CN101736912A - 一种预应力纤维布外粘结加固技术的锚固方法 - Google Patents
一种预应力纤维布外粘结加固技术的锚固方法 Download PDFInfo
- Publication number
- CN101736912A CN101736912A CN200910232633A CN200910232633A CN101736912A CN 101736912 A CN101736912 A CN 101736912A CN 200910232633 A CN200910232633 A CN 200910232633A CN 200910232633 A CN200910232633 A CN 200910232633A CN 101736912 A CN101736912 A CN 101736912A
- Authority
- CN
- China
- Prior art keywords
- cloth
- steel plate
- anchoring
- floor
- fiber cloth
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000004744 fabric Substances 0.000 title claims description 144
- 239000000835 fiber Substances 0.000 title claims description 50
- 238000000034 method Methods 0.000 title claims description 42
- 230000002787 reinforcement Effects 0.000 title claims description 18
- 238000004873 anchoring Methods 0.000 claims description 58
- 229910000831 Steel Inorganic materials 0.000 claims description 42
- 239000010959 steel Substances 0.000 claims description 42
- 238000010438 heat treatment Methods 0.000 claims description 22
- 230000004888 barrier function Effects 0.000 claims description 11
- 238000009434 installation Methods 0.000 claims description 9
- 238000007599 discharging Methods 0.000 claims description 2
- 239000011347 resin Substances 0.000 abstract description 14
- 229920005989 resin Polymers 0.000 abstract description 14
- 239000004567 concrete Substances 0.000 abstract description 12
- 238000005516 engineering process Methods 0.000 abstract description 10
- 229920001187 thermosetting polymer Polymers 0.000 abstract 2
- 239000000463 material Substances 0.000 description 13
- 208000028659 discharge Diseases 0.000 description 11
- 238000010276 construction Methods 0.000 description 9
- 238000010586 diagram Methods 0.000 description 3
- 239000012141 concentrate Substances 0.000 description 2
- 230000002708 enhancing effect Effects 0.000 description 2
- 239000011150 reinforced concrete Substances 0.000 description 2
- 238000005728 strengthening Methods 0.000 description 2
- 239000003795 chemical substances by application Substances 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 238000007596 consolidation process Methods 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 238000001723 curing Methods 0.000 description 1
- 238000007598 dipping method Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000008030 elimination Effects 0.000 description 1
- 238000003379 elimination reaction Methods 0.000 description 1
- 238000005470 impregnation Methods 0.000 description 1
- 230000000977 initiatory effect Effects 0.000 description 1
- 229920000642 polymer Polymers 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000002791 soaking Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/08—Members specially adapted to be used in prestressed constructions
- E04C5/12—Anchoring devices
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0218—Increasing or restoring the load-bearing capacity of building construction elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/07—Reinforcing elements of material other than metal, e.g. of glass, of plastics, or not exclusively made of metal
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/08—Members specially adapted to be used in prestressed constructions
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/08—Members specially adapted to be used in prestressed constructions
- E04C5/12—Anchoring devices
- E04C5/125—Anchoring devices the tensile members are profiled to ensure the anchorage, e.g. when provided with screw-thread, bulges, corrugations
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/12—Mounting of reinforcing inserts; Prestressing
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0218—Increasing or restoring the load-bearing capacity of building construction elements
- E04G2023/0251—Increasing or restoring the load-bearing capacity of building construction elements by using fiber reinforced plastic elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0218—Increasing or restoring the load-bearing capacity of building construction elements
- E04G2023/0251—Increasing or restoring the load-bearing capacity of building construction elements by using fiber reinforced plastic elements
- E04G2023/0255—Increasing or restoring the load-bearing capacity of building construction elements by using fiber reinforced plastic elements whereby the fiber reinforced plastic elements are stressed
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0218—Increasing or restoring the load-bearing capacity of building construction elements
- E04G2023/0251—Increasing or restoring the load-bearing capacity of building construction elements by using fiber reinforced plastic elements
- E04G2023/0262—Devices specifically adapted for anchoring the fiber reinforced plastic elements, e.g. to avoid peeling off
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/30—Adapting or protecting infrastructure or their operation in transportation, e.g. on roads, waterways or railways
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Working Measures On Existing Buildindgs (AREA)
- Bridges Or Land Bridges (AREA)
- Reinforcement Elements For Buildings (AREA)
Abstract
本发明的目的是提供一种端部锚固技术,首先,在混凝土表面张拉FRP片材,用树脂将预应力FRP片材与混凝土粘结成一整体,待树脂加热固化后放张预应力,在端部对预应力FRP片材锚固端采取一定措施,释放或者部分释放预应力FRP片材锚固端部的预应力,以达到消除或者减少端部的应力集中。本发明在混凝土表面张拉FRP片材,用树脂将预应力FRP片材与混凝土粘结成一整体,待树脂加热固化后放张预应力,在端部对预应力FRP片材锚固端采取一定措施,释放或者部分释放预应力FRP片材锚固端部的预应力,以达到消除或者减少端部的应力集中,解除端部不必要的负担。使得FRP片材得到充分的高强性能的同时,解决了建筑构件端部锚固处理问题。
Description
技术领域
本发明涉及一种锚固方法,特别是锚固在FRP片材预应力外粘结加固技术中的应用,属于土建交通工程中的结构加固技术。
背景技术
目前,在结构表面用树脂等粘结剂粘贴连续纤维增强聚合物复合材料(FRP)的加固方法作为一种新型有效的土建交通建筑结构加固增强技术越来越广泛应用。不过这种单纯的将连续纤维粘结在混凝土表面的被动的加固方法存在着诸多缺点,如:FRP与混凝土表面粘结强度有限,容易发生粘结破坏,FRP片材的高强度性能很难得到发挥等。所以就想到变被动为主动,对FRP片材预先张拉,然后利用粘结材料粘贴于混凝土表面共同受力的预应力外粘结加固方法。这样从材料角度考虑,FRP片材的高强性能得到充分发挥,另外从结构本身考虑不仅可以提高结构强度,同时还能有效改善结构的刚度、抗开裂强度、屈服强度等使用性能。而FRP片材预应力外粘结加固技术的端部锚固处理是该技术的关键,端部的锚固处理直接影响到该技术的加固效果。目前,国内外对外贴预应力FRP片材加固结构都进行了很多研究与应用,但仍然没有很好的解决端部锚固的问题.因为施加预应力后在FRP端部会产生很大的应力集中,如采用直接锚固将会给端部造成很大的额外负担。
发明内容
本发明的目的是提供一种端部锚固技术以有效改善建筑构件端部应力集中问题。
本发明提出一种预应力纤维布外粘结加固技术的锚固方法,包括以下步骤:
A、被加固构件(2)端部开槽,嵌入锚具(7)上半部分;
B、将第一层纤维布(3)粘贴在被加固构件(2)表面,锚具(7)下面;
C、在第一层纤维布(3)下面再铺设一层纤维布(1),张拉纤维布(1),并将其粘贴在第一层纤维布(3)下方,在纤维布(1)下方粘贴第三层纤维布(4);
D、加热固化;
E、安装钢板(5)进行第一道锚固,释放部分预应力;
F、安装锚具(7)下半部分,将第一层纤维布、预应力纤维布、第三层纤维布卡在锚具上下之间,加热固化,释放所有预应力。
所述步骤D中加热固化的温度为80-120℃。
所述步骤D中加热固化的时间为1.5-3小时。
所述步骤E中释放预应力为总应力的70~95%。
本发明还提供一种预应力纤维布外粘结加固技术的锚固方法,包括以下步骤:
A、将第一层纤维布3粘贴在被加固构件2表面;
B、在第一层纤维布3下面再铺设一层纤维布1,张拉纤维布1,并将其粘贴在第一层纤维布3下方,在纤维布1下方粘贴第三层纤维布4;
C、加热固化;
D、安装钢板5进行第一道锚固,释放全部预应力;
E、将锚具7上半部分安装在第三层纤维布4下面,然后将第一层纤维布3、预应力纤维布1和第三层纤维布4三者叠合,反贴到锚具上下部分之间。
本发明还有另外一种预应力纤维布外粘结加固技术的锚固方法,包括以下步骤:
A、将第一层纤维布3粘贴在被加固构件2表面;
B、在三层预应力纤维布6端部锚固处设置有隔离膜9;
C、张拉三层纤维布6,并将其粘贴在第一层纤维布3下方;
D、安装钢板5进行第一道锚固,释放部分预应力;
E、设置第二、三道锚固,安装钢板51、52,释放所有预应力;
F、切断三层预应力纤维布6位于钢板51、钢板52之间的,从第一层纤维布3算起的第二层与第三层预应力纤维布,二次张拉三层纤维布6,取出钢板52,去除隔离膜9,铺设增厚纤维布10,重新安装钢板52,加热固化,释放所有预应力。
G、切断三层预应力纤维布6位于钢板51、钢板5之间的,从第一层纤维布3算起的第三层预应力纤维布,取出钢板51,去除隔离膜9,铺设增厚纤维布10,重新安装钢板51,加热固化。
所述步骤D释放预应力为总应力的40%~50%。
所述步骤F张拉应力控制为(T/3)×0.8(T为三层纤维张拉总应力)。
本发明在混凝土表面张拉FRP片材,用树脂将预应力FRP片材与混凝土粘结成一整体,待树脂加热固化后放张预应力,在端部对预应力FRP片材锚固端采取一定措施,释放或者部分释放预应力FRP片材锚固端部的预应力,以达到消除或者减少端部的应力集中,解除端部不必要的负担。使得FRP片材的高强性能得到充分的同时,解决了建筑构件端部锚固处理问题。
附图说明
图1是锚具嵌入式锚固法结构构造示意图及施工技术流程要点;
图1(a)是预应力纤维布1张拉前的构造图;
图1(b)是预应力纤维布1张拉后,锚具7安装构造图;
图2是外置锚具锚固法结构构造示意图及施工技术流程要点;
图2(a)外置锚具7上半部分安装构造图;
图2(b)锚具7下半部分安装后,预应力完全释放构造图;
图2(c)锚具端部加固局部放大图
图3是逐步减小被张拉的纤维层数的张拉锚固法示意图;
图3(a)是分层锚固与不分层锚固端部应力分布比较;
图3(b)多层纤维布6张拉构造图;
图3(c)是在被加固构件2端部贴第一层纤维布3构造详图;
图3(d)是多层纤维布6粘贴、钢板5锚固构造图;
图3(e)是设置钢板51、52锚固构造图;
图3(f)是在钢板52底部粘帖增厚布10锚固构造图;
图3(g)是逐层锚固最终构造图;
以上的图中有:1预应力张拉纤维布,2被加固构件,3第一层纤维布,4第三层纤维布,5、51、52钢板,6多层纤维布,7锚具,9隔离膜,10增厚布,T张拉总应力
具体实施方式
下面结合附图和实施例对本发明的技术方案进一步说明。
图1是本发明的锚固措施之一锚具嵌入法锚固的结构构造,被加固混凝土构件2底部张拉预应力纤维布1,然后通过两道防线进行锚固,一道钢板5锚固,第二道锚具7锚固,两部分个承担部分预应力。
嵌入锚固法实施步骤:
1、被加固构件2端部开槽,嵌入锚具7上半部分
锚具7由两部分组成,上半部分埋入(与被加固构件直接接触)被加固构件2,下半部分卡住纤维布与上半部槽口对接形成一个整体,上下锚具链接部位做成锯齿形。待加固受弯构件2端部开凿,其宽度满足端部锚具7安装需要,深度为底部混凝土保护层厚度;打孔埋置螺栓,实现锚具7的固定。
2、铺设第一层纤维布3
被加固构件2表面,锚具7下面铺设第一层纤维布3,铺设长度2~3倍锚具。并在布起始端至锚具7范围内用树脂浸渍粘贴在被加固构件2表面。。
3、张拉预应力纤维布1,粘贴第三层纤维布4
第一层纤维布3下面铺设预应力纤维布1,预应力纤维布没有层数限制,张拉并对锚具7范围内预应力纤维布涂抹树脂粘帖在被加固构件2上。预应力纤维布1下面,铺设第三层纤维布4,粘贴长度、范围同先粘布,加热固化。
4、粘结、安装钢板,释放预应力。
沿跨中方向靠近锚具7安装钢板5第一道锚固,并用螺栓将钢板、第一层纤维布3、预应力FRP布1、第三层纤维布4与混凝土结构锚固一体。释放部分预应力。残留预应力为FRP设计张拉强度的5%-30%。
5、安装锚具,释放预应力
第一层纤维布3、预应力纤维布1和第三层纤维布4三者叠合在一起,用树酯浸透后安装锚具7下半部第二道锚固,将其卡在锚具上下部分之间,然后抽真空加热固化,释放所有预应力,锚固安装结束,卷起锚具外侧的纤维布。
图2是本发明的锚固措施之二锚具外置法锚固的结构构造,图1图2的两种锚固措施基本类似,两者的本质区别在于,此处锚具7安装在纤维布1、3、4的下面,不承担预应力,是一种安全防护。
第二种锚固措施外置锚具法如图2所示,该方法的特征在于锚具上半部分置于纤维布下面,然后将纤维布反贴到锚具上下部分之间,施工步骤如下:
1、将第一层纤维布3粘贴在被加固构件2表面;
2、在第一层纤维布3下面再铺设一层纤维布1,张拉纤维布1,并将其粘贴在第一层纤维布3下方,在纤维布1下方粘贴第三层纤维布4;
3、加热固化;
4、安装钢板5进行第一道锚固,释放全部预应力;
5、安装锚具:锚具上半部分安装在第三层纤维布4下面,然后将第一层纤维布3、预应力纤维布1和第三层纤维布4三者叠合,用树酯浸透后反贴到锚具上下部分之间。加热固化树脂,卷起锚具外侧的纤维布。
图3是本发明的锚固措施之三逐步减少FRP锚固层数的构造,此方法适用于多层预应力纤维布锚固。被加固混凝土构件2底部张拉预应力纤维布1,然后三块钢板分三道锚固,逐步减少锚固层数。
第三种锚固措施逐步减小被张拉的FRP层数如图3所示,施工步骤如下:
1、在被加固构件表面端部铺设第一层纤维布3。
2、纤维布6端部锚固处设置隔离膜9:为实现多道锚固,在纤维布6端部,从混凝土算起的第一层与二次之间,第二块钢板锚固的位置设置一片,第三块钢板锚固位置,层与层之间各设置一片。隔离膜一片长度同钢板宽度。张拉预应力纤维布6,此处纤维布6为三层,间断浸渍,加热固化后张拉。
3、预应力纤维布6粘贴、设置第一道锚固钢板5,此时预应力释放,推荐值为预拉总应力的40%~50%。
4、设置第二、三道锚固,安装钢板51、52
沿端部方向,在第一块钢板5左侧,依次设置钢板51、52并固定。此时两块钢板底部的纤维布为无浸渍、无粘结,释放所有的预应力。切断预应力纤维布6位于钢板51、钢板52之间的,从第一层纤维布3算起的第2层与第3层预应力纤维布。
5)、二次张拉纤维布6,重新锚固钢板51、52。
二次张拉预应力纤维布6,张拉应力控制为(T/3)×0.8(T为三层纤维张拉总应力)。取出第三块钢板52,去除隔离膜9,粘贴两层增厚纤维布10,固定钢板52,加热固化树脂,释放所有的预应力。取出钢板51,去除隔离膜9,粘贴一层增厚纤维布10,固定钢板51,加热固化树脂,锚固结束。
这种在靠近端部的区域逐步减少层数的外贴钢板锚固方法可大幅地改善端部应力集中现象如图3(a)所示,本实施例仅以三层纤维布为例,其还可以是多层纤维布,也属于本发明保护范围。
Claims (8)
1.一种预应力纤维布外粘结加固技术的锚固方法,其特征在于,包括以下步骤:
A、被加固构件(2)端部开槽,嵌入锚具(7)上半部分;
B、将第一层纤维布(3)粘贴在被加固构件(2)表面,锚具(7)下面;
C、在第一层纤维布(3)下面再铺设一层纤维布(1),张拉纤维布(1),并将其粘贴在第一层纤维布(3)下方,在纤维布(1)下方粘贴第三层纤维布(4);
D、加热固化;
E、安装钢板(5)进行第一道锚固,释放部分预应力;
F、安装锚具(7)下半部分,将第一层纤维布、预应力纤维布、第三层纤维布卡在锚具上下之间,加热固化,释放所有预应力。
2.根据权利要求1所述的一种预应力纤维布外粘结加固技术的锚固方法,其特征在于,所述步骤D中加热固化的温度为80-120℃。
3.根据权利要求1所述的一种预应力纤维布外粘结加固技术的锚固方法,其特征在于,所述步骤D中加热固化的时间为1.5-3小时。
4.根据权利要求1至3所述的一种预应力纤维布外粘结加固技术的锚固方法,其特征在于,所述步骤E中释放预应力为总应力的70~95%。
5.一种预应力纤维布外粘结加固技术的锚固方法,其特征在于,包括以下步骤:
A、将第一层纤维布(3)粘贴在被加固构件(2)表面;
B、在第一层纤维布(3)下面再铺设一层纤维布(1),张拉纤维布(1),并将其粘贴在第一层纤维布(3)下方,在纤维布(1)下方粘贴第三层纤维布(4);
C、加热固化;
D、安装钢板(5)进行第一道锚固,释放全部预应力;
E、将锚具(7)上半部分安装在第三层纤维布(4)下面,然后将第一层纤维布(3)、预应力纤维布(1)和第三层纤维布(4)三者叠合,反贴到锚具上下部分之间。
6.一种预应力纤维布外粘结加固技术的锚固方法,其特征在于,包括以下步骤:
A、将第一层纤维布(3)粘贴在被加固构件(2)表面;
B、在三层预应力纤维布(6)端部锚固处设置有隔离膜(9);
C、张拉三层纤维布(6),并将其粘贴在第一层纤维布(3)下方;
D、安装钢板(5)进行第一道锚固,释放部分预应力;
E、设置第二、三道锚固,安装钢板(51)、(52),释放所有预应力;
F、切断三层预应力纤维布(6)位于钢板(51)、钢板(52)之间的,从第一层纤维布(3)算起的第二层与第三层预应力纤维布,二次张拉三层纤维布(6),取出钢板(52),去除隔离膜(9),铺设增厚纤维布(10),重新安装钢板(52),加热固化,释放所有预应力。G、切断三层预应力纤维布(6)位于钢板(51)、钢板(5)之间的,从第一层纤维布(3)算起的第三层预应力纤维布,取出钢板(51),去除隔离膜(9),铺设增厚纤维布(10),重新安装钢板(51),加热固化。
7.根据权利要求6所述的一种预应力纤维布外粘结加固技术的锚固方法,其特征在于,所述步骤D释放预应力为总应力的40%~50%。
8.根据权利要求6所述的一种预应力纤维布外粘结加固技术的锚固方法,其特征在于,所述步骤F张拉应力控制为(T/3)×0.8(T为三层纤维张拉总应力)。
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009102326334A CN101736912B (zh) | 2009-12-03 | 2009-12-03 | 一种预应力纤维布外粘结加固的锚固方法 |
PCT/CN2010/079385 WO2011066798A1 (zh) | 2009-12-03 | 2010-12-02 | 一种预应力纤维布外粘结加固技术的锚固方法 |
US13/513,180 US8776474B2 (en) | 2009-12-03 | 2010-12-02 | Anchoring method for external bonding and reinforcing technique with prestressed fiber cloth |
JP2012541310A JP5539530B2 (ja) | 2009-12-03 | 2010-12-02 | 外部貼着技術及び強化技術にプレストレスト繊維布を用いたアンカーリング工法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009102326334A CN101736912B (zh) | 2009-12-03 | 2009-12-03 | 一种预应力纤维布外粘结加固的锚固方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101736912A true CN101736912A (zh) | 2010-06-16 |
CN101736912B CN101736912B (zh) | 2012-05-09 |
Family
ID=42460891
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009102326334A Active CN101736912B (zh) | 2009-12-03 | 2009-12-03 | 一种预应力纤维布外粘结加固的锚固方法 |
Country Status (4)
Country | Link |
---|---|
US (1) | US8776474B2 (zh) |
JP (1) | JP5539530B2 (zh) |
CN (1) | CN101736912B (zh) |
WO (1) | WO2011066798A1 (zh) |
Cited By (26)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101974959A (zh) * | 2010-09-30 | 2011-02-16 | 大连理工大学 | 混凝土结构frp端部锚固装置 |
CN101994398A (zh) * | 2010-10-15 | 2011-03-30 | 方远建设集团股份有限公司 | 混凝土结构钢板-frp复合加固方法 |
CN102061811A (zh) * | 2010-11-17 | 2011-05-18 | 建研科技股份有限公司 | 一种采用预应力高强钢丝织物加固混凝土结构的方法 |
WO2011066798A1 (zh) * | 2009-12-03 | 2011-06-09 | 北京特希达技术研发有限公司 | 一种预应力纤维布外粘结加固技术的锚固方法 |
WO2012027967A1 (zh) * | 2010-09-01 | 2012-03-08 | Zhou Chaoyang | 柔性片状材料平行杆式锚固装置及方法 |
CN102425311A (zh) * | 2011-09-05 | 2012-04-25 | 长沙理工大学 | 基于表层嵌贴预应力frp板条的混凝土结构加固方法 |
CN102900200A (zh) * | 2012-10-09 | 2013-01-30 | 东南大学 | 一种智能frp-混凝土复合结构及其制造方法 |
CN102922602A (zh) * | 2012-11-08 | 2013-02-13 | 东南大学 | 预制智能frp-混凝土复合结构的制备工艺 |
CN103225421A (zh) * | 2013-03-05 | 2013-07-31 | 哈尔滨工程大学 | 一种碳纤维增强复合材料拉挤片材端部锚固方法 |
CN103388407A (zh) * | 2013-07-26 | 2013-11-13 | 河海大学 | 表层预应力嵌入技术加固混凝土构件的方法与机械装置 |
CN103541558A (zh) * | 2013-10-30 | 2014-01-29 | 扬州大学 | 预应力碳纤维板围箍加固古砖塔的方法及装置 |
CN104234182A (zh) * | 2014-08-11 | 2014-12-24 | 郑州大学 | 一种采用新型组合界面的frp型材—混凝土组合结构 |
CN104314014A (zh) * | 2014-10-11 | 2015-01-28 | 岩土科技股份有限公司 | 一种预应力钢板加固混凝土桥梁的方法 |
CN104631853A (zh) * | 2015-02-06 | 2015-05-20 | 广东工业大学 | 一种用于加固混凝土结构的纤维增强复合材料锚固装置及其锚固方法 |
CN104727561A (zh) * | 2015-04-02 | 2015-06-24 | 招商局重庆交通科研设计院有限公司 | 碳纤维板锚具限位张拉块 |
CN105507169A (zh) * | 2016-01-16 | 2016-04-20 | 哈尔滨工业大学 | 一种预应力frp布加固钢筋混凝土桥梁的张拉锚固定装置及加固方法 |
CN105569373A (zh) * | 2016-02-17 | 2016-05-11 | 深圳大学 | 一种可控frp加固结构延性的方法及装置 |
CN105926949A (zh) * | 2016-05-20 | 2016-09-07 | 北京特希达科技有限公司 | 一体式预应力纤维板加固梁板的原位张拉系统及方法 |
CN105937306A (zh) * | 2016-05-20 | 2016-09-14 | 东南大学 | 一种预应力纤维片材加固柱的装置及方法 |
CN107780596A (zh) * | 2017-09-29 | 2018-03-09 | 马鞍山十七冶工程科技有限责任公司 | 一种frp布与结构混凝土的锚固结构系统及其施工方法 |
CN109853979A (zh) * | 2019-01-28 | 2019-06-07 | 华侨大学 | 一种加固石梁结构受弯性能的结构 |
CN110318558A (zh) * | 2019-07-31 | 2019-10-11 | 南方工程检测修复技术研究院 | 一种预应力frp加固柱形结构的预应力施加装置及其施工方法 |
CN110629685A (zh) * | 2019-09-29 | 2019-12-31 | 长沙理工大学 | 一种基于梯度放张预应力的混凝土结构的加固方法 |
CN112360179A (zh) * | 2020-11-20 | 2021-02-12 | 郑州大学 | 一种预应力frp片材加固钢筋混凝土梁的施工方法 |
CN114134824A (zh) * | 2021-08-25 | 2022-03-04 | 江苏泊翔结构加固工程有限公司 | 一种桥梁预应力碳纤维布拉张锚固装置 |
CN115012670A (zh) * | 2022-05-19 | 2022-09-06 | 上海师范大学 | 一种纤维增强混凝土梁柱节点的多层式锚固连接方法 |
Families Citing this family (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104612062B (zh) * | 2014-12-10 | 2016-11-23 | 邢兵 | 一种利用环境温差的无铰拱桥预应力综合加固法 |
US9290957B1 (en) * | 2014-12-31 | 2016-03-22 | Fortress Stabilization Systems | Structure reinforcement system and method |
US9290956B1 (en) * | 2014-12-31 | 2016-03-22 | Fortress Stabilization Systems | Structure reinforcement system and method |
US9790697B2 (en) | 2014-12-31 | 2017-10-17 | Fortress Stabilization Systems | Structure reinforcement system and method |
CN105064224B (zh) * | 2015-09-02 | 2017-03-08 | 山东大学 | 预应力碳纤维布双层同时张拉加固装置及方法 |
CN105350790B (zh) * | 2015-10-21 | 2018-02-27 | 盐城工学院 | 一种预制预应力trc板加固钢筋混凝土板的方法 |
CN105569272B (zh) * | 2015-12-15 | 2018-11-30 | 重庆科技学院 | 棘爪式碳纤维板锚具 |
CN106917517B (zh) * | 2017-03-20 | 2023-05-05 | 福州大学 | 一种预应力高强纤维布加固柱构件的施工方法 |
IT201700115951A1 (it) * | 2017-10-13 | 2019-04-13 | Fsc Tech Llc | Elemento strutturale per costruzioni |
CN107964880B (zh) * | 2017-11-22 | 2023-12-15 | 上海悍马建筑科技有限公司 | 预应力碳纤维张拉装置 |
CN111550078B (zh) * | 2020-06-10 | 2024-07-09 | 福州大学 | 预张拉纤维布加固装置及施工方法 |
CN111827139B (zh) * | 2020-06-15 | 2022-07-29 | 山东大学 | 实现多条预应力碳纤维板同时张拉的群锚锚具及方法 |
CN112065090A (zh) * | 2020-09-14 | 2020-12-11 | 马鞍山十七冶工程科技有限责任公司 | 一种提高混凝土结构抗弯承载力的加固系统及施工方法 |
US20220186759A1 (en) * | 2020-10-21 | 2022-06-16 | Kulstoff Composite Products, LLC | Fiber-Reinforced Polymer Anchors and Connectors For Repair and Strengthening of Structures Configured for Field Testing, and Assemblies for Field Testing the Same |
CN112900267B (zh) * | 2021-01-12 | 2022-10-04 | 中国建筑第八工程局有限公司 | 碳纤维板束的张拉锚固系统及其张拉方法 |
CN113846868B (zh) * | 2021-11-10 | 2022-11-15 | 河海大学 | 一种基于多层纤维布预应力施加的加固装置及加固方法 |
CN114855617A (zh) * | 2022-04-18 | 2022-08-05 | 中交二公局东萌工程有限公司 | 一种新建变截面连续梁桥体外预应力施工方法 |
CN115874841B (zh) * | 2022-12-08 | 2023-07-18 | 水利部交通运输部国家能源局南京水利科学研究院 | 一种预应力frp布均匀加固装置及方法 |
CN116241097B (zh) * | 2023-02-24 | 2024-02-02 | 水利部交通运输部国家能源局南京水利科学研究院 | 一种避免预应力frp布拉伸过程发生变形的均匀加固装置 |
Family Cites Families (33)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5249204B2 (zh) * | 1973-10-01 | 1977-12-15 | ||
JPS5636241B2 (zh) * | 1973-10-01 | 1981-08-22 | ||
DE69001440T2 (de) * | 1989-01-12 | 1993-12-09 | Mitsubishi Chem Ind | Verfahren zur Verstärkung von Betonstrukturen. |
US5043033A (en) * | 1991-01-28 | 1991-08-27 | Fyfe Edward R | Process of improving the strength of existing concrete support columns |
US5649398A (en) * | 1994-06-10 | 1997-07-22 | Hexcel-Fyfe L.L.C. | High strength fabric reinforced walls |
US5648137A (en) * | 1994-08-08 | 1997-07-15 | Blackmore; Richard | Advanced cured resin composite parts and method of forming such parts |
US5657595A (en) * | 1995-06-29 | 1997-08-19 | Hexcel-Fyfe Co., L.L.C. | Fabric reinforced beam and column connections |
JPH0967941A (ja) | 1995-09-01 | 1997-03-11 | Kumagai Gumi Co Ltd | コンクリート構造物の補強構造 |
JP4004616B2 (ja) * | 1997-12-24 | 2007-11-07 | 智深 呉 | 繊維材緊張によるコンクリート部材の補強方法 |
US6138420A (en) * | 1999-01-07 | 2000-10-31 | Fyfe Co., Llc | Blast-resistant building |
FR2790500B1 (fr) * | 1999-03-01 | 2002-06-07 | Freyssinet Int Stup | Procede et dispositif de renforcement d'un ouvrage en beton |
US6557201B1 (en) * | 1999-04-12 | 2003-05-06 | The United States Of America As Represented By The Secretary Of The Air Force | Stressed-skin modular fiber reinforced plastic bridge |
JP4277069B2 (ja) | 1999-11-19 | 2009-06-10 | 智深 呉 | 緊張された多層強化繊維シートによるコンクリート補強方法 |
JP2002070323A (ja) * | 2000-08-31 | 2002-03-08 | Chishin Go | コンクリート構造物の補強方法及び補強コンクリート構造物 |
JP4554845B2 (ja) * | 2001-05-30 | 2010-09-29 | 智深 呉 | 構造物の補強方法 |
US6806212B2 (en) * | 2002-02-07 | 2004-10-19 | Fyfe Co., Llc | Coating and method for strengthening a structure |
JP4227795B2 (ja) * | 2002-10-24 | 2009-02-18 | 智深 呉 | 緊張接着技術における分散化定着工法 |
CN1203241C (zh) | 2002-12-13 | 2005-05-25 | 卓静 | 高强度复合材料预应力张拉和锚固的施工方法 |
JP3947463B2 (ja) | 2002-12-26 | 2007-07-18 | 智深 呉 | 連続強化繊維シート逐次緊張接着による構造物の補強方法 |
US7354876B2 (en) * | 2003-07-09 | 2008-04-08 | Saint-Gobain Technical Fabrics Canada Ltd. | Fabric reinforcement and cementitious boards faced with same |
US7682993B2 (en) * | 2005-04-18 | 2010-03-23 | Construction Research & Technology Gmbh | Insulated composite reinforcement material |
CN100366845C (zh) * | 2005-05-10 | 2008-02-06 | 田安国 | 应用高强纤维布加固构件的方法 |
CN1743627A (zh) * | 2005-07-29 | 2006-03-08 | 武汉大学 | 一种加固混凝土受弯构件的方法 |
US8479468B1 (en) * | 2007-05-21 | 2013-07-09 | Seyed Hossein Abbasi | Structure rehabilitation and enhancement |
WO2009002268A1 (en) | 2007-06-27 | 2008-12-31 | Mohammad Al-Emrani | Method |
US20090123770A1 (en) * | 2007-11-13 | 2009-05-14 | Rumber Materials Inc. | Rubber and Plastic Compsite Material Having Reinforcing Layer |
CN101736912B (zh) * | 2009-12-03 | 2012-05-09 | 吴智深 | 一种预应力纤维布外粘结加固的锚固方法 |
CA2794222A1 (en) * | 2010-03-24 | 2011-09-29 | Fyfe Europe S.A. | System for reinforcing structure using site-customized materials |
US20120260792A1 (en) * | 2010-11-19 | 2012-10-18 | Ronald Grossman | Products and methods for ballistic damage mitigation and blast damage suppression |
US8555584B2 (en) * | 2011-09-28 | 2013-10-15 | Romeo Ilarian Ciuperca | Precast concrete structures, precast tilt-up concrete structures and methods of making same |
US20130160393A1 (en) * | 2011-12-22 | 2013-06-27 | Shildan, Inc. | Clip anchor connector |
US8474207B1 (en) * | 2012-06-12 | 2013-07-02 | John A Gilbert | Strengthening wood frame construction against wind damage |
US9133814B2 (en) * | 2012-08-07 | 2015-09-15 | Edward R. Fyfe | Apparatus for creating electricity from pressure fluctuations in pipes |
-
2009
- 2009-12-03 CN CN2009102326334A patent/CN101736912B/zh active Active
-
2010
- 2010-12-02 US US13/513,180 patent/US8776474B2/en not_active Expired - Fee Related
- 2010-12-02 WO PCT/CN2010/079385 patent/WO2011066798A1/zh active Application Filing
- 2010-12-02 JP JP2012541310A patent/JP5539530B2/ja not_active Expired - Fee Related
Cited By (38)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8776474B2 (en) | 2009-12-03 | 2014-07-15 | Zhishen Wu & Beijing Texida Technology Co., Ltd. | Anchoring method for external bonding and reinforcing technique with prestressed fiber cloth |
WO2011066798A1 (zh) * | 2009-12-03 | 2011-06-09 | 北京特希达技术研发有限公司 | 一种预应力纤维布外粘结加固技术的锚固方法 |
WO2012027967A1 (zh) * | 2010-09-01 | 2012-03-08 | Zhou Chaoyang | 柔性片状材料平行杆式锚固装置及方法 |
CN101974959A (zh) * | 2010-09-30 | 2011-02-16 | 大连理工大学 | 混凝土结构frp端部锚固装置 |
CN101994398B (zh) * | 2010-10-15 | 2012-05-23 | 方远建设集团股份有限公司 | 混凝土结构钢板-frp复合加固方法 |
CN101994398A (zh) * | 2010-10-15 | 2011-03-30 | 方远建设集团股份有限公司 | 混凝土结构钢板-frp复合加固方法 |
CN102061811A (zh) * | 2010-11-17 | 2011-05-18 | 建研科技股份有限公司 | 一种采用预应力高强钢丝织物加固混凝土结构的方法 |
CN102061811B (zh) * | 2010-11-17 | 2012-10-03 | 建研科技股份有限公司 | 一种采用预应力高强钢丝织物加固混凝土结构的方法 |
CN102425311A (zh) * | 2011-09-05 | 2012-04-25 | 长沙理工大学 | 基于表层嵌贴预应力frp板条的混凝土结构加固方法 |
CN102900200A (zh) * | 2012-10-09 | 2013-01-30 | 东南大学 | 一种智能frp-混凝土复合结构及其制造方法 |
CN102900200B (zh) * | 2012-10-09 | 2015-02-04 | 东南大学 | 一种智能frp-混凝土复合结构及其制造方法 |
CN102922602A (zh) * | 2012-11-08 | 2013-02-13 | 东南大学 | 预制智能frp-混凝土复合结构的制备工艺 |
CN102922602B (zh) * | 2012-11-08 | 2014-10-08 | 东南大学 | 预制智能frp-混凝土复合结构的制备工艺 |
CN103225421A (zh) * | 2013-03-05 | 2013-07-31 | 哈尔滨工程大学 | 一种碳纤维增强复合材料拉挤片材端部锚固方法 |
CN103225421B (zh) * | 2013-03-05 | 2016-06-29 | 哈尔滨工程大学 | 一种碳纤维增强复合材料拉挤片材端部锚固方法 |
CN103388407A (zh) * | 2013-07-26 | 2013-11-13 | 河海大学 | 表层预应力嵌入技术加固混凝土构件的方法与机械装置 |
CN103388407B (zh) * | 2013-07-26 | 2015-07-29 | 河海大学 | 表层预应力嵌入技术加固混凝土构件的方法与机械装置 |
CN103541558A (zh) * | 2013-10-30 | 2014-01-29 | 扬州大学 | 预应力碳纤维板围箍加固古砖塔的方法及装置 |
CN104234182A (zh) * | 2014-08-11 | 2014-12-24 | 郑州大学 | 一种采用新型组合界面的frp型材—混凝土组合结构 |
CN104314014A (zh) * | 2014-10-11 | 2015-01-28 | 岩土科技股份有限公司 | 一种预应力钢板加固混凝土桥梁的方法 |
CN104631853A (zh) * | 2015-02-06 | 2015-05-20 | 广东工业大学 | 一种用于加固混凝土结构的纤维增强复合材料锚固装置及其锚固方法 |
CN104631853B (zh) * | 2015-02-06 | 2016-08-17 | 广东工业大学 | 一种用于加固混凝土结构的纤维增强复合材料锚固装置及其锚固方法 |
CN104727561A (zh) * | 2015-04-02 | 2015-06-24 | 招商局重庆交通科研设计院有限公司 | 碳纤维板锚具限位张拉块 |
CN105507169A (zh) * | 2016-01-16 | 2016-04-20 | 哈尔滨工业大学 | 一种预应力frp布加固钢筋混凝土桥梁的张拉锚固定装置及加固方法 |
CN105569373A (zh) * | 2016-02-17 | 2016-05-11 | 深圳大学 | 一种可控frp加固结构延性的方法及装置 |
CN105926949B (zh) * | 2016-05-20 | 2018-05-11 | 北京特希达科技有限公司 | 一体式预应力纤维板加固梁板的原位张拉系统及方法 |
CN105937306A (zh) * | 2016-05-20 | 2016-09-14 | 东南大学 | 一种预应力纤维片材加固柱的装置及方法 |
CN105937306B (zh) * | 2016-05-20 | 2018-05-11 | 东南大学 | 一种预应力纤维片材加固柱的装置及方法 |
CN105926949A (zh) * | 2016-05-20 | 2016-09-07 | 北京特希达科技有限公司 | 一体式预应力纤维板加固梁板的原位张拉系统及方法 |
CN107780596A (zh) * | 2017-09-29 | 2018-03-09 | 马鞍山十七冶工程科技有限责任公司 | 一种frp布与结构混凝土的锚固结构系统及其施工方法 |
CN107780596B (zh) * | 2017-09-29 | 2020-10-30 | 马鞍山十七冶工程科技有限责任公司 | 一种frp布与结构混凝土的锚固结构系统及其施工方法 |
CN109853979A (zh) * | 2019-01-28 | 2019-06-07 | 华侨大学 | 一种加固石梁结构受弯性能的结构 |
CN110318558A (zh) * | 2019-07-31 | 2019-10-11 | 南方工程检测修复技术研究院 | 一种预应力frp加固柱形结构的预应力施加装置及其施工方法 |
CN110629685A (zh) * | 2019-09-29 | 2019-12-31 | 长沙理工大学 | 一种基于梯度放张预应力的混凝土结构的加固方法 |
CN112360179A (zh) * | 2020-11-20 | 2021-02-12 | 郑州大学 | 一种预应力frp片材加固钢筋混凝土梁的施工方法 |
CN114134824A (zh) * | 2021-08-25 | 2022-03-04 | 江苏泊翔结构加固工程有限公司 | 一种桥梁预应力碳纤维布拉张锚固装置 |
CN114134824B (zh) * | 2021-08-25 | 2024-02-27 | 江苏泊翔结构加固工程有限公司 | 一种桥梁预应力碳纤维布拉张锚固装置 |
CN115012670A (zh) * | 2022-05-19 | 2022-09-06 | 上海师范大学 | 一种纤维增强混凝土梁柱节点的多层式锚固连接方法 |
Also Published As
Publication number | Publication date |
---|---|
US8776474B2 (en) | 2014-07-15 |
JP2013512362A (ja) | 2013-04-11 |
CN101736912B (zh) | 2012-05-09 |
WO2011066798A1 (zh) | 2011-06-09 |
JP5539530B2 (ja) | 2014-07-02 |
US20120311957A1 (en) | 2012-12-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101736912B (zh) | 一种预应力纤维布外粘结加固的锚固方法 | |
CN103321430B (zh) | 预应力碳纤维片材加固大跨混凝土结构的施工方法 | |
CN103410089A (zh) | 一种正交异性钢板-纤维格栅增强混凝土组合桥面结构 | |
CN203320978U (zh) | 预应力碳纤维片材加固大跨混凝土结构的张拉锚固装置 | |
CN204357147U (zh) | 预应力混凝土结构受弯构件的复合加固结构 | |
CN101122177A (zh) | 预应力纤维薄板在混凝土建筑物中的应用方法 | |
EP2470732A1 (de) | Bewehrungsmatte für eine armierte mörtel- oder spritzmörtelschicht auf einer unterlage sowie verfahren zu deren einbau und damit erstellte armierte mörtelbeschichtung | |
CN101929131B (zh) | 混凝土梁板横向张拉环氧涂层钢筋有粘结预应力加固方法 | |
CN107217597A (zh) | 一种预应力混凝土桥面无缝连接板的施工方法 | |
CN205955261U (zh) | 一种预应力钢丝绳弯剪加固混凝土t梁 | |
CN104389438B (zh) | 一种混凝土柱的抗震加固机构和方法 | |
CN101806024A (zh) | 一种双向先张法预应力混凝土轨道板 | |
CN203420221U (zh) | 一种正交异性钢板-纤维格栅增强混凝土组合桥面结构 | |
CN106906753B (zh) | 无锚固装置预应力高强u型钢绞线网加固混凝土构件的方法 | |
CN102605968A (zh) | 一种用外包纤维与角钢复合加固砌体受压构件的方法 | |
CN108457201A (zh) | 超高性能混凝土格构加固结构及其加固圬工拱桥的方法 | |
CN103469737A (zh) | 一种变粘结预应力碳纤维板加固混凝土受弯构件的方法 | |
CN1068616A (zh) | 压力引水隧洞人工裂缝控制的抗渗漏方法 | |
CN101532277A (zh) | 梁体加固方法 | |
CN203270946U (zh) | 一种软质材料防护的夹具锚及由其夹持的高强片材 | |
CN203270434U (zh) | 一种预应力混凝土变截面箱梁桥 | |
CN217839761U (zh) | 一种桥梁粘钢复合加固结构 | |
CN110029593A (zh) | 一种多层预应力纤维布加固梁的张拉和锚固装置 | |
CN105545062B (zh) | 一种缠绕纤维束纱加固混凝土变电构架的实施方法 | |
CN109338902A (zh) | 一种采用轻骨料混凝土解决已裂钢桥桥面的加固结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20221213 Address after: 210096 No. four archway, 2, Jiangsu, Nanjing Patentee after: Wu Zhishen Patentee after: BEIJING TEXIDA TECHNOLOGY Co.,Ltd. Address before: 210096 No. four archway, 2, Jiangsu, Nanjing Patentee before: Wu Zhishen Patentee before: BEIJING TEXIDA RESEARCH&DEVELOPMENT OF TECHNOLOGY Co.,Ltd. |