CN101735830A - Process for lateral translation of coke dry quenching - Google Patents

Process for lateral translation of coke dry quenching Download PDF

Info

Publication number
CN101735830A
CN101735830A CN200910312973A CN200910312973A CN101735830A CN 101735830 A CN101735830 A CN 101735830A CN 200910312973 A CN200910312973 A CN 200910312973A CN 200910312973 A CN200910312973 A CN 200910312973A CN 101735830 A CN101735830 A CN 101735830A
Authority
CN
China
Prior art keywords
belt wheel
burnt
tank
red
coke
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910312973A
Other languages
Chinese (zh)
Other versions
CN101735830B (en
Inventor
刘海东
蒋升华
郭起营
陈传华
张丽珠
王蕾
孙振山
张勃
徐升
申效国
高丽英
黄纯懿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jigang Group International Engineering Technology Co., Ltd.
Original Assignee
Jigang Group International Engineering Technology Co., Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jigang Group International Engineering Technology Co., Ltd. filed Critical Jigang Group International Engineering Technology Co., Ltd.
Priority to CN2009103129738A priority Critical patent/CN101735830B/en
Publication of CN101735830A publication Critical patent/CN101735830A/en
Application granted granted Critical
Publication of CN101735830B publication Critical patent/CN101735830B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a process for the lateral translation of coke dry quenching, which comprises the following steps: (1) an electric locomotive drives a trolley to move to the position of a lateral translation track; (2) a traction mechanism drags a belt pulley coke tank to the position of the front of a hoisting position for waiting; (3) a hoister descends an empty belt pulley coke tank to the hoisting position; (4) the traction mechanism drags a tank filled with red coke to push the empty coke tank to move forward, the empty coke tank reaches a standby position, and the tank filled with red coke is stopped when reaching the hoisting position; (5) the traction mechanism is disengaged from the red coke tank and is connected with the empty coke tank; the hoister is connected with the belt pulley coke tank filled with the red coke; (6) after the red coke tank is upwards hoisted at a set distance by the hoister, the traction mechanism drags the empty coke tank, and the empty coke tank is arranged on the trolley; (7) the electric locomotive drags the trolley to reversely move to a coke furnace, and red coke of a next furnace is loaded; after the belt pulley coke tank filled with the red coke in the step (6) is continuously hoisted to a set position along a hoisting shaft, the red coke is unloaded, and then the belt pulley coke tank becomes the empty coke tank; and a new round of operation is carried out on the red coke tank in the step (7) according to the steps (1) to (7).

Description

Process for lateral translation of coke dry quenching
Technical field
The present invention relates to a kind of process for lateral translation of coke dry quenching
Background technology
In coal chemical enterprise, the arrangement of dry coke quenching winding shaft has two kinds: online, namely winding shaft is arranged on the coke-quenching vehicle track, and burnt tank chassis directly is transported to burnt tank in the winding shaft, and elevator promotes burnt tank; Off-line type, namely winding shaft is arranged in a side of coke-quenching vehicle track, and burnt tank chassis is transported to burnt tank near the winding shaft, by crossing system burnt tank is moved in the winding shaft from coke-quenching vehicle track along cross moving track, and elevator promotes burnt tank.Since online take up room bigger, therefore at present off-line types that adopt more.Existing off-line type process for lateral translation process steps is as follows: electric locomotive drags two burnt tank chassis, and red burnt tank is arranged on the chassis, and red Jiao's burnt tank namely is housed, and one is empty chassis; Electric locomotive is parked near the winding shaft, makes the sky chassis aim at cross moving track by positioner.Lift is transferred to empty burnt jar on the stand of the lifting position that promotes the bottom in the winding shaft simultaneously, and the haulage gear on the cross moving track moves stand and empty burnt jar to the quenching track, move on the empty chassis that parks.After empty burnt tank was fixing, electric locomotive dragged two spud carriage shiftings, and the chassis that red burnt tank is housed is aimed at cross moving track, located by positioner again.The jail of cross moving track is drawn mechanism red burnt tank is pulled out from burnt tank chassis; After burnt tank left chassis fully, electric locomotive dragged chassis and goes to connect red Jiao of an other stove; Haulage gear continues red burnt tank is drawn lifting position to winding shaft.Elevator promotes red burnt tank, and the stand of burnt tank is parked under the winding shaft.
The deficiency of existing process for lateral translation: when red burnt tank is transported near the winding shaft, can not be directly traversing, must be earlier the slack tank of a upper working cycles be moved on to the sky chassis, behind the spud carriage shifting, red burnt tank could be transported to the lifting position under the winding shaft.It is longer to the process time that can promote red burnt tank that elevator is put empty burnt tank well, therefore increased the duty cycle of elevator, and operating efficiency is lower.
Summary of the invention
The objective of the invention is, a kind of process for lateral translation of coke dry quenching is provided, when it can hot burnt tank be transported near the winding shaft, direct traversing red burnt tank, after can saving empty burnt tank and moving to chassis, the time of two spud carriage shiftings, thus can effectively shorten duty cycle, save time, raise the efficiency.
The present invention is achieved through the following technical solutions for achieving the above object: the concrete technology step is as follows: process for lateral translation of coke dry quenching comprises the steps: that 1. electric locomotive loads a burnt tank of belt wheel that red Jiao is housed with a chassis on the chassis; Electric locomotive drives near chassis moves to cross moving track along coke-quenching vehicle track, and makes chassis aim at cross moving track by the allocation device; 2. haulage gear is connected with the above-mentioned burnt tank of belt wheel that red Jiao is housed, and the described burnt tank of belt wheel that red Jiao is housed is drawn from chassis; The bottom of winding shaft is to promote the position, and the burnt tank of haulage gear traction belt wheel is waited for to being positioned at the described position that promotes the place ahead, position; 3. the elevator in the winding shaft is transferred to described lifting position to the burnt tank of another empty belt wheel; 4. above-mentioned red Jiao's the burnt tank of belt wheel that is equipped with of haulage gear traction is near the burnt tank of the belt wheel of above-mentioned sky, and the burnt tank of the belt wheel that promotes sky advances jointly, until make the burnt tank of the belt wheel of described sky arrive the standby position at the rear, lifting position of winding shaft, the burnt tank of belt wheel that red Jiao is housed arrives till the described lifting position; 5. haulage gear breaks away from the burnt tank of the belt wheel that red Jiao is housed; Simultaneously, the suspension hook of the elevator of winding shaft descends and is connected with the above-mentioned burnt tank of belt wheel that red Jiao is housed, and haulage gear is connected with the burnt tank of the belt wheel of above-mentioned sky; 6. after the elevator of winding shaft upwards promoted setpoint distance with the above-mentioned burnt tank of belt wheel that red Jiao is housed, the burnt tank of belt wheel that haulage gear draws above-mentioned sky moved to chassis, and the burnt tank of belt wheel of above-mentioned sky is placed on the chassis; 7. the locomotive haulage chassis oppositely moves to coke oven along coke-quenching vehicle track, utilizes the burnt tank of belt wheel of above-mentioned sky to go to connect red Jiao of next stove; The burnt canned full red defocused red burnt tank that namely becomes of the belt wheel of above-mentioned sky; The burnt tank of the belt wheel that red Jiao is housed of step in 6. continues to be empty burnt tank along unloading red burnt the change after winding shaft is promoted to desired location; The red burnt tank of described step in 7. by above-mentioned steps 1. to the work of 7. carrying out a new round.For further increasing work efficiency, 2. and 3. described step carries out simultaneously.
Good effect of the present invention is: the time that it can save two spud carriage shiftings in the existing technology, can greatly reduce the burnt used time of tank tank switching, and improve the efficient of dry quenched coke pot operation; And the quantity of normally moving chassis can be reduced to one by two, thereby, can alleviate the load of electric locomotive, the energy consumption when saving burnt tank operation has superior energy-saving effect.Its adopts the burnt tank of belt wheel, can save the stand in the existing technology, burnt tank can be under the drive of haulage gear automatic moving, thereby, can save the operation of burnt tank and the correction of stand in the existing technology, save the activity duration, the raising operating efficiency.
Description of drawings
Fig. 1 is the synoptic diagram of process for lateral translation of coke dry quenching of the present invention, and cross moving track 1 is provided with and treats seat in the plane 3 among the figure, treats that seat in the plane 3 is positioned at winding shaft 2 rears, and promptly winding shaft 2 is being treated between seat in the plane 3 and the quenching car track 7.
Wherein: 1 cross moving track, 2 winding shafts 3 are treated burnt jar of 5 haulage gears, 6 chassis, 7 quenching car tracks of seat in the plane 4 belt wheels 8 electric locomotives.
Embodiment
Process for lateral translation of coke dry quenching step of the present invention is as follows: process for lateral translation of coke dry quenching comprises the steps:
1. electric locomotive 8 has a chassis 6, loads a burnt jar 4 of belt wheel that red Jiao is housed on the chassis 6; Electric locomotive 8 drives near chassis 6 move to cross moving track 1 along quenching car track 7, and makes chassis 6 aim at cross moving tracks 1 by the allocation device;
2. the haulage gear 5 of cross moving track 1 is connected for burnt jar 4 with the above-mentioned belt wheel that red Jiao is housed, and the burnt jar of the described belt wheel that red Jiao is housed 4 is drawn from chassis 6; The bottom of winding shaft 2 is lifting positions, and haulage gear 5 traction belt wheels move to the position that is positioned at the place ahead, described lifting position along cross moving track 1 for burnt jar 4 and wait for;
3. the elevator in the winding shaft 2 in the upper working cycles another year complete red Jiao the burnt tank 4 of belt wheel of sky transfer to described lifting;
4. above-mentioned red Jiao's the burnt tank 4 of belt wheel that is equipped with of haulage gear 5 tractions is near the burnt tank 4 of the belt wheel of above-mentioned sky, and the burnt tank 4 of the belt wheel that promotes sky moves forward jointly, until make the burnt tank 4 of empty belt wheel arrive the standby position 3 at the rear, lifting position of winding shaft 2, the burnt tank 4 of belt wheel that red Jiao is housed arrives till the described lifting position;
5. the burnt tank detent mechanism at the lifting position of winding shaft 2 place is opened the above-mentioned burnt tank 4 of belt wheel that red Jiao is housed spacing; Haulage gear 5 breaks away from the burnt tank 4 of the belt wheel that red Jiao is housed; Simultaneously, the suspension hook of the elevator of winding shaft 2 descends and is connected with the above-mentioned burnt tank 4 of belt wheel that red Jiao is housed, and haulage gear 5 is connected with the burnt tank 4 of the belt wheel of above-mentioned sky;
6. after the elevator of winding shaft 2 upwards promoted setpoint distance with the burnt tank 4 of the above-mentioned belt wheel that red Jiao is housed, the burnt tank of the belt wheel of the above-mentioned sky of haulage gear 5 tractions 4 moved to chassis, and the burnt tank 4 of belt wheel of above-mentioned sky is placed on the chassis 6;
7. electric locomotive 8 traction chassis 6 oppositely move to coke oven along coke-quenching vehicle track 7, utilize the burnt tank 4 of belt wheel of above-mentioned sky to go to connect red Jiao of next stove; The burnt tank 4 of the belt wheel of above-mentioned sky is filled the red defocused red burnt tank that becomes; The burnt tank 4 of the belt wheel that red Jiao is housed of step in 6. continues to become empty burnt tank along unloading red Jiao after winding shaft 2 is promoted to desired location;
The burnt tank 4 of the belt wheel of newly filling red Jiao of described step in 7. by above-mentioned steps 1. to the work of 7. carrying out a new round.
For further improving operating efficiency, shorten the activity duration, 2. and 3. described step carries out simultaneously, be that hot burnt tank is positioned at the place ahead, described lifting position etc. and bides one's time, elevator in the winding shaft 2 is by chance transferred to described lifting position to the burnt tank 4 of the belt wheel of a sky, make red burnt tank slightly do to wait for and maybe need not wait for, just can promote empty burnt tank and continue motion, the burnt tank of sky is pushed in the standby position 3.
The burnt tank 4 of belt wheel of the present invention can be to know Patent Office's application to country on December 1st, 2009, and application number is the dry coke quenching wheeled coke pot of putting down in writing in 200920282088.5 the application documents.

Claims (2)

1. process for lateral translation of coke dry quenching is characterized in that: comprise the steps:
1. electric locomotive (8) has a chassis (6), and chassis (6) is gone up and loaded a belt wheel burnt jar (4) that red Jiao is housed; Electric locomotive (8) drives near chassis (6) moves to cross moving track (1) along quenching car track (7), and makes chassis (6) aim at cross moving track (1) by the allocation device;
2. haulage gear (5) is connected with the above-mentioned belt wheel burnt jar (4) that red Jiao is housed, and the described belt wheel burnt jar (4) that red Jiao is housed is drawn from chassis (6); The bottom of winding shaft (2) is to promote the position, and haulage gear (5) traction belt wheel burnt jar (4) is waited for to being positioned at the described position that promotes the place ahead, position;
3. the elevator in the winding shaft (2) is transferred to described lifting position to the burnt tank of another empty belt wheel (4);
4. above-mentioned red Jiao's the belt wheel burnt jar (4) that is equipped with of haulage gear (5) traction is near the belt wheel of above-mentioned sky burnt jar (4), and the belt wheel that promotes sky burnt jar (4) advances jointly, arrive until the belt wheel that makes described sky burnt jar (4) winding shafts (2) rear, lifting position treat seat in the plane (3), the belt wheel burnt jar (4) that red Jiao is housed arrives till described liftings;
5. haulage gear (5) breaks away from the belt wheel that red Jiao is housed burnt jar (4); Simultaneously, the suspension hook of the lift of winding shaft (2) descends and is connected with the above-mentioned belt wheel burnt jar (4) that red Jiao is housed, and haulage gear (5) is connected with the belt wheel of above-mentioned sky burnt jar (4);
6. after the elevator of winding shaft (2) upwards promotes setpoint distance with the above-mentioned burnt tank of belt wheel (4) that red Jiao is housed, the burnt tank of belt wheel (4) of the above-mentioned sky of haulage gear (5) traction moves to chassis, and the burnt tank of belt wheel (4) of above-mentioned sky is placed on the chassis (6);
7. electric locomotive (8) traction chassis (6) oppositely moves to coke oven along coke-quenching vehicle track (7), utilizes the burnt tank of belt wheel (4) of above-mentioned sky to go to connect red Jiao of next stove; The burnt tank of the belt wheel of above-mentioned sky (4) is filled the red defocused red burnt tank that namely becomes; Belt wheel that red Jiao the is housed burnt tank (4) of step in 6. continues to be empty burnt tank along unloading red burnt the change after winding shaft (2) is promoted to desired location;
The red burnt tank of described step in 7. by above-mentioned steps 1. to the work of 7. carrying out a new round.
2. process for lateral translation of coke dry quenching according to claim 1 is characterized in that: 2. and 3. described step carries out simultaneously.
CN2009103129738A 2009-12-31 2009-12-31 Process for lateral translation of coke dry quenching Expired - Fee Related CN101735830B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009103129738A CN101735830B (en) 2009-12-31 2009-12-31 Process for lateral translation of coke dry quenching

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009103129738A CN101735830B (en) 2009-12-31 2009-12-31 Process for lateral translation of coke dry quenching

Publications (2)

Publication Number Publication Date
CN101735830A true CN101735830A (en) 2010-06-16
CN101735830B CN101735830B (en) 2013-12-11

Family

ID=42459867

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009103129738A Expired - Fee Related CN101735830B (en) 2009-12-31 2009-12-31 Process for lateral translation of coke dry quenching

Country Status (1)

Country Link
CN (1) CN101735830B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013023324A1 (en) * 2011-08-16 2013-02-21 北京华泰焦化工程技术有限公司 Dry coke-quenching device for heat-recovery-type coke oven
CN105368467A (en) * 2014-08-28 2016-03-02 张丹嫣 Novel dry coke quenching transverse movement traction device
CN108587657A (en) * 2018-07-05 2018-09-28 中冶焦耐(大连)工程技术有限公司 A kind of lateral translation of coke dry quenching trailer system and method
CN109181718A (en) * 2018-10-17 2019-01-11 临涣焦化股份有限公司 A kind of red burnt charging apparatus of dry coke quenching
CN112126445A (en) * 2019-06-25 2020-12-25 宝山钢铁股份有限公司 Full-automatic operation control method for electric car in single-electric-car double-traction mode

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4087725A (en) * 1973-07-16 1978-05-02 The Broken Hill Proprietary Company Limited Coke oven hot cars
DE2455830A1 (en) * 1974-11-26 1976-06-10 Hartung Kuhn & Co Maschf CLOSED CONTAINER TROLLEY FOR TRANSPORTING GLOWING COCK FROM THE FURNACE CHAMBERS OF HORIZONTAL COOKING BATTERIES TO A STATIONARY DELETING STATION
DE8233425U1 (en) * 1982-11-27 1983-03-17 Hoesch Werke Ag, 4600 Dortmund TRANSPORT DEVICE FOR COOKING BOWLS FOR LOADING COOKING COOLERS
CN2535276Y (en) * 2002-06-19 2003-02-12 马鞍山钢铁股份有限公司煤焦化公司 Rotary coke car for dry quenching coke
US8246283B2 (en) * 2006-04-28 2012-08-21 Jp Steel Plantech Co. Equipment and method for transporting red-hot coke

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013023324A1 (en) * 2011-08-16 2013-02-21 北京华泰焦化工程技术有限公司 Dry coke-quenching device for heat-recovery-type coke oven
CN105368467A (en) * 2014-08-28 2016-03-02 张丹嫣 Novel dry coke quenching transverse movement traction device
CN108587657A (en) * 2018-07-05 2018-09-28 中冶焦耐(大连)工程技术有限公司 A kind of lateral translation of coke dry quenching trailer system and method
CN108587657B (en) * 2018-07-05 2024-01-26 中冶焦耐(大连)工程技术有限公司 Dry quenching transverse movement traction system and method
CN109181718A (en) * 2018-10-17 2019-01-11 临涣焦化股份有限公司 A kind of red burnt charging apparatus of dry coke quenching
CN112126445A (en) * 2019-06-25 2020-12-25 宝山钢铁股份有限公司 Full-automatic operation control method for electric car in single-electric-car double-traction mode
CN112126445B (en) * 2019-06-25 2021-10-22 宝山钢铁股份有限公司 Full-automatic operation control method for electric car in single-electric-car double-traction mode

Also Published As

Publication number Publication date
CN101735830B (en) 2013-12-11

Similar Documents

Publication Publication Date Title
CN101735830B (en) Process for lateral translation of coke dry quenching
CN104071725B (en) A kind of intelligent harbour electrodynamic type container connects fortune platform and connects transportation method
CN101957141A (en) External heat treatment furnace blank loading and unloading device
CN201559194U (en) Material loading and fetching manipulator for heat treatment
CN108251614A (en) Full-automatic heat processing trackless charging and discharging manipulator
CN201288209Y (en) Full-automatic rolling quenching transfer mechanism for push bar furnace product line
CN102371931B (en) Carrier of slag pot of hot steel-making slag
CN201764813U (en) Electroceramics shuttle kiln transfer vehicle with two-way movable parking track
CN201321064Y (en) Electric three-wheel kiln car
CN202066379U (en) Composite skip car
CN201915127U (en) Material pulling type steel discharge machine
CN201876107U (en) Multistation moveable three-dimensional compound trolley
CN202452837U (en) Electrode-conveying device for calcinatory
CN101850325B (en) Rotationally hanging device for small spraying equipment
CN201809402U (en) Automatic quenching mechanism
CN105173672B (en) Automobile bodies workpiece lower part system
CN201581048U (en) Carrying cart for horizontally-moving rotary coke tank
CN104762093B (en) A kind of dry coke quenching equipment fills burnt method and device
CN210970807U (en) Steady car hopper from loading and unloading function
CN102278889A (en) Composite charging car
CN201735502U (en) Transfer-hanging device for small spraying equipment
CN202322877U (en) Platform wagon of furnace body
CN202413997U (en) Overhead conveying system of scraped car dismantling line
CN202013102U (en) Heavy-load feeding dolly device of large horizontal heat treatment furnace
CN201474353U (en) Floor type garage lifting elevator

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB02 Change of applicant information

Address after: 201-1, room 666, building A1, Jin Zhiyuan IT Industrial Park, No. 250101 Shun Hua Road, Ji'nan hi tech Zone, Shandong, China

Applicant after: Jigang Group International Engineering Technology Co., Ltd.

Address before: 250100 No. 21 industrial North Road, Licheng District, Shandong, Ji'nan

Applicant before: Jigang Group International Engineering Technology Co., Ltd.

C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Liu Haidong

Inventor after: Shen Xiaoguo

Inventor after: Gao Liying

Inventor after: Huang Chunyi

Inventor after: Jiang Shenghua

Inventor after: Guo Qiying

Inventor after: Chen Chuanhua

Inventor after: Zhang Lizhu

Inventor after: Wang Lei

Inventor after: Sun Zhenshan

Inventor after: Zhang Bo

Inventor after: Xu Sheng

Inventor before: Liu Haidong

Inventor before: Shen Xiaoguo

Inventor before: Gao Liying

Inventor before: Huang Chunyi

Inventor before: Jiang Shenghua

Inventor before: Guo Qiying

Inventor before: Chen Chuanhua

Inventor before: Zhang Lizhu

Inventor before: Wang Lei

Inventor before: Sun Zhenshan

Inventor before: Zhang Bo

Inventor before: Xu Sheng

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131211

Termination date: 20161231