CN105781554B - A kind of open coal mine draws bucket shovel overcast stripping recovery method - Google Patents

A kind of open coal mine draws bucket shovel overcast stripping recovery method Download PDF

Info

Publication number
CN105781554B
CN105781554B CN201610220802.2A CN201610220802A CN105781554B CN 105781554 B CN105781554 B CN 105781554B CN 201610220802 A CN201610220802 A CN 201610220802A CN 105781554 B CN105781554 B CN 105781554B
Authority
CN
China
Prior art keywords
stripping
shovel
truck
bucket shovel
ditch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610220802.2A
Other languages
Chinese (zh)
Other versions
CN105781554A (en
Inventor
张瑞新
孙健东
赵红泽
刘煜
马新根
温晓可
武海龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology Beijing CUMTB
Original Assignee
China University of Mining and Technology Beijing CUMTB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology Beijing CUMTB filed Critical China University of Mining and Technology Beijing CUMTB
Priority to CN201610220802.2A priority Critical patent/CN105781554B/en
Publication of CN105781554A publication Critical patent/CN105781554A/en
Application granted granted Critical
Publication of CN105781554B publication Critical patent/CN105781554B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C47/00Machines for obtaining or the removal of materials in open-pit mines
    • E21C47/02Machines for obtaining or the removal of materials in open-pit mines for coal, brown coal, or the like

Abstract

Embodiments of the invention disclose a kind of open coal mine and draw bucket shovel overcast stripping recovery method, are related to Opencut coal mine mining technical field, can ensure coal seam exposure speed, improve and draw bucket shovel operating efficiency.The open coal mine draws bucket shovel overcast stripping recovery method, including:Entity rock step progress pinpoint blasting to coal seam top forms quick-fried heap;Using bull-dozer, monobucket truck integration of operation up-stripping, quick-fried heap is bulldozed, forms the operation square position of predetermined altitude;Bucket shovel is drawn to stand on progress casting operation on operation square position;Pull shovel handling operation completes the overburden operation in a wing exploiting field to side is held;Wherein, bull-dozer, monobucket truck integration of operation fulfil assignment square position to after holding side position, and monobucket truck direction of propulsion of turning round reversely digs ditch along step bench toe on the inside of operation square position and carries out up-stripping, digs material caused by ditch and is used to expand the operation square position.The present invention is applied to open coal mine and draws bucket shovel overcast stripping exploitation.

Description

A kind of open coal mine draws bucket shovel overcast stripping recovery method
Technical field
The present invention relates to Opencut coal mine mining technical field, more particularly to a kind of open coal mine to draw bucket shovel without transport casting work Skill recovery method.
Background technology
The key operation flow of domestic open coal mine application overcast stripping is as follows:
(1) the advance pinpoint blasting of the high step of entity forms quick-fried heap;
(2) bull-dozer, monobucket-quick-fried heap in truck up-stripping part, and square position is expanded, flattened;
(3) bucket shovel is drawn to stand on progress casting operation on operation square position.
It is existing with the change of coal market environment and the production-scale expansion of open coal mine for above work flow For overcast stripping to tackle the lifting of coal production capacity, the following two methods of generally use carry out the regulation that relation is adopted in stripping:
(1) the high shoulder height of casting entity is reduced, is improved under top rock monobucket-truck stripping technology workload, reduction The workload of portion's rock pinpoint blasting-overcast stripping;
(2) operation square position height is reduced, improves bull-dozer, monobucket-truck up-stripping workload, reduces Pull shovel handling Workload.
Above two adjusting method can be caused without transport casting nucleus equipment --- draws under bucket shovel unit operation efficiency Drop, under the conditions of the raising of raw coal production capacity, material peel off burden increase, cause to peel off cost raising.
The content of the invention
In view of this, the embodiment of the present invention provides a kind of open coal mine and draws bucket shovel overcast stripping recovery method, energy Enough ensure coal seam exposure speed, improve and draw bucket shovel operating efficiency.
To reach above-mentioned purpose, embodiments of the invention adopt the following technical scheme that:
A kind of open coal mine draws bucket shovel overcast stripping recovery method, including:
Step 1, the entity rock step to coal seam top carry out pinpoint blasting and form quick-fried heap;
Step 2, using bull-dozer, monobucket-truck integration of operation up-stripping, be bulldozed quick-fried heap, form the work of predetermined altitude Industry square position;
Step 3, bucket shovel is drawn to stand on progress casting operation on operation square position;
Step 4, Pull shovel handling operation complete the overburden operation in a wing exploiting field to side is held;
Wherein, after operation to the end side position described in step 2 is completed in bull-dozer, monobucket-truck integration of operation, monobucket-card Car direction of propulsion of turning round reversely digs ditch along step bench toe on the inside of the operation square position and carries out up-stripping, digs material caused by ditch and uses In the expansion operation square position.
Alternatively, the height of the operation square position is 13-14m.
Alternatively, monobucket-truck turn round direction of propulsion on the inside of the operation square position along step bench toe reversely dig ditch carry out it is auxiliary When helping stripping, dig ditch width and pick ditch final position and adopt relation according to stripping on the premise of not influenceing to draw bucket shovel operation standing area Depending on coordination.
Alternatively, after monobucket-truck completes the pick ditch operation, when going out ditch the truck ramp for helping position will be held to be bulldozed, And to draw bucket shovel structure end to help out ditch job platform.
Alternatively, when before the Pull shovel handling operation is advanced at the pick ditch of monobucket-truck, with the first fltting speed Carry out casting operation;
When the Pull shovel handling operation is advanced at the pick ditch of monobucket-truck, casting work is carried out with the second fltting speed Industry;Wherein, the second fltting speed is more than the first fltting speed.
A kind of open coal mine provided in an embodiment of the present invention draws bucket shovel overcast stripping recovery method, bull-dozer, list Bucket-truck integration of operation up-stripping, quick-fried heap is bulldozed, forms the operation square position of predetermined altitude to after holding side position, monobucket-truck Direction of propulsion of turning round reversely digs ditch along step bench toe on the inside of operation square position and carries out up-stripping, and material caused by pick ditch is used for The operation square position is expanded, can so realize up-stripping equipment and crucial casting equipment availability inventory in casting system Equilibrium is coordinated, and can either ensure coal seam exposure speed during relation regulation is adopted in stripping, improves and draw bucket shovel operating efficiency, ensure Bucket shovel is drawn to maintain maximum unit operation ability.In addition, also to draw bucket shovel energy in the case where production capacity improves, peels off burden Enough technology, economic advantages for continuing to play overcast stripping.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is a wing high step schematic cross-section to be blasted in the embodiment of the present invention;
Fig. 2 is a wing high step sling blasting schematic cross-section in the embodiment of the present invention;
Fig. 3 is that monobucket-truck is bulldozed the quick-fried heap schematic cross-section of a wing in the embodiment of the present invention;
Fig. 4 is open coal mine in the embodiment of the present invention without transport casting working face mining schematic diagram;
Fig. 5 is that monobucket in the embodiment of the present invention-truck auxiliary is bulldozed collapsing figure;
Fig. 6 is that monobucket-truck digs ditch schematic diagram in the embodiment of the present invention;
Fig. 7 is that pick ditch finishes design sketch in the embodiment of the present invention.
In figure:1st, high step to be blasted, 2, coal seam, 3, fall mound, 4, the quick-fried heap of throwing, 5, monobucket-truck auxiliary be bulldozed it is quick-fried Heap, 6, operation square position, 7, the quick-fried heap direction of propulsion of monobucket-truck up-stripping, 8, Pull shovel handling operation direction of propulsion, 9, coal seam Direction of extraction, 10, end side, 11, truck ramp, 12, monobucket-truck pick ditch direction of propulsion, 13, monobucket-truck pick ditch position, 14th, dig ditch expand square position, 15, draw bucket shovel end help out ditch job platform.
Embodiment
Bucket shovel overcast stripping recovery method is drawn a kind of open coal mine of the embodiment of the present invention to enter below in conjunction with the accompanying drawings Row is described in detail.
It will be appreciated that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.Base Embodiment in the present invention, those of ordinary skill in the art obtained under the premise of creative work is not made it is all its Its embodiment, belongs to the scope of protection of the invention.
Referring to Fig. 1 to Fig. 7, a kind of open coal mine of the present invention draws bucket shovel overcast stripping recovery method embodiment, bag Include:
Step 1, the entity rock step to coal seam top carry out pinpoint blasting and form quick-fried heap.
In this step, blasthole is drilled with the high step of entity on coal seam top using perforation rig in advance, then installing is fried Medicine carries out pinpoint blasting.The throwing rate of pinpoint blasting can reach 33%, by the direct throwing of about 1/3 overburden amount to goaf It is interior.
Step 2, using bull-dozer, monobucket-truck integration of operation up-stripping, be bulldozed quick-fried heap, form the work of predetermined altitude Industry square position.
In the present embodiment, monobucket-truck systems are mainly made up of power shovel (being commonly called as power shovel) and haulage truck.
In the present embodiment, after pinpoint blasting implementation, carry out dropping section operation on quick-fried heap dedicated for dropping the bull-dozer of section, This work mainly has two effects, is brushing power shovel preparation place first, reducing the height of the quick-fried heap of pinpoint blasting step, A part of overburden amount is directly pushed away and abandoned to goaf, second, shoveling preparation work square position while section is dropped to draw to struggle against.
Bull-dozer will carry out at the top of quick-fried heap smooth, prepare after the working berm of dredger dredge, adjust dredger dredge to be brushed Help operation, by formed after presplit blasting it is domatic on remaining quick-fried amount casting to outside, high bench face is brushed out into pre- ceasma.Push away Native machine is tracked operation at power shovel rear, and the quick-fried amount that power shovel is poured out pushes away to refuse dump side abandons, and quick-fried heap is carried out into part drop Section, and to draw bucket shovel to do expansion platform.
After the completion of power shovel is made to pre- broken face upper brushes helper, work-yard is carried out through bull-dozer it is smooth, when meeting truck During traffic condition, by power shovel be adjusted to draw bucket shovel will operation one end, carried out by the way of the working face of end drop section operation, its shell Dumped from amount by truck to shovel standing place of struggling against is drawn close to the side of refuse dump, to draw bucket shovel to do expansion platform.
When drawing the shovel expansion platform width that struggles against to meet its operating condition, truck cooperation power shovel is to draw bucket shovel to do with remaining quick-fried amount Into the contact road of working face or end side contact road, route possess truck pass through condition after, by the remaining quick-fried amount of power shovel operation by Truck is directly dumped to internal dumping.So, the workload for drawing bucket shovel is both reduced, that has saved drawing bucket shovel again dumps space.
Excavated by dredger dredge and bull-dozer pushes away and abandons operation, the final work to draw bucket shovel to prepare wide 120m or so is put down Disk, the quick-fried heap shoulder height for drawing bucket shovel operation are 13-15m or so.Bucket shovel is now drawn to enter operation horizontal by centre contact road Disk carries out casting operation.
In the present embodiment, the highly preferred of the operation square position is 13-14m.Bucket is drawn when operation square position is highly 13-14m Shovel unit casting operating efficiency highest.
Step 3, bucket shovel is drawn to stand on progress casting operation on operation square position.
Bucket shovel is drawn, is a kind of large-scale walking excavator, for coal, shale, ferrous metal and nonferrous metallic ores etc. Strip mining transformation and extensive hydraulic engineering are cut the earth.It is mainly used for when peeling off casting to goaf, open pit quarry, water Sharp engineering edge.It can be by the casting of bulk to larger distance.
In this step, draw bucket shovel to stand on working berm, directly dumped to goaf after excavating material.
Step 4, Pull shovel handling operation complete the overburden operation in a wing exploiting field to side is held.
In the embodiment of the present invention, position is helped at operation to the end that bull-dozer, monobucket-truck integration of operation complete described in step 2 Afterwards, monobucket-truck direction of propulsion of turning round reversely digs ditch along step bench toe on the inside of the operation square position and carries out up-stripping, pick ditch production Raw material is used to expand the operation square position.
In the equipment that overcasting technigue recovery method of the embodiment of the present invention is used, bull-dozer, monobucket-truck set for up-stripping Standby, it is crucial casting equipment to draw bucket shovel.
A kind of open coal mine provided in an embodiment of the present invention draws bucket shovel overcast stripping recovery method, bull-dozer, list Bucket-truck integration of operation up-stripping, quick-fried heap is bulldozed, forms the operation square position of predetermined altitude to after holding side position, monobucket-truck Direction of propulsion of turning round reversely digs ditch along step bench toe on the inside of operation square position and carries out up-stripping, and material caused by pick ditch is used for The operation square position is expanded, can so realize up-stripping equipment and crucial casting equipment availability inventory in casting system Equilibrium is coordinated, and can either ensure coal seam exposure speed during relation regulation is adopted in stripping, improves and draw bucket shovel operating efficiency, ensure Bucket shovel is drawn to maintain maximum unit operation ability.In addition, also to draw bucket shovel energy in the case where production capacity improves, peels off burden Enough technology, economic advantages for continuing to play overcast stripping.
In foregoing open coal mine draws bucket shovel overcast stripping recovery method embodiment, alternatively, monobucket-truck falls Turn direction of propulsion when ditch progress up-stripping is reversely dug in operation square position inner side along step bench toe, dig ditch width and pick ditch terminates Position according to stripping depending on harmonious relations are adopted on the premise of not influenceing to draw bucket shovel operation standing area.So can be more efficiently Up-stripping equipment coordination balanced with crucial casting equipment availability inventory in casting system is realized, ensures coal seam exposure speed Degree, improve and draw bucket shovel operating efficiency.
In foregoing open coal mine draws bucket shovel overcast stripping recovery method embodiment, alternatively, monobucket-truck is complete Into after the pick ditch operation, when going out ditch the truck ramp for helping position will be held to be bulldozed, and to draw bucket shovel structure end to help out ditch operation Platform, so, both avoid drawing bucket shovel and holding side position to carry out casting operation, improve casting efficiency, helped again for drawing bucket shovel at end Position, which smoothly goes out ditch and provided, is easy to condition.
It is alternatively, described to draw bucket shovel in foregoing open coal mine draws bucket shovel overcast stripping recovery method embodiment Casting operation be advanced at the pick ditch of monobucket-truck before when, with the first fltting speed carry out casting operation;The drawing bucket is slide tackled When heap operation is advanced at the pick ditch of monobucket-truck, casting operation is carried out with the second fltting speed;Wherein, the second fltting speed More than the first fltting speed.
In the present embodiment, when Pull shovel handling operation is advanced at monobucket-truck auxiliary pick ditch, due to monobucket-truck The casting operation of pick ditch inventory is completed, therefore draws backcast stripping amount in bucket shovel unit advance distance to reduce, Pull shovel handling pushes away Enter speed quickening.The recovery method of the embodiment of the present invention also referred to as draws bucket shovel speed change to promote overcast stripping exploitation side Method, bucket shovel constant speed is drawn to promote overcast stripping recovery method relative to existing, the embodiment of the present invention can realize casting Up-stripping equipment is balanced with crucial casting equipment availability inventory in system coordinates, and can either adopt relation regulation process in stripping In, ensure coal seam exposure speed, improve and draw bucket shovel operating efficiency, ensure to draw bucket shovel to maintain maximum unit operation ability.In addition, So that bucket shovel is drawn to can continue to play the technology of overcast stripping, warp in the case where production capacity improves, peels off burden Ji advantage.
Particularly under the constantly high situation of current oil price, mine truck tire price, casting entity is neither being reduced High shoulder height, in the case of also not reducing operation square position height, the embodiment of the present invention is to up-stripping equipment in casting system Balanced with crucial casting equipment availability inventory to coordinate, odds for effectiveness and cost advantage are more obvious.
The foregoing is only a specific embodiment of the invention, but protection scope of the present invention is not limited thereto, any Those familiar with the art the invention discloses technical scope in, the change or replacement that can readily occur in, all should It is included within the scope of the present invention.Therefore, protection scope of the present invention should be defined by scope of the claims.

Claims (5)

1. a kind of open coal mine draws bucket shovel overcast stripping recovery method, it is characterised in that including:
Step 1, the entity rock step to coal seam top carry out pinpoint blasting and form quick-fried heap;
Step 2, using bull-dozer, monobucket-truck integration of operation up-stripping, be bulldozed quick-fried heap, form the operation horizontal of predetermined altitude Disk;
Step 3, bucket shovel is drawn to stand on progress casting operation on operation square position;
Step 4, Pull shovel handling operation complete the overburden operation in a wing exploiting field to side is held;
Wherein, after operation to the end side position described in step 2 is completed in bull-dozer, monobucket-truck integration of operation, monobucket-truck falls Turn direction of propulsion and reversely dig ditch progress up-stripping along step bench toe on the inside of operation square position, dig material caused by ditch and be used to open up Operation square position described in exhibition.
2. open coal mine according to claim 1 draws bucket shovel overcast stripping recovery method, it is characterised in that described The height of operation square position is 13-14m.
3. open coal mine according to claim 1 or 2 draws bucket shovel overcast stripping recovery method, it is characterised in that Monobucket-truck turns round direction of propulsion when ditch progress up-stripping is reversely dug in operation square position inner side along step bench toe, digs furrow width Degree and pick ditch final position according to stripping depending on harmonious relations are adopted on the premise of not influenceing to draw bucket shovel operation standing area.
4. open coal mine according to claim 1 or 2 draws bucket shovel overcast stripping recovery method, it is characterised in that After monobucket-truck completes the pick ditch operation, when going out ditch the truck ramp for helping position will be held to be bulldozed, and to draw bucket shovel structure end Help out ditch job platform.
5. open coal mine according to claim 1 or 2 draws bucket shovel overcast stripping recovery method, it is characterised in that
The Pull shovel handling operation be advanced at the pick ditch of monobucket-truck before when, with the first fltting speed carry out casting work Industry;
When the Pull shovel handling operation is advanced at the pick ditch of monobucket-truck, casting operation is carried out with the second fltting speed;Its In, the second fltting speed is more than the first fltting speed.
CN201610220802.2A 2016-04-11 2016-04-11 A kind of open coal mine draws bucket shovel overcast stripping recovery method Expired - Fee Related CN105781554B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610220802.2A CN105781554B (en) 2016-04-11 2016-04-11 A kind of open coal mine draws bucket shovel overcast stripping recovery method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610220802.2A CN105781554B (en) 2016-04-11 2016-04-11 A kind of open coal mine draws bucket shovel overcast stripping recovery method

Publications (2)

Publication Number Publication Date
CN105781554A CN105781554A (en) 2016-07-20
CN105781554B true CN105781554B (en) 2018-01-12

Family

ID=56396098

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610220802.2A Expired - Fee Related CN105781554B (en) 2016-04-11 2016-04-11 A kind of open coal mine draws bucket shovel overcast stripping recovery method

Country Status (1)

Country Link
CN (1) CN105781554B (en)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106368706A (en) * 2016-08-27 2017-02-01 肖双双 Casting blast and pull shovel handling mining procedure
US9783955B1 (en) 2016-11-09 2017-10-10 Caterpillar Inc. System and method for moving material
US10640952B2 (en) 2016-12-09 2020-05-05 Caterpillar Inc. System and method for modifying a material movement plan
CN106761759B (en) * 2016-12-28 2019-03-22 中国神华能源股份有限公司 A kind of coal-mining method of open coal mine
CN106930765B (en) * 2017-03-16 2019-01-11 福建省新华都工程有限责任公司 The Ratio in Open-pit Mine dress method of dress process realization cost efficiency is inherently adopted in a kind of change
CN107687342B (en) * 2017-08-21 2019-05-21 中国矿业大学 A kind of open coal mine drawing bucket shovel active line segmentation alternative expression exploiting field forward method
CN109931064B (en) * 2019-03-14 2020-11-24 华北科技学院 Independent reverse stacking operation method for dragline of opencast coal mine
CN109899072B (en) * 2019-03-22 2020-08-18 华北科技学院 Circulating walking operation method for working face of dragline of opencast coal mine
CN109944592B (en) * 2019-03-28 2020-10-16 辽宁工程技术大学 Method for designing height of throwing blasting step in dragline dump process
CN109931065B (en) * 2019-04-03 2020-09-25 华北科技学院 Open pit coal mine throwing blasting-loosening blasting partition mining method
CN110700837A (en) * 2019-11-29 2020-01-17 神华准格尔能源有限责任公司 Dragline operation method
CN113047840B (en) * 2021-04-27 2023-06-27 车兆学 Stripping semi-continuous reverse pile process for open coal mine
CN115977642B (en) * 2022-10-28 2023-08-29 国能经济技术研究院有限责任公司 Double working surface back and forth moving and pile-reversing operation method of bucket-pulling shovel

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE372450C (en) * 1921-09-07 1923-03-29 Clemens Abels Open pit mine with pivoting operation and tilting platform
CN103174427B (en) * 2013-04-09 2015-04-29 中煤平朔集团有限公司 Method for exploiting downward deepening section of anticlinal part of opencast coal mine
CN103388478B (en) * 2013-07-30 2015-07-15 中国神华能源股份有限公司 Forming method for transportation road of bucket shovel applied to open pit coal mine
CN103470262A (en) * 2013-09-12 2013-12-25 中国矿业大学 Mining method of nearly horizontal mineral deposit of opencast coal field by casting and internally dumping
CN104405397A (en) * 2014-10-10 2015-03-11 赵红泽 Open-pit coal mine double-pit dynamic stripping ratio adjusting method

Also Published As

Publication number Publication date
CN105781554A (en) 2016-07-20

Similar Documents

Publication Publication Date Title
CN105781554B (en) A kind of open coal mine draws bucket shovel overcast stripping recovery method
CN103216238B (en) A kind of Opencut coal mine mining technique
CN103216237B (en) A kind of Opencut coal mine mining technique
CN107013217B (en) A kind of open coal mine casting bridge-type Pull shovel handling operational method
AU2013358812B2 (en) Solid-filling coal mining method with two pre-excavated tunnels for advancing
CN100535387C (en) Improved sublevel caving method without bottom column
WO2016045440A1 (en) Mining method
CN106869936A (en) It is a kind of to be suitable to the surface mining new method of steep slope topography
CN107687342B (en) A kind of open coal mine drawing bucket shovel active line segmentation alternative expression exploiting field forward method
CN103470262A (en) Mining method of nearly horizontal mineral deposit of opencast coal field by casting and internally dumping
WO2020010696A1 (en) Method for recovering room coal pillars through reserved roadway cemented filling
CN103388478B (en) Forming method for transportation road of bucket shovel applied to open pit coal mine
CN109931064B (en) Independent reverse stacking operation method for dragline of opencast coal mine
CN103470263A (en) New-level development method for open-pit metal mine
CN104358574A (en) Horizontal room-and-pillar mining method of slightly inclined orebody
CN102235010B (en) Treatment method for hanging sinking stop due to expansive soil in well sinking
CN105626068B (en) Help the method for dismounting of bridge in open coal mine end
CN105626076B (en) It is a kind of to draw bucket shovel zigzag working berm high-efficiency mining method
CN110080774A (en) Mine Dry-placed fill mining is fallen based on the vertical medium-length hole retrusive of high-dipping ore block
CN109630116B (en) Mining method for inclined medium-thickness blind ore body
CN110397439A (en) Mine Dry-placed fill mining is fallen based on the vertical medium-length hole retrusive of high-dipping ore block
CN108252718A (en) Suitable for the surface mining method of slight slope and thin ore body
CN207177895U (en) A kind of noble metal inclined orebody ro om -character
Yamatomi et al. Surface mining methods and equipment
CN103993884A (en) One-time well forming and maintenance method through cutting instead of tunneling during cutting air return well in medium-length hole mining

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180112

Termination date: 20190411