conveyer, and on-the-spot overlying strata cranny development height and gas drainage under suction effect, after filling segment length is greater than 124m, overlying strata cranny development degree is unfavorable for gas pumping, finally determines filling section face length L 1for 120m, it is 98m that tradition combines the section of adopting face length, combines and adopts-filling mixed mining work plane total length 218m.

Claims (5)

1. one kind combine adopt-filling mixed mining work plane filling segment length defining method, it is characterized in that: first, combine according to mine capacity Demand Design and adopt-filling hybrid working face total length, then, produce cash amount according to rock topping work plane spoil every day and adopt-principle that the attal quality that is filled with of filling mixed mining work plane filling section goaf is equal with comprehensive, preliminary design is combined and is adopted-filling mixed mining work plane filling segment length scope, finally, combine according to scene and adopt-filling mixed mining work plane overlying strata cranny development and strata movement feature requirement, determine filling section face length.
2. according to claim 1 combining adopts-filling mixed mining work plane filling segment length defining method, it is characterized in that: described rock protective coat extracted spoil every day goes out cash amount and drawn by following formula:
M 2=μv 2L 2H yη(1)
In formula:
M 2-rock topping produces cash amount every day, t/ day;
μ-washing rate under waste shaft, %;
V 2-topping work plane advance rate every day, m/ day, is determined by coal winning machine cutting bit and coal cutting number of times;
L 2-topping stope face length, m, is determined by firedamp taking-out discharging drilling length;
H y-topping stope rock stratum height, m, is determined by floor crack Growth Depth;
η-rock density, t/m 3.
3. according to claim 1 combining adopts-filling mixed mining work plane filling segment length defining method, it is characterized in that: described combine adopt-attal that filling hybrid working face filling section is filled with obtains by following formula:
M 1=v 1L 1ctH 1ctη c(2)
In formula:
M 1-combine adopt-filling mixed mining work plane consumes cash amount, t/ day every day;
V 1-combine and adopt-filling mixed mining work plane advance rate every day, m/ day, determined by annual production;
L 1ct-combine and adopt-filling mixed mining work plane filling segment length, m, determined by product cash amount and scraper plate conveying capacity;
H 1ct-can packed height, m, shifts to an earlier date deflection by conveyer suspension height and top board and determines;
η c-loose spoil apparent density, t/m 3.
4. according to claim 1 combining adopts-filling mixed mining work plane filling segment length defining method, it is characterized in that: described preliminary design combine adopt-filling mixed mining work plane filling segment length scope is according to M 1>=M 2, simultaneous formula formula (1) and (2), draw to combine and adopt-filling mixed mining work plane filling segment length L 1ctscope is:
L 1 c t ≥ μv 2 L 2 H y η v 1 H 1 c t η c - - - ( 3 ) .
5. according to claim 1 combining is adopted-filling mixed mining work plane overlying strata cranny development and strata movement feature requirement, it is characterized in that: described filling section face length has moving characteristic to determine according to site work face overlying strata cranny development and rock stratum.
CN201510925707.8A 2015-12-14 2015-12-14 Fully mechanized mining filling mixed mining working face filling segment length determines method Active CN105464700B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510925707.8A CN105464700B (en) 2015-12-14 2015-12-14 Fully mechanized mining filling mixed mining working face filling segment length determines method

Applications Claiming Priority (6)

Application Number Priority Date Filing Date Title
CN201510925707.8A CN105464700B (en) 2015-12-14 2015-12-14 Fully mechanized mining filling mixed mining working face filling segment length determines method
AU2016370451A AU2016370451A1 (en) 2015-12-14 2016-11-18 Method for determining length of filling section of fully mechanized coal mining-filling mixed mining working face
PCT/CN2016/106335 WO2017101634A1 (en) 2015-12-14 2016-11-18 Fully mechanized mining-filling mixed mining working face filling section length determination method
CA2986062A CA2986062A1 (en) 2015-12-14 2016-11-18 Method for determining length of filling section of fully mechanized coal mining-filllingmixed miningworking face
RU2017146578A RU2676770C1 (en) 2015-12-14 2016-11-18 Method for determining length of a filled section of fully mechanized coal-mining filling mixing combine harvester
ZA2018/00778A ZA201800778B (en) 2015-12-14 2018-02-06 Fully mechanized mining-filling mixed mining working face filling section length determination method

Publications (2)

Publication Number Publication Date
CN105464700A true CN105464700A (en) 2016-04-06
CN105464700B CN105464700B (en) 2017-12-26

Family

ID=55602805

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510925707.8A Active CN105464700B (en) 2015-12-14 2015-12-14 Fully mechanized mining filling mixed mining working face filling segment length determines method

Country Status (6)

Country Link
CN (1) CN105464700B (en)
AU (1) AU2016370451A1 (en)
CA (1) CA2986062A1 (en)
RU (1) RU2676770C1 (en)
WO (1) WO2017101634A1 (en)
ZA (1) ZA201800778B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105912810A (en) * 2016-04-29 2016-08-31 中国矿业大学 Design method of transition support timbering parameter of filling and fully-mechanized coal mining mixed mining surface
CN106761754A (en) * 2017-03-31 2017-05-31 中国矿业大学 A kind of girdle comprehensive mining and gas control network one cooperative control system and method
WO2017101634A1 (en) * 2015-12-14 2017-06-22 中国矿业大学 Fully mechanized mining-filling mixed mining working face filling section length determination method
CN109057797A (en) * 2018-09-30 2018-12-21 中国矿业大学 A kind of mine, which picks up to fill, takes out mining Design method
CN109488301A (en) * 2018-09-30 2019-03-19 中国矿业大学 A kind of mine, which picks up, fills place's recovery method
CN110924944A (en) * 2019-11-29 2020-03-27 北京科技大学 Coal mine main roadway down-pressing coal segmented circulating filling mining method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1936271A (en) * 2006-08-21 2007-03-28 山东盛泉矿业有限公司 Method for filling coal-steam-free extraction working surface goaf by coal mine waste rock
CN102865099A (en) * 2012-08-29 2013-01-09 山西晋煤集团金鼎煤机矿业有限责任公司 Under-building, under-railway and under-water mining filling process
CN104405437A (en) * 2014-10-08 2015-03-11 中国矿业大学 Mining method employing solid filling and fully-mechanized coal mining hybrid working face
CN104775819A (en) * 2015-03-27 2015-07-15 中国矿业大学 Deep inclined coal seam mining roadway mine pressure control mining method
CN104989408A (en) * 2015-07-14 2015-10-21 三峡大学 Safe and high-efficiency mining method for metal mine in mountainous area

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5782539A (en) * 1995-11-16 1998-07-21 Peterson; Randall D. Wall-to-wall surface mining process
RU2323339C2 (en) * 2006-05-16 2008-04-27 Станислав Александрович Кариман Face equipment assembly
CN1963149B (en) * 2006-11-17 2011-09-14 中国矿业大学 Mining method for replacement of banded coal under building by waste rock
CN101586460B (en) * 2009-06-02 2011-03-30 中国矿业大学 Coal mining solid filling method
CN102996131B (en) * 2012-12-10 2014-10-29 中国矿业大学 Solid-filling coal mining method with two pre-excavating tunnels for advancing
CN103670507B (en) * 2013-02-04 2015-10-21 中国矿业大学 A kind of defining method of high-dipping fully-mechanized mining working Gob Filling with Waste bandwidth
RU2553699C2 (en) * 2013-10-23 2015-06-20 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Сибирский государственный индустриальный университет" Method of methane capture during mining of coal layers by powered mining complex
CN103742148B (en) * 2014-01-14 2016-08-17 山东科技大学 The soft coal-mining method covering the descending waste filling of supporting of a kind of half-edge coal seam
CN104963687B (en) * 2015-07-09 2017-02-22 太原理工大学 Method for recycling upper part residual coal and backfilling goaf by utilizing full-mechanized caving mining in extremely thick coal seam
CN105134215A (en) * 2015-09-25 2015-12-09 西安科技大学 Local filling mining method for longwall face along strike of steeply dipping seam
CN105464700B (en) * 2015-12-14 2017-12-26 中国矿业大学 Fully mechanized mining filling mixed mining working face filling segment length determines method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1936271A (en) * 2006-08-21 2007-03-28 山东盛泉矿业有限公司 Method for filling coal-steam-free extraction working surface goaf by coal mine waste rock
CN102865099A (en) * 2012-08-29 2013-01-09 山西晋煤集团金鼎煤机矿业有限责任公司 Under-building, under-railway and under-water mining filling process
CN104405437A (en) * 2014-10-08 2015-03-11 中国矿业大学 Mining method employing solid filling and fully-mechanized coal mining hybrid working face
CN104775819A (en) * 2015-03-27 2015-07-15 中国矿业大学 Deep inclined coal seam mining roadway mine pressure control mining method
CN104989408A (en) * 2015-07-14 2015-10-21 三峡大学 Safe and high-efficiency mining method for metal mine in mountainous area

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017101634A1 (en) * 2015-12-14 2017-06-22 中国矿业大学 Fully mechanized mining-filling mixed mining working face filling section length determination method
CN105912810A (en) * 2016-04-29 2016-08-31 中国矿业大学 Design method of transition support timbering parameter of filling and fully-mechanized coal mining mixed mining surface
WO2017185724A1 (en) * 2016-04-29 2017-11-02 中国矿业大学 Design method for transition support timbering parameter of filling and fully-mechanized coal mining and mixed mining face
RU2679767C1 (en) * 2016-04-29 2019-02-12 Китайский Университет Горного Дела И Технологии Calculation method of support parameters of the transitional support of clearing barrier of the mixed type when using the bookmark and mechanized support
CN105912810B (en) * 2016-04-29 2019-02-19 中国矿业大学 A kind of filling with fully mechanized mining is mixed adopts face transition bracket supporting parameter design method
US10301939B2 (en) 2016-04-29 2019-05-28 China University Of Mining And Technology Method for designing supporting parameters of transition support for mixed mining face of filling and fully-mechanized mining
CN106761754A (en) * 2017-03-31 2017-05-31 中国矿业大学 A kind of girdle comprehensive mining and gas control network one cooperative control system and method
CN109057797A (en) * 2018-09-30 2018-12-21 中国矿业大学 A kind of mine, which picks up to fill, takes out mining Design method
CN109488301A (en) * 2018-09-30 2019-03-19 中国矿业大学 A kind of mine, which picks up, fills place's recovery method
WO2020062822A1 (en) * 2018-09-30 2020-04-02 中国矿业大学 Mining method with mining-dressing-backfilling-processing for mine
RU2724161C1 (en) * 2018-09-30 2020-06-22 Китайский Университет Горного Дела И Технологии Method for mine development of deposits, separation of rocks, filling of mined space and dressing of ore
CN110924944A (en) * 2019-11-29 2020-03-27 北京科技大学 Coal mine main roadway down-pressing coal segmented circulating filling mining method

Also Published As

Publication number Publication date
CN105464700B (en) 2017-12-26
ZA201800778B (en) 2018-12-19
RU2676770C1 (en) 2019-01-11
CA2986062A1 (en) 2017-06-22
WO2017101634A1 (en) 2017-06-22
AU2016370451A1 (en) 2017-10-26

Similar Documents

Publication Publication Date Title
CN103306720B (en) Inclined separated layer solid filling coal mining method for super thick coal seam
CN105464700B (en) Fully mechanized mining filling mixed mining working face filling segment length determines method
CN103016053B (en) Method of local filling to control surface subsidence in gob
CN103967494B (en) A kind of shallow-hole shrinkage afterwards filling mining methods
CN103437769B (en) Combination is reproduced structure medium-length hole ore blast and is worked in coordination with cable bolting afterwards filling mining method
CN106223958A (en) The slant middle thick orebody subregion rock drilling stage ore deposit afterwards filling that falls works in coordination with mining codes
CN101881169A (en) Sublevel shrinkage caving stage open stope afterwards filling mining method
CN103902780B (en) Solid filling coal mining earth's surface Deformation prediction method
CN104481539A (en) Extruding blasting caving mining method for self-pulling slot
CN106761750B (en) Slot type recovery method is built in the longwell plane milling of half-edge coal seam longitudinal direction
CN106761912B (en) It is a kind of be suitable for unstable formation efficiently on to route slicing and filling mining methods
CN106869931A (en) A kind of barren rock and cementing layering wedging mining with stowing technique and its structure
CN103104259A (en) Inclination fragmentation ore body segment top board reconstruction middle-deep hole ore break down filling mining method
CN106894817A (en) A kind of mechanization Upward slicing wedging mixed filling mining codes
CN103939137B (en) The drift-sand barnyard placement method of western desertification mining area shallow buried coal seam
CN201474347U (en) Sublevel mining room
CN103557001B (en) A kind of low section high oper cylinler shrink afterwards filling mining method
CN109869150A (en) A kind of mine resources are segmented the full office of adopting and fill recovery method
CN104481538B (en) The processing method of interlayer in a kind of non-coal mine high-dipping multilayer ore body
CN108952725A (en) A kind of low dilution mining methods suitable for slight slope and thin ore body
CN105626074A (en) Thick ore body mining method
CN106640080B (en) Under a kind of deep high stress environment mining methods are arranged from steady gallery shape stope
CN107780937A (en) Based on the filling mining method in exploitation of mineral resources
CN107762513A (en) Based on the method dug up mine in exploitation of mineral resources to large diameter, deep borehole open stope afterwards filling
CN107762506A (en) Based on falling ore deposit stage mineral building afterwards filling mining method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
CB03 Change of inventor or designer information

Inventor after: Zhou Nan

Inventor after: Sun Qiang

Inventor after: Zhang Jixiong

Inventor after: Wang Jiaqi

Inventor after: Liu Zhicheng

Inventor after: Yan Hao

Inventor before: Zhang Jixiong

Inventor before: Sun Qiang

Inventor before: Zhang Qiang

Inventor before: Yan Hao

CB03 Change of inventor or designer information