CN101769158B - 掘护锚一体化成套设备 - Google Patents
掘护锚一体化成套设备 Download PDFInfo
- Publication number
- CN101769158B CN101769158B CN2008102303978A CN200810230397A CN101769158B CN 101769158 B CN101769158 B CN 101769158B CN 2008102303978 A CN2008102303978 A CN 2008102303978A CN 200810230397 A CN200810230397 A CN 200810230397A CN 101769158 B CN101769158 B CN 101769158B
- Authority
- CN
- China
- Prior art keywords
- jumbo
- supporting
- bolting
- machine
- transporter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
- Earth Drilling (AREA)
Abstract
本发明涉及煤矿巷道开采领域,具体为掘护锚一体化成套设备,其可实现煤矿巷道掘进过程中掘进、临时支护、永久支护、出煤、除尘等平行作业,全面提高综掘面的工作效率,解决现有技术中煤矿巷道掘进效率过低等问题。该成套设备设有掘进机、支架、锚杆台车、除尘风机、第二运输机,支架为龙门式结构,跨在掘进机上方和两侧,锚杆台车位于掘进机与支架的后面,除尘风机固定在锚杆台车上面,第二运输机铰接在锚杆台车后面。本发明的掘进机在煤头端进行截割、收料、运料,支架跨在掘进机两侧并紧随掘进机自移前进,对顶板进行临时支护,锚杆台车与掘进机配套进行煤料转运,同时完成锚杆、锚索实施永久支护,除尘风机完成巷道通风及除尘工作。
Description
技术领域
本发明涉及煤矿巷道开采领域,具体为掘护锚一体化成套设备,其可实现煤矿巷道掘进过程中掘进、临时支护、永久支护、出煤、除尘等平行作业,全面提高综掘面的工作效率。
背景技术
我国煤炭资源丰富,煤矿企业众多。但目前,煤矿巷道掘进效率过低,严重低制约着综采工作面的开采,从而影响了整个煤矿的生产能力。传统巷道掘进过程为掘进机掘进一段距离后停下来,再进行人工临时支护、人工打锚杆工作,这样使得整个巷道掘进过程中,只有30%的时间是在掘进,而支护工作占用了70%,掘、支比例失调,是制约进尺效率的瓶颈。
发明内容
本发明的目的是提供煤矿巷道开采的掘护锚一体化成套设备,解决现有技术中煤矿巷道掘进效率过低等问题,主要用于煤矿巷道掘进过程中掘进、临时支护、永久支护、出煤、除尘等平行作业,全面提高巷道掘进工作效率。
本发明的技术方案是:
一种掘护锚一体化成套设备,该成套设备主要设有掘进机、迈步自移支架、锚杆台车、除尘风机、第二运输机,迈步自移支架为龙门式结构,跨在掘进机上方和两侧,锚杆台车位于掘进机与迈步自移支架的后面,除尘风机固定在锚杆台车上面,第二运输机铰接在锚杆台车后面。
所述的掘护锚一体化成套设备,掘进机为煤矿用悬臂式掘进机。
所述的掘护锚一体化成套设备,迈步自移支架前端在掘进机的铲板后部。
所述的掘护锚一体化成套设备,迈步自移支架由至少两个分支架组成,分支架之间通过移架油缸相连接。
所述的掘护锚一体化成套设备,每个分支架设有顶支撑架、侧支撑架、主机架、顶支撑油缸、侧支撑油缸,顶支撑架通过滑道安装在主机架的上部,顶支撑架和主机架通过顶支撑油缸相连接,侧支撑架通过滑道安装在主机架的两侧,侧支撑架和主机架通过侧支撑油缸相连接。
所述的掘护锚一体化成套设备,相邻分支架上的支撑架为“王”字形交错结构。
所述的掘护锚一体化成套设备,锚杆台车下部装有履带行走机构,锚杆台车中部装有刮板输送机构,锚杆台车上部安装锚杆钻机,锚杆台车前部装有收料机构,锚杆台车后部装有第二运输机回转台。
所述的掘护锚一体化成套设备,锚杆台车的收料机构与掘进机的第一运输机搭接,第二运输机与锚杆钻机的第二运输机回转台铰接,使第二运输机与锚杆台车的刮板运输机构搭接。
所述的掘护锚一体化成套设备,除尘风机固定在锚杆台车的刮板运输机构的上方,其进风口由负压风筒引至掘进机的回转台处,其排风口由正压风筒引至第二运输机尾部。
本发明的掘护锚一体化成套设备,掘进机在煤头端进行截割、收料、运料,支架跨在掘进机两侧并紧随掘进机自移前进,对顶板进行临时支护,锚杆台车与掘进机配套进行煤料转运,同时完成锚杆、锚索实施永久支护,除尘风机完成巷道通风及除尘工作。
本发明的有益效果是:
1、为提高综掘工作面的开采效率,提高综掘工作面的安全性,本发明提供掘护锚一体化成套设备,其实现巷道开采的掘进、临时支护、永久支护、锚杆、出煤、除尘等平行作业,解决了掘进与支护比例失调的问题,提高巷道掘进的效率,从而打破传统工艺,提高巷道掘进综合进尺速度。
2、本发明为机械自动化施工,降低了人工劳动强度,减少了井下作业人员。
3、本发明掘进工作面使用迈步自移支架独立于掘进机,当掘进机工作时,支架支护于掘进机两侧,不影响掘进机的工作性能,可以实现超前临时支护,与掘进机并行工作,并迈步自移前进。从而,支架对巷道及时支护,避免了顶板事故的发生,保证作业安全。本发明掘进工作面迈步自移支架还可与锚护工作相互配合,使掘进机及护顶支护工作效率都得到了极大的提高。
4、本发明采用了“长压、短抽”的通风方式,有利于工作面的灭尘,改善了工作环境。
附图说明
图1为本发明成套设备结构主视图。
图2为本发明迈步自移支架主视图。
图3为本发明迈步自移支架左视图。
图4为本发明锚杆台车主视图。
图中,1、掘进机;2、支架;3、锚杆台车;4、除尘风机;5、第二运输机;6、分支架;7、移架油缸;8、顶支撑架;9、侧支撑架;10、履带行走机构;11、刮板输送机构;12、锚杆钻机;13、收料机构;14、第二运输机回转台;15主机架;16顶支撑油缸;17侧支撑油缸。
具体实施方式
下面结合附图和具体实施例对本发明作进一步的说明。
如图1-图4所示,本发明是掘护锚一体化成套设备,它包括:掘进机1、迈步自移支架2、锚杆台车3、除尘风机4、第二运输机5及其他后配套设备等。具体结构如下:
掘进机1为煤矿用悬臂式掘进机,掘进机1在煤头端;迈步自移支架2为龙门式结构,迈步自移支架2支起时,跨在掘进机1上方和两侧,与掘进机1没有固定连接,迈步自移支架2前端在掘进机1的铲板后部。锚杆台车3位于掘进机1与迈步自移支架2的后面,锚杆台车3在掘进机1和迈步自移支架2的尾部位置,锚杆台车3与掘进机1及迈步自移支架2没有固定连接。除尘风机4固定在锚杆台车3上面,第二运输机5通过销轴铰接在锚杆台车3后面。
锚杆台车3下部装有履带行走机构10,锚杆台车3中部装有刮板输送机构11,锚杆台车3上部安装锚杆钻机12,锚杆台车3前部装有收料机构13,锚杆台车3后部装有第二运输机回转台14。锚杆台车3的收料机构13与掘进机的第一运输机搭接,第二运输机5与锚杆钻机12的第二运输机回转台14铰接,使第二运输机5与锚杆台车3的刮板运输机构11搭接;除尘风机4固定在锚杆台车3的刮板运输机构11的上方,其进风口由负压风筒引至掘进机回转台14处,其排风口由正压风筒引至第二运输机5尾部。
如图2-图3所示,本发明采用迈步自移支架,该迈步自移支架2由至少两个分支架6组成,分支架6之间通过移架油缸7相连接,相邻分支架6上的支撑架为“王”字形交错结构;每个分支架6设有顶支撑架8、侧支撑架9、主机架15、顶支撑油缸16、侧支撑油缸17,顶支撑架16通过滑道安装在主机架15的上部,顶支撑架8和主机架15通过顶支撑油缸16相连接,侧支撑架9通过滑道安装在主机架15的两侧,侧支撑架9和主机架15通过侧支撑油缸17相连接。
本发明的工作过程如下:
掘进机1在煤头端截煤、收料、前移,迈步自移支架2对空顶、侧帮进行临时支护,在移架油缸7的作用下前移,在整个支撑和移架过程中顶支撑力和侧支撑力保持不变,迈步自移支架2采用“擦顶式”移架方式紧随掘进机前移,以保证最小的空顶距,锚杆台车3在掘进机1尾部,一方面保持与掘进机1第一运输机衔接运料,另一方面进行打锚杆、锚索工作,对移走支架部分的空顶、侧帮实施永久支护,第二运输机5与锚杆台车3的刮板运输机构11搭接,进行煤料的转运,除尘风机4的进风口由负压风筒引至掘进机的回转台处,其排风口由正压风筒引至第二运输机5尾部,对巷道进行通、排风。
Claims (9)
1.一种掘护锚一体化成套设备,其特征在于:该成套设备设有掘进机(1)、迈步自移支架(2)、锚杆台车(3)、除尘风机(4)、第二运输机(5),迈步自移支架(2)为龙门式结构,跨在掘进机(1)上方和两侧,锚杆台车(3)位于掘进机(1)与迈步自移支架(2)的后面,除尘风机(4)固定在锚杆台车(3)上面,第二运输机(5)铰接在锚杆台车(3)后面。
2.按照权利要求1所述的掘护锚一体化成套设备,其特征在于:掘进机(1)为煤矿用悬臂式掘进机。
3.按照权利要求1所述的掘护锚一体化成套设备,其特征在于:迈步自移支架(2)前端在掘进机(1)的铲板后部。
4.按照权利要求1所述的掘护锚一体化成套设备,其特征在于:迈步自移支架(2)由至少两个分支架(6)组成,分支架(6)之间通过移架油缸(7)相连接。
5.按照权利要求4所述的掘护锚一体化成套设备,其特征在于:每个分支架(6)设有顶支撑架(8)、侧支撑架(9)、主机架(15)、顶支撑油缸(16)、侧支撑油缸(17),顶支撑架(16)通过滑道安装在主机架(6)的上部,顶支撑架(8)和主机架(15)通过顶支撑油缸(16)相连接,侧支撑架(9)通过滑道安装在主机架(15)的两侧,侧支撑架(9)和主机架(15)通过侧支撑油缸(17)相连接。
6.按照权利要求5所述的掘护锚一体化成套设备,其特征在于:相邻分支架(6)上的支撑架为“王”字形交错结构。
7.按照权利要求1所述的掘护锚一体化成套设备,其特征在于:锚杆台车(3)下部装有履带行走机构(10),锚杆台车(3)中部装有刮板输送机构(11),锚杆台车(3)上部安装锚杆钻机(12),锚杆台车(3)前部装有收料机构(13),锚杆台车(3)后部装有第二运输机回转台(14)。
8.按照权利要求7所述的掘护锚一体化成套设备,其特征在于:锚杆台车(3)的收料机构(13)与掘进机的第一运输机搭接,第二运输机(5)与锚杆钻机(12)的第二运输机回转台(14)铰接,使第二运输机(5)与锚杆台车(3)的刮板运输机构(11)搭接。
9.按照权利要求7所述的掘护锚一体化成套设备,其特征在于:除尘风机(4)固定在锚杆台车(3)的刮板运输机构(11)的上方,其进风口由负压风筒引至掘进机的回转台处,其排风口由正压风筒引至第二运输机(5)尾部。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008102303978A CN101769158B (zh) | 2008-12-30 | 2008-12-30 | 掘护锚一体化成套设备 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008102303978A CN101769158B (zh) | 2008-12-30 | 2008-12-30 | 掘护锚一体化成套设备 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101769158A CN101769158A (zh) | 2010-07-07 |
CN101769158B true CN101769158B (zh) | 2012-04-18 |
Family
ID=42502241
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2008102303978A Expired - Fee Related CN101769158B (zh) | 2008-12-30 | 2008-12-30 | 掘护锚一体化成套设备 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101769158B (zh) |
Families Citing this family (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102022122B (zh) * | 2010-11-03 | 2013-02-13 | 大同煤矿集团衡安装备有限公司 | 支护式综合掘进机 |
CN102678151B (zh) * | 2012-04-17 | 2015-01-14 | 太原理工大学 | 综掘自移式临时支护系统及其工艺方法 |
CN108150165B (zh) * | 2014-08-09 | 2020-11-24 | 温州速拓科技有限公司 | 一种包括液压控制装载机构的悬臂式纵轴掘锚机 |
CN104533409A (zh) * | 2014-11-13 | 2015-04-22 | 三一重型装备有限公司 | 综掘设备及综掘设备的连接装置 |
CN105386771B (zh) * | 2015-12-17 | 2017-12-19 | 辽宁天安科技有限公司 | 盾构式掘锚机 |
CN105587333A (zh) * | 2016-02-24 | 2016-05-18 | 中国神华能源股份有限公司 | 一种掘进工作面通风除尘装置 |
CN105604558B (zh) * | 2016-03-03 | 2017-08-25 | 辽宁工程技术大学 | 适用于软岩掘进的超前支护式联合机组 |
CN105569701B (zh) * | 2016-03-03 | 2017-08-29 | 辽宁工程技术大学 | 适用于硬岩巷道掘进的迈步式掘进支护装置 |
CN106593437A (zh) * | 2016-12-28 | 2017-04-26 | 中国煤炭科工集团太原研究院有限公司 | 掘、支、锚、钻一体式综掘机 |
CN106837367A (zh) * | 2017-02-23 | 2017-06-13 | 淮南矿业(集团)有限责任公司 | 一种矿用tbm掘进过异常带的围岩及顶板的控制方法 |
CN109869146A (zh) * | 2017-12-05 | 2019-06-11 | 三一重型装备有限公司 | 掘、护、锚平行作业工艺和掘、护、锚平行作业系统 |
CN108005665A (zh) * | 2017-12-28 | 2018-05-08 | 石家庄煤矿机械有限责任公司 | 一种巷道快速综合掘进系统 |
CN110344863A (zh) * | 2018-04-05 | 2019-10-18 | 欧玉金 | 掘护锚机 |
CN109025989A (zh) * | 2018-09-25 | 2018-12-18 | 无锡华瀚能源装备科技有限公司 | 一种新型掘锚运一体式设备系统 |
CN111140245B (zh) * | 2020-01-14 | 2021-08-24 | 天地科技股份有限公司 | 一种巷道智能掘支机及其快速成巷的方法 |
CN111911153B (zh) * | 2020-07-16 | 2022-03-11 | 西安科技大学 | 一种经济型龙门式智能掘进机器人系统及其工作流程 |
CN112377210B (zh) * | 2020-09-28 | 2023-05-02 | 中煤科工开采研究院有限公司 | 巷道大气压力支护打孔判别方法及系统 |
CN112943284A (zh) * | 2021-03-15 | 2021-06-11 | 北京坤世拓智能科技有限公司 | 基于双联多组自移迈步式临时支架的综掘巷道快掘工艺 |
CN113882888B (zh) * | 2021-11-01 | 2024-04-19 | 安徽理工大学 | 一种双门式高效快速循环自移锚支护一体化装备及控制方法 |
CN114233373A (zh) * | 2021-11-02 | 2022-03-25 | 中国煤炭科工集团太原研究院有限公司 | 运输协同控制系统及方法 |
CN114165230A (zh) * | 2021-11-22 | 2022-03-11 | 徐长杰 | 一种带有支护结构的探矿工程掘进装置 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU589393A1 (ru) * | 1975-06-02 | 1978-01-25 | Erpylev Viktor M | Проходческий комплекс |
US6206478B1 (en) * | 1998-05-22 | 2001-03-27 | Ishikawajima-Harima Heavy Industries Co., Ltd. | Tunnel excavator with crawler drive and roof support bearing frames |
RU2184846C2 (ru) * | 2000-05-03 | 2002-07-10 | Черных Николай Георгиевич | Проходческий комплекс |
CN1904311A (zh) * | 2006-05-23 | 2007-01-31 | 山西潞安矿业(集团)有限责任公司 | 掘进机前配套及液压锚杆钻臂系统 |
CN200964858Y (zh) * | 2006-11-01 | 2007-10-24 | 山西焦煤集团有限责任公司 | 掘、护、锚一体化掘进设备 |
CN201344032Y (zh) * | 2008-12-30 | 2009-11-11 | 三一重型装备有限公司 | 掘护锚一体化成套设备 |
-
2008
- 2008-12-30 CN CN2008102303978A patent/CN101769158B/zh not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU589393A1 (ru) * | 1975-06-02 | 1978-01-25 | Erpylev Viktor M | Проходческий комплекс |
US6206478B1 (en) * | 1998-05-22 | 2001-03-27 | Ishikawajima-Harima Heavy Industries Co., Ltd. | Tunnel excavator with crawler drive and roof support bearing frames |
RU2184846C2 (ru) * | 2000-05-03 | 2002-07-10 | Черных Николай Георгиевич | Проходческий комплекс |
CN1904311A (zh) * | 2006-05-23 | 2007-01-31 | 山西潞安矿业(集团)有限责任公司 | 掘进机前配套及液压锚杆钻臂系统 |
CN200964858Y (zh) * | 2006-11-01 | 2007-10-24 | 山西焦煤集团有限责任公司 | 掘、护、锚一体化掘进设备 |
CN201344032Y (zh) * | 2008-12-30 | 2009-11-11 | 三一重型装备有限公司 | 掘护锚一体化成套设备 |
Also Published As
Publication number | Publication date |
---|---|
CN101769158A (zh) | 2010-07-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101769158B (zh) | 掘护锚一体化成套设备 | |
CN201344032Y (zh) | 掘护锚一体化成套设备 | |
WO2018228217A1 (zh) | 一种快速掘进后配套运输及支护系统 | |
CN102787847B (zh) | 一种巷道掘进机 | |
CN202611695U (zh) | 新型矩形煤巷快速掘锚一体机 | |
CN101832103B (zh) | 可移动两臂顶帮锚杆锚索施工钻车 | |
CN202500562U (zh) | 掘、护、锚平行作业系统 | |
CN102410017B (zh) | 支护式综合掘锚机 | |
CN102606152A (zh) | 新型矩形煤巷快速掘锚一体机 | |
CN104747201A (zh) | 不稳定围岩条件下的煤巷快速掘锚一体化设备 | |
CN102536229A (zh) | 掘、护、锚平行作业系统与施工工艺 | |
CN108150177B (zh) | 多功能硬岩巷道快速掘进工艺及装备 | |
CN112343617B (zh) | 一种自动化矿用巷道掘进系统 | |
CN103382844A (zh) | 一种“履带式”液压组合支架临时支护与永久支护平行作业掘进工艺及设备 | |
CN109538224A (zh) | 一种新型煤巷快速掘进机 | |
CN205578001U (zh) | 适用于软岩掘进的超前支护式联合机组 | |
CN104632233A (zh) | 变形巷道的机械化修复工艺及巷道修复机 | |
CN217582189U (zh) | 一种支护转载除尘钻车及快速掘进装备系统 | |
CN103075153B (zh) | 露天用钻式采煤机 | |
CN212389344U (zh) | 硬岩悬臂掘进机 | |
CN211648172U (zh) | 一种十臂掘描机 | |
CN209494569U (zh) | 一种新型煤巷快速掘进机 | |
CN202810858U (zh) | 一种巷道掘进机 | |
CN104564056A (zh) | 掘探一体机 | |
CN201747370U (zh) | 具有机掘作业和钻车打孔作业功能的掘进机 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120418 Termination date: 20161230 |
|
CF01 | Termination of patent right due to non-payment of annual fee |