CN205858370U - A kind of tunnel structure of colliery system - Google Patents

A kind of tunnel structure of colliery system Download PDF

Info

Publication number
CN205858370U
CN205858370U CN201620868055.9U CN201620868055U CN205858370U CN 205858370 U CN205858370 U CN 205858370U CN 201620868055 U CN201620868055 U CN 201620868055U CN 205858370 U CN205858370 U CN 205858370U
Authority
CN
China
Prior art keywords
coal
lane
return airway
sealing
tape machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620868055.9U
Other languages
Chinese (zh)
Inventor
耿雪峰
夏仕方
邵维
刘立志
牛犇
林劲夫
余刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huainan Mining Group Co Ltd
Original Assignee
Huainan Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huainan Mining Group Co Ltd filed Critical Huainan Mining Group Co Ltd
Priority to CN201620868055.9U priority Critical patent/CN205858370U/en
Application granted granted Critical
Publication of CN205858370U publication Critical patent/CN205858370U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

This utility model discloses the tunnel structure of a kind of colliery system, and it includes five the system tunnels being entirely located between two-layer coal and being parallel to each other.Five system tunnels are: track lane, sealing-tape machine lane, coal seam floor return airway, coal top board return airway and spoil sealing-tape machine system lane.Return airway in the coal column in track lane, sealing-tape machine lane, coal seam floor return airway and this four systems tunnel, spoil sealing-tape machine system lane uses rock gangway to replace coal road;The return airway in track lane is directly connected with track lane;The return airway in sealing-tape machine lane is connected with sealing-tape machine lane by coal bunker;The return airway of coal seam floor return airway is connected with coal seam floor return airway by connection lane.This utility model decreases coal roadway tunneling, if protected seam work surface, exposed coal in protection domain, is more beneficial for rapid uncovering coal, the most beneficially assistant conveyance serialization.

Description

A kind of tunnel structure of colliery system
Technical field
This utility model relates to a kind of tunnel structure, in particular to the tunnel structure of a kind of colliery system.
Background technology
The exploiting field scope in one system tunnel, panel, C group coal north, east, Zhu Ji Dong ore deposit: north to F29(∠ 70 °, H=0~30m) and bright Longshan tomography (inverse) (∠ 70 °, H > 1000m), south to Dong Yi great lane protection coal pillar, to the east of DF113 tomography (inverse ∠ 65 °~70 °, H =0~10m), wide west to work and pit shaft protection coal pillar line.This paneling 13-1 and 11-2 coal seam, corresponding ground absolute altitude is+ 22.3m~+24.0m.
General gas control mode selects 11-2 coal to exploit in advance as protective layer.The gas control in this coal seam of 11-2 coal divides Being two kinds, one is that " simultaneously four lane " is arranged, i.e. utilizes base plate extraction lane to drill and screens crossheading driving, is aided with ground well drainage The gas pressure relief of 13-1 coal;Two is that 11-2 coal " simultaneously three lane " is arranged, utilizes the Comprehensive Gas Control lane of 13-1 coal seam floor to screen Crossheading tunnels, and while exploitation 11-2 coal key protective layer, utilizes Comprehensive Gas Control lane and ground drilling, forms " trend Intercept about Shang Shuan lane, vertical upper and ground drilling intercept up and down " three-dimensional gas pumping pattern, it is achieved to 11-2 and 13-1 coal Combined governance.In addition to 1111 (1) work surfaces use " simultaneously four lane " and arrange, remaining all uses " simultaneously three lane ".
When designing in tunnel, panel, general C group seam mining conventional arrangement.13-1 coal and 11-2 coal seam interlamellar spacing exist About 65m~70m, according to group company C group coal mining experience, 13-1 and 11-2 coal generic hierarchical is arranged, is wherein exploited 11-2 5 tunnels, respectively 11-2 coal seam return airway, 11-2 coal seam floor sealing-tape machine lane, 11-2 coal seam floor track lane, 11-2 is arranged during coal Coal seam floor spoil sealing-tape machine lane and 11-2 coal top board spoil sealing-tape machine lane;3 tunnels, respectively 13-1 are arranged during exploitation 13-1 coal Coal return airway, 13-1 coal seam floor sealing-tape machine lane and 13-1 coal seam floor track lane.
Stope drift active workings with system tunnel connected mode are: crossheading is directly connected with coal seam return airway, and exploiting field rail system leads to Crossing to carry and expect that inclined gallery are connected with crossheading, crossheading is connected with sealing-tape machine system by coal bunker (milling coal hole).
Along with mining area exploitation lower limit is the most downward, cost of winning is continuously increased, the renewal of auxiliary conveying equipments, above-mentioned layout There are the following problems for mode: 1) C group coal mining need to arrange that 8 system tunnels, quantities and investment are the biggest, causes cost of winning Higher, of poor benefits;2), in air return system is arranged in coal road, needs extraction borehole shielding driving of constructing before construction, affect exploiting field and throw Produce the duration, strengthen investment, and coal road later maintenance quantities is big;3) in the protection coal pillar of system tunnel, crossheading is coal road, also needs Extraction borehole to be constructed screens, and borehole engineering amount is big, and the construction period is long;4) little structure bend is many, does not utilize mine to assist Transport serialization.
Utility model content
In view of this, this utility model provides the tunnel structure of a kind of colliery system, and it is according to Zhu Ji Dong ore deposit C group coal gas Governance model, 11-2 drainage from coal seam lane is arranged in 11-2 coal top board, and 13-1 coal and 11-2 coal seam interlamellar spacing can arrange a plurality of lane Road, meets the requirement of two-layer coal combined layout, therefore considers, by C group coal combined layout, to reduce system tunnel total amount, reduces and throw Money, increases economic benefit.
This utility model is achieved through the following technical solutions: the tunnel structure of a kind of colliery system, and it includes being entirely located in Between two-layer coal and five system tunnels being parallel to each other, five system tunnels are: track lane, sealing-tape machine lane, coal seam floor return air Lane, coal top board return airway and spoil sealing-tape machine system lane;In track lane, sealing-tape machine lane, coal seam floor return airway and spoil sealing-tape machine Return airway in the coal column in this four systems tunnel, system lane uses rock gangway to replace coal road;The return airway in track lane is straight Connect and be connected with track lane;The return airway in sealing-tape machine lane is connected with sealing-tape machine lane by coal bunker;The work of coal seam floor return airway Face crossheading is connected with coal seam floor return airway by connection lane.
As the further improvement of such scheme, described tunnel structure also includes two coal seam floors between two-layer coal Extraction lane, every coal seam floor extraction lane all communicates with coal top board return airway, spoil sealing-tape machine system lane.
This utility model return airway rock gangway in the coal column in system tunnel replaces coal road, i.e. exposed coal position is positioned at It is incorporated as near line, coal roadway tunneling can be reduced to full capacity.The return airway in track lane is directly connected with track lane;Sealing-tape machine lane Return airway is connected with sealing-tape machine lane by coal bunker;The return airway of coal seam floor return airway is by connection lane and coal seam floor return air Lane is connected, and decreases coal roadway tunneling, if protected seam work surface, exposed coal in protection domain, is more beneficial for rapid uncovering coal, with Time be conducive to assistant conveyance serialization.
Accompanying drawing explanation
Fig. 1 is the tunnel structure horizontal layout schematic diagram of this utility model colliery system embodiment 1.
Fig. 2 is Fig. 1 generalized section.
Fig. 3 is the horizontal layout schematic diagram of this utility model colliery system embodiment 2.
Fig. 4 is the popularization and application schematic diagram of this utility model colliery system embodiment 1.
Detailed description of the invention
Below in conjunction with embodiment, this utility model is further elaborated.Should be appreciated that tool described herein Body embodiment, only in order to explain this utility model, does not limit this utility model.
Embodiment 1
As shown in Figures 1 and 2, the tunnel structure of colliery system of the present utility model, it include being entirely located in two-layer coal it Between and five system tunnels being parallel to each other, five system tunnels are: track lane 1, sealing-tape machine lane 2, coal seam floor return airway 3, coal Top board return airway 4 and spoil sealing-tape machine system lane 5.
In track lane 1, sealing-tape machine lane 2, coal seam floor return airway 3 and this four systems tunnel, spoil sealing-tape machine system lane 5 Return airway 6 in coal column uses rock gangway to replace coal road;The return airway 6 in track lane 1 is directly connected with track lane 1;Glue The return airway 6 in Dai Ji lane 2 is connected with sealing-tape machine lane 2 by coal bunker;The return airway 6 of coal seam floor return airway 3 is by connection Lane 7 is connected with coal seam floor return airway 3.
Therefore, one system tunnel, panel, C group coal north, east, Zhu Ji Dong ore deposit realizes C group coal combined layout, totally 5 system tunnels, entirely Portion is positioned between two-layer coal, and 5 tunnels are respectively track, sealing-tape machine, 13-1 coal seam floor return air, 11-2 coal top board return air and spoil Sealing-tape machine system.Return airway rock gangway in system chain pillar replaces coal road simultaneously, i.e. exposed coal position is positioned at and is incorporated as Near line, reduce coal roadway tunneling as far as possible.Return airway is directly connected with track lane, exploiting field, by coal bunker (milling coal hole) and glue Dai Ji lane is connected, and is connected with exploiting field return airway by connection lane, this construction reduces coal roadway tunneling, if protected seam work surface, Exposed coal in protection domain, is more beneficial for rapid uncovering coal, the most beneficially assistant conveyance serialization.
Embodiment 2
East, Zhu Ji Dong ore deposit one panel, C group coal north roadway layout
Referring to Fig. 3, use the governance model of 11-2 coal " simultaneously four lane " during the design of this panel, therefore this panel is arranged altogether 6 system tunnels, are respectively the big lane of-960m11-2 coal seam floor return air 11, the big lane of-880m13-1 coal seam floor return air by north orientation south 16, the big lane of-895m13-1 coal seam floor east wing sealing-tape machine 12, the big lane of-965m11-2 coal seam floor track 13 ,-885m13-1 coal seam floor The big lane of coal seam floor return air, the big lane of track 14 and-906m13-1 15.
Obtain benefit: an eastern panel, C group coal north compare conventional batch layout minimizing system tunnel about 1500m, 1111 (1) Work surface 17 and 1111 (3) work surface 18, is incorporated as the crossheading between line and system tunnel, and construction rock gangway replaces the pick of 13-1 coal road Enter, accelerate driving speed, decrease extraction borehole 28800m, assess a fee 3,740,000 yuan.Opposite sides on two work surfaces is all Arranging a work surface track crossheading 19, two work surfaces occupy between two work surface haulage gate base plate extraction lanes 20.
In conjunction with two embodiments, connect down and introduce application the most of the present utility model.
C group coal combined layout can further apply C group coal seam, each colliery, Huainan, has been used for west, Pan three ore deposit three C at present Exploiting field in the middle part of group coal;Two panels, C group coal east, Zhu Ji Dong ore deposit also prepare to use combined layout, utilize an eastern panel system to extend and go forward side by side One-step optimization, arranges 5 system tunnels altogether.
1) two panels, Zhu Ji Dong ore deposit C group coal east
This panel is extension panel eastwards, an eastern panel, utilizes system tunnel the Optimizing Reconstruction in panel, north, east one.Should 5 system tunnels are arranged in panel altogether, are entirely located in 13-1 coal seam floor, are respectively-895m13-1 coal seam floor return airway ,-885m13- 1 coal seam floor return airway ,-895m13-1 coal seam floor sealing-tape machine lane ,-885m13-1 coal seam floor spoil sealing-tape machine lane and-906m13-1 Coal seam floor track lane.
Wherein:
-895m13-1 coal seam floor return airway: by eastern-960m11-2 coal seam floor return air big lane, a panel Pass line adjustment be- 885m, 13-1 coal seam floor;
-885m13-1 coal seam floor return airway: orientation deepening is willing in an eastern big lane of-880m13-1 coal seam floor return air, panel;
-895m13-1 coal seam floor sealing-tape machine lane: orientation deepening is willing in an eastern big lane of-880m13-1 coal seam floor return air, panel;
-885m13-1 coal seam floor spoil sealing-tape machine lane: an eastern former orientation, the big lane of-885m13-1 coal seam floor track, panel is prolonged Deeply change the big lane of spoil sealing-tape machine into;
-906m13-1 coal seam floor track lane: using eastern former orientation, the big lane of-906m13-1 coal seam floor return air, a panel deepening as Track lane.
2) exploiting field in the middle part of the three C group coals of west, Pan three ore deposit
As shown in Figure 4, this exploiting field system also combined layout, simultaneously take account of this gas control tunnel, exploiting field and only have 2, front Phase arranges spoil sealing-tape machine system construction Comprehensive Gas Control lane, is changed into return airway time putting into production in exploiting field, and therefore this is adopted District arranges 4 system tunnels altogether, i.e. few than model arrangement arranges 1 return aircourse, and 4 tunnels are respectively track tunnel 34, return aircourse 33, spoil sealing-tape machine tunnel 32 and sealing-tape machine system tunnel 31, time putting into production in spoil sealing-tape machine system exploiting field Change air return system into.The program is few 4 tunnels than layered arrangement, and quantities estimates 3300m.
The foregoing is only preferred embodiment of the present utility model, not in order to limit this utility model, all at this Any amendment, equivalent and the improvement etc. made within the spirit of utility model and principle, should be included in this utility model Protection domain within.

Claims (2)

1. a tunnel structure for colliery system, it includes five the system lanes being entirely located between two-layer coal and being parallel to each other Road, five system tunnels are: track lane (1), sealing-tape machine lane (2), coal seam floor return airway (3), coal top board return airway (4) and spoil Sealing-tape machine system lane (5);It is characterized in that: at track lane (1), sealing-tape machine lane (2), coal seam floor return airway (3) and spoil adhesive tape Return airway (6) in the coal column in machine system lane (5) this four systems tunnel uses rock gangway to replace coal road;Track lane (1) Return airway (6) is directly connected with track lane (1);The return airway (6) in sealing-tape machine lane (2) is by coal bunker and sealing-tape machine lane (2) it is connected;The return airway (6) of coal seam floor return airway (3) is connected with coal seam floor return airway (3) by connection lane (7).
2. the tunnel structure of colliery system as claimed in claim 1, it is characterised in that: described tunnel structure also includes being positioned at two Two coal seam floor extraction lanes (8) between layer coal, every coal seam floor extraction lane (8) and coal top board return airway (4), spoil sealing-tape machine System lane (5) all communicates.
CN201620868055.9U 2016-08-11 2016-08-11 A kind of tunnel structure of colliery system Withdrawn - After Issue CN205858370U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620868055.9U CN205858370U (en) 2016-08-11 2016-08-11 A kind of tunnel structure of colliery system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620868055.9U CN205858370U (en) 2016-08-11 2016-08-11 A kind of tunnel structure of colliery system

Publications (1)

Publication Number Publication Date
CN205858370U true CN205858370U (en) 2017-01-04

Family

ID=57593487

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620868055.9U Withdrawn - After Issue CN205858370U (en) 2016-08-11 2016-08-11 A kind of tunnel structure of colliery system

Country Status (1)

Country Link
CN (1) CN205858370U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106121673A (en) * 2016-08-11 2016-11-16 淮南矿业(集团)有限责任公司 A kind of tunnel structure of colliery system
CN113217096A (en) * 2021-06-03 2021-08-06 北京天地华泰矿业管理股份有限公司 Goaf accumulated water treatment method suitable for multi-coal-seam mining monoclinic structure mining area

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106121673A (en) * 2016-08-11 2016-11-16 淮南矿业(集团)有限责任公司 A kind of tunnel structure of colliery system
CN113217096A (en) * 2021-06-03 2021-08-06 北京天地华泰矿业管理股份有限公司 Goaf accumulated water treatment method suitable for multi-coal-seam mining monoclinic structure mining area

Similar Documents

Publication Publication Date Title
CN103628877B (en) A kind of multilayer gentle dip is thin-in thick mineral deposit filling mining method
CN101975064A (en) Mechanical continuous mining method for gently inclined thin ore body
WO2015090128A1 (en) Skip-mining type wangeviry stope branch roadway filling and coal mining method
CN1078301C (en) All thickness coal mining method for seam misplaced coal tunnel distribution on thick seam
CN108952716B (en) Thick coal seam longwall working face multi-lane arrangement method
CN105298496B (en) Complete adopt of reserved working face coal column is set to fill coal-mining method entirely
CN104100270B (en) A kind of low-angle dip mineral ore Truckless mining method
CN102352769A (en) Integrated mining method for commonly mining coal and gas of high mine
CN107559008B (en) A method of joint second mining super high seam stops adopting line coal column
CN103104261A (en) Multilayer ore body three dimension cooperation mining method
CN108397227A (en) A kind of progressive extinction roadway layout method of tendency
CN104088643A (en) High-dipping extremely-close-distance coal seam top coal caving mining method
CN109915197A (en) A kind of method that rock gangway km directional long borehole substitution middle part bottom pumping rock gangway is taken out at bottom
CN205858370U (en) A kind of tunnel structure of colliery system
CN103147759B (en) Prospecting and short-hole shrinkage mining method of small inclined ore body
CN109882175A (en) It realizes the working face extraction in a lane three and stops adopting equipment returning work compound method
CN104343453B (en) Thick mineral deposit filling mining method in a kind of low-angle dip
CN105201508A (en) Backstoping method for continuous miner under hard roof condition of thick coal seam
CN104343454B (en) A kind of mechanization point pillar house column mining method
CN106437744A (en) Combined supporting method achieving inclined coal seam double-roadway arrangement and three-dimensional tunneling
CN106121673B (en) A kind of tunnel structure of colliery system
CN110671148B (en) One-hole multi-open ground grouting filling method above coal pillar
CN114427463B (en) Deep deposit downward approach type plate area partition unloading layering advanced pressure relief stoping method
CN105649627B (en) A kind of single girdle coal-mining method of high-dipping
CN113294199B (en) Method for arranging gas control roadway under mining of lower protective layer

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20170104

Effective date of abandoning: 20180126