CN101806217A - 三线并行小净距浅埋、偏压隧道群进洞施工方法 - Google Patents
三线并行小净距浅埋、偏压隧道群进洞施工方法 Download PDFInfo
- Publication number
- CN101806217A CN101806217A CN 201010125453 CN201010125453A CN101806217A CN 101806217 A CN101806217 A CN 101806217A CN 201010125453 CN201010125453 CN 201010125453 CN 201010125453 A CN201010125453 A CN 201010125453A CN 101806217 A CN101806217 A CN 101806217A
- Authority
- CN
- China
- Prior art keywords
- tunnel
- construction
- distance
- rock
- spacing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 48
- 239000011435 rock Substances 0.000 claims abstract description 66
- 238000005422 blasting Methods 0.000 claims abstract description 28
- 238000000034 method Methods 0.000 claims abstract description 14
- 239000002689 soil Substances 0.000 claims abstract description 7
- 229910000831 Steel Inorganic materials 0.000 claims description 23
- 238000009412 basement excavation Methods 0.000 claims description 23
- 239000010959 steel Substances 0.000 claims description 23
- 238000007569 slipcasting Methods 0.000 claims description 18
- 238000004880 explosion Methods 0.000 claims description 13
- 230000003014 reinforcing effect Effects 0.000 claims description 13
- 238000005520 cutting process Methods 0.000 claims description 12
- 230000002787 reinforcement Effects 0.000 claims description 12
- 239000002002 slurry Substances 0.000 claims description 12
- 239000004570 mortar (masonry) Substances 0.000 claims description 9
- 239000004568 cement Substances 0.000 claims description 6
- 125000004122 cyclic group Chemical group 0.000 claims description 6
- 239000002360 explosive Substances 0.000 claims description 6
- 230000011218 segmentation Effects 0.000 claims description 4
- 230000007306 turnover Effects 0.000 claims description 4
- 239000000839 emulsion Substances 0.000 claims description 3
- 238000010304 firing Methods 0.000 claims description 3
- 235000019353 potassium silicate Nutrition 0.000 claims description 3
- 239000011378 shotcrete Substances 0.000 claims description 3
- NTHWMYGWWRZVTN-UHFFFAOYSA-N sodium silicate Chemical compound [Na+].[Na+].[O-][Si]([O-])=O NTHWMYGWWRZVTN-UHFFFAOYSA-N 0.000 claims description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 3
- 230000008520 organization Effects 0.000 abstract 1
- 238000005516 engineering process Methods 0.000 description 3
- 238000013461 design Methods 0.000 description 2
- 238000005259 measurement Methods 0.000 description 2
- 241000208202 Linaceae Species 0.000 description 1
- 235000004431 Linum usitatissimum Nutrition 0.000 description 1
- 239000004927 clay Substances 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 238000005474 detonation Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 239000003814 drug Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 231100001261 hazardous Toxicity 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 230000035772 mutation Effects 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 238000010008 shearing Methods 0.000 description 1
- 230000002195 synergetic effect Effects 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 238000012549 training Methods 0.000 description 1
- 230000005641 tunneling Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
本发明公开了一种三线并行小净距浅埋、偏压隧道群进洞施工方法,包括以下施工步骤:1)埋深浅、偏压的三线并行小净距的隧道洞口段采用长管棚支护加固;2)先施工两侧的隧道,施工按单个独洞正常组织进行施工,隧道进洞施工采用控制爆破,中间隧道距离其两侧的隧道距离近,施工按小净距隧道进行施工;3)在隧道洞口刷坡时,两隧道中岩柱坡口处原地面土体应暂时保留,以支挡坡面,向水平小导管中注浆加固中岩柱坡面。本发明解决了三线并行小净距隧道进洞难题,施工操作简单、施工进度快,安全系数高,经济合理,有效降低了施工坍塌风险,确保了施工过程的安全性。
Description
技术领域
本发明涉及三线并行隧道施工领域,具体是一种三线并行小净距浅埋、偏压隧道群进洞施工方法。
背景技术
在岩体中开挖隧道进出洞位于浅埋偏压地段,均位于IV、V级软弱围岩时,小间距隧道群爆破开挖施工,隧道之间相互干扰,很可能造成两隧道间中岩柱的局部或整体垮塌,隧道断面大,洞口埋深浅、偏压,施工宜坍塌,针对韩府山隧道群现场条件,我们通过加固隧道洞口和中岩柱、选择合理施工顺序、选择合适施工方法和进行微震控制爆破技术,顺利安全的完成隧道群的施工。
发明内容
本发明的目的是提供一种三线并行小净距浅埋、偏压隧道群进洞施工方法,解决了三线并行小净距隧道进洞难题,施工操作简单、施工进度快,安全系数高,经济合理,有效降低了施工坍塌风险,确保了施工过程的安全性。
本发明的技术方案如下:
三线并行小净距浅埋、偏压隧道群进洞施工方法,在浅埋偏压地段进行三条并行隧道施工作业,作业地段位于IV、V级软弱围岩,其特征在于:包括以下施工步骤:
1)、埋深浅、偏压的三线并行小净距的隧道洞口段采用长管棚支护加固,沿拱顶140°范围环向布设长管棚加固,布设超前支护钢管长度30~40m,外插角为1°~3°,管棚环向间距40cm左右,钢管φ100-120mm,热轧无缝钢管,棚环上钢管的管壁开有透浆孔,向透孔浆中注入水泥浆或水泥水玻璃双浆液;
2)、先施工两侧的隧道,两侧的隧道之间中夹岩柱厚度大于1.5B,B为隧道开挖宽度,施工按单个独洞正常组织进行施工,隧道进洞施工采用控制爆破,控制爆破必须控制装药量和分段微差爆破,将爆破对相邻隧道引起的爆破振动速度控制10cm/s以下,再施工中间隧道,中间隧道距离其两侧的隧道距离近,施工按小净距隧道进行施工;
3)、在隧道洞口刷坡时,中间隧道两侧的两个隧道中岩柱坡口处原地面土体应暂时保留,以支挡坡面,洞口临时支护完成后,挖除中岩柱坡口土体,并及时沿隧道轴向对两侧的中岩柱正面打入注浆水平小导管,向水平小导管中注浆加固中岩柱坡面,加固范围为拱腰至边墙底部;
随先行隧道开挖同时,沿中间隧道两侧的两个中岩柱侧壁打入注浆水平小导管加固,加固范围为拱腰至边墙底部,注浆水平小导管采用水平设置,并注浆加固;
4)、隧道每循环开挖后,应及时进行初期支护,初期支护采用喷锚构筑法,以拱架、系统锚杆、钢筋网、喷射混凝土构成初期支护受力结构,IV级围岩地段喷射混凝土厚度25cm,钢筋网网格间距20×20cm,系统锚杆长度3.5m间距1.2m×1.2m,全环设置I18工字钢架,每榀间距0.8m;V级围岩地段喷射混凝土厚度28cm,钢筋网网格间距20×20cm,系统锚杆长度4m间距1.2m×1m,全环设置I20a工字钢架,每榀间距0.6m;
5)、各隧道施工应错开一定的距离,两侧的两个隧道之间掌子面错开距离不少于10m,相邻的两个隧道之间掌子面错开距离不少于50m;
及时进行衬砌仰拱的施工,严格控制仰拱、衬砌距离掌子面距离,IV级软弱围岩地段隧道的仰拱距离掌子面不超出50m,衬砌距离掌子面不超出90m,V级软弱围岩地段隧道的仰拱距离掌子面不超出40m,衬砌距离掌子面不超出50m。
所述的中岩柱正面打入的注浆水平小导管,采用长5m、壁厚5mm、φ50钢管,按间距1.5×1.5m成梅花形布置;中岩柱侧面打入的注浆水平小导管,长6-10m,壁厚,间距1.5×1.5m。
所述注浆水平小导管中注浆初始压力为0.5MPa,终止压力为1.5MPa,浆液水灰比为1∶1。
所述的控制爆破为分步开挖,缩小爆破开挖断面面积,在进出洞及V级围岩地段施工方法为双侧壁导坑法,IV级围岩地段施工方法为三台阶七步开挖法;采用中等爆速的乳化炸药,起爆采用非电毫秒雷管,大间隔微差起爆,使相邻段别的起爆间隔大于100ms。
所述的V级软弱围岩地段循环进尺控制在0.5~0.6m之间,所述的IV级软弱围岩地段循环进尺控制在0.8~1.0m之间。
本发明三线并行小净距浅埋、偏压隧道群进洞比分离式隧道占地小,布线灵活,比连拱隧道造价低,对中岩柱的加固增大岩体抗拉(抗剪)强度,从而增大岩柱的极限抗压、抗剪强度;随着岩体水平方向的变形,将增大对岩体变形的水平约束,相应增大岩体的极限强度,减小开挖爆破对岩体的破坏及振动影响。
本发明解决了三线并行小净距隧道进洞难题,施工操作简单、施工进度快,安全系数高,经济合理,有效降低了施工坍塌风险,确保了施工过程的安全性。
附图说明
图1为本发明的三线并行隧道群的结构示意图。
具体实施方式
参见附图,三线并行小净距浅埋、偏压隧道群进洞施工方法,包括以下施工步骤:
1)、埋深浅、偏压的三线并行小净距的隧道洞口段采用长管棚支护加固,沿拱顶140°范围环向布设长管棚加固,布设超前支护钢管长度30~40m,外插角为1°~3°,管棚环向间距40cm左右,钢管φ100-120mm,热轧无缝钢管,棚环上钢管的管壁开有透浆孔,向透孔浆中注入水泥浆或水泥水玻璃双浆液;
开挖中每循环辅以长3.5m加密的Φ42超前小导管1.5m一环。
2)、隧道净距小,选择从一端独头掘进,先施工两侧的隧道1、3,之后施工中间2号隧道的施工方案。两侧的隧道之间中夹岩柱4、5厚度大于1.5B,B为开挖宽度,施工按单个独洞正常组织进行施工,隧道进洞施工采用控制爆破,控制爆破必须控制装药量和分段微差爆破,再施工中间隧道2,中间隧道2距离其两侧的隧道1、3距离近,施工按小净距隧道进行施工。
3)、在隧道洞口刷坡时,两隧道中岩柱坡口处原地面土体应暂时保留,以支挡坡面。洞口临时支护完成后,挖除中岩柱坡口土体,立即沿隧道轴向对中岩柱正面打入长5m、壁厚5mm、φ50注浆水平小导管,注浆加固中岩柱坡面。
随先行隧道开挖的进行,对隧道1与隧道2之间中岩柱和隧道2与隧道3之间中岩柱采用φ50注浆水平小导管加固,加固范围为拱腰至边墙底部。采用水平设置,注浆水平小导管长6-10m,间距1.5×1.5m,按梅花形布置,管与钻孔口处用胶泥与麻丝缠绕,使之与钻孔孔壁充分挤压塞紧。向小导管注浆的注浆初始压力为0.5MPa,终止压力为1.5MPa,浆液水灰比为1∶1。
4)、隧道进洞施工采用控制爆破,控制爆破主要采用控制装药量和分段微差爆破技术来实现,控制爆破技术要点主要有:
①分步开挖,缩小爆破开挖断面面积:进出洞及V级围岩地段施工方法为双侧壁导坑法,IV级围岩地段施工方法为三台阶七步开挖法。
②采用中等爆速的乳化炸药。
③起爆采用非电毫秒雷管,大间隔微差起爆,使相邻段别的起爆间隔大于100ms,以
减少每段起爆的炸药量及各段爆轰波的叠加,让爆破地震主震相间无叠加效应,达到减小对围岩扰动的目的。
④尽量减小周边眼的间距,根据围岩情况的不同,一般控制在40cm左右,周边眼采用小直径药卷间隔装药技术,以控制开挖成型,减小爆破对围岩的扰动,周边眼采用不耦合装药结构的光面爆破。
⑤开挖中严格遵循“弱爆破、短进尺”的施工原则,V级围岩循环进尺控制在0.5~0.6m之间,IV级围岩循环进尺控制在0.8~1.0m之间。
以减小每次爆破的炸药总用量。
⑥采用IDTS3850爆破振动记录仪对爆破振动进行测试,将爆破对相邻隧道引起的爆破振动速度控制10cm/s以下。
5)、隧道循环开挖后,及时进行支护,初期支护采用喷锚构筑法,以拱架、系统锚杆、钢筋网、喷射混凝土构成的初期支护为主要受力结构。根据围岩等级加强初期支护。IV级围岩地段喷射混凝土厚度25cm,钢筋网网格间距20×20cm,系统锚杆长度3.5m间距1.2m×1.2m,全环设置I18工字钢架,每榀间距0.8m。V级围岩地段喷射混凝土厚度28cm,钢筋网网格间距20×20cm,系统锚杆长度4m间距1.2m×1m,全环设置I20a工字钢架,每榀间距0.6m。
6)、施工距离的确定
各隧道施工应错开一定的距离,隧道1、3之间掌子面错开距离不少于10m,隧道2、3之间掌子面错开距离不少于50m。
及时进行衬砌仰拱的施工,严格控制仰拱、衬砌距离掌子面距离,IV级围岩仰拱距离掌子面不宜超出50m,衬砌距离掌子面不宜超出90m,V级围岩仰拱距离掌子面不宜超出40m,衬砌距离掌子面不宜超出50m。
各隧道掌子面错开距离要经过爆破振动测试来进行验证。
7)、安全保证措施:
①做好超前地质预报工作,配备有经验的地质工程师,24小时轮流值班,及时了解地质情况变化。
②严格遵循“短开挖、弱爆破、强支护、勤量测、早封闭”的施工原则保证不坍方。
③施工前,对所有参建员工进行上岗前的安全教育。对从事电器、爆破、高空作业、焊接、机动车驾驶等特殊工种的人员,经过专业培训,获得《安全操作合格证》后,方准持证上岗。
④电缆线路采用“三相五线”接线方式,现场配电箱采用统一配电箱加工定做,固定式配电箱并严格按照《供配电系统设计规范》要求开关箱“一机、一闸、一漏、一箱”制和动力、照明配电分设原则。
⑤隧道开挖后必须及时进行支护。支护质量必须达到设计规定的标准。
⑥加强监控量测工作,信息及时反馈,指导现场施工。量测人员发现量测数据有突变或异变时,应于量测后及时向技术负责人汇报,并立即采取应急措施或通知施工人员暂时撤离危险地段。
Claims (5)
1.三线并行小净距浅埋、偏压隧道群进洞施工方法,在浅埋偏压地段进行三条并行隧道施工作业,作业地段位于IV、V级软弱围岩,其特征在于:包括以下施工步骤:
1)、埋深浅、偏压的三线并行小净距的隧道洞口段采用长管棚支护加固,沿拱顶140°范围环向布设长管棚加固,布设超前支护钢管长度30~40m,外插角为1°~3°,管棚环向间距40cm左右,钢管φ100-120mm,热轧无缝钢管,棚环上钢管的管壁开有透浆孔,向透孔浆中注入水泥浆或水泥水玻璃双浆液;
2)、先施工两侧的隧道,两侧的隧道之间中夹岩柱厚度大于1.5B,B为隧道开挖宽度,施工按单个独洞正常组织进行施工,隧道进洞施工采用控制爆破,控制爆破必须控制装药量和分段微差爆破,将爆破对相邻隧道引起的爆破振动速度控制10cm/s以下,再施工中间隧道,中间隧道距离其两侧的隧道距离近,施工按小净距隧道进行施工;
3)、在隧道洞口刷坡时,中间隧道两侧的两个隧道中岩柱坡口处原地面土体应暂时保留,以支挡坡面,洞口临时支护完成后,挖除中岩柱坡口土体,并及时沿隧道轴向对两侧的中岩柱正面打入注浆水平小导管,向水平小导管中注浆加固中岩柱坡面,加固范围为拱腰至边墙底部;
随先行隧道开挖同时,沿中间隧道两侧的两个中岩柱侧壁打入注浆水平小导管加固,加固范围为拱腰至边墙底部,注浆水平小导管采用水平设置,并注浆加固;
4)、隧道每循环开挖后,应及时进行初期支护,初期支护采用喷锚构筑法,以拱架、系统锚杆、钢筋网、喷射混凝土构成初期支护受力结构,IV级围岩地段喷射混凝土厚度25cm,钢筋网网格间距20×20cm,系统锚杆长度3.5m间距1.2m×1.2m,全环设置I18工字钢架,每榀间距0.8m;V级围岩地段喷射混凝土厚度28cm,钢筋网网格间距20×20cm,系统锚杆长度4m间距1.2m×1m,全环设置I20a工字钢架,每榀间距0.6m;
5)、各隧道施工应错开一定的距离,两侧的两个隧道之间掌子面错开距离不少于10m,相邻的两个隧道之间掌子面错开距离不少于50m;
及时进行衬砌仰拱的施工,严格控制仰拱、衬砌距离掌子面距离,IV级软弱围岩地段隧道的仰拱距离掌子面不超出50m,衬砌距离掌子面不超出90m,V级软弱围岩地段隧道的仰拱距离掌子面不超出40m,衬砌距离掌子面不超出50m。
2.根据权利要求1所述的施工方法,其特征在于:所述的中岩柱正面打入的注浆水平小导管,采用长5m、壁厚5mm、φ50钢管,按间距1.5×1.5m成梅花形布置;中岩柱侧面打入的注浆水平小导管,长6-10m,壁厚,间距1.5×1.5m。
3.根据权利要求1所述的施工方法,其特征在于:所述注浆水平小导管中注浆初始压力为0.5MPa,终止压力为1.5MPa,浆液水灰比为1∶1。
4.根据权利要求1所述的施工方法,其特征在于:所述的控制爆破为分步开挖,缩小爆破开挖断面面积,在进出洞及V级围岩地段施工方法为双侧壁导坑法,IV级围岩地段施工方法为三台阶七步开挖法;采用中等爆速的乳化炸药,起爆采用非电毫秒雷管,大间隔微差起爆,使相邻段别的起爆间隔大于100ms。
5.根据权利要求1所述的施工方法,其特征在于:所述的V级软弱围岩地段循环进尺控制在0.5~0.6m之间,所述的IV级软弱围岩地段循环进尺控制在0.8~1.0m之间。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010125453 CN101806217B (zh) | 2010-03-12 | 2010-03-12 | 三线并行小净距浅埋、偏压隧道群进洞施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010125453 CN101806217B (zh) | 2010-03-12 | 2010-03-12 | 三线并行小净距浅埋、偏压隧道群进洞施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101806217A true CN101806217A (zh) | 2010-08-18 |
CN101806217B CN101806217B (zh) | 2013-05-29 |
Family
ID=42608150
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201010125453 Active CN101806217B (zh) | 2010-03-12 | 2010-03-12 | 三线并行小净距浅埋、偏压隧道群进洞施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101806217B (zh) |
Cited By (24)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102128035A (zh) * | 2011-04-29 | 2011-07-20 | 重庆大学 | 双侧偏压小净距隧道施工方法 |
CN102155234A (zh) * | 2011-04-08 | 2011-08-17 | 中铁上海设计院集团有限公司 | 非对称的小间距隧道开挖施工方法 |
CN102536252A (zh) * | 2012-02-17 | 2012-07-04 | 中国建筑第六工程局有限公司 | 一种极小净距隧道后行洞开挖方法 |
CN102748035A (zh) * | 2012-06-21 | 2012-10-24 | 中铁十三局集团有限公司 | 人工山体法隧道施工进洞方法 |
CN103375170A (zh) * | 2013-07-26 | 2013-10-30 | 中铁六局集团石家庄铁路建设有限公司 | 三孔小净距隧洞下穿铁路干线的暗挖施工变形控制方法 |
CN104196537A (zh) * | 2014-08-26 | 2014-12-10 | 广东省建筑工程机械施工有限公司 | 一种三条平行的超小净距地铁隧道施工方法 |
CN104847375A (zh) * | 2015-05-20 | 2015-08-19 | 深圳市市政设计研究院有限公司 | 一种小净距四车道浅埋大跨隧道支护方法 |
CN105888674A (zh) * | 2016-05-11 | 2016-08-24 | 中铁十六局集团北京轨道交通工程建设有限公司 | 不同围岩等级下的小净距隧道中夹岩加固方法 |
CN106050243A (zh) * | 2016-07-28 | 2016-10-26 | 中冶建工集团有限公司 | 超浅埋小间距大断面的多隧道并行施工方法 |
CN106050240A (zh) * | 2016-05-11 | 2016-10-26 | 上海交通大学 | 山区软弱围岩小净距隧道中夹岩稳定性控制方法 |
CN106321106A (zh) * | 2015-06-30 | 2017-01-11 | 中交二公局第六工程有限公司 | 一种隧道软弱围岩、半明半暗偏压地段洞口桥台进洞施工方法 |
CN106917628A (zh) * | 2017-03-23 | 2017-07-04 | 中铁五局集团成都工程有限责任公司 | 小净距隧道施工结构及其工艺 |
CN107989620A (zh) * | 2017-12-28 | 2018-05-04 | 中铁五局集团第四工程有限责任公司 | 一种三洞小间距隧道的施工方法 |
CN109555527A (zh) * | 2018-11-21 | 2019-04-02 | 中铁隧道集团二处有限公司 | 一种五线并行小间距浅埋大断面隧道群施工方法 |
CN110284887A (zh) * | 2019-06-24 | 2019-09-27 | 中铁隧道局集团有限公司 | 一种线隧道洞身的施工方法 |
CN110307002A (zh) * | 2019-05-09 | 2019-10-08 | 深圳市综合交通设计研究院有限公司 | 一种ii、iii级围岩超小净距隧道精细化施工方法 |
CN111472787A (zh) * | 2020-04-24 | 2020-07-31 | 中铁五局集团有限公司 | 基于小间距洞室群三洞分离段的爆破施工方法 |
CN112228105A (zh) * | 2020-09-10 | 2021-01-15 | 中铁二十一局集团第五工程有限公司 | 一种土石混合体下的超小净距隧道群开挖方法 |
CN112593946A (zh) * | 2020-12-16 | 2021-04-02 | 北京市政建设集团有限责任公司 | 一种小净距多孔洞暗挖隧道近接施工方法 |
CN112682046A (zh) * | 2020-12-31 | 2021-04-20 | 中铁大桥局集团第五工程有限公司 | 一种石质围岩进口段小净距并行隧道群的施工方法 |
CN112682055A (zh) * | 2021-03-22 | 2021-04-20 | 中铁九局集团第四工程有限公司 | 一种小净距并行隧道盾构掘进施工方法 |
CN112983460A (zh) * | 2020-04-27 | 2021-06-18 | 中铁十四局集团有限公司 | 一种地铁车站与区间的构造布局及其机械化快速施工方法 |
CN114718582A (zh) * | 2022-06-08 | 2022-07-08 | 中铁九局集团第七工程有限公司 | 一种小净距水平节理页岩地质隧道洞口段的施工方法 |
CN117823176A (zh) * | 2023-11-07 | 2024-04-05 | 云南省交通规划设计研究院股份有限公司 | 一种多孔近距隧洞编块减扰施工方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002266598A (ja) * | 2001-03-07 | 2002-09-18 | Zenitaka Corp | シールド工法、大断面トンネルおよびその施工方法並びにシールド掘進機 |
JP2003113695A (ja) * | 2001-10-03 | 2003-04-18 | Ryoji Honma | 土圧壁の構成方法及び土圧壁構成用推進管 |
CN101126318A (zh) * | 2007-09-28 | 2008-02-20 | 中铁二局股份有限公司 | 三线并行下穿铁路干线隧道的盾构施工方法 |
-
2010
- 2010-03-12 CN CN 201010125453 patent/CN101806217B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002266598A (ja) * | 2001-03-07 | 2002-09-18 | Zenitaka Corp | シールド工法、大断面トンネルおよびその施工方法並びにシールド掘進機 |
JP2003113695A (ja) * | 2001-10-03 | 2003-04-18 | Ryoji Honma | 土圧壁の構成方法及び土圧壁構成用推進管 |
CN101126318A (zh) * | 2007-09-28 | 2008-02-20 | 中铁二局股份有限公司 | 三线并行下穿铁路干线隧道的盾构施工方法 |
Non-Patent Citations (5)
Title |
---|
《中国优秀博士学位论文》 20071231 郑余朝 三孔并行盾构隧道近接施工的影响度研究 全文 1-5 , 2 * |
《中国优秀硕士学位论文》 20061231 李树锋 软土地铁三管并行盾构隧道近接施工离心模型试验研究 全文 1-5 , 2 * |
《四川建筑》 20070428 陈强等 三孔并行盾构隧道设计和施工的对策措施 117-120 1-5 第27卷, 第2期 2 * |
《现代城市轨道交通》 20090430 许新雁 浅埋三联拱大跨隧道施工技术 34-37 1-5 , 第2期 2 * |
《现代隧道技术》 20041001 李友强等 超小净距三洞并行地铁区间隧道的施工技术 27-31 1-5 第41卷, 第5期 2 * |
Cited By (37)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102155234A (zh) * | 2011-04-08 | 2011-08-17 | 中铁上海设计院集团有限公司 | 非对称的小间距隧道开挖施工方法 |
CN102155234B (zh) * | 2011-04-08 | 2012-12-26 | 中铁上海设计院集团有限公司 | 非对称的小间距隧道开挖施工方法 |
CN102128035B (zh) * | 2011-04-29 | 2012-12-26 | 重庆大学 | 双侧偏压小净距隧道施工方法 |
CN102128035A (zh) * | 2011-04-29 | 2011-07-20 | 重庆大学 | 双侧偏压小净距隧道施工方法 |
CN102536252A (zh) * | 2012-02-17 | 2012-07-04 | 中国建筑第六工程局有限公司 | 一种极小净距隧道后行洞开挖方法 |
CN102536252B (zh) * | 2012-02-17 | 2014-05-21 | 中国建筑第六工程局有限公司 | 一种极小净距隧道后行洞开挖方法 |
CN102748035A (zh) * | 2012-06-21 | 2012-10-24 | 中铁十三局集团有限公司 | 人工山体法隧道施工进洞方法 |
CN103375170B (zh) * | 2013-07-26 | 2015-07-08 | 中铁六局集团石家庄铁路建设有限公司 | 三孔小净距隧洞下穿铁路干线的暗挖施工变形控制方法 |
CN103375170A (zh) * | 2013-07-26 | 2013-10-30 | 中铁六局集团石家庄铁路建设有限公司 | 三孔小净距隧洞下穿铁路干线的暗挖施工变形控制方法 |
CN104196537A (zh) * | 2014-08-26 | 2014-12-10 | 广东省建筑工程机械施工有限公司 | 一种三条平行的超小净距地铁隧道施工方法 |
CN104847375A (zh) * | 2015-05-20 | 2015-08-19 | 深圳市市政设计研究院有限公司 | 一种小净距四车道浅埋大跨隧道支护方法 |
CN106321106A (zh) * | 2015-06-30 | 2017-01-11 | 中交二公局第六工程有限公司 | 一种隧道软弱围岩、半明半暗偏压地段洞口桥台进洞施工方法 |
CN106321106B (zh) * | 2015-06-30 | 2018-05-15 | 中交二公局第六工程有限公司 | 一种隧道软弱围岩、半明半暗偏压地段洞口桥台进洞施工方法 |
CN105888674A (zh) * | 2016-05-11 | 2016-08-24 | 中铁十六局集团北京轨道交通工程建设有限公司 | 不同围岩等级下的小净距隧道中夹岩加固方法 |
CN106050240B (zh) * | 2016-05-11 | 2019-05-24 | 上海交通大学 | 山区软弱围岩小净距隧道中夹岩稳定性控制方法 |
CN106050240A (zh) * | 2016-05-11 | 2016-10-26 | 上海交通大学 | 山区软弱围岩小净距隧道中夹岩稳定性控制方法 |
CN106050243B (zh) * | 2016-07-28 | 2019-01-22 | 中冶建工集团有限公司 | 超浅埋小间距大断面的多隧道并行施工方法 |
CN106050243A (zh) * | 2016-07-28 | 2016-10-26 | 中冶建工集团有限公司 | 超浅埋小间距大断面的多隧道并行施工方法 |
CN106917628A (zh) * | 2017-03-23 | 2017-07-04 | 中铁五局集团成都工程有限责任公司 | 小净距隧道施工结构及其工艺 |
CN106917628B (zh) * | 2017-03-23 | 2019-11-15 | 中铁五局集团成都工程有限责任公司 | 小净距隧道施工工艺 |
CN107989620A (zh) * | 2017-12-28 | 2018-05-04 | 中铁五局集团第四工程有限责任公司 | 一种三洞小间距隧道的施工方法 |
CN109555527A (zh) * | 2018-11-21 | 2019-04-02 | 中铁隧道集团二处有限公司 | 一种五线并行小间距浅埋大断面隧道群施工方法 |
CN109555527B (zh) * | 2018-11-21 | 2020-06-30 | 中铁隧道集团二处有限公司 | 一种五线并行小间距浅埋大断面隧道群施工方法 |
CN110307002A (zh) * | 2019-05-09 | 2019-10-08 | 深圳市综合交通设计研究院有限公司 | 一种ii、iii级围岩超小净距隧道精细化施工方法 |
CN110307002B (zh) * | 2019-05-09 | 2020-07-31 | 深圳市综合交通设计研究院有限公司 | 一种ii、iii级围岩超小净距隧道精细化施工方法 |
CN110284887A (zh) * | 2019-06-24 | 2019-09-27 | 中铁隧道局集团有限公司 | 一种线隧道洞身的施工方法 |
CN111472787A (zh) * | 2020-04-24 | 2020-07-31 | 中铁五局集团有限公司 | 基于小间距洞室群三洞分离段的爆破施工方法 |
CN112983460A (zh) * | 2020-04-27 | 2021-06-18 | 中铁十四局集团有限公司 | 一种地铁车站与区间的构造布局及其机械化快速施工方法 |
CN112983460B (zh) * | 2020-04-27 | 2022-09-27 | 中铁十四局集团有限公司 | 一种地铁车站与区间的构造布局及其机械化快速施工方法 |
CN112228105A (zh) * | 2020-09-10 | 2021-01-15 | 中铁二十一局集团第五工程有限公司 | 一种土石混合体下的超小净距隧道群开挖方法 |
CN112593946A (zh) * | 2020-12-16 | 2021-04-02 | 北京市政建设集团有限责任公司 | 一种小净距多孔洞暗挖隧道近接施工方法 |
CN112593946B (zh) * | 2020-12-16 | 2023-10-24 | 北京市政建设集团有限责任公司 | 一种小净距多孔洞暗挖隧道近接施工方法 |
CN112682046A (zh) * | 2020-12-31 | 2021-04-20 | 中铁大桥局集团第五工程有限公司 | 一种石质围岩进口段小净距并行隧道群的施工方法 |
CN112682055A (zh) * | 2021-03-22 | 2021-04-20 | 中铁九局集团第四工程有限公司 | 一种小净距并行隧道盾构掘进施工方法 |
CN114718582A (zh) * | 2022-06-08 | 2022-07-08 | 中铁九局集团第七工程有限公司 | 一种小净距水平节理页岩地质隧道洞口段的施工方法 |
CN114718582B (zh) * | 2022-06-08 | 2022-09-06 | 中铁九局集团第七工程有限公司 | 一种小净距水平节理页岩地质隧道洞口段的施工方法 |
CN117823176A (zh) * | 2023-11-07 | 2024-04-05 | 云南省交通规划设计研究院股份有限公司 | 一种多孔近距隧洞编块减扰施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN101806217B (zh) | 2013-05-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101806217B (zh) | 三线并行小净距浅埋、偏压隧道群进洞施工方法 | |
CN102562099B (zh) | 黄土隧道双排小导管快速进洞施工方法 | |
CN102287198B (zh) | 一种过江盾构隧道破碎地层联络通道的施工方法 | |
CN109209392B (zh) | 适用于大断面隧道ⅳ-ⅴ级围岩的全环开挖方法 | |
CN110374633B (zh) | 隧道穿越松散体的洞口段施工方法 | |
CN110424969B (zh) | 一种先隧后站明挖法车站施工工法 | |
CN104747194A (zh) | 三线并行小间距大断面隧道群施工方法 | |
CN103306687A (zh) | 软岩隧道长悬臂水平旋喷变形控制施工方法 | |
CN106014449B (zh) | 双线小净距大断面节理岩体地铁隧道的施工方法 | |
CN109736827B (zh) | 城市地铁硬岩地层联络通道高压气体膨胀致裂开挖的方法 | |
CN102606168B (zh) | 防止浅埋暗挖隧道开挖时沉降变形的施工方法 | |
CN107091101A (zh) | 海域中部矿山盾构交接隧道叠合型接头结构及施工方法 | |
CN112832785B (zh) | 一种盾构矿山组合工法隧道海底对接方法及微型拆机洞室 | |
CN104314585A (zh) | 隧道全断面预加固方法及结构 | |
CN112253133A (zh) | 上软下硬岩体大断面暗挖隧道安全高效施工方法 | |
CN102979531A (zh) | 加固大型岩质边坡深部软弱结构面的施工方法和结构 | |
CN207033463U (zh) | 海域中部矿山盾构交接隧道叠合型接头结构 | |
CN105065037A (zh) | 公路软岩隧道双层拱架支护施工方法 | |
CN107165661A (zh) | 一种高地应力软弱围岩大变形隧道超长扩大头锚索施工方法 | |
CN110230495A (zh) | 一种地铁车站双侧壁导坑施工核心土开挖工法 | |
CN112145203A (zh) | 全断面前进式分段注浆施工方法及重叠隧道施工工法 | |
CN107165641B (zh) | 薄层破碎硬质岩石地层中大倾角扶梯通道反方向暗挖施工方法 | |
CN104863613B (zh) | 岩质地层暗挖地下结构高边墙锚拉初支结构及施工方法 | |
CN109184752A (zh) | 一种煤矿用穿越老窑采空区的支护结构及其支护方法 | |
CN202731938U (zh) | 极松软岩层煤仓井壁圈梁支护装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |