CN101806869B - General-purpose automatic test system for locomotive switching power supply and method thereof - Google Patents

General-purpose automatic test system for locomotive switching power supply and method thereof Download PDF

Info

Publication number
CN101806869B
CN101806869B CN 201010129025 CN201010129025A CN101806869B CN 101806869 B CN101806869 B CN 101806869B CN 201010129025 CN201010129025 CN 201010129025 CN 201010129025 A CN201010129025 A CN 201010129025A CN 101806869 B CN101806869 B CN 101806869B
Authority
CN
China
Prior art keywords
power supply
control
test
switching power
load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201010129025
Other languages
Chinese (zh)
Other versions
CN101806869A (en
Inventor
曹金洲
罗文涛
陈志漫
李涛
易卫华
陈长春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuzhou CRRC Times Electric Co Ltd
Original Assignee
Zhuzhou CSR Times Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhuzhou CSR Times Electric Co Ltd filed Critical Zhuzhou CSR Times Electric Co Ltd
Priority to CN 201010129025 priority Critical patent/CN101806869B/en
Publication of CN101806869A publication Critical patent/CN101806869A/en
Application granted granted Critical
Publication of CN101806869B publication Critical patent/CN101806869B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Inverter Devices (AREA)

Abstract

The invention relates to a general-purpose automatic test method for a locomotive switching power supply, and general-purpose automatic test system, and comprises a test control system, a programmable power supply unit, a programmable DC load unit and a programmable data acquisition unit, wherein the programmable power supply unit is connected with the test control system through a GPIB bus and provides excitation for the tested switching power supply; the programmable DC load unit is connected with the test control system through the GPIB bus and provides a load for the switching power supply to be tested; and the programmable data acquisition unit is connected with the test control system through the GPIB bus and acquires responses of the tested switching power supply. The output voltage, voltage regulation factor, load regulation factor and the like are tested by logging in virtual instrument software on a personal computer. The invention can well overcome the defects of insufficient compatibility, high complexity and low reliability of the test system in the prior art, and has the advantages of automation, general purpose, convenient operation and reliable performance.

Description

A kind of locomotive switching power supply General Purpose Automatic Test method
Technical field
The present invention relates to a kind of computer measurement measuring technology, especially a kind of relate to the rolling stock Switching Power Supply based on GPIB(General Purpose Interface Bus, general purpose interface bus, a kind of instrument control bus) bussing technique and virtual instrument (Virtual Instrument, virtual instrument, be that instrument can be controlled by software programming, what see at the software end is exactly virtual instrument) the General Purpose Automatic Test method of technology.
Background technology
Switching Power Supply: Switch Mode Power Supply namely refers to a kind of D.C. regulated power supply of operating with on-off mode as the device of voltage adjustment function.The locomotive switching power supply veneer is the important component part of locomotive control, also is the more and indispensable part of quantity, for miscellaneous equipment and veneer provide reliable and stable working power.Different Switching Power Supply veneer function basically identicals just adopt different input voltages, different version, different output way and output voltages according to different application demands.
Because the locomotive switching power supply veneer is being undertaken the important task that reliable and stable working power is provided for locomotive control, and kind is various, One's name is legion.And existing locomotive switching power supply single board testing system, only can finish the test of one or more Switching Power Supply veneers mostly, all must build new test macro again whenever new product occurring, and the foundation of locomotive switching power supply veneer condition of work and adjustment, test result correctness, rely on operating personnel's manual operation and artificial judgement fully, complexity height, poor reliability.
At present, existing locomotive switching power supply single board testing system, or only can test one or more Switching Power Supply veneers, when new product occurring, must build new test macro again; Or adopted bus integrated, but adopt traditional programming language control such as C language, assembly language, new product or product up-gradation exploitation new procedures difficulty are big, readable poor; Or signal transmission and judge and be subjected to the direct supply single board starting easily or the influence of electromagnetic interference (EMI) when turn-offing, easily judge by accident.
Summary of the invention
The invention provides a kind of locomotive switching power supply General Purpose Automatic Test method, this invention can overcome well that the locomotive switching power supply single board testing system test compatibility that prior art exists is strong, complexity is high, the shortcoming of poor reliability, makes up the locomotive switching power supply veneer general purpose automatic test system of automatic, general a, simple operation, dependable performance.
The invention provides a kind of embodiment of general-purpose automatic test system for locomotive switching power supply, general-purpose automatic test system for locomotive switching power supply comprises test control system, the programmable power supply unit, program control DC load unit and programmable data collecting unit, test control system comprises the industry control PC, the industry control PC comprises the virtual instrument software module, described programmable power supply unit links to each other with test control system by gpib bus, for tested Switching Power Supply provides excitation, described program control DC load unit links to each other with test control system by gpib bus, for described tested Switching Power Supply provides load, described programmable data collecting unit links to each other with test control system by gpib bus described tested Switching Power Supply response is gathered.
As the further embodiment of a kind of general-purpose automatic test system for locomotive switching power supply of the present invention, test control system further comprises the PCI-GPIB card, described industry control PC links to each other with the PCI-GPIB card by pci bus, and the PCI-GPIB cartoon is crossed gpib bus and linked to each other with the programmable data collecting unit with programmable power supply unit, program control DC load unit.
As the further embodiment of a kind of general-purpose automatic test system for locomotive switching power supply of the present invention, the programmable power supply unit further comprises programme-controlled dc power and program control AC power, described programme-controlled dc power requires to provide power supply for the tested Switching Power Supply of DC voltage for input voltage, and described program control AC power requires to provide power supply for the tested Switching Power Supply of alternating voltage for input voltage.
As the further embodiment of a kind of general-purpose automatic test system for locomotive switching power supply of the present invention, program control DC load unit further comprises program-controlled electronic load 1 and program-controlled electronic load 2, described program-controlled electronic load 1 provides the load of multichannel high-voltage large current high power DC, and described program-controlled electronic load 2 provides the little electric current miniwatt of multi-way low voltage DC load.
As the further embodiment of a kind of general-purpose automatic test system for locomotive switching power supply of the present invention, the programmable data collecting unit further comprises programmable oscilloscope and programmable data collection switchgear, described programmable data is gathered switchgear the response of tested Switching Power Supply is gathered, and described programmable oscilloscope shows the data that collect.
The present invention also provides a kind of embodiment of locomotive switching power supply General Purpose Automatic Test method, a kind of locomotive switching power supply General Purpose Automatic Test method, described method of testing comprises the test of locomotive switching power supply output voltage, described locomotive switching power supply output voltage test may further comprise the steps: after connecting the adapter that mates with tested Switching Power Supply, login virtual instrument software at the industry control PC, open and move corresponding control program, control program is at first selected program control AC power or programme-controlled dc power and program control DC load unit, make program control AC power or programme-controlled dc power provide input voltage by the gpib bus transfer control signal, control program control DC load unit and provide the setting load, gather the closed corresponding data acquisition channel of switchgear and read data by programmable data then, and institute's image data sent back industry control PC virtual instrument software by the gpib bus system, virtual instrument software reads the data of sending back to and compares with setting value, automatically whether judgement meets the demands, and generates test report automatically.
As the further embodiment of locomotive switching power supply General Purpose Automatic Test method of the present invention, described method of testing further comprises the voltage regulation factor test, described voltage regulation factor test may further comprise the steps: after connecting the adapter that mates with tested Switching Power Supply, login virtual instrument software at PC, open and move corresponding control program, control program is at first selected program control AC power or programme-controlled dc power and program control DC load unit, make the program-controlled electronic load of program control DC load unit provide the setting load by the gpib bus transfer control signal, at first provide the specified input voltage of tested Switching Power Supply by program control AC power or programme-controlled dc power, gather the closed corresponding data acquisition channel of switchgear by programmable data then and read tested electric power output voltage value and institute's image data is sent back industry control PC virtual instrument software by the gpib bus system, virtual instrument software reads the data of sending back to; Provide input voltage higher limit and the input voltage lower limit of tested Switching Power Supply then respectively by program control AC power or programme-controlled dc power, programmable data is gathered switchgear and is sent the tested switch power source output voltage value under two kinds of conditions respectively back to and send virtual instrument software back to, virtual instrument software read collect for three times output voltage values and with calculate voltage regulation factor automatically, and compare with setting value, automatically whether judgement meets the demands, and generates test report automatically.
As the further embodiment of locomotive switching power supply General Purpose Automatic Test method of the present invention, described method of testing further comprises the load regulation test, described load regulation test may further comprise the steps: after connecting the adapter that mates with tested Switching Power Supply, login virtual instrument software at PC, open and move corresponding control program, control program is at first selected program control AC power or programme-controlled dc power and program control DC load unit, make program control AC power or programme-controlled dc power provide the specified input voltage of tested Switching Power Supply by the gpib bus transfer control signal, and the program-controlled electronic load that control is worth program control DC load unit provides nominal load, gather the closed corresponding data acquisition channel of switchgear by programmable data then and read tested switch power source output voltage value and institute's image data is sent back industry control PC virtual instrument software by the gpib bus system, virtual instrument software reads the data of sending back to; Provide output higher limit and the output load lower limit of tested Switching Power Supply then respectively by the program-controlled electronic load, programmable data is gathered switchgear and is sent the tested switch power source output voltage value under two kinds of conditions respectively back to and send virtual instrument software back to, virtual instrument software read collect for three times output voltage values and with calculate load regulation automatically, and compare with setting value, automatically whether judgement meets the demands, and generates test report automatically.
As the further embodiment of locomotive switching power supply General Purpose Automatic Test method of the present invention, described method of testing further comprises ripple test, described ripple test may further comprise the steps: after connecting the adapter that mates with tested Switching Power Supply, login virtual instrument software at PC, open and move corresponding control program, control program is at first selected program control AC power or programme-controlled dc power and program control DC load unit, programmable oscilloscope, make program control AC power or programme-controlled dc power provide the specified input voltage of tested Switching Power Supply by the gpib bus transfer control signal, and the program-controlled electronic load of controlling program control DC load unit provides nominal load, gather the closed corresponding data acquisition channel of switchgear by programmable data then, the coupling scheme of programmable oscilloscope are set automatically, the bandwidth restriction, automatically read ripple value or waveform and send back industry control PC virtual instrument software by gpib bus, virtual instrument software reads data, and with setting value or set waveform and compare, automatically whether judgement meets the demands, and generates test report automatically.
As the further embodiment of locomotive switching power supply General Purpose Automatic Test method of the present invention, described method of testing further comprises the dynamic load test, described dynamic load test may further comprise the steps: after connecting the adapter that mates with tested Switching Power Supply, login virtual instrument software at PC, open and move corresponding control program, control program is at first selected program control AC power or programme-controlled dc power and program control DC load unit, programmable oscilloscope, make program control AC power or programme-controlled dc power provide the specified input voltage of tested Switching Power Supply by the gpib bus transfer control signal, and the program-controlled electronic load of controlling program control DC load unit the cycle between nominal load and 50% nominal load changes by setpoint frequency and load variations speed, gather the closed corresponding data acquisition channel of switchgear by programmable data then, the coupling scheme of programmable oscilloscope are set automatically, the bandwidth restriction, automatically read waveform parameter or waveform and send back industry control PC virtual instrument software by gpib bus, virtual instrument software reads data, and with setting value or set waveform and compare, automatically whether judgement meets the demands, and generates test report automatically.
By using the described locomotive switching power supply General Purpose Automatic Test of embodiment of the present invention method, for the locomotive switching power supply veneer provides a general automatically testing platform.One has realized that locomotive switching power supply tests automatically, with the workload that reduces operating personnel, the complicacy that reduces operation, strengthens the accuracy of judging in the testing process, and examining report reliable and that be convenient to safeguard is provided fast.Its two, realized the universalization of locomotive switching power supply test platform, when new Switching Power Supply veneer occurring, only need more changer adapter on the hardware, only need the easy configuration program parameter on the software, can realize required test.Its three, strengthened maintainability, by regular automatically operation checkout routine, can finish the automatic school inspection of all resources of locomotive switching power supply veneer general purpose automatic test system fast.Its four since adopted be easy to use, long-tested gpib bus control technology has superior functions such as low delay, high bandwidth, improved signal transmitting speed and accuracy, strengthened accuracy and the reliability of locomotive switching power supply test macro.
Description of drawings
In order to be illustrated more clearly in the embodiment of the invention or technical scheme of the prior art, to do to introduce simply to the accompanying drawing of required use in embodiment or the description of the Prior Art below, apparently, accompanying drawing in describing below only is some embodiments of the present invention, for those of ordinary skills, under the prerequisite of not paying creative work, can also obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is general-purpose automatic test system for locomotive switching power supply structure composition frame chart 1 of the present invention;
Fig. 2 is general-purpose automatic test system for locomotive switching power supply structure composition frame chart 2 of the present invention;
Fig. 3 gathers switchgear structure composition frame chart for general-purpose automatic test system for locomotive switching power supply programmable data of the present invention; Wherein: the 1-test control system, 2-industry control PC, the 3-PCI-GPIB card, 4-program-controlled electronic load 1, the 5-programmable oscilloscope, 6-program-controlled electronic load 2,7-programmable data collecting unit, the 8-programme-controlled dc power, the program control AC power of 9-, 10-programmable power supply unit, the program control DC load of 11-unit, the 12-programmable data is gathered switchgear, 13-test lead interface module, the tested end interface module of 14-, female mouthful of 15-breakout box, public mouthful of 16-breakout box, 17-connector fit line, female mouthful of 18-AN connector, public mouthful of 19-AN connector, the tested Switching Power Supply of 20-, 21-programmable data Acquisition Instrument, 22-2 * 10 multiplexer switch cards, 23-2 * 4 road multiplexer switch cards.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the invention, the technical scheme in the embodiment of the invention is clearly and completely described, obviously, described embodiment only is a part of embodiment of the present invention, rather than whole embodiment.Based on the embodiment among the present invention, those of ordinary skills belong to the scope of protection of the invention not making the every other embodiment that obtains under the creative work prerequisite.
A kind of exemplary embodiment as this general-purpose automatic test system for locomotive switching power supply, general-purpose automatic test system for locomotive switching power supply as shown in Figure 1 specifically comprises test control system 1, programmable power supply unit 10, program control DC load unit 11 and programmable data collecting unit 7, programmable power supply unit 10 links to each other with test control system 1 by gpib bus, for tested Switching Power Supply 20 provides excitation, program control DC load unit 11 links to each other with test control system 1 by gpib bus, for tested Switching Power Supply 20 provides load, programmable data collecting unit 7 links to each other with test control system 1 by gpib bus described tested Switching Power Supply 20 responses is gathered.Program control namely is the device that can realize control able to programme.As shown in Figure 2, test macro also comprises various breakout boxs and the adapter that links to each other with tested locomotive switching power supply, comprise the connecting line and the connector that are connected with programmable power supply unit 10, program control DC load unit 11, programmable data collecting unit 7, adapter comprises connecting line and the connector that is connected with tested locomotive switching power supply veneer.Whole connector comprises test lead interface module 13 and tested end interface module 14, and test lead interface module 13 comprises that female mouthful 15 of breakout box, public mouthful 16 of breakout box, connector fit line 17, female mouthful 18 of AN connector, tested end interface module 14 comprise public mouthful 19 of AN connector.Because the hardware frame structure of the general-purpose automatic test system for locomotive switching power supply that embodiment of the present invention adopts adopts the mode of gpib bus to realize whole test system, so versatility and compatibility are very strong.Owing to adopt GPIB test macro, breakout box, fit line, realize being connected with the segmentation of tested Switching Power Supply veneer, so only need to change corresponding adapter, can realize all Switching Power Supply veneers of locomotive control field and the functional test of the new Switching Power Supply veneer of exploitation later on.Simultaneously, adopt the gpib bus technology platform, this bussing technique is the outstanding platform that universally acknowledged bus system is closed Auto-Test System, have that standardization level, standardization are good, high bandwidth, lowly postpone, characteristics such as antijamming capability is strong, so specific embodiment of the invention stability height, good reliability, test speed are fast.
Test control system 1 further comprises industry control PC 2 and PCI-GPIB card 3, industry control PC 2 is by PCI(Peripheral Component Interconnection, a kind of local bus standard) bus links to each other with PCI-GPIB card 3, and PCI-GPIB card 3 links to each other with programmable data collecting unit 7 with programmable power supply unit 10, program control DC load unit 11 by gpib bus.Wherein industry control PC 2 can also be replaced by PC or the controller of other similar functions, industry control PC 2 comprises that mouse, keyboard, display, PC include PCI slot and pci bus, and test control system 1 also comprises the gpib interface of instruments self such as PCI-GPIB card 3, GPIB cable and programme-controlled dc power 8, program control AC power 9, program control DC load unit 11, programmable data collection switchgear 12, programmable oscilloscope 5.Programmable power supply unit 10 further comprises programme-controlled dc power 8 and program control AC power 9, programme-controlled dc power 8 requires to provide power supply for the tested Switching Power Supply 20 of DC voltage for input voltage, and program control AC power 9 requires to provide power supply for the tested Switching Power Supply 20 of alternating voltage for input voltage.Program control DC load unit 11 further comprises program-controlled electronic load 1 and program-controlled electronic load 2, and program-controlled electronic load 1 provides the load of multichannel high-voltage large current high power DC, and program-controlled electronic load 2 provides the little electric current miniwatt of multi-way low voltage DC load.The programmable data collecting unit further comprises programmable oscilloscope 5 and programmable data collection switchgear 12, and programmable data is gathered the response of 12 pairs of tested Switching Power Supplies 20 of switchgear and gathered, and 5 pairs of data that collect of programmable oscilloscope show.
As shown in Figure 3, programmable data collection switchgear 12 further comprises programmable data Acquisition Instrument 21,2 * 10 multiplexer switch cards 22 and 2 * 4 multiplexer switch cards 23 etc.
A kind of exemplary embodiment as this locomotive switching power supply General Purpose Automatic Test method, in conjunction with Fig. 1, the test process that output voltage is described is as follows: after connecting the adapter that mates with the tested engine Switching Power Supply, login virtual instrument software at the industry control PC, open and move corresponding control program, control program is at first selected program control AC power or programme-controlled dc power and program-controlled electronic load, make program control AC power or programme-controlled dc power provide input voltage by the gpib bus transfer control signal, the load of control program-controlled electronic provides the setting load, gather the closed corresponding data acquisition channel of switchgear and read data by programmable data then, and institute's image data sent back industry control PC virtual instrument software by the gpib bus system, virtual instrument software reads the data of sending back to and compares with setting value, automatically whether judgement meets the demands, and generates test report automatically.Virtual instrument software is a kind of software that is applied to virtual instrument.Particularly, virtual instrument (Virtual Instrument) is a kind of can control by software programming, a kind of virtual software device of seeing at the software end of PC.Wherein, LabVIEW is exactly a outstanding virtual instrument programming software, and it is based on TestStand software administration platform.
In conjunction with Fig. 1, the test process of account for voltage regulation is as follows: after connecting the adapter that mates with the tested engine Switching Power Supply, login virtual instrument software at the industry control PC, open and move corresponding control program, control program is at first selected program control AC power or programme-controlled dc power and program-controlled electronic load, make the program-controlled electronic load provide the setting load by the gpib bus transfer control signal, at first provide the specified input voltage of tested Switching Power Supply veneer by program control AC power or programme-controlled dc power, gather the closed corresponding data acquisition channel of switchgear by programmable data then and read tested switch power source output voltage value and institute's image data is sent back industry control PC virtual instrument software by the gpib bus system, virtual instrument software reads the data of sending back to; Provide input voltage higher limit and the input voltage lower limit of tested Switching Power Supply veneer then respectively by program control AC power or programme-controlled dc power, programmable data is gathered switchgear and is sent the tested switch power source output voltage value under two kinds of conditions respectively back to and send virtual instrument software back to, virtual instrument software read collect for three times output voltage values and with calculate voltage regulation factor automatically, and compare with setting value, automatically whether judgement meets the demands, and generates test report automatically.The test of analog voltage regulation, this test macro can be finished the test of input overvoltage protection, input under-voltage protection test etc.The test of voltage adjustment rate is that the reflection power supply keeps nominal load, and output voltage is with a kind of power technology index of variable quantity with the ratio of input voltage variable quantity of input voltage variation.The test of input overvoltage protection is that the reflection power supply keeps nominal load, and when reducing input voltage to certain limit, power protection turn-offs, a kind of power technology index.The input under-voltage protection is that the reflection power supply keeps nominal load, and the rising input voltage is during to certain limit, a kind of power technology index that power protection turn-offs.
In conjunction with Fig. 1, the test process that load regulation is described is as follows: after connecting the adapter that mates with the tested engine Switching Power Supply, login virtual instrument software at the industry control PC, open and move corresponding control program, control program is at first selected program control AC power or programme-controlled dc power and program-controlled electronic load, make program control AC power or programme-controlled dc power provide the specified input voltage of tested Switching Power Supply veneer by the gpib bus transfer control signal, and the load of control program-controlled electronic provides nominal load, gather the closed corresponding data acquisition channel of switchgear by programmable data then and read tested switch power source output voltage value and institute's image data is sent back industry control PC virtual instrument software by the gpib bus system, virtual instrument software reads the data of sending back to; Provide output higher limit and the output load lower limit of tested Switching Power Supply veneer then respectively by the program-controlled electronic load, programmable data is gathered switchgear and is sent the tested switch power source output voltage value under two kinds of conditions respectively back to and send virtual instrument software back to, virtual instrument software read collect for three times output voltage values and with calculate load regulation automatically, and compare with setting value, automatically whether judgement meets the demands, and generates test report automatically.The test of analogy load regulation, this test macro can be finished output overcurrent protection test, output under-voltage protection test, output over-voltage protection test etc.The load regulation test is that the reflection power supply keeps specified input voltage, and output voltage is with a kind of power technology index of variable quantity with the ratio of load variation amount of load variations.
In conjunction with Fig. 1, the process that ripple test is described is as follows: after connecting the adapter that mates with the tested engine Switching Power Supply, login virtual instrument software at the industry control PC, open and move corresponding control program, control program is at first selected program control AC power or programme-controlled dc power, the program-controlled electronic load, programmable oscilloscope, make program control AC power or programme-controlled dc power provide the specified input voltage of tested Switching Power Supply veneer by the gpib bus transfer control signal, and the load of control program-controlled electronic provides nominal load, gather the closed corresponding data acquisition channel of switchgear by programmable data then, the coupling scheme of programmable oscilloscope are set automatically, bandwidth restriction etc., automatically read ripple value (or waveform) and send back the PC virtual instrument software by gpib bus, virtual instrument software reads data, and compare with setting value (or set waveform), automatically whether judgement meets the demands, and generates test report automatically.Ripple is a kind of power technology index that reflection is superimposed upon the DC component that tested Switching Power Supply output DC presses.
In conjunction with Fig. 1, the process that the dynamic load test is described is as follows: after connecting the adapter that mates with the tested engine Switching Power Supply, login virtual instrument software at the industry control PC, open and move corresponding control program, control program is at first selected program control AC power or programme-controlled dc power, the program-controlled electronic load, programmable oscilloscope, make program control AC power or programme-controlled dc power provide the specified input voltage of tested Switching Power Supply veneer by the gpib bus transfer control signal, and setpoint frequency is pressed in the load of control program-controlled electronic and load variations speed cycle between nominal load and 50% nominal load changes, gather the closed corresponding data acquisition channel of switchgear by programmable data then, the coupling scheme of programmable oscilloscope are set automatically, bandwidth restriction etc., automatically read waveform parameter (or waveform) and send back industry control PC virtual instrument software by gpib bus, virtual instrument software reads data, and compare with setting value (or set waveform), automatically whether judgement meets the demands, and generates test report automatically.Dynamic load has reflected that load is by certain frequency periodically variable characteristic within the specific limits.
In conjunction with Fig. 1, the process that efficiency test is described is as follows: after connecting the adapter that mates with the tested engine Switching Power Supply, login virtual instrument software at the industry control PC, open and move corresponding control program, control program is at first selected program control AC power or programme-controlled dc power and program-controlled electronic load, make program control AC power or programme-controlled dc power provide specified input voltage by the gpib bus transfer control signal, the load of control program-controlled electronic provides specified setting load, pass through by program control AC power or programme-controlled dc power and program-controlled electronic load voltage then, current sense function, read data and data are sent back industry control PC virtual instrument software by the gpib bus system, virtual instrument software reads the data of sending back to and analyzes computing, can draw the power conversion efficiency, and compare with setting value, automatically whether judgement meets the demands, and generates test report automatically.
In conjunction with Fig. 1, the process that the switching tube waveform testing is described is as follows: after connecting the adapter that mates with the tested engine Switching Power Supply, login virtual instrument software at the industry control PC, open and move corresponding control program, control program is at first selected program control AC power or programme-controlled dc power and program-controlled electronic load, make program control AC power or programme-controlled dc power provide specified input voltage by the gpib bus transfer control signal, the load of control program-controlled electronic provides nominal load, prompting connects oscilloprobe according to control program then, the basic setup of control program automatic setting programmable oscilloscope, and read waveform, and data are sent back industry control PC virtual instrument software by the gpib bus system, virtual instrument software reads the waveform of sending back to and compares and analyze computing with the setting waveform, both can judge automatically whether the switching tube waveform meets the demands, and generate test report automatically.Above-mentioned output voltage test, voltage regulation factor test, load regulation test, input overvoltage are tested, are imported under-voltage test, output overvoltage test, export control programs such as under-voltage test, output overcurrent test, ripple test, dynamic load test, efficiency test, switching tube waveform testing, can manage integrated by the virtual instrument management software, automatically operation successively, the unified form that generates behind the end of run.Also can only operation step or a few step wherein, generate test report behind the end of run automatically according to operator's needs.Output over-voltage protection is that reflection surpasses certain value when electric power output voltage rises, and power protection turn-offs a kind of power technology index in ground.The output under-voltage protection is that reflection surpasses certain value when electric power output voltage descends, and power protection turn-offs a kind of power technology index in ground.The output overcurrent protection is to reflect when power source loads increases to certain value a kind of power technology index that power protection turn-offs.Switching tube is the switching device of adjusting with operating power in the Switching Power Supply, is generally MOSFET, BJT etc., is a kind of electronic switching device.
Simultaneously, power source single-board general purpose automatic test system of the present invention, can utilize the self-checking function of programmable instrument self, develop the automatic checkout routine of described test macro by virtual instrument technique, and by regularly moving the self check that checkout routine is finished described power source single-board Auto-Test System automatically, the result of self check will determine whether to permit the operator is used described power source single-board Auto-Test System to carry out the test of power source single-board.
In order easily general-purpose automatic test system for locomotive switching power supply and method thereof to be researched and developed and to be tested, embodiment of the present invention has been used modularization programming thought, realize the locomotive switching power supply veneer automatically in the test, also providing simple operation, powerful self-defined test platform for the professional and technical personnel.
Power source single-board general purpose automatic test system of the present invention is not limited to above function, can use virtual instrument software to develop according to the resource of tested single board testing requirement and described test macro.
Because the power source single-board General Purpose Automatic Test method that the specific embodiment of the invention adopts has adopted virtual instrument technique software programming platform, the system automation degree is very high, comprise virtual instrument standard program software (LabVIEW) and virtual instrument standard management software (TestStand), realized that graphic programming controls described test macro, and automatically test result has been analyzed the generation form.Program development personnel, procedure operation personnel's different level rights managements have been realized simultaneously, and for operating personnel provide succinctly friendly interface easily, school checking functions automatically quickly, convenient powerful self-defined test platform.Simultaneously, system resource is abundant, can realize simulating signal and the unlatching such as input voltage signal, input current signal, output voltage signal, output current signal, switching tube waveform of tested power source single-board and turn-off the isoparametric collection of control signal.Among the present invention, can realize measurement, 10 tunnel analog input current signals, the collection of 4 way switch tube wave shapes or the collection of 8 road output ripples of 20 tunnel 0 ~ 200V analog input channel voltage signals simultaneously.
The above only is preferred implementation of the present invention; should be pointed out that for those skilled in the art, under the prerequisite that does not break away from the principle of the invention; can also make some improvements and modifications, these improvements and modifications also should be considered as protection scope of the present invention.

Claims (2)

1. locomotive switching power supply General Purpose Automatic Test method, it is characterized in that, general-purpose automatic test system for locomotive switching power supply comprises: test control system (1), programmable power supply unit (10), program control DC load unit (11) and programmable data collecting unit (7), described test control system (1) comprises industry control PC (2), industry control PC (2) comprises the virtual instrument software module, described programmable power supply unit (10) links to each other with test control system (1) by gpib bus, for tested Switching Power Supply (20) provides excitation, described program control DC load unit (11) links to each other with test control system (1) by gpib bus, for described tested Switching Power Supply (20) provides load, described programmable data collecting unit (7) links to each other with test control system (1) by gpib bus described tested Switching Power Supply (20) response is gathered; Described programmable data collecting unit (7) comprises programmable data collection switchgear (12), and described programmable data is gathered switchgear (12) response of tested Switching Power Supply (20) is gathered; Described method of testing comprises ripple test, described ripple test may further comprise the steps: after connecting the adapter that mates with tested Switching Power Supply (20), in industry control PC (2) login virtual instrument software module, open and move corresponding control program, control program is at first selected program control AC power (9) or programme-controlled dc power (8) and program control DC load unit (11), programmable oscilloscope (5), make program control AC power (9) or programme-controlled dc power (8) provide the specified input voltage of tested Switching Power Supply (20) by the gpib bus transfer control signal, and the program-controlled electronic load of controlling program control DC load unit (11) provides nominal load, gather the closed corresponding data acquisition channel of switchgear (12) by programmable data then, the coupling scheme of programmable oscilloscope (5) are set automatically, the bandwidth restriction, automatically read ripple value or waveform and send back industry control PC (2) virtual instrument software module by gpib bus, the virtual instrument software module reads data, and with setting value or set waveform and compare, automatically whether judgement meets the demands, and generates test report automatically.
2. locomotive switching power supply General Purpose Automatic Test method according to claim 1, it is characterized in that, described method of testing also further comprises the dynamic load test, described dynamic load test may further comprise the steps: after connecting the adapter that mates with tested Switching Power Supply (20), in industry control PC (2) login virtual instrument software module, open and move corresponding control program, control program is at first selected program control AC power (9) or programme-controlled dc power (8) and program control DC load unit (11), programmable oscilloscope (5), make program control AC power (9) or programme-controlled dc power (8) provide the specified input voltage of tested Switching Power Supply (20) by the gpib bus transfer control signal, and setpoint frequency is pressed in the program-controlled electronic load of controlling program control DC load unit (11) and load variations speed cycle between nominal load and 50% nominal load changes, gather the closed corresponding data acquisition channel of switchgear (12) by programmable data then, the coupling scheme of programmable oscilloscope (5) are set automatically, the bandwidth restriction, automatically read waveform parameter or waveform and send back industry control PC (2) virtual instrument software module by gpib bus, the virtual instrument software module reads data, and with setting value or set waveform and compare, automatically whether judgement meets the demands, and generates test report automatically.
CN 201010129025 2010-03-22 2010-03-22 General-purpose automatic test system for locomotive switching power supply and method thereof Expired - Fee Related CN101806869B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010129025 CN101806869B (en) 2010-03-22 2010-03-22 General-purpose automatic test system for locomotive switching power supply and method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010129025 CN101806869B (en) 2010-03-22 2010-03-22 General-purpose automatic test system for locomotive switching power supply and method thereof

Publications (2)

Publication Number Publication Date
CN101806869A CN101806869A (en) 2010-08-18
CN101806869B true CN101806869B (en) 2013-08-28

Family

ID=42608751

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010129025 Expired - Fee Related CN101806869B (en) 2010-03-22 2010-03-22 General-purpose automatic test system for locomotive switching power supply and method thereof

Country Status (1)

Country Link
CN (1) CN101806869B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111813072A (en) * 2020-06-11 2020-10-23 中车唐山机车车辆有限公司 Detection system for input and output functions of electronic equipment

Families Citing this family (49)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102455413A (en) * 2010-10-20 2012-05-16 鸿富锦精密工业(深圳)有限公司 Conversion efficiency testing device and using method thereof
CN102486533A (en) * 2010-12-01 2012-06-06 西安中科麦特电子技术设备有限公司 LED switching power supply test device
CN102759648B (en) * 2011-04-28 2015-04-08 上海博泰悦臻电子设备制造有限公司 Method and system for testing power panel
CN102830296B (en) * 2011-06-16 2015-11-25 上海天祥质量技术服务有限公司 Power supply ripple disturbed test method and system
CN102230955B (en) * 2011-06-24 2013-06-19 株洲南车时代电气股份有限公司 Dynamic ageing monitoring system and method for switch mode power supply of locomotive
CN102360046B (en) * 2011-07-22 2013-11-06 株洲南车时代电气股份有限公司 General test method for motor vehicle electrical product
CN102385042A (en) * 2011-10-25 2012-03-21 天津市中环电子计算机有限公司 Program-controlled alternating current power supply testing system capable of outputting various testing voltages
CN103165201B (en) * 2011-12-14 2016-03-30 中国广核集团有限公司 Nuclear power station power detection system and method
CN102707244A (en) * 2012-05-23 2012-10-03 苏州市职业大学 Performance test system for miniature switching power supply
CN102721936B (en) * 2012-06-28 2015-09-16 惠州市德赛西威汽车电子股份有限公司 A kind of automobile audio power source loads aptitude tests devices and methods therefor
CN103675498A (en) * 2012-09-20 2014-03-26 昆达电脑科技(昆山)有限公司 Automatic test device of power supply
CN103869260B (en) * 2012-12-13 2016-08-24 中兴通讯股份有限公司 A kind of power detecting system and method
CN103149386B (en) * 2013-03-05 2014-11-26 深圳市中科源电子有限公司 Electronic load module of power supply aging test and power supply aging test system
CN103293420B (en) * 2013-06-06 2016-01-20 中国电子科技集团公司第四十一研究所 A kind of multiparameter digital signal processing hardware circuit and multiparameter disposal route
CN103364741A (en) * 2013-07-19 2013-10-23 延锋伟世通电子科技(上海)有限公司 Vehicle-mounted electronic product power supply pulse automated test system
CN104422895B (en) * 2013-08-21 2018-07-27 鸿富锦精密工业(深圳)有限公司 Power sensor detecting circuit
CN103439671B (en) * 2013-08-23 2016-04-06 深圳晶福源科技股份有限公司 A kind of for can the test macro of inverter of parallel operation and method
CN103558562B (en) * 2013-11-07 2016-01-27 浙江中控技术股份有限公司 A kind of power module proving installation and method
CN105629180A (en) * 2014-11-11 2016-06-01 中兴通讯股份有限公司 Test method, test device and controller
CN104569855A (en) * 2015-01-08 2015-04-29 珠海许继电气有限公司 Automatic testing system for power supply
CN105137364A (en) * 2015-07-23 2015-12-09 浪潮电子信息产业股份有限公司 Automatic test system of switch power supply
CN105242219B (en) * 2015-09-24 2018-07-06 浪潮电子信息产业股份有限公司 A kind of method of auto-measuring DC voltage transfer efficiency
CN105242218A (en) * 2015-09-24 2016-01-13 浪潮电子信息产业股份有限公司 DC source full-coverage automatic test system
CN106908742A (en) * 2015-12-18 2017-06-30 技嘉科技股份有限公司 Power supply testing device and method
CN105676147A (en) * 2016-01-26 2016-06-15 合肥华耀电子工业有限公司 Radar power supply automatic test method
CN105676148A (en) * 2016-04-25 2016-06-15 浪潮电子信息产业股份有限公司 Apparatus for improving automated testing efficiency of switching power supplies and programming method
CN107782988A (en) * 2016-08-24 2018-03-09 株洲中车时代电气股份有限公司 The test system and Efficiency test method of multiple-channel output AuCT
CN106291397B (en) * 2016-08-25 2018-12-11 中国船舶重工集团公司第七一九研究所 Ship'ssupply automatic testing equipment and its test method
CN106597320B (en) * 2016-11-28 2019-01-11 北京卫星制造厂 A kind of special for automatic test macro for microwave components power supply
CN107345978B (en) * 2017-06-23 2023-07-04 沈阳工程学院 Movable control power supply for power plant or intelligent substation and control method
CN109143111A (en) * 2017-06-28 2019-01-04 东软集团股份有限公司 A kind of power supply changes test method, device and equipment
CN109164399B (en) * 2018-09-10 2021-03-09 大族激光科技产业集团股份有限公司 Power supply test system and test method
CN109375021B (en) * 2018-11-16 2024-02-06 浙江理工大学 Universal program control testing system and method for electric automobile central electric box
CN109581017B (en) * 2018-11-28 2021-06-29 北京宏动科技有限公司 Multifunctional digital transient response tester
CN109471047B (en) * 2018-12-21 2021-04-02 北京无线电计量测试研究所 Portable automatic measuring device for AC/DC power supply calibration
CN109633483A (en) * 2018-12-29 2019-04-16 四川九洲电器集团有限责任公司 A kind of power module intelligent test system and test method
CN109884552A (en) * 2019-03-20 2019-06-14 浪潮商用机器有限公司 Power supply test method and system
CN110161428A (en) * 2019-04-30 2019-08-23 惠州市德赛西威智能交通技术研究院有限公司 A kind of power supply monitoring system and method
CN110275511A (en) * 2019-06-25 2019-09-24 中国第一汽车股份有限公司 Automatic test equipment suitable for power motor controller hardware
CN111308383B (en) * 2019-11-19 2022-02-15 江西洪都航空工业集团有限责任公司 Aircraft power supply adaptability test feedback control circuit
CN110908424A (en) * 2019-12-06 2020-03-24 北京小马智行科技有限公司 Load regulation rate test method and device and nonvolatile storage medium
CN111487554A (en) * 2020-03-17 2020-08-04 北京交通大学 Automatic testing system and method for direct current-to-direct current power supply module
CN112327198A (en) * 2020-10-29 2021-02-05 中国航空工业集团公司上海航空测控技术研究所 Automatic testing equipment for component-level power supply of airborne entertainment system
CN112485701A (en) * 2020-11-25 2021-03-12 国营芜湖机械厂 Universal switching adapter plate for testing DC/DC power supply module and testing method thereof
CN112578304A (en) * 2020-11-26 2021-03-30 广州金升阳科技有限公司 Automatic test system and method for high-voltage output switching power supply
CN112763930A (en) * 2020-12-01 2021-05-07 国营芜湖机械厂 Device and method for measuring response time of airborne power supply
CN113702858B (en) * 2021-07-26 2024-03-15 苏州浪潮智能科技有限公司 Dynamic response testing device of switching power supply
CN114019402A (en) * 2021-09-24 2022-02-08 北京无线电测量研究所 Customized switch power supply automatic test system and method
CN116520182B (en) * 2023-05-11 2023-11-14 珠海中瑞电力科技有限公司 DCS device power supply module abnormality early diagnosis method

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1385973A (en) * 2001-05-10 2002-12-18 深圳市中兴通讯股份有限公司上海第二研究所 Power source single-board universal tester

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5574654A (en) * 1994-02-24 1996-11-12 Dranetz Technologies, Inc. Electrical parameter analyzer
ITTO20030252A1 (en) * 2003-04-01 2004-10-02 Wrap Spa METHOD AND SYSTEM FOR AUTOMATIC TESTING OF
CN101101324A (en) * 2006-07-04 2008-01-09 上海创想电源设备有限公司 Power supply apparatus test device containing coding load
CN101221226B (en) * 2008-01-24 2011-04-06 中兴通讯股份有限公司 Automatic testing method and apparatus of electric power
CN201421487Y (en) * 2009-05-31 2010-03-10 广州飞机维修工程有限公司 On-line function detecting and fault removing system of circuit board

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1385973A (en) * 2001-05-10 2002-12-18 深圳市中兴通讯股份有限公司上海第二研究所 Power source single-board universal tester

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111813072A (en) * 2020-06-11 2020-10-23 中车唐山机车车辆有限公司 Detection system for input and output functions of electronic equipment

Also Published As

Publication number Publication date
CN101806869A (en) 2010-08-18

Similar Documents

Publication Publication Date Title
CN101806869B (en) General-purpose automatic test system for locomotive switching power supply and method thereof
CN201757767U (en) General comprehensive automatic test system of airplane electronic part
CN102073029B (en) Electronic mutual inductor test system and test method
CN204945356U (en) A kind of Calibration for Special Testing Equipment platform
CN202548240U (en) Automated test platform for photovoltaic grid-connected micro-inverter
CN201812014U (en) Automatic open-circuit and short-circuit testing system for integrated circuits
CN105548948A (en) Device and method for testing digitalization electric energy metering system
CN108982996B (en) Outdoor scene substitution type extra-high voltage direct current protection field testing device
CN204832381U (en) Energy repayment formula is charged intellectual detection system and is overhauld a system
CN206209081U (en) A kind of Auto-Test System of power module
CN103616560A (en) Automatic power consumption parameter testing device and method applied to avionics device
CN109613906B (en) Third-generation intelligent substation measurement and control submachine test system and application method thereof
CN210347811U (en) New forms of energy car machine integration test system that charges
CN103516448A (en) Collection terminal communication interface load capacity test system
CN103513223A (en) Electric energy meter communication interface load capacity test system
CN213689799U (en) Alternating current-direct current fills electric pile integration testing platform
CN112285477A (en) Integrated detection platform for AC/DC charging pile and field detection method for charging pile
CN100595597C (en) Lightning arrester various waveform aging test device
CN201322790Y (en) Testing device for constant-current power panel
CN202522658U (en) System for automatically testing and diagnosing corrosion fault points of substation grounding grid
CN105548717A (en) Electrical parameter testing device based on virtual instrument technology
CN205880090U (en) Alternating -current charging stake field inspection device
CN105353331A (en) Electronic transformer metering performance detection system and method
CN201812005U (en) Performance test box and performance test system for analogue input/output (AI/O) module
CN107204133A (en) A kind of automatic teaching and examination robot

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130828