CN101735830B - Process for lateral translation of coke dry quenching - Google Patents

Process for lateral translation of coke dry quenching Download PDF

Info

Publication number
CN101735830B
CN101735830B CN2009103129738A CN200910312973A CN101735830B CN 101735830 B CN101735830 B CN 101735830B CN 2009103129738 A CN2009103129738 A CN 2009103129738A CN 200910312973 A CN200910312973 A CN 200910312973A CN 101735830 B CN101735830 B CN 101735830B
Authority
CN
China
Prior art keywords
burnt tank
belt wheel
coke
tank
red
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009103129738A
Other languages
Chinese (zh)
Other versions
CN101735830A (en
Inventor
刘海东
蒋升华
郭起营
陈传华
张丽珠
王蕾
孙振山
张勃
徐升
申孝国
高丽英
黄纯懿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jigang Group International Engineering Technology Co., Ltd.
Original Assignee
Jigang Group International Engineering Technology Co., Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jigang Group International Engineering Technology Co., Ltd. filed Critical Jigang Group International Engineering Technology Co., Ltd.
Priority to CN2009103129738A priority Critical patent/CN101735830B/en
Publication of CN101735830A publication Critical patent/CN101735830A/en
Application granted granted Critical
Publication of CN101735830B publication Critical patent/CN101735830B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Coke Industry (AREA)

Abstract

The invention discloses a process for the lateral translation of coke dry quenching, which comprises the following steps: (1) an electric locomotive drives a trolley to move to the position of a lateral translation track; (2) a traction mechanism drags a belt pulley coke tank to the position of the front of a hoisting position for waiting; (3) a hoister descends an empty belt pulley coke tank to the hoisting position; (4) the traction mechanism drags a tank filled with red coke to push the empty coke tank to move forward, the empty coke tank reaches a standby position, and the tank filled with red coke is stopped when reaching the hoisting position; (5) the traction mechanism is disengaged from the red coke tank and is connected with the empty coke tank; the hoister is connected with the belt pulley coke tank filled with the red coke; (6) after the red coke tank is upwards hoisted at a set distance by the hoister, the traction mechanism drags the empty coke tank, and the empty coke tank is arranged on the trolley; (7) the electric locomotive drags the trolley to reversely move to a coke furnace, and red coke of a next furnace is loaded; after the belt pulley coke tank filled with the red coke in the step (6) is continuously hoisted to a set position along a hoisting shaft, the red coke is unloaded, and then the belt pulley coke tank becomes the empty coke tank; and a new round of operation is carried out on the red coke tank in the step (7) according to the steps (1) to (7).

Description

Process for lateral translation of coke dry quenching
Technical field
The present invention relates to a kind of process for lateral translation of coke dry quenching
Background technology
In coal chemical enterprise, the decoration form of dry coke quenching winding shaft has two kinds: online, winding shaft is arranged on coke-quenching vehicle track, and burnt tank chassis directly is transported to burnt tank in winding shaft, and lift promotes burnt tank; Off-line type, winding shaft is arranged in a side of coke-quenching vehicle track, and burnt tank chassis is transported to burnt tank near winding shaft, by crossing system, burnt tank is moved in winding shaft from coke-quenching vehicle track along cross moving track, and lift promotes burnt tank.Due to online take up room larger, therefore at present off-line types that adopt more.Existing off-line type process for lateral translation process steps is as follows: electric locomotive drags two burnt tank chassis, and red burnt tank is arranged on a chassis, and red Jiao's burnt tank is housed, and one is empty chassis; Electric locomotive is parked near winding shaft, by locating device, makes the sky chassis aim at cross moving track.Simultaneously in winding shaft lift empty burnt tank transfer to promote into bottom the stand of lifting position on, the haulage gear on cross moving track to the quenching rail moving, moves to stand and empty burnt tank on the empty chassis parked.After empty burnt tank is fixing, electric locomotive drags two spud carriage shiftings, the chassis that red burnt tank is housed is aimed to cross moving track, then locate by locating device.The jail of cross moving track is drawn mechanism red burnt tank is pulled out from burnt tank chassis; After burnt tank leaves chassis fully, electric locomotive drags chassis and goes to connect red Jiao of an other stove; Haulage gear continues red burnt tank is drawn to the lifting position to winding shaft.Lift promotes red burnt tank, and the stand of burnt tank is parked under winding shaft.
The deficiency of existing process for lateral translation: when red burnt tank is transported near winding shaft, can not be directly traversing, must first the slack tank of a upper working cycle be moved on to the sky chassis, after spud carriage shifting, red burnt tank could be transported to the lifting position under winding shaft.It is longer to the process time that can promote red burnt tank that lift is put empty burnt tank well, therefore increased the working cycle of lift, and working efficiency is lower.
Summary of the invention
The objective of the invention is, a kind of process for lateral translation of coke dry quenching is provided, when it can hot burnt tank be transported near winding shaft, direct traversing red burnt tank, after can saving empty burnt tank and moving to chassis, the time of two spud carriage shiftings, thus can effectively shorten working cycle, save time, raise the efficiency.
The present invention for achieving the above object, is achieved through the following technical solutions: the concrete technology step is as follows: process for lateral translation of coke dry quenching comprises the steps: that 1. electric locomotive, with a chassis, loads a burnt tank that red Jiao's belt wheel is housed on chassis; Near electric locomotive drive chassis moves to cross moving track along coke-quenching vehicle track, and make chassis aim at cross moving track by the allocation device; 2. haulage gear is connected with the above-mentioned burnt tank that red Jiao's belt wheel is housed, and the described burnt tank that red Jiao's belt wheel is housed is drawn from chassis; The bottom of winding shaft is to promote position, and the burnt tank of haulage gear traction belt wheel is waited for to being positioned at the described position that promotes the place ahead, position; 3. the burnt tank of the belt wheel empty another of the lift in winding shaft is transferred to described liftings; 4. the burnt tank of the above-mentioned belt wheel that red Jiao is housed of haulage gear traction is near the burnt tank of the belt wheel of above-mentioned sky, and the burnt tank that promotes empty belt wheel advances jointly, until make the burnt tank of the belt wheel of described sky arrive the standby position at the rear, lifting position of winding shaft, till the burnt tank that red Jiao's belt wheel is housed arrives described liftings; 5. haulage gear breaks away from the burnt tank of the belt wheel that red Jiao is housed; Simultaneously, the suspension hook of the lift of winding shaft descends and is connected with the above-mentioned burnt tank that red Jiao's belt wheel is housed, and haulage gear is connected with the burnt tank of the belt wheel of above-mentioned sky; 6., after the lift of winding shaft upwards promotes setpoint distance by the above-mentioned burnt tank that red Jiao's belt wheel is housed, the burnt tank that haulage gear draws the belt wheel of above-mentioned sky moves to chassis, and the burnt tank of the belt wheel of above-mentioned sky is placed on chassis; 7. the locomotive haulage chassis oppositely moves to coke oven along coke-quenching vehicle track, utilizes the burnt tank of the belt wheel of above-mentioned sky to go to connect red Jiao of next stove; The canned full red defocused red burnt tank that becomes of Jiao of the belt wheel of above-mentioned sky; The burnt tank of the belt wheel that red Jiao is housed of step in 6. continues to become empty burnt tank along unloading red Jiao after winding shaft is promoted to desired location; The red burnt tank of described step in 7. by above-mentioned steps 1. to 7. carrying out the work of a new round.For further increasing work efficiency, 2. and 3. described step carries out simultaneously.
Positively effect of the present invention is: the time that it can save two spud carriage shiftings in existing technique, can greatly reduce the burnt tank tank switching time used, and improve the efficiency of dry quenched coke pot operation; And the quantity of normally moving chassis can be reduced to one by two, thereby, can alleviate the load of electric locomotive, the energy expenditure while saving burnt tank operation, have superior energy-saving effect.Its adopts the burnt tank of belt wheel, can save the stand in existing technique, burnt tank can be under the drive of haulage gear automatic moving, thereby, can save the operation of burnt tank and the correction of stand in existing technique, save the activity duration, the raising operating efficiency.
The accompanying drawing explanation
The schematic diagram that Fig. 1 is process for lateral translation of coke dry quenching of the present invention, in figure, cross moving track 1 is provided with standby position 3, and standby position 3 is positioned at winding shaft 2 rears, and winding shaft 2 is between standby position 3 and coke-quenching vehicle track 7.
Wherein: burnt tank 5 haulage gear 6 chassis 7 coke-quenching vehicle track 8 electric locomotives of 1 cross moving track 2 winding shaft 3 standby position 4 belt wheels.
Embodiment
Process for lateral translation of coke dry quenching step of the present invention is as follows: process for lateral translation of coke dry quenching comprises the steps:
1. electric locomotive 8, with a chassis 6, loads a burnt tank 4 that red Jiao's belt wheel is housed on chassis 6; Near electric locomotive 8 drive chassis 6 move to cross moving track 1 along coke-quenching vehicle track 7, and make chassis 6 aim at cross moving tracks 1 by the allocation device;
2. the haulage gear 5 of cross moving track 1 is connected with the above-mentioned burnt tank 4 that red Jiao's belt wheel is housed, and the described burnt tank 4 that red Jiao's belt wheel is housed is drawn from chassis 6; The bottom of winding shaft 2 is to promote position, and the burnt tank 4 of haulage gear 5 traction belt wheels moves to along cross moving track 1 position that is positioned at the place ahead, described lifting position and waited for;
3. the lift in winding shaft 2 is transferred to described lifting position to the burnt tank 4 of the belt wheel of the sky of another year complete red Jiao in a upper working cycle;
4. the burnt tank 4 of the above-mentioned belt wheel that red Jiao is housed of haulage gear 5 traction is near the burnt tank 4 of the belt wheel of above-mentioned skies, and the burnt tank 4 that promotes empty belt wheel moves forward jointly, until make the burnt tank 4 of empty belt wheel arrive the standby position 3 at the rear, lifting position of winding shafts 2, till the burnt tank 4 that red Jiao's belt wheel is housed arrives described liftings;
5. the burnt tank locating mechanism at the lifting position of winding shaft 2 place is opened the burnt tank 4 of the above-mentioned belt wheel that red Jiao is housed spacing; Haulage gear 5 breaks away from the burnt tank 4 of the belt wheel that red Jiao is housed; Simultaneously, the suspension hook of the lift of winding shaft 2 descends and is connected with the above-mentioned burnt tank 4 that red Jiao's belt wheel is housed, and haulage gear 5 is connected with the burnt tank 4 of the belt wheel of above-mentioned sky;
6., after the lift of winding shaft 2 upwards promotes setpoint distance by the above-mentioned burnt tank 4 that red Jiao's belt wheel is housed, the burnt tank 4 of the belt wheel of the above-mentioned sky of haulage gear 5 traction moves to chassis, and the burnt tank 4 of the belt wheel of above-mentioned sky is placed on chassis 6;
7. electric locomotive 8 traction chassis 6 oppositely move to coke oven along coke-quenching vehicle track 7, utilize the burnt tank 4 of the belt wheel of above-mentioned sky to go to connect red Jiao of next stove; The burnt tank 4 of the belt wheel of above-mentioned sky is filled the red defocused red burnt tank that becomes; The burnt tank 4 of the belt wheel that red Jiao is housed of step in 6. continues to become empty burnt tank along unloading red Jiao after winding shaft 2 is promoted to desired location;
The burnt tank 4 of the belt wheel of newly filling red Jiao of described step in 7. by above-mentioned steps 1. to 7. carrying out the work of a new round.
For further improving operating efficiency, shorten the activity duration, 2. and 3. described step carries out simultaneously, be that hot burnt tank is positioned at the place ahead, described lifting position etc. and bides one's time, lift in winding shaft 2 is by chance transferred to described lifting position to the burnt tank 4 of the belt wheel of a sky, make red burnt tank slightly do to wait for and maybe need not wait for, just can promote empty burnt tank and continue motion, the burnt tank of sky is pushed in standby position 3.
The burnt tank 4 of belt wheel of the present invention can be to know Patent Office's application, the dry coke quenching wheeled coke pot of putting down in writing in the application documents that application number is 200920282088.5 to country on December 1st, 2009.

Claims (2)

1. process for lateral translation of coke dry quenching, is characterized in that: comprise the steps:
1. electric locomotive (8) is with a chassis (6), and chassis (6) above loads a burnt tank (4) that red Jiao's belt wheel is housed; Near electric locomotive (8) drive chassis (6) moves to cross moving track (1) along coke-quenching vehicle track (7), and make chassis (6) aim at cross moving track (1) by the allocation device;
2. haulage gear (5) is connected with the above-mentioned burnt tank (4) that red Jiao's belt wheel is housed, and the described burnt tank (4) that red Jiao's belt wheel is housed is drawn from chassis (6); The bottom of winding shaft (2) is to promote position, and the burnt tank (4) of haulage gear (5) traction belt wheel is waited for to being positioned at the described position that promotes the place ahead, position;
3. the burnt tank (4) of the belt wheel empty another of the lift in winding shaft (2) is transferred to described liftings;
4. haulage gear (5) draws the burnt tank (4) of the burnt tank (4) of the above-mentioned belt wheel that red Jiao is housed near the belt wheel of above-mentioned sky, and the burnt tank (4) that promotes empty belt wheel advances jointly, until make the burnt tank (4) of the belt wheel of described sky arrive the standby position (3) at the rear, lifting position of winding shaft (2), till the burnt tank (4) that red Jiao's belt wheel is housed arrives described liftings;
5. haulage gear (5) breaks away from the burnt tank (4) of the belt wheel that red Jiao is housed; Simultaneously, the suspension hook of the lift of winding shaft (2) descends and is connected with the above-mentioned burnt tank (4) that red Jiao's belt wheel is housed, and haulage gear (5) is connected with the burnt tank (4) of the belt wheel of above-mentioned sky;
6. after the lift of winding shaft (2) upwards promotes setpoint distance by the above-mentioned burnt tank (4) that red Jiao's belt wheel is housed, the burnt tank (4) that haulage gear (5) draws the belt wheel of above-mentioned sky moves to chassis, and the burnt tank (4) of the belt wheel of above-mentioned sky is placed on chassis (6);
7. electric locomotive (8) traction chassis (6) oppositely moves to coke oven along coke-quenching vehicle track (7), utilizes the burnt tank (4) of the belt wheel of above-mentioned sky to go to connect red Jiao of next stove; The burnt tank (4) of the belt wheel of above-mentioned sky is filled the red defocused red burnt tank that becomes; The burnt tank (4) of the belt wheel that red Jiao is housed in step 6 continues to become empty burnt tank along unloading red Jiao after winding shaft (2) is promoted to desired location;
7. 1. red burnt tank in described step 7 extremely carry out the work of a new round by above-mentioned steps.
2. process for lateral translation of coke dry quenching according to claim 1, it is characterized in that: 2. and 3. described step carries out simultaneously.
CN2009103129738A 2009-12-31 2009-12-31 Process for lateral translation of coke dry quenching Expired - Fee Related CN101735830B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009103129738A CN101735830B (en) 2009-12-31 2009-12-31 Process for lateral translation of coke dry quenching

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009103129738A CN101735830B (en) 2009-12-31 2009-12-31 Process for lateral translation of coke dry quenching

Publications (2)

Publication Number Publication Date
CN101735830A CN101735830A (en) 2010-06-16
CN101735830B true CN101735830B (en) 2013-12-11

Family

ID=42459867

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009103129738A Expired - Fee Related CN101735830B (en) 2009-12-31 2009-12-31 Process for lateral translation of coke dry quenching

Country Status (1)

Country Link
CN (1) CN101735830B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013023324A1 (en) * 2011-08-16 2013-02-21 北京华泰焦化工程技术有限公司 Dry coke-quenching device for heat-recovery-type coke oven
CN105368467A (en) * 2014-08-28 2016-03-02 张丹嫣 Novel dry coke quenching transverse movement traction device
CN108587657B (en) * 2018-07-05 2024-01-26 中冶焦耐(大连)工程技术有限公司 Dry quenching transverse movement traction system and method
CN109181718A (en) * 2018-10-17 2019-01-11 临涣焦化股份有限公司 A kind of red burnt charging apparatus of dry coke quenching
CN112126445B (en) * 2019-06-25 2021-10-22 宝山钢铁股份有限公司 Full-automatic operation control method for electric car in single-electric-car double-traction mode

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4028192A (en) * 1974-11-26 1977-06-07 Firma Carl Still Apparatus for receiving incandescent coke from respective coke ovens in a battery and for removing the coke in a closed chamber away from the battery
US4087725A (en) * 1973-07-16 1978-05-02 The Broken Hill Proprietary Company Limited Coke oven hot cars
EP0110052A2 (en) * 1982-11-27 1984-06-13 Hoesch Aktiengesellschaft Apparatus for the transportation of coke bins for charging coke coolers
CN2535276Y (en) * 2002-06-19 2003-02-12 马鞍山钢铁股份有限公司煤焦化公司 Rotary coke car for dry quenching coke
CN101133139A (en) * 2006-04-28 2008-02-27 钢铁普蓝特克股份有限公司 Glowing red coke conveying device and method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4087725A (en) * 1973-07-16 1978-05-02 The Broken Hill Proprietary Company Limited Coke oven hot cars
US4028192A (en) * 1974-11-26 1977-06-07 Firma Carl Still Apparatus for receiving incandescent coke from respective coke ovens in a battery and for removing the coke in a closed chamber away from the battery
EP0110052A2 (en) * 1982-11-27 1984-06-13 Hoesch Aktiengesellschaft Apparatus for the transportation of coke bins for charging coke coolers
CN2535276Y (en) * 2002-06-19 2003-02-12 马鞍山钢铁股份有限公司煤焦化公司 Rotary coke car for dry quenching coke
CN101133139A (en) * 2006-04-28 2008-02-27 钢铁普蓝特克股份有限公司 Glowing red coke conveying device and method thereof

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
刘克璋.日本的干熄焦技术.《重型机械》.1992,1-7页.
张勃等.济钢100t/h干熄焦装置的设计特点.《山东冶金》.2008,第30卷1-3页.
日本的干熄焦技术;刘克璋;《重型机械》;19921231;1-7页 *
济钢100t/h干熄焦装置的设计特点;张勃等;《山东冶金》;20081231;第30卷;1-3页 *

Also Published As

Publication number Publication date
CN101735830A (en) 2010-06-16

Similar Documents

Publication Publication Date Title
CN101735830B (en) Process for lateral translation of coke dry quenching
WO2014169732A1 (en) Shuttle carrier system for container terminal and container transporting method therefor
CN106429267A (en) Rail-mounted material lifting device
CN108251614A (en) Full-automatic heat processing trackless charging and discharging manipulator
CN101957141A (en) External heat treatment furnace blank loading and unloading device
CN101307418B (en) Vertical lift three-dimensional composite skip
CN201288209Y (en) Full-automatic rolling quenching transfer mechanism for push bar furnace product line
CN102001588A (en) Coke quenching vehicle displacement detection device and use method thereof
CN201915127U (en) Material pulling type steel discharge machine
CN102371931B (en) Carrier of slag pot of hot steel-making slag
CN201764813U (en) Electroceramics shuttle kiln transfer vehicle with two-way movable parking track
CN201321064Y (en) Electric three-wheel kiln car
CN207671342U (en) A kind of mine car subframe automation device for discharging
CN202452837U (en) Electrode-conveying device for calcinatory
CN105173672B (en) Automobile bodies workpiece lower part system
CN201876107U (en) Multistation moveable three-dimensional compound trolley
CN201581048U (en) Carrying cart for horizontally-moving rotary coke tank
CN104762093B (en) A kind of dry coke quenching equipment fills burnt method and device
CN211191999U (en) L type steel ladle car and ladle storage device
CN220951644U (en) Sideslip traction type red coke conveying system matched with large-scale coke ovens with multiple holes
CN200999257Y (en) Vertically displaceable three-dimensional composite truck
CN207646243U (en) A kind of multistation VD/VOD vacuum refining furnace apparatus
CN102278889A (en) Composite charging car
CN201474353U (en) Floor type garage lifting elevator
CN215363374U (en) Tank container in-and-out heating furnace and in-furnace stacking structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB02 Change of applicant information

Address after: 201-1, room 666, building A1, Jin Zhiyuan IT Industrial Park, No. 250101 Shun Hua Road, Ji'nan hi tech Zone, Shandong, China

Applicant after: Jigang Group International Engineering Technology Co., Ltd.

Address before: 250100 No. 21 industrial North Road, Licheng District, Shandong, Ji'nan

Applicant before: Jigang Group International Engineering Technology Co., Ltd.

C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Liu Haidong

Inventor after: Shen Xiaoguo

Inventor after: Gao Liying

Inventor after: Huang Chunyi

Inventor after: Jiang Shenghua

Inventor after: Guo Qiying

Inventor after: Chen Chuanhua

Inventor after: Zhang Lizhu

Inventor after: Wang Lei

Inventor after: Sun Zhenshan

Inventor after: Zhang Bo

Inventor after: Xu Sheng

Inventor before: Liu Haidong

Inventor before: Shen Xiaoguo

Inventor before: Gao Liying

Inventor before: Huang Chunyi

Inventor before: Jiang Shenghua

Inventor before: Guo Qiying

Inventor before: Chen Chuanhua

Inventor before: Zhang Lizhu

Inventor before: Wang Lei

Inventor before: Sun Zhenshan

Inventor before: Zhang Bo

Inventor before: Xu Sheng

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131211

Termination date: 20161231