CN101714735A CN200910186824A CN200910186824A CN101714735A CN 101714735 A CN101714735 A CN 101714735A CN 200910186824 A CN200910186824 A CN 200910186824A CN 200910186824 A CN200910186824 A CN 200910186824A CN 101714735 A CN101714735 A CN 101714735A
Authority
CN
China
Prior art keywords
bacterium
construction method
bio
grounding
resistance reducer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910186824A
Other languages
Chinese (zh)
Other versions
CN101714735B (en
Inventor
黄永青
欧阳伟
沈力军
黄小银
王方雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGXI NERIN ELECTRIC AUTOMATION CO., LTD.
Original Assignee
China Nerin Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nerin Engineering Co Ltd filed Critical China Nerin Engineering Co Ltd
Priority to CN2009101868241A priority Critical patent/CN101714735B/en
Publication of CN101714735A publication Critical patent/CN101714735A/en
Application granted granted Critical
Publication of CN101714735B publication Critical patent/CN101714735B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigating Or Analyzing Materials By The Use Of Electric Means (AREA)
  • Manufacturing Of Electrical Connectors (AREA)

Abstract

The invention discloses a construction method of a bio-bacterium grounding resistance reducer. In the method, based on the need for water of the bio-bacterium grounding resistance reducer, effective measures, such as arranging an access hole capable of holding water above a backfill layer, digging a flume and paving crushed stones with high water permeability around the bottom of the access hole or the top of a resistance reduction pit, are adopted to lead more rain water to the resistance reducer in rainy seasons for the resistance reducer to absorb the rain water. The method can reliably ensure that the bio-bacterium grounding resistance reducer is wet all the year around and stable in performance. At the same time, in the patent, an access pipe with a hole is buried in a grounding pit for sampling and supplying strains and nutrients.

Description

The construction method of bio-bacterium grounding resistance reducer
Technical field
The present invention relates to a kind of lightning protection construction method, especially a kind of construction method of bio-bacterium grounding resistance reducer.
Background technology
To solve at present send out, defeated, change, distribution system integrated lightning protection, except that the shocking preventing technology means that adopt current domestic and international advanced person, the earth resistance of managing to reduce system core place earthing device is vital.Science selects for use resistance reducing agent and effective construction method thereof to be important.
Summary of the invention
The object of the present invention is to provide a kind of construction method of bio-bacterium grounding resistance reducer, bio-bacterium grounding resistance reducer not only improves resistance-reducing performance, and is pollution-free, and the ratio of performance to price improves more than 50%.This construction method can guarantee that bio-bacterium grounding resistance reducer is moistening throughout the year, and resistance-reducing performance is stable.
Technical scheme of the present invention is: a kind of construction method of bio-bacterium grounding resistance reducer the steps include: that (1) calculates ground connection hole size by demand, and it is dug.Vertical grounding electrode is vertically erected at center, ground connection hole, and be connected with earth connection; (2) will be equipped with the biological bacteria resistance reducing agent and pour in the ground connection hole, vertical grounding electrode covered fully, when resistance reducing agent is poured the 1m left and right sides into, insert access tube with holes.(3) backfill soil is excavated gutter as backfill layer on backfill layer, collects effective rainwater., drive gutter according to physical features on every side, gutter need be used cement plaster.(4) inject the moisture content that is equivalent to 0.5~2 times of resistance reducing agent weight to backfill layer; (5) backfill layer is provided with inspection opening, and inspection opening is built by laying bricks or stones with stone; Spread one deck rubble around reaching at the bottom of the inspection opening; With template with holes or precast reinforced mixed earth plate capping inspection opening.
The invention has the advantages that: resistance can fall in bio-bacterium grounding resistance reducer, bacterial classification can generate in resistance reducing agent, breed, key is to need resistance reducing agent to keep moisture content throughout the year, be in dampness, the resistance reducing agent performance is more stable, the present invention can allow resistance reducing agent fully absorb moisture content in rainy season, has guaranteed the stability and the chronicity of ground connection resistance reducing effect.This construction method is buried an access tube with holes underground in the ground connection hole simultaneously, helps sampling and bacterial classification and nutrient supply.
Description of drawings
Fig. 1 is the construction method floor map of bio-bacterium grounding resistance reducer of the present invention;
Fig. 2 is an A-A cutaway view of the present invention.
Embodiment
A kind of construction method of bio-bacterium grounding resistance reducer, its step: (1) calculates ground connection hole size by demand, and it is dug.Vertical grounding electrode 2 is vertically erected at center, ground connection hole, and make it and earth connection 3 welding according to code requirement.(2) will be equipped with biological bacteria resistance reducing agent 1 pours in the ground connection hole.Vertical grounding electrode 2 is covered fully.Fill out when causing the 1m left and right sides when resistance reducing agent 1, insert access tube 5 with holes.Access tube 5 is as sampling and bacterial classification and nutrient feed channel, and is convenient to the sampling and testing of biological bacteria resistance reducing agent and maintenance in the future.(3) the thick original soil of backfill 500mm is as backfill layer 4.(4) inject the moisture content that is equivalent to 0.5~2 times of resistance reducing agent weight to backfill layer.(5) build 500 * 500 * 300 (mm) inspection opening 6 by laying bricks or stones with stone on backfill layer 4, drive gutter according to physical features on every side, gutter need be used cement plaster.(6) at 6 ends of inspection opening and around spread one deck 100mm rubble, increase water penetration.(7) checking the aperture with template with holes or precast reinforced mixed earth plate capping, is for security needs, does not also influence the retaining effect of water keeping.
Construction technique main material of the present invention:
(1) prepares " bio-bacterium grounding resistance reducer " with 500 kilograms of bentonites, 200 kilograms of mine tailings, biological bacteria, nutrients and water.
(2) earth electrode: coating steel pipe φ 50, long 2.5 meters one,
Earth connection: band steel (40 * 4) is by actual amount;
(3) access tube is managed one of φ 110 * 3.2 (boring one in 10mm hole every 300mm) with UPVC.

Claims (5)

1. the construction method of a bio-bacterium grounding resistance reducer the steps include: that (1) calculates ground connection hole size by demand, and it is dug.Vertical grounding electrode is vertically erected at center, ground connection hole, and be connected with earth connection; (2) will be equipped with the biological bacteria resistance reducing agent and pour in the ground connection hole, vertical grounding electrode covered fully, insert access tube; (3) backfill soil is as backfill layer; (4) inject the moisture content that is equivalent to 0.5~2 times of resistance reducing agent weight to backfill layer; (5) backfill layer is provided with inspection opening.
2. according to the construction method of the described bio-bacterium grounding resistance reducer of claim 1, it is characterized in that: on backfill layer, excavate gutter, collect effective rainwater., drive gutter according to physical features on every side, gutter need be used cement plaster.
3. according to the construction method of the described bio-bacterium grounding resistance reducer of claim 1, it is characterized in that: with template with holes or precast reinforced mixed earth plate capping inspection opening.
4. according to the construction method of the described bio-bacterium grounding resistance reducer of claim 1, it is characterized in that: spread one deck rubble around at the bottom of inspection opening, reaching.
5. according to the construction method of the described bio-bacterium grounding resistance reducer of claim 1, it is characterized in that: access tube is with holes.
CN2009101868241A 2009-12-28 2009-12-28 Construction method of bio-bacterium grounding resistance reducer Active CN101714735B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009101868241A CN101714735B (en) 2009-12-28 2009-12-28 Construction method of bio-bacterium grounding resistance reducer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009101868241A CN101714735B (en) 2009-12-28 2009-12-28 Construction method of bio-bacterium grounding resistance reducer

Publications (2)

Publication Number Publication Date
CN101714735A true CN101714735A (en) 2010-05-26
CN101714735B CN101714735B (en) 2011-11-09

Family

ID=42418096

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009101868241A Active CN101714735B (en) 2009-12-28 2009-12-28 Construction method of bio-bacterium grounding resistance reducer

Country Status (1)

Country Link
CN (1) CN101714735B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102790386A (en) * 2012-07-31 2012-11-21 江西鹰潭供电公司 Tower lightning protection method
CN117096629A (en) * 2023-08-25 2023-11-21 江苏安全技术职业学院 Electric power safety earthing device

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4407884A (en) * 1981-08-11 1983-10-04 Permagrain Products, Inc. Stain-resistant earthen articles
CN2562388Y (en) * 2002-07-18 2003-07-23 武汉爱劳高科技有限责任公司 Resistance reduced anticorrosion ground electrode
CN2833910Y (en) * 2005-08-24 2006-11-01 武汉高压研究所 Soil resistivity improving pit for reducing earth resistance

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102790386A (en) * 2012-07-31 2012-11-21 江西鹰潭供电公司 Tower lightning protection method
CN117096629A (en) * 2023-08-25 2023-11-21 江苏安全技术职业学院 Electric power safety earthing device
CN117096629B (en) * 2023-08-25 2024-04-19 江苏安全技术职业学院 Electric power safety earthing device

Also Published As

Publication number Publication date
CN101714735B (en) 2011-11-09

Similar Documents

Publication Publication Date Title
CN102661171B (en) Frost damage prevention drainage system for tunnel
CN201943173U (en) Sinking groove type permeable gutter inlet facility system
CN203912501U (en) A kind of vegetation felt that closes storehouse Reclamation for Some Mining Districts Tailings Dam
CN104806257A (en) Sandy gravel stratum shield construction cap-type ground advance reinforcement structure and sandy gravel stratum shield construction cap-type ground advance reinforcement method
CN202560320U (en) Frost-damage preventing drainage system for tunnels
CN110777819A (en) High and steep mine mountain reconstruction ecological restoration method
CN106679735A (en) Multi-water-type real-time monitoring device for mine soil dump site and using method thereof
CN103266633B (en) A kind of hydrometallurgy tailings storehouse antiseep sewer drains off floodwaters method
CN204228155U (en) A kind of shallow-depth-excavation tunnel construction land tenure table settlement monitoring point buries structure underground
CN207392215U (en) A kind of rock side slope ecological afforestation slope protection device
CN101714735B (en) Construction method of bio-bacterium grounding resistance reducer
CN108532406A (en) Can rapid construction high-bearing capacity pervious surface and laying method
CN103032096A (en) Cold-proof construction method of tunnel central ditch of severe cold area
CN104895111A (en) Construction method of integrated pipe trench in soft soil
CN102561134B (en) Compaction method for embankment filling under high liquid limit red clay according to equilibrium moisture content
CN103741708B (en) Prefabricated concrete rod sleeve basis
CN104452805A (en) Roadbed structure of underpass expressway adjacent to bridge pier
CN205000325U (en) Urban road ground that tubular pile was handled
CN201590495U (en) Bio-fungus grounding resistance-reducing agent device
CN102031742B (en) roadbed longitudinal crack treatment method based on convex tenon type cement grouting geomembrane belt
CN106930358A (en) A kind of pergola on the city road LID is biological to be detained ditch
CN202202339U (en) Geogrid reinforced soil retaining wall of concrete module
CN203096697U (en) Ballast field structure at earth and rockfill dam toe
CN113737863B (en) Mixed solid waste pile point soil pollution risk control method based on horizontal barrier technology
CN204326098U (en) The road structure of underpass of freeways next-door neighbour Bridge Pier

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: JIANGXI NERIN ELECTRIC AUTOMATIZATION CO., LTD.

Free format text: FORMER OWNER: CHINA NERIN ENGINEERING CO., LTD.

Effective date: 20130422

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 330008 NANCHANG, JIANGXI PROVINCE TO: 330013 NANCHANG, JIANGXI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20130422

Address after: Office building 1 No. 330013 Jiangxi Province Economic and Technological Development Zone Nanchang Shuanggang Road

Patentee after: JIANGXI NERIN ELECTRIC AUTOMATION CO., LTD.

Address before: 330008 No. 1 Bayi Avenue, Jiangxi, Nanchang

Patentee before: China Nerin Engineering Co., Ltd.