CN101994398B - 混凝土结构钢板-frp复合加固方法 - Google Patents

混凝土结构钢板-frp复合加固方法 Download PDF

Info

Publication number
CN101994398B
CN101994398B CN2010105095438A CN201010509543A CN101994398B CN 101994398 B CN101994398 B CN 101994398B CN 2010105095438 A CN2010105095438 A CN 2010105095438A CN 201010509543 A CN201010509543 A CN 201010509543A CN 101994398 B CN101994398 B CN 101994398B
Authority
CN
China
Prior art keywords
cloth
screw rod
steel plate
steel disc
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2010105095438A
Other languages
English (en)
Other versions
CN101994398A (zh
Inventor
吴智敏
程功
董海
石昌文
董伟
何化南
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FANGYUAN CONSTRUCTION GROUP Co Ltd
Dalian University of Technology
Original Assignee
FANGYUAN CONSTRUCTION GROUP Co Ltd
Dalian University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FANGYUAN CONSTRUCTION GROUP Co Ltd, Dalian University of Technology filed Critical FANGYUAN CONSTRUCTION GROUP Co Ltd
Priority to CN2010105095438A priority Critical patent/CN101994398B/zh
Publication of CN101994398A publication Critical patent/CN101994398A/zh
Application granted granted Critical
Publication of CN101994398B publication Critical patent/CN101994398B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

一种混凝土结构钢板-FRP复合加固方法,属于土木工程结构加固技术领域。其特征是在钢片的两侧各有一个和螺杆直径相匹配的孔,在纤维布两侧确定把要安装锚固件的螺杆的位置,螺杆距离要对应钢片上两孔的距离,再用钻头在混凝土构件标定位置上钻孔,注入胶粘剂,固定螺杆,接着清理粘贴纤维布的混凝土部位,把纤维布粘贴在设计的粘贴位置,然后把钢板放置于粘贴好的纤维布上压实,最后将钢片依次套装在固定好的螺杆上,最后将螺母和垫片套装在螺杆上,用扭力扳手对螺母施加扭矩。本发明的效果和益处是:纤维布受到锚固件的压力比较均匀,延缓纤维布的剥离,FRP材料利用率更高;引入钢板这一锚固件,钢板本身参与受力,加固梁的承载力更大,延性更好。

Description

混凝土结构钢板-FRP复合加固方法
技术领域
本发明属于土木工程结构加固技术领域,涉及混凝土结构钢板-FRP复合加固方法。
背景技术
传统机械锚固方法是将锚固件穿过纤维布表面,这样会使纤维布受到多向力的作用并在穿孔附近产生应力集中,导致纤维布强度降低并且分析模型难以确定,限制了这种传统加固方法在工程中的应用。近年来有学者提出了复合锚固技术,利用螺杆将钢片压在纤维布上,达到阻止纤维布早期剥离破坏的目的。这种方法利用的是螺杆挤压钢片实现对纤维布的压紧作用,不需要将锚固件穿过纤维布表面。但是这种方法存在如下问题:1)纤维布属于脆性材料,破坏时脆性很大;2)锚固件施加给FRP的力不均匀;3)容易在锚固件附近产生应力集中;4)FRP利用率不够理想。
发明内容
本发明要解决的技术问题是:
为了克服现有纤维布锚固方法中的不足,本发明提供一种混凝土结构钢板-FRP复合加固方法,不仅解决了由于纤维布属于脆性材料导致破坏时很突然的问题,而且提高了纤维布利用率,而且钢板也参与受力,加固梁的承载力更高,延性更好。
本发明的技术方案如下:
混凝土结构钢板-FRP复合加固方法包括钢片、钢板、螺杆、螺母、垫片、胶粘剂和纤维布。钢片的形状为矩形,在钢片的两侧各有一个和螺杆直径相匹配的孔,要保证两孔内侧边缘距离稍微大于纤维布宽度。首先沿着纤维布纵向方向,按照预先设计好的锚固件间距,在纤维布两侧确定把要安装锚固件的螺杆的位置,螺杆之间距离要对应钢片上两孔的距离,再用钻头在混凝土构件标定位置上钻孔,孔深一般为50mm,然后注入胶粘剂,固定螺杆,螺杆的埋深为50mm。螺杆的总长度根据埋深、粘贴纤维布的厚度、钢片厚度以及螺母高度来确定。接着清理粘贴纤维布的混凝土部位,把纤维布粘贴在设计的粘贴位置,然后把钢板放置于粘贴好的纤维布上压实,最后将钢片依次套装在固定好的螺杆上,最后将螺母和垫片套装在螺杆上,用扭力扳手对螺母施加扭矩。
本发明的效果和益处是:
改进的复合锚固方法的局部钢片施加压力容易导致纤维布不平整,进而可能诱发应力集中,引入钢板这一锚固件可以解决这个问题;纤维布受到锚固件的压力比较均匀,提高了纤维布和混凝土的粘结效果,延缓纤维布的剥离,从而使FRP材料利用率更高;同时由于纤维布是脆性材料,加固层数越多脆性越明显,但是因为钢板本身参与受力,这样多层纤维布加固时的脆性破坏大大降低,加固梁的承载力更大,延性更好。
附图说明
附图1是钻孔后的钢片示意图。
附图2是螺杆和螺母组合示意图。
附图3是钢板示意图。
附图4是螺杆螺母钢片组合示意图。
附图5是本发明在加固中的横截面示意图。
附图6是本发明在加固中的纵截面示意图。
图中:1钢片;2螺杆;3螺母;4垫片;5钢板;6纤维布;7混凝土梁。
具体实施方式
以下结合技术方案和附图详细叙述本发明的具体实施方式。
混凝土结构钢板-FRP复合加固方法由钢片1,螺杆2,螺母3,垫片4,钢板5,纤维布6,混凝土梁7组成。钢片1是矩形,长边棱角打磨光滑,首先在预定位置用电钻钻出对称的孔,用来固定螺杆2,孔的大小和螺杆匹配。在钻孔过程中要保证钻孔的垂直和位置的准确。经过清孔处理后,在孔内注入胶粘剂,把螺杆2插入孔中,固定在相应位置,在插入过程中要保持螺杆的垂直。然后待固定螺杆的胶粘剂完全固化后,用裁好的纤维布6,把纤维布粘贴到预先设计好的位置。然后把钢板5放到粘贴好的纤维布上压实。然后将垫片4和螺母3套装在螺杆2上,并用扭力扳手对螺母3施加扭力,用来紧固钢片1和钢板5。

Claims (1)

1.一种混凝土结构钢板-FRP复合加固方法,包括:钢片(1);螺杆(2);螺母(3);垫片(4);钢板(5);纤维布(6);混凝土梁(7);其特征是:钢片(1)的形状为矩形,在钢片(1)的两侧各有一个和螺杆(2)直径相匹配的孔,要保证两孔内侧边缘距离稍微大于纤维布(6)宽度;首先沿着纤维布(6)纵向方向,按照预先设计好的锚固件间距,在纤维布(6)两侧确定螺杆(2)的位置,螺杆(2)之间距离要对应钢片(1)上两孔的距离,再用钻头在混凝土梁(7)确定的螺杆位置上钻孔,孔深为50mm,然后注入胶粘剂,固定螺杆(2),螺杆(2)的埋深为50mm;螺杆(2)的总长度根据埋深、粘贴纤维布(6)的厚度、钢片(1)厚度以及螺母(3)高度确定;接着清理粘贴纤维布(6)的混凝土部位,把纤维布(6)粘贴在设计的粘贴位置,然后把钢板(5)放置于粘贴好的纤维布(6)上压实,最后将钢片(1)依次套装在固定好的螺杆(2)上,最后将螺母(3)和垫片(4)套装在螺杆(2)上,用扭力扳手对螺母(3)施加扭矩。
CN2010105095438A 2010-10-15 2010-10-15 混凝土结构钢板-frp复合加固方法 Active CN101994398B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105095438A CN101994398B (zh) 2010-10-15 2010-10-15 混凝土结构钢板-frp复合加固方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105095438A CN101994398B (zh) 2010-10-15 2010-10-15 混凝土结构钢板-frp复合加固方法

Publications (2)

Publication Number Publication Date
CN101994398A CN101994398A (zh) 2011-03-30
CN101994398B true CN101994398B (zh) 2012-05-23

Family

ID=43785096

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105095438A Active CN101994398B (zh) 2010-10-15 2010-10-15 混凝土结构钢板-frp复合加固方法

Country Status (1)

Country Link
CN (1) CN101994398B (zh)

Families Citing this family (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102182326B (zh) * 2011-04-02 2012-06-27 武汉大学 一种用于混凝土受弯构件的加固方法
CN102392541B (zh) * 2011-11-15 2013-05-29 安徽工业大学 一种用pvc-frp管加固混凝土柱的方法
CN102561412A (zh) * 2012-02-07 2012-07-11 山东大学 一种纤维增强复合塑料和混凝土之间的加固方法
CN102660927A (zh) * 2012-03-23 2012-09-12 陈兴冲 一种碳纤维抗震加固桥墩的方法
CN102635073B (zh) * 2012-05-14 2014-04-09 中交第一公路勘察设计研究院有限公司 一种钢板粘贴加压装置及其使用方法
CN102635245A (zh) * 2012-05-14 2012-08-15 武汉大学 一种抗震墙加固体及其加固方法
CN105569373B (zh) * 2016-02-17 2017-08-08 深圳大学 一种可控frp加固结构延性的方法及装置
CN106555481B (zh) * 2016-10-27 2018-08-14 湖南大学 预拉纤维复合板材加固钢筋混凝土受弯构件的设备及方法
CN106567555B (zh) * 2016-10-31 2019-02-01 同济大学 一种表面斜贴纤维复合材提高钢筋混凝土构件直剪承载力的方法
CN106968450B (zh) * 2017-03-29 2019-08-27 北京建筑大学 一种嵌入式纤维增强聚合物筋锚固装置及锚固方法
CN107143151A (zh) * 2017-06-30 2017-09-08 唐山钢铁集团有限责任公司 一种建筑工程框架梁加固装置
CN107630564B (zh) * 2017-09-12 2020-04-10 叶长青 一种混凝土梁的加固结构施工方法
CN108252227A (zh) * 2018-01-16 2018-07-06 广州北环高速公路有限公司 一种构筑物粘钢加固方法
CN109853979A (zh) * 2019-01-28 2019-06-07 华侨大学 一种加固石梁结构受弯性能的结构
CN111749146A (zh) * 2020-06-19 2020-10-09 河海大学 一种钢板锚固纤维布加固的服役期开裂梁及其加固方法
CN112065090A (zh) * 2020-09-14 2020-12-11 马鞍山十七冶工程科技有限责任公司 一种提高混凝土结构抗弯承载力的加固系统及施工方法
CN115030547B (zh) * 2022-05-17 2023-05-16 山东大学 一种避免锚固剪切破坏的混凝土梁机械锚固装置及方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2295637A (en) * 1994-12-02 1996-06-05 Sho Bond Corp Strengthening a reinforced concrete structure
CN1231371A (zh) * 1999-04-20 1999-10-13 日本Sho-Bond建设株式会社 补强加固混凝土建筑物的方法
CN1236184C (zh) * 2003-12-08 2006-01-11 卓静 高强度复合材料无预应力张拉和锚固的施工方法
CN101736912A (zh) * 2009-12-03 2010-06-16 吴智深 一种预应力纤维布外粘结加固技术的锚固方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2295637A (en) * 1994-12-02 1996-06-05 Sho Bond Corp Strengthening a reinforced concrete structure
CN1231371A (zh) * 1999-04-20 1999-10-13 日本Sho-Bond建设株式会社 补强加固混凝土建筑物的方法
CN1236184C (zh) * 2003-12-08 2006-01-11 卓静 高强度复合材料无预应力张拉和锚固的施工方法
CN101736912A (zh) * 2009-12-03 2010-06-16 吴智深 一种预应力纤维布外粘结加固技术的锚固方法

Also Published As

Publication number Publication date
CN101994398A (zh) 2011-03-30

Similar Documents

Publication Publication Date Title
CN101994398B (zh) 混凝土结构钢板-frp复合加固方法
CN101974959A (zh) 混凝土结构frp端部锚固装置
CN103912132B (zh) 横向张拉预应力碳纤维布与钢材复合加固框架梁的方法
CN103912133B (zh) 框架梁横向张拉预应力碳纤维片材加固方法
CN105863288B (zh) 纤维薄板‑钢板组合加固rc结构及其方法与应用
CN201962604U (zh) Frp组合板
CN103837383A (zh) 预应力碳纤维片材双平板式锚具锚固性能试验方法
CN103981839A (zh) Frp修复带裂缝的老旧混凝土重力坝坝体的固定方法
CN202299472U (zh) 一种采用预应力碳纤维板加固混凝土梁的加固结构
CN101929254B (zh) 绕杆搭接锚固纤维片材加固结构构件的方法
CN201439646U (zh) 外贴纤维布法加固混凝土结构中纤维布锚固装置
CN104806031B (zh) 木结构加固施工方法
CN210828422U (zh) 一种剪力墙外粘型钢加固结构
CN104533019B (zh) 一种高性能纤维网格锚固体系及锚固方法
CN100347390C (zh) 锚栓及钢筋混凝土结构件外锚钢加固方法
CN101775863B (zh) 箱形钢竹或钢木组合楼板
CN208733665U (zh) 一种砼侧面预埋件的固定结构
CN203307934U (zh) 螺孔增强型大跨度胶合木柱梁连接结构
CN211313463U (zh) 一种混凝土结构frp自锁式端部锚固装置
CN202416079U (zh) 高速铁路轨道板压紧装置
CN201747077U (zh) 一种有裂缝混凝土梁的加固构造
CN201704695U (zh) 一种采用玻璃钢纤维预应力土钉支护的边坡加固结构
CN110206336A (zh) 带预压力的纤维增强复合材料锚固装置及锚固结构
CN209874538U (zh) 一种变截面梁的加固装置
CN218029171U (zh) 一种钢筋混凝土深梁加固装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant