CN101812975A - 抗冰隔水套管组合结构 - Google Patents

抗冰隔水套管组合结构 Download PDF

Info

Publication number
CN101812975A
CN101812975A CN 201010159914 CN201010159914A CN101812975A CN 101812975 A CN101812975 A CN 101812975A CN 201010159914 CN201010159914 CN 201010159914 CN 201010159914 A CN201010159914 A CN 201010159914A CN 101812975 A CN101812975 A CN 101812975A
Authority
CN
China
Prior art keywords
waterproof casing
conductor tube
internal layer
layer waterproof
composite structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010159914
Other languages
English (en)
Other versions
CN101812975B (zh
Inventor
谢梅波
马英文
杨进
邓建明
刘书杰
唐文波
杨成
韩丰欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Offshore Oil Corp CNOOC
CNOOC Research Institute Co Ltd
Original Assignee
China University of Petroleum Beijing
China National Offshore Oil Corp CNOOC
CNOOC Research Center
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Petroleum Beijing, China National Offshore Oil Corp CNOOC, CNOOC Research Center filed Critical China University of Petroleum Beijing
Priority to CN2010101599144A priority Critical patent/CN101812975B/zh
Publication of CN101812975A publication Critical patent/CN101812975A/zh
Application granted granted Critical
Publication of CN101812975B publication Critical patent/CN101812975B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

本发明公开了一种抗冰隔水套管组合结构,该抗冰隔水套管组合结构包括一表层套管和一外层隔水套管,外层隔水套管套设于所述表层套管外;一内层隔水套管,对应于冰区范围设置在所述外层隔水套管与表层套管之间,且内层隔水套管的长度小于外层隔水套管的长度、大于冰区厚度,以在冰区范围局部增加外层隔水套管厚度,外层隔水套管、内层隔水套管之间的环空部分以及内层隔水套管与表层套管之间的环空部分均以水泥浇注固结。本发明内层隔水套管与表层套管之间固连,避免了内层隔水套管锤入深度不易控制的缺点,同时减少了材料用量,增大了冰区范围内局部隔水套管的抗弯刚度。本发明能够有效提高隔水套管抗冰能力,且对钻井工期无影响,能节约大量的工程费用。

Description

抗冰隔水套管组合结构
技术领域
本发明涉及一种海上石油工程设备,尤其是一种用于海上钻井隔水套管抗冰的抗冰隔水套管组合结构。
背景技术
对于海上钻井而言,隔水套管是必不可少的重要钻井设备。冬季由于有海冰覆盖,冰区跨度大,冰力大,对表层隔水套管侧向作用力大,因此表层隔水套管的抗冰能力对于冬季海上钻井安全作业起着重要的影响。目前,提高表层隔水导管抗冰能力的常规方法是:
一,采用双层隔水导管套管结构,如图1所示,即外层采用直径为76.2厘米的外层隔水套管1’,内层采用直径为60.96厘米的内层隔水套管2’,在内层隔水套管2’的内部又套设一表层套管3’,两层隔水套管的长度都是从水上井口到泥线以下50米。这种结构类型在进行内层隔水套管2’下入施工时,内层隔水套管2’锤入深度很难控制,并且会浪费大量的内层隔水套管2’,施工时间和费用会大大增加。
二,采用单层隔水套管结构,另外增加一个导管架水平层,使用导管架水平层来扶正单层隔水套管,起到提高隔水套管的抗冰能力。这种结构类型增加了导管架建造和施工的工作量,建造和作业费用增加巨大。
三,采用大尺寸隔水套管结构,来提高隔水套管的抗冰能力,这种结构类型将增加隔水套管的钢材用量,使隔水套管的作业费用大大增加。
发明内容
针对上述问题,本发明的目的是提供一种抗冰隔水套管组合结构,其可以在冰区范围局部增加表层隔水套管厚度,增强表层隔水套管抗侧应力的刚度和抗弯能力,有效地提高隔水套管抗冰能力。
为实现上述目的,本发明采取以下技术方案:一种抗冰隔水套管组合结构,包括一表层套管、一套设在所述表层套管之外的外层隔水套管,其特征在于:对应于冰区厚度范围,在所述外层隔水套管与表层套管之间夹设一内层隔水套管;所述内层隔水套管的长度小于所述外层隔水套管的长度且大于所述冰区厚度;所述外层隔水套管与内层隔水套管之间的环空部分,以及所述内层隔水套管与表层套管之间的环空部分均以水泥浇注固结。
所述内层隔水套管的上部和下部分别与所述表层套管固定连接,并随所述表层套管同时钻入。
所述内层隔水套管两端分别通过连接接头与表层套管螺纹连接。
所述连接接头包括内固定管及外固定管,所述内固定管与外固定管之间间隔设置有多个连接板,相邻的连接板之间形成有导流孔,所述内固定管的上端通过螺纹与所述表层套管连接,所述外固定管的下端通过螺纹与所述内层隔水套管连接。
所述连接接头的内固定管与外固定管之间还设置有两个以上的加强筋。
所述内层隔水套管顶部高出海平面3~8米,所述内层隔水套管水下长度为4~8米,最佳为所述内层隔水套管长10米,且其水上、水下长度均为5米。
所述内层隔水套管的厚度范围为20~51mm,最佳为25mm。
所述外层隔水套管的内径可选择36英寸或30英寸,内层隔水套管2的内径可选择24英寸或20英寸,表层套管3的内径可选择
Figure GSA00000084244000021
英寸或
Figure GSA00000084244000022
英寸,实施时可根据需要进行适当地组合。
本发明由于采取以上技术方案,其具有以下优点:
1、简化的内层隔水套管的长度控制在冰区范围,相当于增加了冰区范围的局部外层隔水套管的厚度,从而有效地提高了外层隔水套管在冰区范围内局部的抗侧应力的刚度,而且增大了与冰区范围对应的局部表层套管的抗侧应力的刚度,从而提高隔水套管的整体抗冰能力。
2、简化的内层隔水套管的上部和下部与表层套管通过连接接头进行连接,内层隔水套管上部通过上接头与表层套管连接,内层隔水套管下部通过下接头与表层套管连接。内层隔水套管随表层套管同时下入,内层隔水套管与表层套管之间环空以水泥固结来固定,从而避免了现有技术中内层隔水套管钻入深度不易控制的缺点,不仅便于施工,而且减少了套管材料用量。
3、针对冬季表层隔水套管受到的海冰作用力,简化隔水套管组合结构,用以抵抗冬季海冰作用,能够保证冬季钻井作业安全。
4、对钻完井工期无影响,且节约了大量的工程费用等。
附图说明
图1为常用的双层隔水套管结构示意图;
图2为本发明的抗冰隔水套管组合结构的具体实施例的应用示意图;
图3为图2的俯视示意图;
图4为本发明的抗冰隔水套管组合结构所用的连接接头的侧视示意图;
图5为本发明的抗冰隔水套管组合结构所用的连接接头的立体结构示意图。
具体实施方式
为了对本发明所要解决的问题、解决问题所采取的技术方案以及采取方案所产生的有益效果有更加清楚的理解,现对照附图说明本发明的具体实施方式。
如图1所示,本发明的一种抗冰隔水套管组合结构,实质为一种局部加厚的隔水套管结构,是一种简化的双层隔水套管结构。它包括:一外层隔水套管1、一内层隔水套管2、一表层套管3。外层隔水套管1套设于表层套管3之外;内层隔水套管2对应于冰区厚度4,设置在外层隔水套管1与表层套管3之间。内层隔水套管2的长度小于外层隔水套管1的长度且大于冰区厚度,以便在冰区范围内,局部增加外层隔水套管1的厚度。外层隔水套管1与内层隔水套管2之间的环空部分,以及内层隔水套管2与表层套管3之间的环空部分均以水泥浇注固结(图中未示出)。
本发明简化了现有技术的内层隔水套管结构,简化后的内层隔水套管2长度控制在冰区厚度4内,针对冬季海冰的作用力,本发明相当于增加了冰区范围内的局部外层隔水套管1的厚度,从而有效地提高了外层隔水套管1在冰区范围内局部抗侧应力的刚度,增大了对表层套管3的保护力度。
一并参照图2~图5,靠近海平面附近的局部表层套管3之外套设有简化的内层隔水套管2,内层隔水套管2的上端部和下端部分别与表层套管3固定连接,以便在安装隔水套管时,内层隔水套管2随表层套管3同时钻入。其中一实施例中,内层隔水套管2的上端部和下端部分别通过连接接头5与表层套管3固定连接,连接接头5的结构及其与它们的连接方式为:连接接头5包括内固定管6和外固定管7,内固定管6和外固定管7之间间隔连接有多个连接板8,相邻的连接板8之间形成有导流孔9。内固定管6和外固定管7上均具有螺纹,内固定管6和表层套管3相螺接,外固定管7和内层隔水套管2相螺接,连接接头5、表层套管3以及内层隔水套管2上的螺纹较佳应符合API标准规范。
由于本发明相邻的连接板8之间形成有导流孔9,导流孔9可以使内层隔水套管2的内、外之间连通,从而能够满足流体上、下流动和水泥浆上返流动。
较佳地,连接接头5的内固定管6与外固定管7之间还设有多个加强筋10,从而使内层隔水套管2与表层套管3连接更为牢固。本发明图4、图5所示的实施例中,连接接头5设有八个连接板8和四条加强筋10。
本发明的抗冰隔水套管组合结构安装完成后,外层隔水套管1和内层隔水套管2之间的环空,以及内层隔水套管2与表层套管3之间的环空均以水泥(图中未示)浇注固结,以避免现有技术内层隔水套管2钻入深度不易控制的缺点,且减少了套管材料用量,增大了冰区范围局部外层隔水套管1的抗弯刚度。具体实现过程是:
1)在外层隔水套管1打入后,使用一个钻头从外层隔水套管1里面钻出一个井眼,井眼的深度较佳是稍微大于表层套管3的下入长度,钻头直径小于外层隔水套管1的内径,而大于表层套管3外径。
2)钻好井眼后,把预先组合好的内层隔水套管2与表层套管3的组合结构下入井眼。
3)组合结构下好后,先从表层套管3内部打入一定量的前置液对表层套管3外部的环空进行清洗,然后打入水泥浆,水泥浆通过表层套管3底部上返到表层套管3与井眼之间的环空。
4)利用顶替液把表层套管3内部的水泥浆全部顶出表层套管3内部,其中,水泥浆的用量要经过科学计算,保证水泥浆在表层套管3与井眼之间环空中的上返高度达到内层隔水套管2顶部以上至少3米位置处。这样由于导流孔9的作用,在内层隔水套管2与内部的表层套管3之间就充满了水泥浆,外层隔水套管1与内层隔水套管2之间也都充满了水泥浆。等待水泥浆凝固一定时间后,在这三个管柱之间形成了水泥固结,从而使这段管柱组合结构的抗冰能力大大提高。
本发明的外层隔水套管1、内层隔水套管2以及表层套管3的各规格型号、尺寸参数可以根据具体的实施情况来设置。例如,外层隔水套管1的内径可选择36英寸或30英寸,内层隔水套管2的内径可选择24英寸或20英寸,表层套管3的内径可选择
Figure GSA00000084244000041
英寸或英寸,实施时可根据需要进行适当地组合,本发明的一具体实施例中,外层隔水套管1、内层隔水套管2、表层套管分别采用30英寸、20英寸、
Figure GSA00000084244000043
英寸,以保证较佳的抗冰能力。
本发明中内层隔水套管2的长度大于海冰厚度,并对应于冰区范围设置,内层隔水套管2长度应控制在一个合理范围,通过强度计算和稳定性分析结果,较佳地,安装好后的内层隔水套管2的顶部高出海平面3~8米,内层隔水套管2的水下长度应控制在5~8米。在一具体实施例中,内层隔水套管2的长度约为10米,且其水上、水下长度约为5米左右,以便提供较佳的强度和稳定性。另外,内层隔水套管2的壁厚应满足抗冰强度要求,厚度范围一般在20~51mm,在一具体实施例中,内层隔水套管2的厚度为25mm。
以上所述仅为本发明示意性的具体实施方式,并非用以限定本发明的保护范围。任何本领域的技术人员,在不脱离本发明的构思和技术方案的前提下所作出的等同变化与修改,均应在本发明保护的范围之内。

Claims (10)

1.一种抗冰隔水套管组合结构,包括一表层套管、一套设在所述表层套管之外的外层隔水套管,其特征在于:对应于冰区厚度范围,在所述外层隔水套管与表层套管之间夹设一内层隔水套管;
所述内层隔水套管的长度小于所述外层隔水套管的长度且大于所述冰区厚度;
所述外层隔水套管与内层隔水套管之间的环空部分,以及所述内层隔水套管与表层套管之间的环空部分均以水泥浇注固结。
2.如权利要求1所述的抗冰隔水套管组合结构,其特征在于:所述内层隔水套管的上部和下部分别与所述表层套管固定连接,并随所述表层套管同时钻入。
3.如权利要求1或2所述的抗冰隔水套管组合结构,其特征在于:所述内层隔水套管两端分别通过连接接头与表层套管螺纹连接。
4.如权利要求3所述的抗冰隔水套管组合结构,其特征在于,所述连接接头包括内固定管及外固定管,所述内固定管与外固定管之间间隔设置有多个连接板,相邻的连接板之间形成有导流孔,所述内固定管的上端通过螺纹与所述表层套管连接,所述外固定管的下端通过螺纹与所述内层隔水套管连接。
5.如权利要求4所述的抗冰隔水套管组合结构,其特征在于:所述连接接头的内固定管与外固定管之间还设置有两个以上的加强筋。
6.如权利要求1~5任一所述的抗冰隔水套管组合结构,其特征在于:所述内层隔水套管顶部高出海平面3~8米,所述内层隔水套管水下长度为4~8米。
7.如权利要求6所述的抗冰隔水套管组合结构,其特征在于:所述内层隔水套管长10米,且其水上、水下长度均为5米。
8.如权利要求1~5任一所述的抗冰隔水套管组合结构,其特征在于:所述内层隔水套管的厚度范围为20~51mm。
9.如权利要求8所述的抗冰隔水套管组合结构,其特征在于:所述内层隔水套管的厚度为25mm。
10.如权利要求1~5任一所述的抗冰隔水套管组合结构,其特征在于:所述外层隔水套管的内径为30英寸,所述内层隔水套管的内径为20英寸,所述表层套管的内径为英寸。
CN2010101599144A 2010-04-28 2010-04-28 抗冰隔水套管组合结构 Active CN101812975B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101599144A CN101812975B (zh) 2010-04-28 2010-04-28 抗冰隔水套管组合结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101599144A CN101812975B (zh) 2010-04-28 2010-04-28 抗冰隔水套管组合结构

Publications (2)

Publication Number Publication Date
CN101812975A true CN101812975A (zh) 2010-08-25
CN101812975B CN101812975B (zh) 2012-07-04

Family

ID=42620325

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101599144A Active CN101812975B (zh) 2010-04-28 2010-04-28 抗冰隔水套管组合结构

Country Status (1)

Country Link
CN (1) CN101812975B (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102226378A (zh) * 2011-05-26 2011-10-26 中国石油大学(北京) 加强隔水导管组合结构及其施工方法
CN104060945A (zh) * 2014-06-19 2014-09-24 中国海洋石油总公司 一种用于隔水导管的内套管
CN106761467A (zh) * 2017-03-15 2017-05-31 中国海洋石油总公司 一种一体化接头及利用该一体化接头实施的深水固井方法
CN107687322A (zh) * 2016-08-04 2018-02-13 烟台中集来福士海洋工程有限公司 对中器
CN107842322A (zh) * 2017-10-31 2018-03-27 中海石油(中国)有限公司湛江分公司工程技术作业中心 大口径隔水导管水上扶正装置
CN109827801A (zh) * 2019-01-23 2019-05-31 河海大学 一种用于水下取土的隔水装置

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4059148A (en) * 1975-12-30 1977-11-22 Shell Oil Company Pressure-compensated dual marine riser
US4527928A (en) * 1983-07-15 1985-07-09 Texaco Inc. Protective riser-conductor for offshore structures
US6035938A (en) * 1998-03-26 2000-03-14 Dril-Quip, Inc. Wellhead system and method for use in drilling a subsea well
CN200958368Y (zh) * 2006-10-20 2007-10-10 张超 油井真空隔热套管
CN200999936Y (zh) * 2006-03-25 2008-01-02 尹延华 抗冰隔水管快速接头
CN201794524U (zh) * 2010-04-28 2011-04-13 中国海洋石油总公司 抗冰隔水套管组合结构

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4059148A (en) * 1975-12-30 1977-11-22 Shell Oil Company Pressure-compensated dual marine riser
US4527928A (en) * 1983-07-15 1985-07-09 Texaco Inc. Protective riser-conductor for offshore structures
US6035938A (en) * 1998-03-26 2000-03-14 Dril-Quip, Inc. Wellhead system and method for use in drilling a subsea well
CN200999936Y (zh) * 2006-03-25 2008-01-02 尹延华 抗冰隔水管快速接头
CN200958368Y (zh) * 2006-10-20 2007-10-10 张超 油井真空隔热套管
CN201794524U (zh) * 2010-04-28 2011-04-13 中国海洋石油总公司 抗冰隔水套管组合结构

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《石油学报》 20000131 段梦兰等 浅海井口抗冰装置结构计算的有限单元法 96-102 第21卷, 第1期 2 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102226378A (zh) * 2011-05-26 2011-10-26 中国石油大学(北京) 加强隔水导管组合结构及其施工方法
CN104060945A (zh) * 2014-06-19 2014-09-24 中国海洋石油总公司 一种用于隔水导管的内套管
CN107687322A (zh) * 2016-08-04 2018-02-13 烟台中集来福士海洋工程有限公司 对中器
CN107687322B (zh) * 2016-08-04 2019-12-31 烟台中集来福士海洋工程有限公司 对中器
CN106761467A (zh) * 2017-03-15 2017-05-31 中国海洋石油总公司 一种一体化接头及利用该一体化接头实施的深水固井方法
CN106761467B (zh) * 2017-03-15 2018-12-25 中国海洋石油集团有限公司 一种一体化接头及利用该一体化接头实施的深水固井方法
CN107842322A (zh) * 2017-10-31 2018-03-27 中海石油(中国)有限公司湛江分公司工程技术作业中心 大口径隔水导管水上扶正装置
CN109827801A (zh) * 2019-01-23 2019-05-31 河海大学 一种用于水下取土的隔水装置
CN109827801B (zh) * 2019-01-23 2021-06-11 河海大学 一种用于水下取土的隔水装置

Also Published As

Publication number Publication date
CN101812975B (zh) 2012-07-04

Similar Documents

Publication Publication Date Title
CN101812975B (zh) 抗冰隔水套管组合结构
CN203729424U (zh) 顶管施工改型骑马检查井
CN105257908B (zh) 一种地下管道的顶推钻进施工设备及方法
CN101538902A (zh) 混凝土隔热墙体及施工方法
CN208793021U (zh) 一种盾构隧道抗浮控制结构
CN102561271A (zh) 一种高聚物注浆土石坝及其施工方法
CN102226378B (zh) 加强隔水导管组合结构及其施工方法
CN104912065A (zh) 水下锚筋桩施工方法
CN110886422A (zh) 一种用于钢结构整体装配式楼体的外墙与楼承板连接构件
CN205857173U (zh) 一种应用在水上灌注桩的新型钢护筒护套
CN201794524U (zh) 抗冰隔水套管组合结构
CN202039771U (zh) 长螺旋注浆、压灌砼多功能钻具
CN202164545U (zh) 竖向预应力孔道联通压浆管
CN206753627U (zh) 防渗水式隧道衬砌加固结构
CN113653092A (zh) 一种双桩套筒式基础及其安装方法
CN206591532U (zh) 一种锚杆格构梁护坡
CN101545259A (zh) 钻孔桩非水下灌注混凝土的装置和方法
CN202090847U (zh) 加强隔水导管组合结构
CN102094428A (zh) 一种减小钢围堰封底混凝土厚度和防止渗漏的方法
CN204959733U (zh) 灌注桩钢筋笼结构
CN201351275Y (zh) 一种新的复合管柱式海上井口平台
CN208604607U (zh) 一种山坡用的护坡加强装置
CN205617315U (zh) 一种用于混凝土六方块护坡的锚固装置
CN203668917U (zh) 高层、超高层超强注浆张拉预制桩
CN201065528Y (zh) 一种复合管柱式海上井口平台

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 100010 Beijing, Chaoyangmen, North Street, No. 25, No.

Patentee after: China National Offshore Oil Corporation

Patentee after: CNOOC Research Institute

Patentee after: China University of Petroleum (Beijing)

Address before: 100010 Beijing, Chaoyangmen, North Street, No. 25, No.

Patentee before: China National Offshore Oil Corporation

Patentee before: CNOOC Research Center

Patentee before: China University of Petroleum (Beijing)

CP01 Change in the name or title of a patent holder

Address after: 100010 Beijing, Chaoyangmen, North Street, No. 25, No.

Co-patentee after: CNOOC research institute limited liability company

Patentee after: China Offshore Oil Group Co., Ltd.

Co-patentee after: China University of Petroleum (Beijing)

Address before: 100010 Beijing, Chaoyangmen, North Street, No. 25, No.

Co-patentee before: CNOOC Research Institute

Patentee before: China National Offshore Oil Corporation

Co-patentee before: China University of Petroleum (Beijing)

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20210812

Address after: 100010 No. 25 North Main Street, Dongcheng District, Beijing, Chaoyangmen

Patentee after: CHINA NATIONAL OFFSHORE OIL Corp.

Patentee after: CNOOC RESEARCH INSTITUTE Co.,Ltd.

Address before: 100010 No. 25 North Main Street, Dongcheng District, Beijing, Chaoyangmen

Patentee before: CHINA NATIONAL OFFSHORE OIL Corp.

Patentee before: CNOOC RESEARCH INSTITUTE Co.,Ltd.

Patentee before: China University of Petroleum (Beijing)

TR01 Transfer of patent right