CN101804944B - Device for exchanging wire rope of gantry crane - Google Patents
Device for exchanging wire rope of gantry crane Download PDFInfo
- Publication number
- CN101804944B CN101804944B CN2010101578951A CN201010157895A CN101804944B CN 101804944 B CN101804944 B CN 101804944B CN 2010101578951 A CN2010101578951 A CN 2010101578951A CN 201010157895 A CN201010157895 A CN 201010157895A CN 101804944 B CN101804944 B CN 101804944B
- Authority
- CN
- China
- Prior art keywords
- rope
- winch
- hauling
- shape plate
- shape
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)
Abstract
The invention discloses a device for exchanging a wire rope of a gantry crane, which aims to overcome the defects that people and auxiliary equipment are needed, the workload is high, the consumed time is long, the working intensity is high, and the occupied resources are wide for exchanging a hoisting wire rope at present. The device comprises a redirection pulley block and hauling ropes. A rope exchanging winch is arranged on a frame of a crane trolley; one end of each of two hauling ropes is fixed at two ends of a roller of the rope exchanging winch respectively, and the other end is a free end; and a plurality of redirection pulleys for changing the walking direction of the hauling ropes are also arranged on the trolley frame. Because the two hauling ropes on the roller of the rope exchanging winch are wound around the redirection pulleys or the redirection pulley block, the ends of the hauling ropes can be connected to two ends of the hoisting wire rope on the ground respectively; and the rope exchanging winch is started, the hauling ropes haul the two ends of the hoisting wire rope to fix the two ends at respective fixing points on the trolley without manual work or other auxiliary equipment. Therefore, the labor intensity is reduced, the time is saved, and the working efficiency can be improved by 2 to 3 times by using the device.
Description
Technical field
The invention belongs to and attach the facility of helping, specifically a kind ofly be convenient for changing the device that the transfer crane hoist rope is used.
Background technology
Use the transfer crane loading and unloading container; Be to lift container spreader by four hoist ropes on the cylinder of dolly winch on the door frame to realize; Promptly the head end of four steel ropes is fixed on the cylinder of dolly winch, separately existing hoist changed course assembly pulley and the pulley of installing on four angles of container spreader in the cooresponding car frame of pile warp; Its end returns on the vehicle frame that is fixed on dolly, and freight container leans on lockset and the container lock stressed joint lifting below the suspender.Handle lockset, can or unclamp freight container and suspender locking.Change the hand of rotation of dolly elevator cylinder, can the freight container below the suspender mentioned or put down.
Because the handling labor of container wharf is very busy, steel rope frequently rises and falls and can produce fatigue.For guaranteeing the safety of handling labor, steel rope must regularly replace, and to avoid rope-broken accident.
Since four hoist ropes on the changed course assembly pulley that hoists around complicated to very, and the diameter of hoist rope reaches 26mm, long about 80 meters of every steel rope, weight is more than 200 kilograms, more change steel rope bothers very much.The existing more method of change steel rope is; Earlier with four old steel ropes after the attachment point in the car frame is with the artificial unloading; The people stands in the car frame and with tiny hauling rope old steel rope is put into ground, will be placed on ground-surface new steel rope termination again and tie up to the hauling rope lower end, and manual work lifts hauling rope; Make the end head pass the changed course assembly pulley that hoists accordingly respectively, need the suspension rod of crane auxiliary sometimes.Through hauling rope four hoist rope one ends are moved on the cylinder of dolly winch fixingly, the other end is fixed on the attachment point in the car frame, just accomplish the replacing of hoist rope.Usually changing steel cable probably needs 2-3 hour, up draws by manpower with 4,5 people, and whole process work capacity is big, and the consumption time is long, labour intensity is big and dangerous, and the manpower and the equipment that take are many, have influenced normally carrying out of handling labor.
Summary of the invention
Technical matters to be solved by this invention is; Overcome prior art and change four hoist ropes of transfer crane; Need many people also will cooperate accessory equipment to accomplish, work capacity is big, and the consumption time is long, working strength is high; The shortcoming that manpower that takies and equipment are many provides a kind of more changing device of wire rope of gantry crane.
In order to solve the problems referred to above that prior art exists, the present invention adopts following technical proposals to realize: the more changing device of said steel rope comprises the changed course assembly pulley that hoist rope walks around, the hauling rope that can tie up to the hoist rope termination; In the car frame of transfer crane, be equipped with and change the rope winch, the cylinder that changes the rope winch is arranged side by side and parallel with the hoist rope cylinder of dolly winch; One end of two hauling ropes is separately fixed at and changes rope winch cylinder two ends, and the other end of hauling rope is for can fall to ground-surface free end; In car frame, also be equipped with, when the hauling rope on will changing rope winch cylinder is guided ground into, a plurality of changed course pulleys that hauling rope needs the change of direction place to be provided with on through car frame.
The present invention also has following technical characterictic:
The support of said changed course pulley is, the labyrinth type support that is combined into by " U " shape plate and " L " shape plate;
Said labyrinth type support is supported with pulley in " U " shape plate " U " shape, " U " is one side the another side of being longer than " U " shape of shape plate is long limit; The vertical edge of " L " shape plate is perpendicular to " U " shape plate long limit suitable for reading, and its " L " pin is buckled on the long limit fixing downwards, the top that " U " shape plate is suitable for reading with fix after " L " shape plate between opening said hauling rope is passed through.In " U " shape bottom of " U " shape plate, be fixed with leg perpendicular to long limit, leg and the vertical edge of " L " shape frame constitute the supporting leg of labyrinth type support jointly.
When not using rope changer, two hauling ropes are to be wound on the cylinder that changes the rope winch.To change the cylinder reversing of rope winch when changing rope and pull out hauling rope; With wherein one through being installed in the said changed course pulley in the car frame; After arriving the attachment point of hoist rope to be replaced; Be connected with the two ends of old hoist rope to be replaced, through changed course pulley and existing changed course assembly pulley old steel rope hauled hauling rope under the effect of deadweight and arrive ground, accomplish the dismounting of old steel rope.And then new hoist rope two ends are connect with two hauling ropes respectively, start and change the rope winch and just changeing hauling rope is rolled, when an end of hoist rope is towed to the fixed point in the car frame, removes and take root with being connected fixedly of hauling rope; When the other end of hoist rope drew to the hoist rope cylinder, same releasing was connected with hauling rope, is fixed on the hoist rope cylinder, has so just accomplished the erection work of hoist rope.
Advantage of the present invention and good effect are; Owing in the car frame of transfer crane, be equipped with and change the rope winch, changing to roll up on the rope winch cylinder has two can fall to ground-surface hauling rope, simultaneously; The guiding of passing through when hauling rope is turned to also is installed in the car frame uses the changed course pulley; When two hauling rope terminations are connected to the two ends of hoist rope, start and change the rope winch, walk around the changed course pulley and the existing changed course assembly pulley of new installation respectively; The old steel rope that can will pull down is put into ground and new steel rope is moved on the attachment point on the dolly.Use said apparatus need not stand in stay cord in the car frame by the people, greatly reduce labour intensity, it is few to take human resources, safe and reliable; Do not need simultaneously other accessory equipments such as crane, change the time weak point that rope consumes.According to measuring and calculating, use said apparatus more change steel rope compared with prior art can improve work efficiency 2-3 doubly, and the time of being saved is put in the handling labor, and its benefit is considerable.
Description of drawings
Fig. 1 is the entire arrangement sketch map of existing transfer crane;
Fig. 2 is the scheme drawing that moves towards of four hoist ropes of existing transfer crane dolly suspender;
Fig. 3 for the present invention when changing first hoist rope hauling rope move towards scheme drawing;
Fig. 4 for the present invention when changing second hoist rope hauling rope move towards scheme drawing;
Fig. 5 for the present invention when changing the 3rd hoist rope hauling rope move towards scheme drawing;
Fig. 6 for the present invention when changing the 4th hoist rope hauling rope move towards scheme drawing;
Fig. 7 is among Fig. 3,4,5,6, is installed in the structural front view of the changed course pulley in the car frame;
Fig. 8 is the A-A cutaway view of Fig. 7.
The specific embodiment
Below in conjunction with accompanying drawing and embodiment the present invention is made further detailed description.
Among Fig. 1; The large-sized gantry crane that lifting container is used, the bottom of its two heel post 12 is equipped with road wheel 11, and being equipped with above the column 12 can be along the dolly of track 8 walkings; On the vehicle frame 4 of dolly lifting mechanism winch 3 is installed; Be fixed with four hoist ropes (referring to Fig. 2) on the cylinder of lifting mechanism winch 3, four hoist ropes are walked around above the container spreader pulley of installing on four angles 5 respectively, and its end upwards is separately fixed in the car frame 4 on each self-corresponding attachment point.
Among Fig. 2; The head end of prior art hoist rope a (referring to the solid line part among the figure) is fixed on the attachment point a1 of car frame 4; The terminal suspender of walking around above the container spreader 1 one jiao downwards lifts pulley 5; Upwards walk around (as follows) changed course assembly pulley 2 that change of direction is used, be fixed on the cylinder of dolly winch 3;
The head end of hoist rope b (referring to the long and short dash line part among the figure) is fixed on the b1 attachment point of car frame 4; The terminal suspender of walking around one group of changed course assembly pulley 2 and another angle above the container spreader 1 downwards lifts pulley 5; Upwards walk around another group changed course assembly pulley 2, be fixed on the cylinder of dolly winch 3;
The head end of hoist rope c (referring to the long and two-short dash line part among the figure) is fixed on the c1 attachment point of car frame 4, and the terminal suspender of walking around the 3rd angle above the container spreader 1 downwards lifts pulley 5, upwards directly is fixed on the cylinder of dolly winch 3;
The head end of hoist rope d (referring to the dotted portion among the figure) is fixed on the d1 attachment point of car frame 4; Terminal to walking around one group of changed course assembly pulley 2; Suspender down to the 4th angle above the container spreader 1 lifts pulley 5, upwards directly is fixed on the cylinder of dolly winch 3.
Among Fig. 3, Fig. 4, Fig. 5, Fig. 6, the more changing device of wire rope of gantry crane comprises the hauling rope 7 that can tie up to hoist rope a, b, c, d termination respectively.In the car frame 4 of transfer crane, be equipped with and change rope winch 6, the cylinder that changes rope winch 6 is parallel and corresponding with the cylinder of dolly winch 3; In car frame 4, be positioned at and be suitable for changing hauling rope 7 directions and make things convenient for hauling rope 7 through the place, the end that 9, two hauling ropes 7 of a plurality of changed course pulleys are installed is separately fixed on the cylinder that changes rope winch 6, the other end is for can fall to ground-surface free end.
When not using rope changer, two hauling ropes 7 are wound on the cylinder that changes rope winch 6.In the time of need changing rope; With the free end of a hauling rope 7 wherein; Walk around and be installed in changed course pulley 9 or the changed course assembly pulley 2 that needs the change of direction place to be provided with in the car frame 4, vertical ground direction is docked with a termination of any root among ground hoist rope a, b, c, the d; The free end of another root hauling rope 7 is walked around the changed course assembly pulley 2 of the winding hoist rope a that is installed in the car frame 4, b, c, d, and vertical ground direction and is docked with above-mentioned cooresponding another termination among ground hoist rope a, b, c, the d.Start and change rope winch 6, can the relevant position that move on the dolly at the two ends of any hoist rope be fixed, hoist rope is changed and is accomplished simultaneously.
Among Fig. 7, Fig. 8; Be installed in to be positioned in the car frame 4 (referring to Fig. 3, Fig. 4, Fig. 5, Fig. 6) and be fit to change hauling rope 7 directions and make things convenient for the position of hauling rope 7 through car frame 4; A plurality of changed course pulleys 9 of installing, its version is, in " U " shape of " U " shape plate 9.3; Be supported with pulley 9.1 with bearing pin 9.5, the another side of " U " shape is longer than on the long limit 9.31 of " U " shape plate 9.3; The vertical edge 9.21 of " L " shape plate 9.2 is perpendicular to " U " shape plate 9.3 long limit 9.31 suitable for reading; " L " pin 9.22 of " L " shape plate 9.2 is downward; It is fixing that vertical edge 9.21 is buckled in 9.31 tops, long limit; With the top of long limit 9.31 cooresponding another sides, and the opening 9.6 between " L " shape plate 9.2 after fixing leaves the gap, forms the labyrinth type framework on said " U " shape plate 9.3.When needs lift when changing hoist rope with hauling rope 7, hauling rope 7 is installed convenient on changed course pulley 9 through the gap of opening 9.6, has prevented that simultaneously hauling rope 7 from deviating from from the labyrinth type framework." U " " U " shape lower position of shape plate 9.3, being fixed with leg 9.4 perpendicular to long limit 9.31, the vertical edge 9.21 common supporting legs that constitute changed course pulley 9 labyrinth type supports of leg 9.4 and shape plate 9.2 are fixed on the vehicle frame 4 of dolly.
Claims (2)
1. the more changing device of a wire rope of gantry crane; Comprise the changed course assembly pulley that has hoist rope now and walk around, the hauling rope that can tie up to the hoist rope termination; It is characterized in that: in the car frame of transfer crane, be equipped with and change the rope winch, the cylinder that changes the rope winch is arranged side by side and parallel with the hoist rope cylinder of dolly winch; One end of two hauling ropes is separately fixed at and changes rope winch cylinder two ends, and the other end of hauling rope is for can fall to ground-surface free end; In car frame, also be equipped with, when the hauling rope on will changing rope winch cylinder is guided ground into, a plurality of changed course pulleys that hauling rope needs the change of direction place to be provided with on through car frame.
2. the more changing device of wire rope of gantry crane as claimed in claim 1; It is characterized in that: the support of said changed course pulley is; The labyrinth type support that " U " shape plate and " L " shape plate be combined into of serving as reasons; In " U " shape plate " U " shape, be supported with pulley, " U " is one side the another side of being longer than " U " shape of shape plate is long limit; The vertical edge of " L " shape plate is perpendicular to " U " shape plate long limit suitable for reading, and its " L " pin is buckled on the long limit fixing downwards, the top that " U " shape plate is suitable for reading with fix after " L " shape plate between opening said hauling rope is passed through; In " U " shape bottom of " U " shape plate, be fixed with leg perpendicular to long limit, leg and the vertical edge of " L " shape frame constitute the supporting leg of labyrinth type support jointly.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101578951A CN101804944B (en) | 2010-04-22 | 2010-04-22 | Device for exchanging wire rope of gantry crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101578951A CN101804944B (en) | 2010-04-22 | 2010-04-22 | Device for exchanging wire rope of gantry crane |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101804944A CN101804944A (en) | 2010-08-18 |
CN101804944B true CN101804944B (en) | 2012-02-01 |
Family
ID=42606928
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010101578951A Expired - Fee Related CN101804944B (en) | 2010-04-22 | 2010-04-22 | Device for exchanging wire rope of gantry crane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101804944B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103420302A (en) * | 2013-07-11 | 2013-12-04 | 江苏永钢集团有限公司 | Pulley special for replacing steel wire ropes of loading trolley |
CN104828696B (en) * | 2015-03-27 | 2017-03-01 | 山东钢铁股份有限公司 | A kind of method for running block in bridge crane and steel rope replacing |
CN110436365B (en) * | 2019-07-26 | 2021-03-05 | 山东钢铁股份有限公司 | Method for replacing steel wire rope of crane |
CN110395660B (en) * | 2019-07-30 | 2020-11-24 | 山东钢铁股份有限公司 | Method for replacing steel wire rope of crane |
CN111453530B (en) * | 2020-03-27 | 2021-11-30 | 青岛港国际股份有限公司 | Lifting steel wire rope replacing device and control method thereof |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2562071B2 (en) * | 1990-03-20 | 1996-12-11 | 川鉄マシナリー株式会社 | How to replace the crane wire rope |
JPH0597398A (en) * | 1991-10-08 | 1993-04-20 | Mitsubishi Electric Corp | Pulley structure for hoist |
KR20020001391A (en) * | 2000-06-28 | 2002-01-09 | 이구택 | Device for changing wire rope |
CN101239695A (en) * | 2008-03-14 | 2008-08-13 | 首钢总公司 | Threading method for main steel wire rope of track crane |
CN101628696A (en) * | 2008-07-18 | 2010-01-20 | 卫华集团有限公司 | Automatic rope-replacing device movable on ground |
CN101323417B (en) * | 2008-07-28 | 2011-12-28 | 三一集团有限公司 | Anti-swing mechanism of container gantry crane sling |
CN201325829Y (en) * | 2008-11-25 | 2009-10-14 | 无锡华东重型机械有限公司 | Light shore bridge steel wire rope fast changing device |
-
2010
- 2010-04-22 CN CN2010101578951A patent/CN101804944B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN101804944A (en) | 2010-08-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101804944B (en) | Device for exchanging wire rope of gantry crane | |
CN210236912U (en) | Movable cable carrying crane capable of carrying and walking track mechanism and walking system thereof | |
CN110240048A (en) | A kind of external attached type skyscraper goods jack system | |
CN111549662A (en) | Planetary walking trolley for detecting and maintaining main cable and sling of suspension bridge | |
CN105621280A (en) | Device and method for mounting and dismounting crane boom | |
CN107344697A (en) | Cable boom hoisting | |
CN103738861B (en) | A kind of ultra-high voltage transformer station type column of steel pipe integral hoisting method | |
CN110042760B (en) | But on-load removes cable carries loop wheel machine | |
CN110040638B (en) | Cable-mounted crane device for mounting stiff beam of suspension bridge and mounting method | |
CN201670704U (en) | Gantry crane cable wire replacing device | |
CN208994999U (en) | Mobile cable crane device | |
CN115367617B (en) | Device and method for replacing trolley track for ship unloader | |
CN113235460B (en) | Prefabricated segment swinging method for bridge cantilever assembly | |
CN209778102U (en) | Cable carrying crane device for installing stiff beam of suspension bridge | |
CN212533725U (en) | Planetary walking trolley for detecting and maintaining main cable and sling of suspension bridge | |
CN214570042U (en) | Hoisting tool | |
CN212403165U (en) | Adjusting and hoisting device for T-beam hogging moment prestress tensioning jack | |
CN101537983B (en) | Hoisting method of large-scale equipment in factory building for high-altitude positioning | |
CN204530513U (en) | The manned maintenance Hanging Basket of suspension cable | |
CN210915021U (en) | Large-tonnage hoisting device for bridge | |
CN207090834U (en) | Cable boom hoisting | |
CN108059088B (en) | Method and device for deflection turning and transposition of carrying pole Liang Kongzhong of slot erecting machine | |
CN112252195A (en) | Assembly type continuous beam prestressed steel strand whole-bundle tensioning operation trolley and use method thereof | |
CN206654670U (en) | A kind of safe lifting machine for building | |
CN201857225U (en) | Hoisting device for bridge crane frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120201 Termination date: 20150422 |
|
EXPY | Termination of patent right or utility model |