Light-duty bank bridge steel rope quick replacement device
Technical field
The utility model relates to a kind of shore container crane, specifically a kind of light-duty bank bridge steel rope quick replacement device.
Background technology
Superhuge super Panamanian ship has appearred in flourish along with container shipping, and in order to satisfy the needs of harbour handling, shore container crane (being called for short the bank bridge) has also been produced the type that matches.Therefore, in the mechanism especially the steel rope of lifting mechanism, dolly trailer coupling twine and to become increasingly complex, more and more longer, more required time of change steel rope also just more and more longer, need more auxilian and instrument, the maintenance progress is wayward.For a long time, the method for the steel rope replacing of shore container crane all is manually to finish, and old steel rope is disassembled the steel rope that renews then earlier.During replacing, the fag end that tacks steel rope with iron wire slowly passes pulley and other anchor fittings, is fastened at reel at last.All working is finished by manpower entirely, and not only efficient is low, influences the maintenance progress, and the quality (wearing and tearing, scratch) of also bad control steel rope in changing the rope process buries potential safety hazard for later production.
Summary of the invention
The purpose of this utility model is to design a kind of light-duty bank bridge steel rope quick replacement device, to increase work efficiency, alleviates working strength of workers.
According to the technical scheme that the utility model provides, two bearing seats are installed on support, between two bearing seats, utilize the bearing installation rotating shaft, in described rotating shaft, reel is set.
Described reel comprises the cylindrical shell and the annulus that is positioned at the cylindrical shell two ends of tubular, and the external diameter of described annulus is greater than the external diameter of described cylindrical shell, and the internal diameter of described annulus is less than the internal diameter of cylindrical shell; Axle sleeve is set in annulus, and the internal diameter of described axle sleeve approaches the external diameter of rotating shaft; Described reel utilizes axle sleeve and rotating shaft to interconnect.
Three-in-one electrical motor is installed on support, between the output shaft of three-in-one electrical motor and rotating shaft, utilizes coupler to interconnect.Described more changing device comprises initiatively more changing device and driven more changing device; Described active more the reel in the changing device and the reel in the driven more changing device respectively facing to the roller of steel rope to be replaced.
The utility model has the advantages that: used this device, saved human and material resources, avoided workman's aloft work, alleviated labour intensity, improved the efficient of changing, avoided the wearing and tearing of steel rope in the replacing process, the life-span of having improved steel rope.Adopt the shore container crane of this device, finished more change steel rope with few time, shortened greatly and changed the rope time, be subjected to user's welcome deeply, filled up the blank of domestic steel rope quick replacement device.
Description of drawings
Fig. 1 is the constructional drawing of wind2.
Fig. 2 is to use constitution diagram.
The specific embodiment
Among Fig. 1,1, bearing seat, 2, bearing, 3, regulating sleeve, 4, axle sleeve, 5, rotating shaft, 6, reel, 7, support, 8, coupler, 9, three-in-one electrical motor (referring to that electrical motor, reductor and three kinds of mechanisms of drg lump together), 10, changing device more initiatively, 11, driven more changing device, 12, the roller of steel rope to be replaced.
As shown in the figure: two bearing seats 1 are installed on support 7, between two bearing seats 1, are utilized bearing 2 that rotating shaft 5 is installed, in described rotating shaft 5, reel 6 is set.Described reel comprises the cylindrical shell and the annulus that is positioned at the cylindrical shell two ends of tubular, and the external diameter of described annulus is greater than the external diameter of described cylindrical shell, and the internal diameter of described annulus is less than the internal diameter of cylindrical shell; Axle sleeve 4 is set in annulus, and the internal diameter of described axle sleeve approaches the external diameter of rotating shaft 5; Described reel 6 utilizes axle sleeve and rotating shaft 5 to interconnect.Three-in-one electrical motor 9 is installed on support 7, between the output shaft of three-in-one electrical motor 9 and rotating shaft 5, utilizes coupler 8 to interconnect.Described more changing device comprises initiatively more changing device 10 and driven more changing device 11; Described active more the reel 6 in the reel in the changing device 10 6 and the driven more changing device 11 respectively facing to the roller 12 of steel rope to be replaced.
During use, as shown in Figure 2, the side walls by the land side in machine house is arranged the steel rope quick replacement device, and arranges about placed in the middle.One of them has three-in-one electrical motor, is changing device 10 more initiatively, and opposite side is driven more changing device 11, has hand brake 13.Before the steel rope that more renews, wind isometric new steel rope on the reel of driven more changing device 11 in advance, the wire rope fixing device at reclining device place is laid down, guarantee that it freely rotates with leading sheave, the suspender zero load is put to ground.Remaining steel rope on the steel rope roller 12 to be replaced is unloaded, to tightly wrap near the new cable wire end braiding on the old cable wire end of driven more changing device 11 1 sides and the driven more changing device 11 becomes steel cable, again near initiatively the older cable wire end of changing device 10 1 sides be fixed on initiatively on the reel of changing device 10 more.
Start three-in-one electrical motor 9, more changing device is started working, and initiatively more changing device 10 is substituted old steel rope fall, and is wound up into active more on the reel 6 of changing device 10; Driven more changing device 11 twines into original steel rope position with new steel rope, up to initiatively more new cable wire end occurring on the changing device 10, stop three-in-one electrical motor 9, manual work is twined new steel rope on original reel, fix the number of turns identical when unloading.Initiatively more scrap the steel rope handling to floor treatment on the changing device 10.So far, finish more changing jobs of steel rope.Repeat above-mentioned step, change the steel rope of scrapping on other reels.
The primary mover of three-in-one electrical motor 9 for driving produces moment of torsion and rotating speed, drives the more operation of changing device.Reel 6 is used to deposit new and old steel rope.