CN201671391U - 轻型线路抢修塔 - Google Patents

轻型线路抢修塔 Download PDF

Info

Publication number
CN201671391U
CN201671391U CN2010201796241U CN201020179624U CN201671391U CN 201671391 U CN201671391 U CN 201671391U CN 2010201796241 U CN2010201796241 U CN 2010201796241U CN 201020179624 U CN201020179624 U CN 201020179624U CN 201671391 U CN201671391 U CN 201671391U
Authority
CN
China
Prior art keywords
tower body
section
tower
cross
linkage section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010201796241U
Other languages
English (en)
Inventor
赵建华
赵金峰
魏国
钱未泉
刘涛
张亚军
李鑫
李炜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhangjiakou Power Supply Co Of Jibei Electric Power Co ltd
State Grid Corp of China SGCC
Original Assignee
NORTH CHINA GRID CO Ltd ZHANGJIAGANG POWER SUPPLY Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NORTH CHINA GRID CO Ltd ZHANGJIAGANG POWER SUPPLY Co filed Critical NORTH CHINA GRID CO Ltd ZHANGJIAGANG POWER SUPPLY Co
Priority to CN2010201796241U priority Critical patent/CN201671391U/zh
Application granted granted Critical
Publication of CN201671391U publication Critical patent/CN201671391U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

本实用新型涉及输电线路设备技术领域,具体的说是一种轻型线路抢修塔。配电网中10kV、35kV输配电线路分布较广,发生倒杆等事故严重影响电网正常供电。现有的抢修方式,由于正常电杆、塔体体积和重量较大,运输不便,导致停电和抢修时间较长。本实用新型由底盘、塔体、横担、支撑装置组成;塔体由上段、中段、下段、四通段及拉线组成;塔体的上段呈锥型,四通段分别与上段下端面及中段上端面的连接;中段下端面与下段上端面或另一中段上端面连接;塔体的下段与底盘连接;横担连接在四通段上。本实用新型结构简单合理,运输方便,现场组装,快速处理倒杆、断线事故,提高了线路抢修工作效率,缩短了线路故障停电时间。

Description

轻型线路抢修塔
技术领域
本实用新型涉及输电线路设备技术领域,具体的说是一种轻型线路抢修塔。
背景技术
10kV、35kV输配电线路遍布城乡村镇,点多面广,倒杆断线事故是配电网经常发生的外力破坏事故。10kV、35kV线路发生倒杆、断线事故,往往造成大面积停电,严重影响电网正常安全供电。使用传统的设备和抢修方式,由于正常电杆、塔体体积和重量都较大,运输不便,导致线路停电和抢修时间较长,供电可靠性不能满足重要用户(如煤矿等,长时间停电会造成通风和排水系统停止)的需求。特别是山区等道路地理情况复杂的故障现场,因车辆难以到达,操作难度较大,施工效率低。
发明内容
本实用新型的目的是提供一种轻型线路抢修塔。
本实用新型的技术方案是:由底盘、塔体、横担、支撑装置组成;底盘上部有带转轴孔的连接座,下部设有定位锥,底盘边缘开有固定孔或焊接有固定片;
塔体由上段、中段、下段、四通连接段及拉线组成;塔体的上段呈锥型,四通连接段上、下两端面的法兰通过螺栓分别与上段下端面及中段上端面的法兰连接;中段下端面的法兰通过螺栓与下段上端面或另一中段上端面的法兰连接;塔体下段的下部呈倒锥型,末端开有转轴孔;转轴穿过转轴孔将塔体的下段与底盘的连接座连接;
四通连接段上固定有挂板,四通连接段的两侧各有两条连接臂;横担的中部及外端部固定有挂板,横担的内侧通过销轴连接在四通连接段的连接臂上,横担的外侧通过支撑装置与塔体连接;拉线上端与四通连接段的挂板连接,另一端固定在地面上。
本实用新型的优点是:结构简单合理,运输方便,适用于直线杆塔和耐张杆塔,可在抢修现场组装,快速处理倒杆、断线事故,有效地提高了线路抢修工作效率,缩短了线路故障停电时间。
说明书附图
图1为本实用新型的结构示意图
图2为本实用新型底盘结构示意图
图3为本实用新型底盘的俯视图
图4为本实用新型塔体上段的结构示意图
图5为本实用新型塔体中段的结构示意图
图6为本实用新型塔体下段的结构示意图
图7为本实用新型塔体四通连接段的结构示意图
图8为本实用新型塔体四通连接段的俯视图
图9为本实用新型横担的结构示意图
图10为本实用新型撑臂的结构示意图
图11为本实用新型实施例2的塔体上部的示意图
图12为实施例2的塔体上部的侧视图
具体实施方式
图中1底盘、2连接座、3定位锥、4固定片、5上段、6中段、7下段、8四通连接段、9连接臂、10横担、11撑臂、12拉杆。
实施例1
从图1——图10可知,本实用新型由底盘1、塔体、横担10、支撑装置组成;本实施例为10kv直线杆塔的抢修塔,采用针式绝缘子,分别安装在塔体上段5顶端及横担10中部的挂板上;支撑装置采用撑臂11;底盘1上部有带转轴孔的连接座2,下部设有定位锥3,底盘1边缘焊接有固定片4,固定片4上开有固定孔;
根据运行线路的呼称高度要求,本实施例塔体由上段5、下段7、四通连接段8及三节中段6组成,三节中段6间的端面法兰通过螺栓连接,塔体的上段5呈锥型,四通连接段8上、下两端面的法兰通过螺栓分别与上段5下端面及第一节中段上端面的法兰连接;第三节中段6下端面的法兰通过螺栓与下段7上端面的法兰连接;塔体下段7的下部呈倒锥型,末端开有转轴孔;塔体的下段7与底盘1的连接座2通过转轴连接;
四通连接段8上焊接有挂板,四通连接段8的两侧各有两条连接臂9;横担10的内侧通过销轴连接在四通连接段8的连接臂9上,撑臂11两端分别通过螺栓与横担10的外侧及塔体的中段6连接;拉线一端通过楔形线夹与四通连接段的挂板连接,另一端固定在地面上。
抢修现场施工时,使用钢钎将底盘1固定在地面上,将塔体的上段5、中段6、下段7、四通连接段8、横担10、撑臂11组装,并安装绝缘子,塔体的下段7通过转轴与底盘1连接,通过吊车或绞盘将装配好的抢修塔立起,再使用拉线将抢修塔固定在地面。
实施例2
本实施例为35kv耐张塔杆的抢修塔。从图11——图12可知,中相的耐张绝缘子串安装在塔体上段5顶部的挂板上,针式绝缘子瓷瓶安装在塔体上段5顶部,作为引线支持;其它两边相的耐张绝缘子串连接在横担10外端部挂板处;与实施例1不同的是,支撑装置采用拉杆12;拉杆12的两端分别通过U型环与塔体上段5的顶端及横担10外端部连接固定,拉杆12上装配有花栏螺栓,用来调整拉杆12的长度。
实施例3
与实施例1、实施例2不同的是,根据输电线路的呼称高度要求,本实施例抢修塔塔体的采用一节中段6;底盘1的边缘开有固定孔。
实施例4
与实施例1、实施例2不同的是,根据输电线路呼称高度的要求,本实施例抢修塔的塔体采用四节中段6。
为了便于运输、组、立,减轻塔身的总体重量,抢修塔除横担10、法兰、底盘1、支撑装置等承力件为钢质材料,其他全部采用铝合金等材料。

Claims (2)

1.一种轻型线路抢修塔,其特征是:由底盘(1)、塔体、横担(10)、支撑装置组成;底盘(1)上部有带转轴孔的连接座(2),下部设有定位锥(3),底盘(1)边缘开有固定孔或焊接有固定片(4);
塔体由上段(5)、中段(6)、下段(7)、四通连接段(8)及拉线组成;塔体的上段(5)呈锥型,四通连接段(8)上、下两端面的法兰通过螺栓分别与上段(5)下端面及中段(6)上端面的法兰连接;中段(6)下端面的法兰通过螺栓与下段(7)上端面或另一中段(6)上端面的法兰连接;塔体下段(7)的下部呈倒锥型,末端开有转轴孔;转轴穿过转轴孔将塔体的下段(7)与底盘(1)的连接座(2)连接;
四通连接段(8)上固定有挂板,四通连接段(8)的两侧各有两条连接臂(9);横担(10)的中部及外端部固定有挂板,横担(10)的内侧通过销轴连接在四通连接段(8)的连接臂(9)上,横担(10)的外侧通过支撑装置与塔体连接;拉线上端与四通连接段(8)的挂板连接,另一端固定在地面上。
2.如权利要求1所述的一种轻型线路抢修塔,其特征是:所述的支撑装置采用撑臂(11)或拉杆(12)。
CN2010201796241U 2010-04-30 2010-04-30 轻型线路抢修塔 Expired - Lifetime CN201671391U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201796241U CN201671391U (zh) 2010-04-30 2010-04-30 轻型线路抢修塔

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201796241U CN201671391U (zh) 2010-04-30 2010-04-30 轻型线路抢修塔

Publications (1)

Publication Number Publication Date
CN201671391U true CN201671391U (zh) 2010-12-15

Family

ID=43328803

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201796241U Expired - Lifetime CN201671391U (zh) 2010-04-30 2010-04-30 轻型线路抢修塔

Country Status (1)

Country Link
CN (1) CN201671391U (zh)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103147459A (zh) * 2013-03-13 2013-06-12 江苏省电力公司宜兴市供电公司 快速成型10kV钢管杆金属基础
CN103982076A (zh) * 2014-06-04 2014-08-13 国家电网公司 一种单回110kV/35拉线型铝合金抢修塔
CN104265050A (zh) * 2014-10-17 2015-01-07 国家电网公司 一种快速抢修杆塔柱
CN104453339A (zh) * 2014-11-04 2015-03-25 国家电网公司 电力线路钢管杆架设用组装工具及工艺
CN105178680A (zh) * 2015-06-25 2015-12-23 重庆瑜煌电力设备制造有限公司 事故抢修塔及其安装方法
CN105971366A (zh) * 2016-04-29 2016-09-28 邹平县供电公司 一种基于供电施工系统的高压架空输电线路组立机构
CN106639590A (zh) * 2015-10-28 2017-05-10 刘刚 便携式农电线路抢修辅助工具
CN106639544A (zh) * 2015-10-28 2017-05-10 刘刚 线路抢修自动立杆器
CN110259258A (zh) * 2019-07-03 2019-09-20 杨平 中低压配电网应急抢修用组合式自立杆及其搭建方法
CN111817242A (zh) * 2020-07-10 2020-10-23 广州沐风信息科技有限公司 一种传送电力设备

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103147459A (zh) * 2013-03-13 2013-06-12 江苏省电力公司宜兴市供电公司 快速成型10kV钢管杆金属基础
CN103982076A (zh) * 2014-06-04 2014-08-13 国家电网公司 一种单回110kV/35拉线型铝合金抢修塔
CN104265050A (zh) * 2014-10-17 2015-01-07 国家电网公司 一种快速抢修杆塔柱
CN104453339A (zh) * 2014-11-04 2015-03-25 国家电网公司 电力线路钢管杆架设用组装工具及工艺
CN104453339B (zh) * 2014-11-04 2017-10-10 国家电网公司 电力线路钢管杆架设用组装工具及工艺
CN105178680A (zh) * 2015-06-25 2015-12-23 重庆瑜煌电力设备制造有限公司 事故抢修塔及其安装方法
CN106639590A (zh) * 2015-10-28 2017-05-10 刘刚 便携式农电线路抢修辅助工具
CN106639544A (zh) * 2015-10-28 2017-05-10 刘刚 线路抢修自动立杆器
CN105971366A (zh) * 2016-04-29 2016-09-28 邹平县供电公司 一种基于供电施工系统的高压架空输电线路组立机构
CN105971366B (zh) * 2016-04-29 2018-05-15 邹平县供电公司 一种基于供电施工系统的高压架空输电线路组立机构
CN110259258A (zh) * 2019-07-03 2019-09-20 杨平 中低压配电网应急抢修用组合式自立杆及其搭建方法
CN110259258B (zh) * 2019-07-03 2024-01-09 杨平 中低压配电网应急抢修用组合式自立杆及其搭建方法
CN111817242A (zh) * 2020-07-10 2020-10-23 广州沐风信息科技有限公司 一种传送电力设备

Similar Documents

Publication Publication Date Title
CN201671391U (zh) 轻型线路抢修塔
CN204662661U (zh) 大跨度双箱梁双索张弦桁架体系
CN202401815U (zh) 一种220kV输电线路新型复合绝缘子横担抢修塔
CN202260340U (zh) 配电网架空线路绝缘塔头吊装工具
CN202578109U (zh) 一种双立柱式铝合金事故抢修塔
CN204645793U (zh) 一种输电线路的抢修塔
CN201656340U (zh) 高压管母线支撑绝缘子更换工具
CN204577640U (zh) 一种高压预付费开关箱出线电缆连接装置
CN210598351U (zh) 一种新型三管通讯塔
CN103967314B (zh) 一种10kv-110kv应急抢修杆
CN202831765U (zh) 一种铰接式横担抢修塔
CN206237109U (zh) 一种变电站站内避雷线连接机构
CN205165660U (zh) 新型拉线制作装置
CN204703489U (zh) 绝缘快装脚手架专用固定装置
CN203961412U (zh) 空中终端的双回路钢管杆
CN103825222A (zh) 一种带电更换220kV窄基塔耐张绝缘子串用工具
CN211318521U (zh) 一种可移动超高压辅助验电支架
CN203821931U (zh) 一种10kv-110kv应急抢修杆
CN203813320U (zh) 带电更换220kV窄基塔耐张绝缘子串用工具
CN202712717U (zh) 一种敞开式变电站架构避雷针的加固支架
CN204457038U (zh) 一种变电构架横梁悬挑结构及桁架
CN204609420U (zh) 一种高电压等级快速抢修塔
CN206329132U (zh) 一种220kV架空输电线路高跨钢管杆塔
CN204205869U (zh) 动力电缆中间连接装置
CN103825223A (zh) 带电更换220kv窄基塔耐张绝缘子串工具及作业方法

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20130509

C41 Transfer of patent application or patent right or utility model
C56 Change in the name or address of the patentee

Owner name: ZHANGJIAKOU POWER SUPPLY COMPANY, JI-BEI ELECTRIC

Free format text: FORMER NAME: NORTH CHINA GRID CO., LTD. ZHANGJIAGANG POWER SUPPLY COMPANY

CP01 Change in the name or title of a patent holder

Address after: 075000 Zhangjiakou City, Hebei province Qiaodong District Road No. 131 Street

Patentee after: ZHANGJIAKOU POWER SUPPLY COMPANY OF JIBEI ELECTRIC POWER Co.,Ltd.

Address before: 075000 Zhangjiakou City, Hebei province Qiaodong District Road No. 131 Street

Patentee before: North China Grid Company Ltd. Zhangjiakou Branch

TR01 Transfer of patent right

Effective date of registration: 20130509

Address after: 075000 Zhangjiakou City, Hebei province Qiaodong District Road No. 131 Street

Patentee after: ZHANGJIAKOU POWER SUPPLY COMPANY OF JIBEI ELECTRIC POWER Co.,Ltd.

Patentee after: State Grid Corporation of China

Address before: 075000 Zhangjiakou City, Hebei province Qiaodong District Road No. 131 Street

Patentee before: ZHANGJIAKOU POWER SUPPLY COMPANY OF JIBEI ELECTRIC POWER Co.,Ltd.

CX01 Expiry of patent term

Granted publication date: 20101215

CX01 Expiry of patent term