CN101804522A - 甲板片制作方法 - Google Patents

甲板片制作方法 Download PDF

Info

Publication number
CN101804522A
CN101804522A CN 201010142445 CN201010142445A CN101804522A CN 101804522 A CN101804522 A CN 101804522A CN 201010142445 CN201010142445 CN 201010142445 CN 201010142445 A CN201010142445 A CN 201010142445A CN 101804522 A CN101804522 A CN 101804522A
Authority
CN
China
Prior art keywords
welding
platen
column
web
flange plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010142445
Other languages
English (en)
Other versions
CN101804522B (zh
Inventor
杨国军
赵学义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 19th Metallurgical Group Co ltd
Original Assignee
MCC Shijiu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Shijiu Construction Co Ltd filed Critical MCC Shijiu Construction Co Ltd
Priority to CN2010101424455A priority Critical patent/CN101804522B/zh
Publication of CN101804522A publication Critical patent/CN101804522A/zh
Application granted granted Critical
Publication of CN101804522B publication Critical patent/CN101804522B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

本发明公开了一种减少台板变形量的甲板片制作方法,台板、立柱同时焊接,台板与台板的焊缝落在“梁”上时,焊缝要预留4~6mm间隙,焊缝没有落在“梁”上时,预留0~4mm间隙,单片台板与“梁”焊接时,先焊接次梁与台板的角焊缝,再焊接主梁与台板的角焊缝。焊接立柱与主框架时,以“梁”腹板-立柱翼缘板、“梁”翼缘板-立柱翼缘板顺序或“梁”腹板-立柱翼缘板、“梁”腹板-立柱腹板、“梁”翼缘板-立柱翼缘板顺序焊接,从而减小了立柱焊接对台板变形的影响,同样的人员和设备投入,应用本发明方法可减少台板变形,减少矫正工作量,可缩短甲板片制作工期4~5天,而且也提高了制作质量。

Description

甲板片制作方法
技术领域
本发明涉及一种大型焊接结构的制作方法,尤其是一种甲板片制作方法。
背景技术
甲板片是一种模块化的钢结构,由台板、“梁”、甲板片段柱焊接形成,“梁”即主梁、次梁,主梁、次梁焊接形成主框架,主框架上分别焊接台板和立柱构成甲板片,立柱和台板相互不直接连接。其中,台板一般为多种规格的花纹钢板,主梁采用H型钢、次梁采用H型钢或角钢,甲板片段立柱一般为H型钢,甲板片段立柱在本文中简称为“立柱”。甲板片主要用作海洋石油工程设备的构件。
现有甲板片制作方法是这样的,首先,对主梁、次梁进行组对,即根据主框架尺寸线将主梁与次梁按照图纸方案摆放就位,并进行水平调平、框架尺寸调整达到预焊接标准;然后焊接主框架,即按次梁与次梁、次梁与主梁、主梁与主梁的顺序由中间向四周对称焊接,将主框架焊接成型,待其收缩后检验合格;然后将台板与主框架焊接,最后焊接立柱。按此方法施工的成品,因焊接后型材收缩,引起台板变形凸起,如果要达到相邻两甲板梁间的甲板面上的凹陷度不得超过3mm的质量要求,还必须对台板进行矫正,导致每一甲板片的制作工期达到37-40天。
发明内容
为了克服现有甲板片制作方法台板变形量较大的不足,本发明所要解决的技术问题是提供一种能减少台板变形量的甲板片制作方法。
本发明解决其技术问题所采用的技术方案是:甲板片制作方法,对“梁”即主梁、次梁进行组对,将主框架焊接成型,待主框架收缩后,将台板点焊在主框架上,然后安装立柱,在立柱安装好后,同时焊接台板与主框架和立柱与主框架。所称的“同时”,是指对位于由四根相邻的立柱所确定的矩形小框架内的台板及该四根立柱同时施焊。
焊接台板与主框架时,由中间向两边对称焊接;先以间断焊焊接台板与“梁”的焊缝;再以连续焊焊接台板与台板的焊缝。
台板与台板的焊缝落在“梁”上时,焊缝要预留4~6mm间隙,焊缝没有落在“梁”上时,预留0~4mm间隙。
单片台板与“梁”焊接时,先焊接次梁与台板的角焊缝,再焊接主梁与台板的角焊缝。
对整个甲板片,按由中间到四周的顺序确定各立柱的焊接顺序。
为减小焊接变形,焊接单根立柱与主框架时,分以下两种情况确定焊接顺序,若“梁”腹板与立柱翼缘板相连接:先以填角焊焊接“梁”腹板与立柱翼缘板的焊缝,再以坡口焊焊接“梁”翼缘板与立柱翼缘板之间的焊缝,坡口形式根据梁的翼缘板厚度决定;若“梁“腹板与立柱腹板相连接:先以坡口焊焊接“梁”腹板与立柱翼缘板之间的焊缝,坡口形式根据梁的腹板厚度决定,再以坡口焊焊接“梁”腹板与立柱腹板之间的焊缝,坡口形式根据“梁”腹板厚度决定,最后以坡口焊焊接“梁”翼缘板与立柱翼缘板之间的焊缝,坡口形式根据“梁”的翼缘板厚度决定。
本发明的有益效果是:将现有的先台板后立柱的焊接安装顺序优化为台板、立柱同时焊接,减小了立柱焊接对台板变形的影响,同样的人员和设备投入,应用本发明方法可减少台板变形,减少矫正工作量,可缩短甲板片制作工期4~5天,而且也提高了制作质量。
附图说明
图1是甲板片的结构示意图。
图中标记为,1-主梁,2-次梁,3-立柱,4-台板,5-小框架,2b-节点,2c-节点,3b-节点,3c-节点。
具体实施方式
下面结合附图和实施例对本发明进一步说明。
本发明的甲板片由台板、“梁”、立柱焊接形成,先对“梁”即主梁1、次梁2进行组对,将主框架焊接成型,待主框架收缩后,为减小台板焊接变形,将台板4点焊在主框架上,然后安装立柱3,待立柱3安装好后,同时焊接台板4与主框架和立柱3与主框架。所称的“同时”,是指对位于由四根相邻的立柱所确定的矩形小框架内的台板及该四根立柱同时施焊,例如,在图1中,对位于节点2b、节点2c及节点3b、节点3c处的四根相邻的立柱3而言,对位于由该四根立柱3所确定的矩形小框架5来说,位于该区域内的台板4和该四根立柱3同时焊接。
实施例:
如图1所示,甲板片整个制作过程如下。
(1)准备
根据尺寸划线余量在施工场地用石灰粉初步勾勒出主框架结构,然后根据垫墩布置图铺设垫墩,用水准仪调平;
(2)组对
按由中间向四周的组对顺序进行组对:例如,先组对中间主梁1,即BC段-②③④段间,再组对其间的次梁2,依次向四周延伸进行组对,直至整个甲板片的主梁1、次梁2组对就位完成;
(3)调整
按照划线余量尺寸进行轴线跨距调整与对角线的调整,构件调整完成后,要适当的用点焊或是临时拉筋进行固定,临时加固措施不应过多,加固措施过多的话,虽然使甲板片整体性比较好,但它影响了构件焊接时的收缩,容易在构件内部产生应力;
(4)焊接主框架
在铺设台板4之前,要先把主框架非与立柱3连接段的焊缝全部焊接完成,仍按先焊接中间部分,再焊接四周部分的顺序,并待其收缩,检验合格;
(5)铺设台板
根据甲板片主框架尺寸进行合理的台板4下料并进行焊道处油漆打磨,焊缝两边各打磨50mm宽,铺设台板4时要尽可能使台板4与台板4之间的焊缝处于“梁”上,以减小台板4焊接收缩变形,并点焊固定台板4,方便在安装立柱3时台板4不移位;
(6)安装立柱
“梁”与立柱3连接一端处根据焊接余量分析进行对应的切割下料,注意将长度误差控制在±1mm以内并打磨光滑,立柱3焊道处进行焊缝油漆打磨完成后根据编号正确安装并检验合格;
(7)同时进行台板、立柱各自与主框架的焊接
对整个甲板片,按由中间到四周的顺序对全部立柱3及台板4进行焊接。
在焊接台板4时应注意焊接顺序,以减小焊接变形:由中间向两边进行对称焊接,先焊接次梁2与台板4之间的角焊缝,再焊接主梁1与台板4之间的角焊缝,要间断焊,最后焊接台板4与台板4之间的焊缝;综合多次焊接后的经验,台板4焊缝落在“梁”上的焊缝优选预留4mm~6mm间隙,焊缝没有落在“梁”上的优选预留0~4mm间隙;焊接台板4与“梁”的焊缝时要保证台板4与“梁”之间没有缝隙,台板4与台板4焊接时要保证台板4之间的平整度;
为减小焊接变形,在焊接单根立柱3与主框架时,分以下两种情况确定焊接顺序,若“梁”腹板与立柱3翼缘板相连接:先以填角焊焊接“梁”腹板与立柱3翼缘板的焊缝,再以坡口焊焊接“梁”翼缘板与立柱3翼缘板之间的焊缝,坡口形式根据梁的翼缘板厚度决定;若“梁“腹板与立柱3腹板相连接:先以坡口焊焊接“梁”腹板与立柱3翼缘板之间的焊缝,坡口形式根据梁的腹板厚度决定,再以坡口焊焊接“梁”腹板与立柱3腹板之间的焊缝,坡口形式根据“梁”腹板厚度决定,最后以坡口焊焊接“梁”翼缘板与立柱3翼缘板之间的焊缝,坡口形式根据“梁”的翼缘板厚度决定。

Claims (6)

1.甲板片制作方法,对“梁”即主梁(1)、次梁(2)进行组对,将主框架焊接成型,其特征是:待主框架收缩后,将台板(4)点焊在主框架上,然后安装立柱(3),在立柱(3)安装好后,同时焊接台板(4)与主框架和立柱(3)与主框架。
2.如权利要求1所述的甲板片制作方法,其特征是:焊接台板(4)与主框架时,由中间向两边对称焊接;先以间断焊焊接台板(4)与“梁”的焊缝;再以连续焊焊接台板(4)与台板(4)的焊缝。
3.如权利要求2所述的甲板片制作方法,其特征是:台板(4)与台板(4)的焊缝落在“梁”上时,焊缝要预留4~6mm间隙,焊缝没有落在“梁”上时,预留0~4mm间隙。
4.如权利要求2所述的甲板片制作方法,其特征是:单片台板(4)与“梁”焊接时,先焊接次梁(2)与台板(4)的角焊缝,再焊接主梁(1)与台板(4)的角焊缝。
5.如权利要求1、2、3或4所述的甲板片制作方法,其特征是:对整个甲板片,按由中间到四周的顺序确定各立柱(3)的焊接顺序。
6.如权利要求1、2、3或4所述的甲板片制作方法,其特征是:焊接单根立柱(3)与主框架时,分以下两种情况确定焊接顺序,
若“梁”腹板与立柱翼缘板相连接:先以填角焊焊接“梁”腹板与立柱翼缘板的焊缝,再以坡口焊焊接“梁”翼缘板与立柱翼缘板之间的焊缝,坡口形式根据梁的翼缘板厚度决定;
若“梁“腹板与立柱腹板相连接:先以坡口焊焊接“梁”腹板与立柱翼缘板之间的焊缝,坡口形式根据梁的腹板厚度决定,再以坡口焊焊接“梁”腹板与立柱腹板之间的焊缝,坡口形式根据“梁”腹板厚度决定,最后以坡口焊焊接“梁”翼缘板与立柱翼缘板之间的焊缝,坡口形式根据“梁”的翼缘板厚度决定。
CN2010101424455A 2010-04-09 2010-04-09 甲板片制作方法 Active CN101804522B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101424455A CN101804522B (zh) 2010-04-09 2010-04-09 甲板片制作方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101424455A CN101804522B (zh) 2010-04-09 2010-04-09 甲板片制作方法

Publications (2)

Publication Number Publication Date
CN101804522A true CN101804522A (zh) 2010-08-18
CN101804522B CN101804522B (zh) 2012-05-09

Family

ID=42606562

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101424455A Active CN101804522B (zh) 2010-04-09 2010-04-09 甲板片制作方法

Country Status (1)

Country Link
CN (1) CN101804522B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106347577A (zh) * 2016-09-26 2017-01-25 中国海洋石油总公司 缩短组块滑道总装周期的建造工艺
CN107235120A (zh) * 2017-07-21 2017-10-10 中国海洋石油总公司 立柱非贯通式甲板片的吊装就位工艺
CN107398649A (zh) * 2017-07-26 2017-11-28 南通振华重型装备制造有限公司 一种升压站上部模块结构铺板加工工艺
CN107584250A (zh) * 2017-09-01 2018-01-16 济宁东源机械制造有限公司 推土机3d基准悬臂结构翼板的生产工艺及生产工装

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3942706A (en) * 1974-07-24 1976-03-09 General Electric Company Steam iron soleplate construction
CN1827285A (zh) * 2006-03-21 2006-09-06 天津新港船厂 钢轨与船舶甲板的焊接方法
CN101186003A (zh) * 2007-11-26 2008-05-28 中铁大桥局集团第七工程有限公司 钢梁制孔先孔施工方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3942706A (en) * 1974-07-24 1976-03-09 General Electric Company Steam iron soleplate construction
CN1827285A (zh) * 2006-03-21 2006-09-06 天津新港船厂 钢轨与船舶甲板的焊接方法
CN101186003A (zh) * 2007-11-26 2008-05-28 中铁大桥局集团第七工程有限公司 钢梁制孔先孔施工方法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106347577A (zh) * 2016-09-26 2017-01-25 中国海洋石油总公司 缩短组块滑道总装周期的建造工艺
CN107235120A (zh) * 2017-07-21 2017-10-10 中国海洋石油总公司 立柱非贯通式甲板片的吊装就位工艺
CN107235120B (zh) * 2017-07-21 2019-04-09 中国海洋石油集团有限公司 立柱非贯通式甲板片的吊装就位工艺
CN107398649A (zh) * 2017-07-26 2017-11-28 南通振华重型装备制造有限公司 一种升压站上部模块结构铺板加工工艺
CN107584250A (zh) * 2017-09-01 2018-01-16 济宁东源机械制造有限公司 推土机3d基准悬臂结构翼板的生产工艺及生产工装

Also Published As

Publication number Publication date
CN101804522B (zh) 2012-05-09

Similar Documents

Publication Publication Date Title
CN110369941A (zh) 一种h形钢构件组立胎架及h形钢构件制作方法
CN102039510A (zh) 用于组焊工字梁的工装
CN103659182A (zh) 弯扭箱型梁360°旋转楼梯的制作方法
CN102632344A (zh) 船舶上层建筑焊接变形控制工艺
CN101804522B (zh) 甲板片制作方法
CN202064456U (zh) 端部局部伸长型防屈曲支撑-梁-柱连接节点
CN107675895A (zh) 定位连接装置、定位连接系统、建筑模块装置和连接方法
CN110900081A (zh) 一种大型箱型梁焊接平台及焊接方法
CN106351462A (zh) 一种临时钢管支撑预应力加固结构及其施工方法
CN204657793U (zh) 一种防止钢桥板单元制造焊接变形的装置
CN109958065A (zh) 一种桥梁钢箱梁分段吊装高空合拢的施工方法
CN201738597U (zh) 高、大截面梁型钢及钢管组合式支撑系统
CN113322816B (zh) 一种关于多接口梁塔匹配精度控制方法及装置
CN102296704B (zh) 端部局部伸长型防屈曲支撑-梁-柱连接节点
CN104563525B (zh) 一种箱式钢拱梁整体卧式组对方法
CN107414391A (zh) 三维柱状工件焊接工艺装备
CN103212928A (zh) 防止悬臂梁底板焊接变形的方法
CN104060689A (zh) 一种三角形截面弯扭构件、专用胎架及其加工方法
CN209195049U (zh) 大截面扭曲钢箱梁装配推顶装置
CN212530010U (zh) 一种机舱外板分段建造专用模板胎架
CN215889346U (zh) 一种弧形模板排架支撑体系
CN102003067A (zh) 饰面清水混凝土结构梁、柱接头模板加固体系
CN104759814A (zh) 一种承力地轨梁的加工平台及其制备方法
CN109434315A (zh) 一种连体式箱体剪力墙结构的加工制作工艺
CN213896815U (zh) 钢木结合高强度端头模板

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CHINA 19TH METALLURGICAL CORPORATION

Free format text: FORMER OWNER: MCC SHIJIU CONSTRUCTION CO., LTD.

Effective date: 20110318

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 617023 NO. 350, RENMIN STREET, PANZHIHUA CITY, SICHUAN PROVINCE TO: 617000 NO. 350, RENMIN STREET, EAST DISTRICT, PANZHIHUA CITY, SICHUAN PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20110318

Address after: 617000 Panzhihua, Sichuan, East Street, No. 350

Applicant after: CHINA 19TH METALLURGICAL GROUP Co.,Ltd.

Address before: 617023 No. 350 Renmin Street, Sichuan, Panzhihua

Applicant before: MCC SHIJIU CONSTRUCTION Co.,Ltd.

C14 Grant of patent or utility model
GR01 Patent grant