CN106347577A - 缩短组块滑道总装周期的建造工艺 - Google Patents
缩短组块滑道总装周期的建造工艺 Download PDFInfo
- Publication number
- CN106347577A CN106347577A CN201610851590.8A CN201610851590A CN106347577A CN 106347577 A CN106347577 A CN 106347577A CN 201610851590 A CN201610851590 A CN 201610851590A CN 106347577 A CN106347577 A CN 106347577A
- Authority
- CN
- China
- Prior art keywords
- deck plate
- general assembly
- deck sheet
- deck
- slideway
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B71/00—Designing vessels; Predicting their performance
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
一种缩短组块滑道总装周期的建造工艺,采用以下建造步骤:一:将甲板片在场地进行预制,并在甲板片上安装设备底座、盘柜底座、地漏;二:安装立柱、斜拉筋、小立柱、栏杆、挡水扁铁、墙皮、管支架、电仪支架、马脚、房间;然后,再安装保温钉和护管;三:将甲板片进行喷涂,使甲板片的外面形成一保护层;并使甲板片构成一体化模块;四:将甲板片运输至滑道后,再安装管线、小型设备、电缆托架、灯支架;五:将甲板片吊装至滑靴上。本发明其能够在组块甲板片预制阶段,将组块结构建造采用“一体化”预制、安装及总装,不仅大大降低了高空交叉作业所带来的安全风险;而且,还提高了施工质量和施工效率,降低了生产成本,缩短总装及占用滑道的周期。
Description
技术领域
本发明涉及大型海洋结构物,尤其涉及一种缩短组块滑道总装周期的建造工艺。属于海洋石油工程领域。
背景技术
随着近海及深海海域油气的不断开发,大批量的海洋结构物制造也越来越多,因此,大型结构物制造占用滑道总装工期问题显得尤为突出。
目前,现有的海洋工程行业大型结构物,如:海上平台的陆地建造工艺,基本上都是沿承传统的建造工艺,以结构甲板片为单体进行预制、进行总装作业,因此,形成了三维空间主结构后,再逐步开展机、管、电仪讯、舾装通风保温等专业的安装工作。由于机、管、电仪讯、舾装通风保温等专业的施工是以高空交叉作业为主,因此,需要投入大量的人力及设备台时,不仅增加高空交叉作业安全管控的风险,而且,还增加了建造成本的投入,不利于施工质量的提高,组块长期占用总装滑道。
发明内容
本发明的主要目的在于克服现有技术存在的上述缺点,而提供一种缩短组块滑道总装周期的的建造工艺,其能够在组块甲板片预制阶段,将组块结构建造采用“一体化”预制、安装及总装,不仅大大降低了高空交叉作业所带来的安全风险;而且,还提高了施工质量和施工效率,降低了生产成本,缩短总装及占用滑道的周期。
本发明的目的是由以下技术方案实现的:
一种缩短组块滑道总装周期的建造工艺,其特征在于:采用以下建造步骤:
第一步:将甲板片在场地进行预制,并在甲板片上安装设备底座、盘柜底座、地漏;
第二步:安装立柱、斜拉筋、小立柱、栏杆、挡水扁铁、墙皮、管支架、电仪支架、马脚,并进行房间的完善;然后,再安装保温钉和护管,以完成整个甲板片的预制;
第三步:将甲板片运输至喷涂车间进行喷涂,使甲板片的外面形成一保护层;并使甲板片构成一体化模块;
第四步:将甲板片运输至用于总装的滑道附近后,再安装管线、小型设备、电缆托架、灯支架,然后,再进行打磨、补漆;
第五步:使用吊机将甲板片吊装至滑靴上。
所述甲板片是通过组合梁、型钢、板材、甲板板组对而成。
所述第二步中,安装立柱、斜拉筋、小立柱、安装栏杆、挡水扁铁、墙皮、保温钉,护管及在甲板片的下部安装管支架,安装电仪支架,马脚时,先将甲板片用临时支撑垫高。
本发明的有益效果:本发明由于采用上述技术方案,其能够在组块甲板片预制阶段,将组块结构建造采用“一体化”预制、安装及总装,不仅大大降低了高空交叉作业所带来的安全风险;而且,还提高了施工质量和施工效率,降低了生产成本,缩短总装及占用滑道的周期。
附图说明
图1为本发明甲板片预制俯视示意图。
图2为本发明甲板片预制主视示意图。
图3为本发明甲板片墙皮内侧示意图。
图4为本发明甲板片预制侧视示意图。
图5为本发明甲板片总装示意图。
图中主要标号说明:
1.甲板片 2.设备底座、3.临时支撑、4.立柱、5.墙皮、6.斜拉筋、7.管支架、8.电仪支架、9.盘柜底座、10.地漏、11.马脚、12.栏杆、13.挡水扁铁、14.保温钉、15.小立柱、16.护管、17.滑靴、18.滑道、19.吊机、20.电缆托架、21.灯支架、22.小型设备、23.管线。
具体实施方式
如图1—图5所示,本发明设有:一预制好的甲板片1,甲板片1的上面采用焊接连接方式安装有设备底座2、盘柜底座9、地漏10,其中,甲板片1上还安装有立柱4、斜拉筋6、小立柱15、栏杆12、挡水扁铁13、采用焊接连接方式安装墙皮5、房间、保温钉14、护管16;甲板片1的下部采用焊接连接方式安装管支架7、电仪支架8、采用焊接连接方式安装马脚11;然后,再给甲板片1喷涂保护层,使甲板片1构成一体化模块。
上述甲板片1是通过组合梁、型钢、板材、甲板板组对而成。
上述安装斜拉筋6、小立柱15、安装栏杆12、挡水扁铁13、墙皮5、房间、保温钉14、护管16及在甲板片1的下部安装管支架7、电仪支架8、马脚11时,先将甲板片1用临时支撑3垫高。
上述甲板片1喷涂保护层后,再采用螺栓连接方式安装电缆托架20、灯支架21,安装小型设备22、管线23。
本发明采用以下建造步骤:
第一步:将甲板片1在场地进行预制,并在甲板片1上安装设备底座2、盘柜底座9、地漏10等构件;
第二步:将甲板片1用临时支撑3垫高,再安装立柱4、斜拉筋6、小立柱15、栏杆12、挡水扁铁13、采用焊接连接方式安装墙皮5、管支架7、电仪支架8、马脚11,并进行房间的完善,然后,再安装保温钉14和护管16,以完成整个甲板片1的预制;
第三步:将甲板片1运输至喷涂车间进行喷涂,使甲板片1的外面形成一保护层,并使甲板片构成一体化模块;
第四步:将甲板片1运输至用于总装的滑道18附近后,再安装管线23、小型设备22、电缆托架20、灯支架21等,然后,再进行打磨、补漆;
第五步:使用吊机19将甲板片1吊装至滑靴17上。
上述甲板片、设备底座、电仪支架、盘柜底座、保温钉、滑靴、滑道、吊机、小型设备为现有技术,未作说明的技术为现有技术,故不再赘述。
以上所述,仅是本发明的较佳实施例而已,并非对本发明作任何形式上的限制,凡是依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化与修饰,均仍属于本发明技术方案的范围内。
Claims (3)
1.一种缩短组块滑道总装周期的建造工艺,其特征在于:采用以下建造步骤:
第一步:将甲板片在场地进行预制,并在甲板片上安装设备底座、盘柜底座、地漏;
第二步:安装立柱、斜拉筋、小立柱、栏杆、挡水扁铁、墙皮、管支架、电仪支架、马脚,并进行房间的完善;然后,再安装保温钉和护管,以完成整个甲板片的预制;
第三步:将甲板片运输至喷涂车间进行喷涂,使甲板片的外面形成一保护层;并使甲板片构成一体化模块;
第四步:将甲板片运输至用于总装的滑道附近后,再安装管线、小型设备、电缆托架、灯支架,然后,再进行打磨、补漆;
第五步:使用吊机将甲板片吊装至滑靴上。
2.根据权利要求1所述的缩短组块滑道总装周期的预制结构,其特征在于:所述甲板片是通过组合梁、型钢、板材、甲板板组对而成。
3.根据权利要求1所述的缩短组块滑道总装周期的预制结构,其特征在于:所述第二步中,安装立柱、斜拉筋、小立柱、安装栏杆、挡水扁铁、墙皮、保温钉,护管及在甲板片的下部安装管支架,安装电仪支架,马脚时,先将甲板片用临时支撑垫高。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610851590.8A CN106347577A (zh) | 2016-09-26 | 2016-09-26 | 缩短组块滑道总装周期的建造工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610851590.8A CN106347577A (zh) | 2016-09-26 | 2016-09-26 | 缩短组块滑道总装周期的建造工艺 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106347577A true CN106347577A (zh) | 2017-01-25 |
Family
ID=57859519
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610851590.8A Pending CN106347577A (zh) | 2016-09-26 | 2016-09-26 | 缩短组块滑道总装周期的建造工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106347577A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107953970A (zh) * | 2017-11-21 | 2018-04-24 | 中船黄埔文冲船舶有限公司 | 一种无底座的船舶大型门架的安装方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101804522A (zh) * | 2010-04-09 | 2010-08-18 | 中冶实久建设有限公司 | 甲板片制作方法 |
KR20130097022A (ko) * | 2012-02-23 | 2013-09-02 | 삼성중공업 주식회사 | 스퍼드 장치, 이를 구비한 선박 및 스퍼드 장치를 구비한 선박의 건조방법 |
CN103324842A (zh) * | 2013-06-08 | 2013-09-25 | 博迈科海洋工程股份有限公司 | 大型结构物底层甲板片临时支撑点定位方法 |
CN105109939A (zh) * | 2015-07-31 | 2015-12-02 | 中国海洋石油总公司 | 大跨度结构片的运输工艺 |
KR20160044220A (ko) * | 2014-10-15 | 2016-04-25 | 삼성중공업 주식회사 | 공정계획 통합화 시스템 |
-
2016
- 2016-09-26 CN CN201610851590.8A patent/CN106347577A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101804522A (zh) * | 2010-04-09 | 2010-08-18 | 中冶实久建设有限公司 | 甲板片制作方法 |
KR20130097022A (ko) * | 2012-02-23 | 2013-09-02 | 삼성중공업 주식회사 | 스퍼드 장치, 이를 구비한 선박 및 스퍼드 장치를 구비한 선박의 건조방법 |
CN103324842A (zh) * | 2013-06-08 | 2013-09-25 | 博迈科海洋工程股份有限公司 | 大型结构物底层甲板片临时支撑点定位方法 |
KR20160044220A (ko) * | 2014-10-15 | 2016-04-25 | 삼성중공업 주식회사 | 공정계획 통합화 시스템 |
CN105109939A (zh) * | 2015-07-31 | 2015-12-02 | 中国海洋石油总公司 | 大跨度结构片的运输工艺 |
Non-Patent Citations (3)
Title |
---|
宋青武等: "一体化建造工艺在海洋平台建造中的优势分析与应用建议", 《石油工程建设》 * |
张占立等: "海上平台模块化与传统工艺建造对比浅析", 《第十六届中国海洋(岸) 工程学术讨论会论文集》 * |
张占立等: "海洋平台一体化建造新工艺的效益浅析", 《中国造船》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107953970A (zh) * | 2017-11-21 | 2018-04-24 | 中船黄埔文冲船舶有限公司 | 一种无底座的船舶大型门架的安装方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106624639A (zh) | 一种大型阀门与大直径管道预拼短接制作及吊装方法 | |
CN103243926A (zh) | 高层建筑工程管井立管吊装的施工方法 | |
CN208379596U (zh) | 基坑支护结构 | |
CN108457308B (zh) | 一种用于海洋钢管桩包覆防腐系统的施工装置的安装方法 | |
CN106836782A (zh) | 一种脚手架连墙件及幕墙更换方法 | |
CN105800475A (zh) | 一种自灭火龙门起重机 | |
CN103993745B (zh) | 一种转换梁整体吊装装置及其吊装方法 | |
KR20170068524A (ko) | 풍력 터빈 발전기 조립체 | |
CN106347577A (zh) | 缩短组块滑道总装周期的建造工艺 | |
CN104527923B (zh) | 一种应用辅助托架的主推电机进舱安装方法 | |
CN204112721U (zh) | 一种轨道附着式超高架体钢骨混凝土巨柱爬模装置 | |
CN104060809B (zh) | 一种屋面采光玻璃钢架安装设备及其运行方法 | |
WO2016202247A1 (zh) | 一种固定式高层塔架 | |
CN104692149A (zh) | 一种翻车机安装工艺 | |
CN205834738U (zh) | 可升降机床结构 | |
CN102101629B (zh) | 大吨位海洋工程结构物分级同步液压顶升工艺 | |
CN107879261A (zh) | 一种倾斜式拱形拦污栅吊装装置及吊装方法 | |
CN203669721U (zh) | 一种挂式斜梯 | |
CN104594319B (zh) | 深水海洋平台泵护管的整体提升安装方法 | |
CN203866805U (zh) | 一种重力式海上升压站 | |
CN202925471U (zh) | 用于高墩施工的液压模板系统 | |
CN202703846U (zh) | 定置复板 | |
CN208778011U (zh) | 砼衬砌隧道边墙钢模板台车 | |
CN204152481U (zh) | 水下隔离阀门支撑的笼式结构 | |
CN207069447U (zh) | 一种新型双层电缆安装平台 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170125 |