CN101824932B - 抢修塔的塔段 - Google Patents

抢修塔的塔段 Download PDF

Info

Publication number
CN101824932B
CN101824932B CN2010101339518A CN201010133951A CN101824932B CN 101824932 B CN101824932 B CN 101824932B CN 2010101339518 A CN2010101339518 A CN 2010101339518A CN 201010133951 A CN201010133951 A CN 201010133951A CN 101824932 B CN101824932 B CN 101824932B
Authority
CN
China
Prior art keywords
column
tower
tower section
brace
flange
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010101339518A
Other languages
English (en)
Other versions
CN101824932A (zh
Inventor
李福员
吕伟宏
吕卫国
周建强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China Electric Power Research Institute Co Ltd
Ningbo Tianhong Power Appliance Co Ltd
Original Assignee
Ningbo Tianhong Power Appliance Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Tianhong Power Appliance Co Ltd filed Critical Ningbo Tianhong Power Appliance Co Ltd
Priority to CN2010101339518A priority Critical patent/CN101824932B/zh
Publication of CN101824932A publication Critical patent/CN101824932A/zh
Application granted granted Critical
Publication of CN101824932B publication Critical patent/CN101824932B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

本发明公开了一种抢修塔的塔段,包括立柱(1)、斜杆(2),所述的斜杆(2)连接在两相邻立柱(1)之间,在塔段的两端各设有一个法兰(3),所述的立柱(1)和斜杆(2)、立柱(1)和法兰(3)之间均为可拆式连接;所述的塔段还包括若干个抱箍(5),所述的抱箍(5)套在立柱(1)上,所述的斜杆(2)连接在立柱(1)上;所述的法兰(3)上设有套筒(4),所述的立柱(1)可套入套筒(4)内。采用本发明结构,柱杆、斜杆、法兰、抱箍都是可拆式连接,所以在搬运的时候,可以将各部分分别运往事故地点,就地组装成塔段,而无需事先铆接好整个塔段,克服了整个塔段搬运的不便,从而减少了抢修的难度和时间。

Description

抢修塔的塔段
技术领域:
本发明涉及抢修塔领域,具体的讲是一种抢修塔的塔段。
背景技术:
倒杆、倒塔事故对电力系统构成重大的威胁,它不仅造成电力设备损坏,供电中断,还严重影响了电网的安全运行和用户正常的安全用电。抢修塔是用于电力系统输电线路发生倒杆、倒塔或塔基滑坡造成停电事故时,能临时代替事故塔迅速恢复供电的设备。
现有技术的抢修塔是由多个塔段通过法兰连接而成,每一个塔段包括立柱、斜杆,所述的立柱有四根,所述的斜杆连接在两相邻立柱之间,在塔段的两端各设有一个法兰。在采用抢修塔对电力设备进行抢修和临时代替事故塔恢复供电时,需要将设计好的多个塔段运往事故地点,在事故地点用塔段两端的法兰对多个塔段进行拼接。
然而,上述现有技术的抢修塔的塔段中的立柱、斜杆、法兰都是铆接而成的,在运往事故地点之前,整个塔段都已经铆接完毕,在搬运的时候就需要将完整的塔段运往事故地点,这就对搬运造成了一定的难度,尤其在交通运输不方便地区,如:高山上,因为无法采用交通工具运输,就势必要采用人工运输,大大增加了抢修的难度和时间。
发明内容:
本发明要解决的技术问题,是提供一种便于运输的抢修塔的塔段。
本发明的技术解决方案是,提供以下结构的抢修塔的塔段,包括立柱、斜杆,所述的立柱有四根,所述的斜杆连接在两相邻立柱之间,在塔段的两端各设有一个法兰。
所述的立柱和斜杆、立柱和法兰之间均为可拆式连接。
所述的塔段还包括若干个抱箍,所述的抱箍套在立柱上,所述的斜杆可通过抱箍及其螺栓、螺帽连接在立柱上。
所述的法兰上设有四个带限位端板的套筒,所述的立柱可一一对应套入套筒内,经紧固螺钉固紧。
所述的抱箍上设有两对安装耳,所述的两对安装耳互为90度;每对安装耳(6)相互之间形成安装嵌槽,所述的安装耳上设有通孔,所述的斜杆的两端各设有一安装孔,可采用螺栓穿过通孔和安装孔实现抱箍和斜杆的可拆式连接。
采用以上结构后与现有技术相比,本发明具有以下优点:采用本发明结构,立柱、斜杆、法兰、抱箍都是可拆式连接,所以在搬运的时候,可以将立柱、斜杆、法兰、抱箍分别运往事故地点,在事故地点就地组装成塔段,而无需事先铆接好整个塔段,克服了整个塔段搬运的不便,从而减少了抢修的难度和时间。
在将立柱、斜杆、法兰、抱箍运往事故地点后,可以先在斜杆的两端连接在抱箍的安装耳上,再将抱箍套入立柱当中,并采用紧固件将抱箍与立柱抱紧,然后,将立柱套入法兰的套筒内,并采用紧固螺钉将立柱和法兰固定,这样的连接方式,既方便组装,也容易拆卸;需要拆卸时,则只需取下紧固件,将立柱从套筒中取出,抱箍从立柱中取出,并对抱箍和斜杆进行拆卸就可以顺利完成塔段的拆卸了;由于抱箍和斜杆之间是可以转动的,所以也可以先将斜杆与抱箍连接好,并折叠起来,到事故现场组装的时候之间将抱箍套入立柱就可以了,拆卸时,斜杆与抱箍可以不进行拆卸,而是直接将抱箍从立柱中取出,斜杆和抱箍在下次组装时就可以直接拿来使用了。
附图说明:
图1为本发明的抢修塔的塔段的结构示意图。
图2为本发明的抢修塔的塔段的侧面示意图
图3为本发明的抢修塔的塔段的法兰的结构示意图。
图4为本发明的抢修塔的塔段的抱箍的结构示意图。
图5为本发明的抢修塔的塔段的安装耳的结构示意图。
图6为本发明的抢修塔的塔段的斜杆的结构示意图。
图中所示:1、立柱,2、斜杆,3、法兰,4、套筒,5、抱箍,6、安装耳,7、安装嵌槽,8、通孔,9、安装孔,10、限位端板。
具体实施方式:
下面结合附图和具体实施方式对本发明作进一步说明:
本发明的抢修塔的塔段,包括立柱1、斜杆2,所述的立柱1有四根,所述的斜杆2连接在两相邻立柱1之间,在塔段的两端各设有一个法兰3。
所述的立柱1和斜杆2、立柱1和法兰3之间均为可拆式连接。
所述的塔段还包括若干个抱箍5,所述的抱箍5套在立柱1上,所述的斜杆2可通过抱箍5及其螺栓、螺帽连接在立柱1上。
所述的法兰3上设有四个带限位端板10的套筒4,所述的立柱1可一一对应套入套筒4内,经紧固螺钉固紧;所述的限位端板10上设有比立柱1口径小的中心孔,以方便雨水的流过,且在每个限位端板10上还设有3个连接孔,用以塔段之间法兰的连接。
所述的抱箍5上设有两对安装耳6,所述的两对安装耳6互为90度;每对安装耳6相互之间形成安装嵌槽7,所述的安装耳6上设有通孔8,所述的斜杆2的两端各设有一安装孔9,可采用螺栓穿过通孔8和安装孔9实现抱箍5和斜杆2的可拆式连接;由于塔段的两个相邻侧面是垂直的,两对安装耳6互为90度有利于斜杆2的安装。
以上仅就本发明较佳的实施例作了说明,但不能理解为是对权利要求的限制。本发明不仅局限于以上实施例,其具体结构允许有变化,例如:所述的带有两对安装耳6的抱箍5也可以用两个带一对安装耳的抱箍来替换,总之,凡在本发明独立权利要求的保护范围内所作的各种变化均在本发明的保护范围内。

Claims (1)

1.一种抢修塔的塔段,包括立柱(1)、斜杆(2),所述的立柱(1)有四根,所述的斜杆(2)连接在两相邻立柱(1)之间,在塔段的两端各设有一个法兰(3),其特征在于:所述的立柱(1)和斜杆(2)、立柱(1)和法兰(3)之间均为可拆式连接;所述的塔段还包括若干个抱箍(5),所述的抱箍(5)套在立柱(1)上,所述的斜杆(2)通过抱箍(5)及其螺栓、螺帽连接在立柱(1)上;所述的法兰(3)上设有四个带限位端板(10)的套筒(4),所述的立柱(1)一一对应套入套筒(4)内,经紧固螺钉固紧;所述的抱箍(5)上设有两对安装耳(6),所述的两对安装耳(6)互为90度;每对安装耳(6)相互之间形成安装嵌槽(7),所述的安装耳(6)上设有通孔(8),所述的斜杆(2)的两端各设有一安装孔(9),采用螺栓穿过通孔(8)和安装孔(9)实现抱箍(5)和斜杆(2)的可拆式连接。
CN2010101339518A 2010-03-23 2010-03-23 抢修塔的塔段 Expired - Fee Related CN101824932B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101339518A CN101824932B (zh) 2010-03-23 2010-03-23 抢修塔的塔段

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101339518A CN101824932B (zh) 2010-03-23 2010-03-23 抢修塔的塔段

Publications (2)

Publication Number Publication Date
CN101824932A CN101824932A (zh) 2010-09-08
CN101824932B true CN101824932B (zh) 2011-08-03

Family

ID=42689076

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101339518A Expired - Fee Related CN101824932B (zh) 2010-03-23 2010-03-23 抢修塔的塔段

Country Status (1)

Country Link
CN (1) CN101824932B (zh)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102661057B (zh) * 2012-05-30 2015-01-21 国家电网公司 电力转角塔拉腿主材更换方法以及专用主材卡具
CN104074388A (zh) * 2013-03-28 2014-10-01 国家电网公司 一种组合式高压线路抢修塔用单元体
CN104074389A (zh) * 2013-03-28 2014-10-01 国家电网公司 一种组合式高压线路铁塔立柱式抢修塔
CN103243955B (zh) * 2013-05-24 2015-02-04 国家电网公司 一种水田电力线路电杆抢修方法
CN103967317B (zh) * 2014-05-26 2016-09-21 国家电网公司 一种输电线路抢修塔塔身
CN104847156A (zh) * 2015-05-29 2015-08-19 王勇 一种单元组合式通信塔
CN105804476A (zh) * 2016-05-09 2016-07-27 常熟风范电力设备股份有限公司 一种高稳定性全钢通讯塔
CN106593069B (zh) * 2016-12-30 2019-01-15 浙江瑞邦智能装备股份有限公司 一种线路抢修铁塔组件
CN107620515A (zh) * 2017-11-06 2018-01-23 贵州电网有限责任公司 塔段分段吊立装置
CN108915334B (zh) * 2018-07-20 2020-08-04 南方电网科学研究院有限责任公司 一种输电抢修塔
CN113605744A (zh) * 2021-08-16 2021-11-05 广东宏丰建设工程有限公司 一种轻钢装配式仿古建筑

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004084438A (ja) * 2002-08-26 2004-03-18 Fukumoto Kogyo Kk 鉄塔構造用鋼管主柱材密封時の除湿方法
JP4343646B2 (ja) * 2003-10-20 2009-10-14 株式会社巴技研 ガイドタワーを構成する支柱及びその支柱を用いた風力発電機の構築方法。
CN2903262Y (zh) * 2006-03-24 2007-05-23 浙江安成通信工程有限公司 通信用三管塔
CN201679267U (zh) * 2010-03-23 2010-12-22 宁波天弘电力器具有限公司 抢修塔的塔段

Also Published As

Publication number Publication date
CN101824932A (zh) 2010-09-08

Similar Documents

Publication Publication Date Title
CN101824932B (zh) 抢修塔的塔段
CN201679267U (zh) 抢修塔的塔段
CN201671391U (zh) 轻型线路抢修塔
CN101463667A (zh) 输电铁塔的加固方法
CN203799586U (zh) 输电线路钢管塔标识牌安装支架
BR112017010873B1 (pt) Dispositivo para reforçar um monopolo
CN201362979Y (zh) 输电铁塔的加固机构
CN213980159U (zh) 一种单管通信塔加固装置
CN105606858A (zh) 一种聚碳酸酯电表箱固定架
CN202260340U (zh) 配电网架空线路绝缘塔头吊装工具
CN201584124U (zh) 一种led屏幕连接结构及运用该连接结构的led大屏幕
CN202090658U (zh) 一种用于钢管塔的节点连接的插板、钢管塔及其节点
CN103967314B (zh) 一种10kv-110kv应急抢修杆
CN102828567A (zh) 一种新型联肢剪力墙结构
CN201447769U (zh) “十”字型立柱房梁
CN105064708B (zh) 一种建筑施工用防护栏
CN210263402U (zh) 一种大型钢结构建筑用弧形单层网壳结构
CN204607445U (zh) 分离式爬升架防护装置
CN219772788U (zh) 一种道路施工维修用装置
CN105356370A (zh) 配电线路受超出设计条件的自然灾害时弃线保杆装置
CN202004400U (zh) 电缆终端杆塔布置结构
CN204850518U (zh) 一种建筑施工用防护栏
CN202118461U (zh) 一种用于移动通信设备的增高支架
CN220415006U (zh) 一种电力铁塔用钢结构拼接装置
CN214384311U (zh) 一种安防监控系统用摄像头安装结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: NORTH CHINA POWER SCIENCE RESEARCH INST., CO., LTD

Effective date: 20131218

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 315722 NINGBO, ZHEJIANG PROVINCE TO: 315700 NINGBO, ZHEJIANG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20131218

Address after: The Western Zhou Dynasty in Xiangshan County in Zhejiang province 315700 Ningbo City Electrical Industrial Park

Patentee after: Ningbo Tianhong Power Appliance Co., Ltd.

Patentee after: North China Electrical Power Research Institute LLC

Address before: 315722 Ningbo County, Zhejiang City, Xiangshan Province West Zhou mechanical and Electrical Industrial Park

Patentee before: Ningbo Tianhong Power Appliance Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110803

Termination date: 20150323

EXPY Termination of patent right or utility model