CN103147459A - 快速成型10kV钢管杆金属基础 - Google Patents
快速成型10kV钢管杆金属基础 Download PDFInfo
- Publication number
- CN103147459A CN103147459A CN2013100794529A CN201310079452A CN103147459A CN 103147459 A CN103147459 A CN 103147459A CN 2013100794529 A CN2013100794529 A CN 2013100794529A CN 201310079452 A CN201310079452 A CN 201310079452A CN 103147459 A CN103147459 A CN 103147459A
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- positioning disk
- pole metal
- main pipe
- metal foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Butt Welding And Welding Of Specific Article (AREA)
Abstract
本发明涉及一种快速成型10kV钢管杆金属基础,具体的说是用于快速抢修配电网的,属于高压电传输技术领域。其包括上定位盘和下定位盘,多个底座上端通过螺栓连接底板,并通过底座螺母紧固。底板中心焊接主管体,主管体两侧焊接连接板,连接板下端焊接在底板上。上定位盘和下定位盘分别连接在主管体上端和中间,上定位盘和下定位盘之间连接多个双头螺杆。本发明结构简单、紧凑、合理;能够满足短时间内完成架线工作的要求,使相关抢修工程及特定时间要求的工程不受水泥养护期的影响,提高抢修速度,提早送电时间,提高配网运行的可靠性;有效降低了抢修成本。
Description
技术领域
本发明涉及一种快速成型10kV钢管杆金属基础,具体的说是用于快速抢修配电网的,属于高压电传输技术领域。
背景技术
随着国家经济的高速发展,电力输送网络迅速扩大,电力部门对电网的管理要求越来越高,停电所造成的损失越来越变得难以承受。因此为保证实现供电可靠性目标,提高客户的满意率,必须实现配电网快速抢修。
配电网是电力系统的重要组成部分,它是直接和用户相连并向用户分配电能的重要环节,其安全可靠性直接影响着国民经济发展和人民生活水平。据不完全统计,我国用户停电故障中80%是由于配电网故障引起的。因此,如何提高配电网供电可靠性水平就具有非常重要的实际意义。配电网的可靠性水平由停电次数和每次停电时间来反映的,因此提高配网作业的抢修质量和效率,最大限度缩短抢修时间,对于提升供电可靠性和服务优质水平具有十分重要的意义。
根据以往的配电抢修情况分析,每当抢修工作涉及有钢管杆、法兰杆的时候,由于杆塔的基础浇筑都必须达到一定的保养时间后方可投入使用,只能等到浇筑基础满足养护期(一般为28天)后才能立杆架线,完成抢修工作。基础保养期时间长就给我们的抢修工作以及有特殊时间要求的工程带来了很大的不便,也影响了供电可靠性。
发明内容
本发明的目的在于克服上述不足之处,从而提供一种快速成型10kV钢管杆金属基础,能够满足短时间内完成架线工作的要求,使相关抢修工程及特定时间要求的工程不受水泥养护期的影响,提早送电时间,提高配网运行的可靠性。
按照本发明提供的技术方案,快速成型10kV钢管杆金属基础包括并排设置的多个底座,其特征是:还包括上定位盘和下定位盘,多个底座上端通过螺栓连接底板,并通过底座螺母紧固。底板中心焊接主管体,主管体两侧焊接连接板,连接板下端焊接在底板上。上定位盘和下定位盘分别连接在主管体上端和中间,上定位盘和下定位盘之间连接多个双头螺杆。
进一步的,连接板和底板之间焊接多个肋板。
进一步的,双头螺杆上端通过上螺母紧固,双头螺杆下端通过下螺母紧固。
进一步的,上定位盘和主管体之间焊接上加强板。
进一步的,下定位盘和主管体之间焊接下加强板。
进一步的,多个双头螺杆互相平行。
进一步的,多个双头螺杆之间焊接多个箍筋。
本发明与已有技术相比具有以下优点:
本发明结构简单、紧凑、合理;能够满足短时间内完成架线工作的要求,使相关抢修工程及特定时间要求的工程不受水泥养护期的影响,提高抢修速度,提早送电时间,提高配网运行的可靠性;有效降低了抢修成本。
附图说明
图1为本发明主视图。
图2为本发明侧视图。
图3为本发明俯视图。
附图标记说明:1-上定位盘、2-双头螺杆、3-箍筋、4-下定位盘、5-主管体、6-底板、7-肋板、8-底座、9-螺栓、10-上加强板、11-下加强板、12-上螺母、13-下螺母、14-底座螺母、15-连接板。
具体实施方式
下面本发明将结合附图中的实施例作进一步描述:
如图1~3所示,本发明主要包括并排设置的多个底座8,底座8采用混凝土浇筑,多个底座8上端通过螺栓9连接底板6,并通过底座螺母14紧固。
底板6中心焊接主管体5,主管体5两侧焊接连接板15,连接板15下端焊接在底板6上。所述连接板15和底板6之间焊接多个肋板7,多个肋板7起到加强固定的作用。
本发明还包括上定位盘1和下定位盘4,上定位盘1和下定位盘4分别连接在主管体5上端和中间。所述上定位盘1和下定位盘4之间连接多个双头螺杆2,双头螺杆2上端通过上螺母12紧固,双头螺杆2下端通过下螺母13紧固。
所述上定位盘1和主管体5之间焊接上加强板10,下定位盘4和主管体5之间焊接下加强板11,上加强板10和下加强板11起到加强强度的作用。
所述多个双头螺杆2互相平行,多个双头螺杆2之间焊接多个箍筋3,通过箍筋3进一步加强连接的强度。
本发明结构简单,方便大批量制造,在使用时,只需要将其埋在土坑中,上端上定位盘1连接固定钢管杆,能够快速进行施工,能够满足短时间内完成架线工作的要求,使相关抢修工程及特定时间要求的工程不受水泥养护期的影响,提高抢修速度,提早送电时间,提高配网运行的可靠性;有效降低了抢修成本。
Claims (7)
1.一种快速成型10kV钢管杆金属基础,包括并排设置的多个底座(8),其特征是:还包括上定位盘(1)和下定位盘(4),多个底座(8)上端通过螺栓(9)连接底板(6),并通过底座螺母(14)紧固;底板(6)中心焊接主管体(5),主管体(5)两侧焊接连接板(15),连接板(15)下端焊接在底板(6)上;上定位盘(1)和下定位盘(4)分别连接在主管体(5)上端和中间,上定位盘(1)和下定位盘(4)之间连接多个双头螺杆(2)。
2.如权利要求1所述的快速成型10kV钢管杆金属基础,其特征是:所述连接板(15)和底板(6)之间焊接多个肋板(7)。
3.如权利要求1所述的快速成型10kV钢管杆金属基础,其特征是:所述双头螺杆(2)上端通过上螺母(12)紧固,双头螺杆(2)下端通过下螺母(13)紧固。
4.如权利要求1所述的快速成型10kV钢管杆金属基础,其特征是:所述上定位盘(1)和主管体(5)之间焊接上加强板(10)。
5.如权利要求1所述的快速成型10kV钢管杆金属基础,其特征是:所述下定位盘(4)和主管体(5)之间焊接下加强板(11)。
6.如权利要求1所述的快速成型10kV钢管杆金属基础,其特征是:所述多个双头螺杆(2)互相平行。
7.如权利要求1所述的快速成型10kV钢管杆金属基础,其特征是:所述多个双头螺杆(2)之间焊接多个箍筋(3)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013100794529A CN103147459A (zh) | 2013-03-13 | 2013-03-13 | 快速成型10kV钢管杆金属基础 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013100794529A CN103147459A (zh) | 2013-03-13 | 2013-03-13 | 快速成型10kV钢管杆金属基础 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103147459A true CN103147459A (zh) | 2013-06-12 |
Family
ID=48545752
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013100794529A Pending CN103147459A (zh) | 2013-03-13 | 2013-03-13 | 快速成型10kV钢管杆金属基础 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103147459A (zh) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004353297A (ja) * | 2003-05-29 | 2004-12-16 | Nippon Steel Corp | 接合構造体 |
CN200999346Y (zh) * | 2006-09-15 | 2008-01-02 | 刘海峰 | 一种全钢制通用加固式杆塔桩基 |
CN201671391U (zh) * | 2010-04-30 | 2010-12-15 | 华北电网有限公司张家口供电公司 | 轻型线路抢修塔 |
CN201730107U (zh) * | 2010-06-30 | 2011-02-02 | 潍坊长安铁塔股份有限公司 | 电力钢管塔的桩基础 |
CN202194152U (zh) * | 2011-06-30 | 2012-04-18 | 河南省电力公司安阳供电公司 | 电力钢管塔基础 |
CN202265836U (zh) * | 2011-10-12 | 2012-06-06 | 浙江巨匠钢业有限公司 | 一种通信塔的基础结构 |
CN203113369U (zh) * | 2013-03-13 | 2013-08-07 | 江苏省电力公司宜兴市供电公司 | 快速成型10kV钢管杆金属基础 |
-
2013
- 2013-03-13 CN CN2013100794529A patent/CN103147459A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004353297A (ja) * | 2003-05-29 | 2004-12-16 | Nippon Steel Corp | 接合構造体 |
CN200999346Y (zh) * | 2006-09-15 | 2008-01-02 | 刘海峰 | 一种全钢制通用加固式杆塔桩基 |
CN201671391U (zh) * | 2010-04-30 | 2010-12-15 | 华北电网有限公司张家口供电公司 | 轻型线路抢修塔 |
CN201730107U (zh) * | 2010-06-30 | 2011-02-02 | 潍坊长安铁塔股份有限公司 | 电力钢管塔的桩基础 |
CN202194152U (zh) * | 2011-06-30 | 2012-04-18 | 河南省电力公司安阳供电公司 | 电力钢管塔基础 |
CN202265836U (zh) * | 2011-10-12 | 2012-06-06 | 浙江巨匠钢业有限公司 | 一种通信塔的基础结构 |
CN203113369U (zh) * | 2013-03-13 | 2013-08-07 | 江苏省电力公司宜兴市供电公司 | 快速成型10kV钢管杆金属基础 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103532076B (zh) | 一种输电线路防鸟箱 | |
CN201673736U (zh) | 针式绝缘子 | |
CN107508192B (zh) | 一种可调节导线检修滑车 | |
CN203800477U (zh) | 带电更换输电线路耐张单串导线侧第一片绝缘子的卡具 | |
CN203871745U (zh) | 220kV线路钢管杆带电更换直线绝缘子所用双吊点杆头卡具 | |
CN203113369U (zh) | 快速成型10kV钢管杆金属基础 | |
CN204241323U (zh) | 绝缘绳索试验装置 | |
CN209277668U (zh) | 一种加强型电线横担 | |
CN103147459A (zh) | 快速成型10kV钢管杆金属基础 | |
CN207235348U (zh) | 一种带有绝缘支撑件的短屏蔽罩 | |
CN202592314U (zh) | 一种双馈风力发电机轴承组合拆卸工装 | |
CN203113874U (zh) | 快速成型10kV钢管杆金属基础底座 | |
CN207553725U (zh) | 一种适合于高海拔地区输电塔复合材料导线横担的纵向钢支架 | |
CN203119391U (zh) | 快速成型10kV钢管杆金属基础定位盘 | |
CN103573005B (zh) | 一种复合材料杆塔加固装置及其加固方法 | |
CN202658866U (zh) | 高空门型架检修平台 | |
CN203967265U (zh) | 便携式铁塔专用接地线 | |
CN203813320U (zh) | 带电更换220kV窄基塔耐张绝缘子串用工具 | |
CN202977773U (zh) | 一种接地线万用接头 | |
CN203456795U (zh) | 用于更换四分裂导线双联耐张绝缘子串导线侧的联板卡具 | |
CN203977960U (zh) | 一种组装式防雷电线杆 | |
CN203674913U (zh) | 一种加热炉燃烧器电机拆卸辅助装置 | |
CN102683915A (zh) | 高压线快速接头 | |
CN204590410U (zh) | 一种户外变电构架悬挑钢梁 | |
CN201975684U (zh) | 一种安装在供电线路杆塔上的防雷侧针 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20130612 |