CN1078301C - All thickness coal mining method for seam misplaced coal tunnel distribution on thick seam - Google Patents

All thickness coal mining method for seam misplaced coal tunnel distribution on thick seam Download PDF

Info

Publication number
CN1078301C
CN1078301C CN98100544A CN98100544A CN1078301C CN 1078301 C CN1078301 C CN 1078301C CN 98100544 A CN98100544 A CN 98100544A CN 98100544 A CN98100544 A CN 98100544A CN 1078301 C CN1078301 C CN 1078301C
Authority
CN
China
Prior art keywords
seam
coal
intake
high seam
mining method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN98100544A
Other languages
Chinese (zh)
Other versions
CN1190693A (en
Inventor
赵景礼
吴健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
University China Mining
Original Assignee
University China Mining
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by University China Mining filed Critical University China Mining
Priority to CN98100544A priority Critical patent/CN1078301C/en
Publication of CN1190693A publication Critical patent/CN1190693A/en
Application granted granted Critical
Publication of CN1078301C publication Critical patent/CN1078301C/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Auxiliary Methods And Devices For Loading And Unloading (AREA)
  • Road Paving Structures (AREA)

Abstract

The present invention relates to an all thickness coal mining method for seam misplaced coal tunnel distribution on a thick seam. In the seam, an air inlet coal tunnel (in general, also a conveying coal tunnel) and an air return coal tunnel which are connected with both ends of an extracting face are respectively distributed in different seam positions in the thick seam. The present invention has the advantages of simple coal tunnel distribution, easy operation, high practicality, high extraction rate and low cost of coal mining and is favorable to the solution of the problems of fire hazard prevention and cure, methane drainage, coal tunnel maintenance, etc.

Description

High seam staggered floor position roadway arrangement is adopted complete thick coal-mining method
The present invention relates to a kind of high seam coal-mining method, particularly a kind of high seam staggered floor position roadway arrangement is adopted complete thick coal-mining method.
In the present prior art, exploitation gentle dip and inclination high seam mainly adopt separate zone production and top coal caving.There is high seam to compose the mining area of depositing in the whole nation and mostly adopts separate zone production.In recent years, obtained using comparatively widely, mainly adopted top coal caving as Lu'an Bureau of Mine, Yangquan mineral bureau, Yanzhou mining industry (group) company owing to top coal caving has highly efficient and productive advantage.Though top coal caving has highly efficient and productive advantage, exist also simultaneously that to lose coal more, the shortcoming that coal recovery rate is low.In addition, the problem of control fire, firedamp drainage, improvement dust is also even more serious than separate zone production.In the Coal Loss of top coal caving, face end and two lanes that link to each other are not therewith put coal that coal causes to decrease proportion big, and can not get for a long time solving.Owing to there is such shortcoming, the further popularization of top coal caving is restricted.No matter be separate zone production, or top coal caving, in existing production system, connect the intake and the return aircourse at stope two ends, be arranged in the same one deck position in the coal seam; Then to stay between adjacent two work planes and establish bigger coal column, satisfy the requirement of protecting the lane.This part coal column also causes loses coal, and is arranged in the tunnel of coal column, and its maintenance situation is also not so good.
The objective of the invention is provides a kind of simple, practical at above-mentioned the deficiencies in the prior art, and can improve coal recovery rate by a relatively large margin, the high seam staggered floor position roadway arrangement that more helps simultaneously solving problems such as control fire, firedamp drainage, roadway maintenance is adopted complete thick coal-mining method.
The object of the present invention is achieved like this: in the coal seam, will connect the intake (generally being haulage drift simultaneously) at stope two ends and the different layers position that the return aircourse is arranged in high seam.
The layer position of intake in the coal seam is below or above the layer position of return aircourse in this coal seam.When seam inclination hour, intake is along the high seam backplane, the return aircourse arranges that along the high seam top board when seam inclination was big, intake arranged that along roof the return aircourse is along the high seam backplane.Back production finish under the stable goaf of a work plane, arrange intake or return aircourse.
In the present invention, owing to adopted the roadway arrangement mode of staggered layers position, thus make the top coal in insoluble termination of existing top coal caving and two lanes be able to extraction; Also, improved the rate of extraction, reduced disaster hidden-trouble coal column (strip coal pillar when section coal pillar or the inclination broadwall) extraction that needs to stay under existing top coal caving and the separate zone production condition between adjacent two work planes of establishing.Because air intake or return aircourse near the goaf are arranged under the stable goaf, are positioned at stress relaxed area, corresponding another return aircourse or intake arrange along roof, like this to the driving in two tunnels with safeguard all very favourable.In most of the cases, the return aircourse is arranged along roof, helps firedamp drainage.
Advantage of the present invention is: roadway arrangement is simple, easily row, practical, the rate of extraction is high, mining costs is low, more helps solving difficult problems such as control fire, firedamp drainage and roadway maintenance.
Fig. 1 be seam inclination hour, the roadway arrangement schematic diagram.
Fig. 2 is seam inclination when big, the roadway arrangement schematic diagram.
The present invention is further illustrated below in conjunction with accompanying drawing.
As shown in Figure 1, after a last working face extraction finishes, under its return aircourse (4) and stable goaf (6) thereof, tunnel the intake (1) of this work plane (3) along seat earth (7), be triangle coal column (5) between an intake (1) and the last work plane goaf (6), tunnel the return aircourse (2) of this work plane (3) along roof (9), the layer position in 2 air way roads (2) is higher than the layer position of intake (1), stope mainly adopts existing caving mining technology to emit top coal (8), local location can be according to the needs of digging laneway under the goaf, be aided with measures such as lapping or notes oar, after waiting to have adopted this work plane, can adopt next work plane, back production is carried out as shown in Figure 1 by that analogy in the position of the intake of next stope (10).Stope can advance by across pitch, also can be determined on a case-by-case basis along tilting to advance.
As shown in Figure 2, the inclination angle of high seam is bigger, after a last working face extraction finishes, under its intake (14) and stable goaf (16) thereof, along seat earth (17) driving return aircourse (12), be triangle coal column (15) between return aircourse (12) and goaf (1 6), the intake (11) of this work plane (13) arranges that along roof (19) top board (19) is top coal (18) down.The return aircourse of next stope (20) is in this work plane intake (11) bottom.

Claims (4)

1, high seam staggered floor position roadway arrangement is adopted complete thick coal-mining method, it is characterized in that: in the coal seam, will connect the intake at stope two ends and the different layers position that the return aircourse is arranged in high seam.
2, high seam staggered floor according to claim 1 position roadway arrangement is adopted complete thick coal-mining method, it is characterized in that: the layer position in this high seam of intake place is below or above the layer position in this high seam of place, return aircourse.
3, high seam staggered floor according to claim 1 and 2 position roadway arrangement is adopted complete thick coal-mining method, it is characterized in that: when seam inclination hour, intake is along the high seam backplane, the return aircourse is arranged along the high seam top board, when seam inclination is big, intake arranges that along roof the return aircourse is along the high seam backplane.
4, high seam staggered floor according to claim 1 and 2 position roadway arrangement is adopted complete thick coal-mining method, it is characterized in that: back production finish under the stable goaf of a work plane, arrange intake or return aircourse.
CN98100544A 1998-02-18 1998-02-18 All thickness coal mining method for seam misplaced coal tunnel distribution on thick seam Expired - Lifetime CN1078301C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN98100544A CN1078301C (en) 1998-02-18 1998-02-18 All thickness coal mining method for seam misplaced coal tunnel distribution on thick seam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN98100544A CN1078301C (en) 1998-02-18 1998-02-18 All thickness coal mining method for seam misplaced coal tunnel distribution on thick seam

Publications (2)

Publication Number Publication Date
CN1190693A CN1190693A (en) 1998-08-19
CN1078301C true CN1078301C (en) 2002-01-23

Family

ID=5216087

Family Applications (1)

Application Number Title Priority Date Filing Date
CN98100544A Expired - Lifetime CN1078301C (en) 1998-02-18 1998-02-18 All thickness coal mining method for seam misplaced coal tunnel distribution on thick seam

Country Status (1)

Country Link
CN (1) CN1078301C (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100590295C (en) * 2004-02-10 2010-02-17 中国矿业大学(北京校区) Three-section type stoping process for full-height mining of thick coal seam

Families Citing this family (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100356036C (en) * 2003-03-18 2007-12-19 淮南矿业(集团)有限责任公司 Method for pumping out gas from mining coal layer roof
CN101876253A (en) * 2009-04-29 2010-11-03 宝钢集团新疆八一钢铁有限公司 Working surface layout method for mining steeply dipping coal seam
CN102031972B (en) * 2009-09-25 2013-04-24 中国矿业大学(北京) L-shaped mining method under open-underground mining
CN101967975B (en) * 2010-09-30 2012-11-21 大同煤矿集团有限责任公司 Fully-mechanized caving mining process technology with large mining height in super-high seam (14-20m)
CN102392681A (en) * 2011-10-14 2012-03-28 中国矿业大学 Scour protection arrangement method of gateway of adjacent hollow area at thick coal seam
CN102564725A (en) * 2012-03-12 2012-07-11 徐州中矿安达矿山科技有限公司 Simulation experiment device of three-dimensional gas extraction worked-out area flow field
CN102900438B (en) * 2012-10-12 2014-11-19 山西焦煤集团有限责任公司 Residual coal full-mechanized repeated mining method of near-distance inflammable seam gob
CN103061765B (en) * 2012-12-14 2015-02-18 北京昊华能源股份有限公司 Z type horizontal stratification top coal caving coal mining method in half-edge thick coal seam
CN103266893B (en) * 2013-05-08 2015-08-12 中国矿业大学(北京) Without the application of coal column coal-mining method in lower protective seam mining
CN105317438B (en) * 2015-11-09 2017-10-13 中国矿业大学(北京) The pre- coal-mining method for adopting the broken top coal of layering in the middle part of a kind of super high seam
CN106437744A (en) * 2016-09-26 2017-02-22 中国矿业大学(北京) Combined supporting method achieving inclined coal seam double-roadway arrangement and three-dimensional tunneling
CN107060763A (en) * 2017-07-03 2017-08-18 中国矿业大学(北京) A kind of method for realizing pole close-in seamses economy, safety and high-efficiency mining
CN109723439A (en) * 2017-10-30 2019-05-07 中国矿业大学(北京) The method of super high seam full-seam mining Coal Mining Equipment Complement
CN108086976A (en) * 2017-12-11 2018-05-29 中国矿业大学(北京) The method of low-angle dip, inclined super high seam full-seam mining top coal caving
CN108086978B (en) * 2017-12-18 2019-12-10 太原理工大学 Coal mining method suitable for deep well extra-thick coal seam
CN108442929A (en) * 2018-03-21 2018-08-24 中国矿业大学(北京) Wrong formula longwall top coal caving is along top arrangement drilling presplitting top coal outside high seam staggered floor position
CN108843354A (en) * 2018-06-22 2018-11-20 太原理工大学 A kind of inclined super high seam lane top asymmetric anchor stalk method for protecting support of gob side entry driving
CN108952716B (en) * 2018-06-22 2020-06-09 太原理工大学 Thick coal seam longwall working face multi-lane arrangement method
CN108952715B (en) * 2018-06-22 2020-05-05 太原理工大学 Gob-side entry driving top coal supporting and reinforcing method for inclined thick/extra-thick coal seam entry top
CN109763822A (en) * 2019-01-21 2019-05-17 西安科技大学 Face in steep thick coal seam Multi sectional is without coal column placement method between coal column staggered floor Hu Xiang and section
CN110080767B (en) * 2019-04-03 2020-11-10 太原理工大学 Overlap joint arrangement method for layered mining working face of thick coal seam
CN112377194A (en) * 2020-11-06 2021-02-19 窑街煤电集团有限公司 Method for preventing rock burst by staggered arrangement of mining working face roadway

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1656124A1 (en) * 1988-07-11 1991-06-15 Институт угля СО АН СССР Method for mining thick steeply deeping coal seam with stowing
SU1659657A1 (en) * 1989-07-20 1991-06-30 Всесоюзный научно-исследовательский и проектно-конструкторский угольный институт "КузНИУИ" Method of mining thick steep and sloping coal seams
CN1067705A (en) * 1991-06-14 1993-01-06 王晓利 Funnel work plane medium-thickness seam exploitation method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1656124A1 (en) * 1988-07-11 1991-06-15 Институт угля СО АН СССР Method for mining thick steeply deeping coal seam with stowing
SU1659657A1 (en) * 1989-07-20 1991-06-30 Всесоюзный научно-исследовательский и проектно-конструкторский угольный институт "КузНИУИ" Method of mining thick steep and sloping coal seams
CN1067705A (en) * 1991-06-14 1993-01-06 王晓利 Funnel work plane medium-thickness seam exploitation method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100590295C (en) * 2004-02-10 2010-02-17 中国矿业大学(北京校区) Three-section type stoping process for full-height mining of thick coal seam

Also Published As

Publication number Publication date
CN1190693A (en) 1998-08-19

Similar Documents

Publication Publication Date Title
CN1078301C (en) All thickness coal mining method for seam misplaced coal tunnel distribution on thick seam
CN104727820B (en) Two-step sublevel open-stop and delayed filling mining method
CN104141495B (en) Filling mining method for gently inclined medium-thickness phosphate ore body
CN108952716B (en) Thick coal seam longwall working face multi-lane arrangement method
CN108150172A (en) A kind of single method of mining coal from heavy pitch thick coal seam
CN104100270B (en) A kind of low-angle dip mineral ore Truckless mining method
CN101975064A (en) Mechanical continuous mining method for gently inclined thin ore body
CN102953733A (en) Central outside-vein house pillar type combined crosscut two-end inside-vein continuous segment filling mining method
CN105804788A (en) Method for managing coalbed gas roadway
CN101105129A (en) Mining environment reconstructed continuous mining afterwards filling mining method
CN103628877A (en) Multilayer gentle dip thin-medium ore deposit filling and mining method
CN102352769A (en) Integrated mining method for commonly mining coal and gas of high mine
CN102392642A (en) Method for arranging roadways on coal-pillar-free stope
CN103485786A (en) Steeply inclined coal seam strike long-wall mechanization mining method
CN104343453B (en) Thick mineral deposit filling mining method in a kind of low-angle dip
CN114427463B (en) Deep deposit downward approach type plate area partition unloading layering advanced pressure relief stoping method
CN108505999A (en) A kind of high prominent more lane method for arranging of working face of coal seam
CN100590295C (en) Three-section type stoping process for full-height mining of thick coal seam
CN103174424A (en) Breast and pillar method under long-wall arrangement
CN102678122B (en) Improved inlet-route stoping method for large, thick and cracked ores under scattered body through top and bottom column
CN101981273A (en) A method and an apparatus for mining a material in an underground environment
CN211666747U (en) Coal mine underground crossheading roadway tunneling composite supporting device
CN1067290A (en) Room-and-pilar type caving for mine
CN207829887U (en) A kind of single steep-inclined thick coal seam coal mining system
CN103362511A (en) Steep medium-thickness coal seam stepped coal pillar-free coal mining method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20020123

CX01 Expiry of patent term