CN101806218A - Underground small-size sloping way construction method for mines - Google Patents

Underground small-size sloping way construction method for mines Download PDF

Info

Publication number
CN101806218A
CN101806218A CN 201010132108 CN201010132108A CN101806218A CN 101806218 A CN101806218 A CN 101806218A CN 201010132108 CN201010132108 CN 201010132108 CN 201010132108 A CN201010132108 A CN 201010132108A CN 101806218 A CN101806218 A CN 101806218A
Authority
CN
China
Prior art keywords
construction
scraper
meters
tunnel
laneway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010132108
Other languages
Chinese (zh)
Other versions
CN101806218B (en
Inventor
董金奎
刘润田
张忠辉
唐振江
冷寒松
邱俊刚
于斌
张召磊
郭建民
刘涛
毕洪涛
张万超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Gold Mining (laizhou) Co Ltd Jiaojia Gold Mine
Original Assignee
Shandong Gold Mining (laizhou) Co Ltd Jiaojia Gold Mine
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Gold Mining (laizhou) Co Ltd Jiaojia Gold Mine filed Critical Shandong Gold Mining (laizhou) Co Ltd Jiaojia Gold Mine
Priority to CN2010101321088A priority Critical patent/CN101806218B/en
Publication of CN101806218A publication Critical patent/CN101806218A/en
Application granted granted Critical
Publication of CN101806218B publication Critical patent/CN101806218B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The invention relates to an underground small-size sloping way construction method for mines, which comprises the following steps: firstly, lifting 1.7 to 2 m of a horizontal section of a construction sloping way laneway from a laneway bottom plate at one side of an ort laneway for manual slag tapping; lifting 1.1 m of a construction scraper cave chamber at the other side of the ort laneway for installing a scraper; then, erecting a simple chute at an outer opening of the horizontal section of the sloping way laneway; thirdly, carrying out gradient change blasting construction from a gradient change point at the end of the horizontal section of the sloping way laneway; using the scraper for scraping blasted rocks into the simple chute, and directly loading the rocks into a mine car to be transported away; and fourthly, blasting and transporting away scraping passage rocks from the gradient point to the bottom plate of the ort laneway. When the method of the invention is adopted, the efficiency of the small-size sloping way digging construction can be obviously improved, the production efficiency is improved from the original manual rock transportation of 2 m/d to the current scraper rock transportation of 3 m/d, and the efficiency is improved by 50 percent.

Description

A kind of underground small-size sloping way construction method for mines
Technical field the present invention relates to a kind of ramp job practices, specifically, is a kind of underground small-size sloping way construction method for mines.
Background technology in small-sized ramp (long * is wide to be 2.8m*2.8m and the following) work progress, is subjected to the restriction of span length and height under mine, can't use relatively large number shovel fortune equipment.If adopt 1m 3Diesel LHD below reaching shovels pretends industry, limited by only operation, and diesel LHD discharge tail gas pollution is bigger, and operating environment is relatively poor; If adopt 1m 3Electric LHD below reaching shovels pretends industry, is subjected to the restriction of electric LHD climbing capacity, and the efficient of carrying rock is lower.Therefore, the a dead lift rocks that adopt when construction small-sized ramp more, but constructor's labour intensity is bigger, and extension with ramp construction length, the ventilation degradation, and be subjected to transportation range and far wait conditionality, workman's operating environment variation, labour intensity increase, production efficiency decreases, and has seriously restricted the raising of production capacity.
Summary of the invention problem to be solved by this invention provides a kind of underground small-size sloping way construction method for mines, utilize scraper rapid construction small-sized ramp, use the scraper mine car of packing into of slagging tap, effectively alleviate labor strength, improve the efficient of excavation work.
Technical scheme provided by the invention is:
A kind of method of utilizing scraper rapid construction small-sized ramp, it is characterized in that: job practices may further comprise the steps:
(1), raises 1.7~2 meters construction ramp tunnel horizontal segments in a side in Chuan Mai tunnel from roadway floor, ramp tunnel horizontal segment base plate is according to 10 meters long of horizontal direction constructions, the long back of horizontal segment top board level construction 4~6m, ramp tunnel becomes the construction of position, slope, the height of tunnel horizontal segment is 1.7~2.0 meters, manually slags tap;
And raise 1.1 meters construction scraper chambers at the opposite side in Chuan Mai tunnel, the construction specification is that 1.4 meters high 2 meters of * of 2 meters wide * are long, at the scraper chamber 15KW scraper is installed;
(2), the horizontal segment collar extension sets up simple and easy chute in the ramp tunnel, its chute base plate and ramp roadway floor keep same level;
(3), begin to become position, slope blast working, and with the base plate of tunnel, slope horizontal segment rake road, use scraper will be quick-fried to descend rock to harrow in the simple and easy chute, and the mine car of directly packing into is transported as scraper from the knick point of the ramp tunnel horizontal segment end;
(4), knick point is transported to the rake road rock blasting of wearing between the arteries and veins roadway floor.
Good effect of the present invention is:
(1) obviously improve small-sized incline boring efficiency of construction, production efficiency is brought up to the 3m/d of present scraper haulage rock by the 2m/d of original artificial haulage rock, and efficient has improved 50%.
(2) effectively reduce the operation number, obviously improve workman's operating environment and labour intensity, the workman only needs 1 people to be sitting in the control of scraper chamber just can harrow the slag operation, reduces by 2~3 people than former operating personnel; Personnel directly do not arrive operation under the quick-fried talus down simultaneously, and safety also improves greatly; Adopt mechanical work, labor strength also alleviates.
(3) obviously reduce operating cost,, reduce by 20 yuan/m than the manual work cost owing to adopt electromechanical work 3, (length is by 100 meters, and section is pressed 6m for every ramp 3Calculate) but 12000 yuan of cost savings, and overall economic efficiency is fairly obvious.
Description of drawings Fig. 1 is the schematic diagram of the small-sized incline boring construction of the present invention;
Fig. 2 is the I-I cross-sectional schematic of Fig. 1.
The specific embodiment is further described the present invention below in conjunction with drawings and Examples.
Shown in Fig. 1-2, a kind of underground small-size sloping way construction method for mines, step is as follows:
(1), raises 1.7~2 meters construction ramp tunnel horizontal segments in a side in Chuan Mai tunnel 2 from roadway floor, raise highly preferred 1.8m, described ramp tunnel horizontal segment base plate is according to 10 meters long of horizontal direction constructions, become the construction of position, slope after top board 10 levels construction 4~6m is long again, walk for ease of the pedestrian, the height of tunnel horizontal segment is 1.7~2.0 meters, manually slags tap; And raise 1.1 meters construction scraper chambers 1 at the opposite side in Chuan Mai tunnel 2, the construction specification is that 1.4 meters high 2 meters of * of 2 meters wide * are long, adopts expansion type rock bolt to install 15KW scraper 12 at scraper chamber 1.
(2), set up simple and easy chute 11, its chute base plate and ramp roadway floor keep same level at ramp tunnel horizontal segment collar extension; 1.2 meters wide of simple and easy chute 11 collar extensions, 1.6 meters of internal orifices are wide, are convenient to ore concentrated harrow in the mine car 3.
(3), the knick point 9 from the ramp tunnel horizontal segment end begins to become position, slope blast working, and with the base plate of tunnel, slope horizontal segment rake road 5 as scraper 12, the pulley 7 of meeting head on to be provided with at ramp, by wire rope pulling scraper head 8, quick-fried rock 6 is down harrowed in the simple and easy chute 11, and the mine car 3 of directly packing into is transported.
(4), rake road rock 4 explosions between 2 base plates of knick point 9 to Chuan Mai tunnels are transported, whole small-sized ramp construction finishes.
Adopting said method is successful Application in Jiao family's gold mine many places small-sized ramp work progress, rake slag distance reaches 60m, and production efficiency is brought up to 3m/d by the 2m/d of artificial haulage rock, and efficient has improved 50%, and effectively reduce operating personnel 2~3 people, obviously improve safety condition.

Claims (1)

1. underground small-size sloping way construction method for mines is characterized in that: construct according to following steps:
(1), raises 1.7~2 meters construction ramp tunnel horizontal segments in a side of Chuan Mai tunnel (2) from roadway floor, ramp tunnel horizontal segment base plate is according to 10 meters long of horizontal direction constructions, the long back of ramp tunnel horizontal segment top board (10) level construction 4~6m becomes the construction of position, slope, the height of tunnel horizontal segment is 1.7~2.0 meters, manually slags tap;
And raise 1.1 meters construction scraper chambers (1) at the opposite side of Chuan Mai tunnel (2), the construction specification is that 1.4 meters high 2 meters of * of 2 meters wide * are long, at scraper chamber (1) 15KW scraper (12) is installed;
(2), set up simple and easy chute (11), its chute base plate and ramp roadway floor keep same level at ramp tunnel horizontal segment collar extension;
(3), the knick point (9) from the ramp tunnel horizontal segment end begins to become position, slope blast working, and with the base plate of tunnel, slope horizontal segment rake road (5) as scraper (12), use scraper (12) that quick-fried rock (6) is down harrowed in the simple and easy chute (11), and the mine car (3) of directly packing into is transported;
(4), knick point (9) is transported to rake road rock (4) explosion between the base plate of Chuan Mai tunnel (2).
CN2010101321088A 2010-03-25 2010-03-25 Underground small-size sloping way construction method for mines Active CN101806218B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101321088A CN101806218B (en) 2010-03-25 2010-03-25 Underground small-size sloping way construction method for mines

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101321088A CN101806218B (en) 2010-03-25 2010-03-25 Underground small-size sloping way construction method for mines

Publications (2)

Publication Number Publication Date
CN101806218A true CN101806218A (en) 2010-08-18
CN101806218B CN101806218B (en) 2011-10-05

Family

ID=42608151

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101321088A Active CN101806218B (en) 2010-03-25 2010-03-25 Underground small-size sloping way construction method for mines

Country Status (1)

Country Link
CN (1) CN101806218B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108222946A (en) * 2017-12-20 2018-06-29 佛山科学技术学院 A kind of tunnel excavation construction equipment
CN109577894A (en) * 2018-12-12 2019-04-05 锡矿山闪星锑业有限责任公司 A kind of Fast Installation fixing means of underground scraper
CN110259460A (en) * 2019-06-21 2019-09-20 铜陵有色金属集团股份有限公司 A kind of inclined chute forming method of kaolin suspension
CN111022062A (en) * 2019-12-06 2020-04-17 首钢滦南马城矿业有限责任公司 Construction method for clay layer section of ramp
CN108222946B (en) * 2017-12-20 2024-05-31 佛山科学技术学院 Tunnel underground excavation construction equipment

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4939043B1 (en) * 1969-10-09 1974-10-23
CN101008316A (en) * 2007-01-31 2007-08-01 贵州开磷(集团)有限责任公司 Phosphogypsum cementing and post-filling mining method and pulping technology thereof
CN201269103Y (en) * 2008-08-20 2009-07-08 三一重型装备有限公司 Drift driving construction system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4939043B1 (en) * 1969-10-09 1974-10-23
CN101008316A (en) * 2007-01-31 2007-08-01 贵州开磷(集团)有限责任公司 Phosphogypsum cementing and post-filling mining method and pulping technology thereof
CN201269103Y (en) * 2008-08-20 2009-07-08 三一重型装备有限公司 Drift driving construction system

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
《有色金属》 19851231 刘满启 斜坡道施工的几种方法 6-8 1 , 第2期 2 *
《有色金属》 19971231 吉兆宁等 小铁山主斜坡道机械化掘进施工工艺的研究 27-30 1 , 第3期 2 *
《铜业工程》 20081231 陈华等 矿山斜坡道工程设计及应用 1-4 1 , 第4期 2 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108222946A (en) * 2017-12-20 2018-06-29 佛山科学技术学院 A kind of tunnel excavation construction equipment
CN108222946B (en) * 2017-12-20 2024-05-31 佛山科学技术学院 Tunnel underground excavation construction equipment
CN109577894A (en) * 2018-12-12 2019-04-05 锡矿山闪星锑业有限责任公司 A kind of Fast Installation fixing means of underground scraper
CN110259460A (en) * 2019-06-21 2019-09-20 铜陵有色金属集团股份有限公司 A kind of inclined chute forming method of kaolin suspension
CN110259460B (en) * 2019-06-21 2021-01-05 铜陵有色金属集团股份有限公司 Inclined chute forming method of high-pass shaft
CN111022062A (en) * 2019-12-06 2020-04-17 首钢滦南马城矿业有限责任公司 Construction method for clay layer section of ramp
CN111022062B (en) * 2019-12-06 2022-09-16 首钢滦南马城矿业有限责任公司 Construction method for clay layer section of ramp

Also Published As

Publication number Publication date
CN101806218B (en) 2011-10-05

Similar Documents

Publication Publication Date Title
CN103527200B (en) Bottom-column-free sectional Rhombic room afterwards filling mining method
CN105781554B (en) A kind of open coal mine draws bucket shovel overcast stripping recovery method
CN103790588B (en) A kind of gently inclined orebody is from slipping mining methods
CN103388481B (en) A kind of assembling-type precast plate for administering pucking and the method administering pucking
CN108661646A (en) A kind of false top house column type shrink afterwards filling mining method
CN108843382A (en) Downward subsequent filling method suitable for unstable medium-thickness ore body of gently inclined surrounding rock
CN107975373B (en) A kind of lower continuous digging hard-rock mine method of mechanization of liquid-gas phase transition induction
CN101725350A (en) Footwall vein rock drilling vein-passing access road ore removal stope caving method
AU2014393189B2 (en) Method for filling open stope with aeolian sand in shallow coal seam in western desertified mining areas
CN104389607A (en) Novel drilling and blasting method vertical shaft drilling machine
CN101806218B (en) Underground small-size sloping way construction method for mines
CN101824990B (en) Rock drivage process for four-arm hydraulic drill rig and breaking-loading-transporting-guniting integrated machine
CN103696774A (en) Development method of blind shaft frame for surface and underground parallel construction
CN103790591A (en) Comprehensive mechanized impact type rock tunneling machine
CN113530558B (en) Double-drop shaft-inclined drift combined layered construction method for high-large chamber
CN102561433A (en) Drilling, crushing, digging and loading integrated machine for all-hydraulic tunneling
CN104763452A (en) Transferring and anchor rod anchor cable supporting system
CN104265294A (en) Coal pillar-free mining technology for blasting mining face of steeply dipping seam
CN105971605A (en) A non-waste mining method for underground mines
CN105626076B (en) It is a kind of to draw bucket shovel zigzag working berm high-efficiency mining method
CN109630116B (en) Mining method for inclined medium-thickness blind ore body
CN103711488B (en) The traction mining methods in prediction and disposal leak stopping or cavity
CN109505604B (en) Slope ramp arrangement method applied to stope adopting upward layered filling mining method
CN204851264U (en) Shaft construction is slagged tap and is dug all -in -one with grabbing
CN106638894A (en) Underground sludge discharging device and method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant